Landscaping Management Plan. Woodlawn Mechanical Biological Treatment Facility. Veolia Environmental Services Australia Pty Ltd

Similar documents
Vegetation Management

MAIN ROADS Western Australia COALFIELDS HIGHWAY PROJECTS ROADSIDE REVEGETATION MANAGEMENT

14 Visual Amenity 14-1

LYNWOOD QUARRY. Earth Bund Options Environmental Impact Analysis FINAL

SECTION AMENDED TOPSOIL

I539. Smales 2 Precinct

APPENDIX K. Visual Impact Assessment

FINAL AND TEMPORARY REHABILITATION PRINCIPLES. BLOOMFIELD GROUP REPORT 2013 Rix s Creek

North West Rail Link - Environmental Assessment Urban Design and Visual Assessment Prepared for Transport Infrastructure Development Corporation

3. Highway Landscaping Assessment

SOIL CONSERVATION METHODS OF SOIL CONSERVATION

Soil Reclamation and Site Reinstatement

4.6. Low Impact and Retentive Grading

July 2011 ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) AMENITY BERMS MANAGEMENT PLAN

EASTERN CREEK WASTE PROJECT REVISED MAY 2017 ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) AMENITY BERMS MANAGEMENT PLAN

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Landscape Maintenance Plan Proposed Childcare Centre Leichhardt Park

5.0 Storm Water Landscape Guidance Introduction

Clearing and Soil Management Plan

Soil Health Practices in the Landscape

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

BUSHFIRE CONSTRAINTS ASSESSMENT FOR THE SHONE AVENUE WEST DAPTO ROAD NEIGHBOURHOOD PLAN HORSLEY

Appendix 16 Guideline for native revegetation plantings

Guidelines for planting within the 100 Ft. Buffer

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

The Progress of Rehabilitation. Neil Dale

Lawn Solutions Australia. Simple specifications for turf installation

EROSION & SEDIMENT CONTROL

Landscape Management Plan. South Keswick Solar Farm

Dealing with Soil Compaction

Appendix 29. Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited

Bushfire Management Plan

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

6.9 Check Dams Description/Purpose Catchment Area Construction

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Revegetation. Symbol EROSION CONTROL TECHNIQUE

ACTIVITY: Trees, Shrubs and Vines ES 10

Rain Gardens. A Welcome Addition to Your Landscape

The entire site supports grass on which sheep had been grazing recently.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Genex Kidston Connection Project: Draf t Environmental Assessment Report Powerlink Queensland

02 SITE 0252p LAWN SOLUTIONS in landscape natural grass surfaces

TIDAPA Structure Plan

Environmental Protection Guidelines for Transmission Lines

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B5 Construction Heritage Management Plan

3. Landscape and Streetscape

The checklist can be used for a single filter strip or groups of filter strips with the same characteristics.

Town of Essex Small Site Erosion Control Guide

EXAMPLE. Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay

CHAPTER 20 VISUAL AMENITY

ARROW BOWEN PIPELINE ENVIRONMENTAL MANAGEMENT PLAN OUTLINE SOIL MANAGEMENT PLAN

BUSHFIRE THREAT ASSESSMENT REPORT. Special Fire Protection Purpose Development. North Byron Beach Resort. Proposed Central Facilities

CHAPTER 21 LANDSCAPE AND VISUAL AMENITY GULF ALUMINA LTD SKARDON RIVER BAUXITE PROJECT

LEAP. Wetland and watercourse Rehabilitation and Management Plan

REPORT AND SPECIFICATION FOR RESTORATION WORKS ON NELLIES GLEN ROAD and THE 6 - FOOT TRACK NELLIES GLEN

HIGHLAND HILLS MAINTENANCE COMMISSION. Board of Trustees. BOARD POLICY NO: 3-9 Dated: 28 Sep 2001 Revised: 2 Feb 2005

CA.1 Coastal Area. Index. CA.1.1 Description and Expectations

Permaculture Design Certificate Course Outline By Geoff and Nadia Lawton

McCormick Pit Category 1 Class A License, Pit Below Water For Blueland Farms Limited. Visual Impact Assessment Report February 2013

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

South Australian Regulatory Requirements

SOIL EROSION COMBATING IS ESSENTIAL IN ORDER TO CONSERVE OUR VALUABLE SOIL RESOURCES

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Surface Coal Mining and Reclamation in ND. Guy Welch ND Public Service Commission

A. Contractor shall provide product data for each type of product indicated.

Visual Impact Assessment - December Figure 5.2: Viewshed analysis of the haul route.

Effects of the Bupa retirement complex on the soil resources at 25 & 35 Ulyatt Road, Napier

4.2 Ecological Principles

2017 Iowa FFA Soil Judging CDE Exam

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

by Barbara Guilland With help from Spokane Master Gardener Program

York Potash Project Mine, MTS and MHF Environmental Statement, Part 2 Chapter: 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan

Red Hill Quarry. West Quarry Extension Area A. Screening and Rehabilitation Plan. Ministerial Statement 912

2014 Iowa FFA Soil Judging CDE Exam

POISON KEEP OUT OF REACH OF CHILDREN

Landscape Management Plan Kitchener SIS. January 2015

Section 3 Non-Structural BMPs

Oil Sands Reclamation From the Ground Up : A Suncor Energy Perspective

Building Healthy Soil:

OVERBURDEN MANAGEMENT PLAN APPENDIX ENVIRONMENTAL IMPACT STATEMENT

SECTION 6. Routine Maintenance Activity Details

Soil Structure and the Physical Fertility of Soil

Muswellbrook Coal Company No.1 Open Cut Extension Soil Study

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

South Whitehaven, Cumbria EIA

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

I309. Cornwall Park Precinct

E16: MAINTENANCE OF LANDSCAPED AREAS

Infiltration. Keep Water Where it Falls. Frank Franciosi Novozymes

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

I611. Swanson North Precinct

Post mine land use plan

EMERGENCY RESPONSE PLAN Environment & Work Health and Safety (WHS)

Town of Fuquay-Varina

COUNCIL POLICY Policy Effective Number Subject: Number Date of Pages SINGLE FAMILY RESIDENTIAL LANDSCAPE

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables

B. Finish Grade: Elevation of finished surface of planting soil.

Transcription:

Landscaping Management Plan Woodlawn Mechanical Biological Treatment Facility Veolia Environmental Services Australia Pty Ltd May 2014

THIS PAGE INTENTIONALLY LEFT BLANK Landscaping Management Plan Page 2 of 9

Contents 1 Introduction...4 1.1 Conditions of Consent/Approvals...4 2 Goals of the LMP...5 2.1 Objectives...5 2.2 Responsibilities...5 3 Site Description and Background...6 3.1 Local and Regional Setting...6 3.2 Visual Assessment Findings...6 3.3 Treatment Requirements...7 4 Landscape and Vegetation Management Plan...8 4.1 Vegetation and Topsoil Removal...8 4.2 Planting...8 4.3 Treatment of Other Areas...9 4.4 Maintenance...9 List of Figures and Tables Table 2.1 Summaries of Responsibilities LMP...5 Table 3.1 Location of Surrounding Properties...6 Landscaping Management Plan Page 3 of 9

1 Introduction This Landscape Management Plan (LMP) has been prepared to detail the landscaping and vegetation treatments for the MBT Facility to minimise impact to local visual amenity both during its construction and operational phases. The LMP forms part of the Construction Environmental Management Plan (CEMP). The landscaping shall be confined to the edges of the MBT Facility to ensure that operations can be completed with a minimum of soil disturbance. The species selected for treatment as required shall be predominantly native species, selected for their suitability to site conditions as well as their appearance and screening abilities. 1.1 Conditions of Consent/Approvals Landscaping Management Plan Page 4 of 9

2 Goals of the LMP 2.1 Objectives The objective of the LMP is to provide details of the management practices that will be undertaken on the MBT Facility site to ensure that the built environment of the MBT Facility does not have an adverse impact on the surrounding receivers. 2.2 Responsibilities Responsibilities for implementation of the LMP are summarised in Table 2.1 below. T a b l e 2. 1 S u m m a r i e s o f R e s p o n s i b i l i t i e s L M P Action Responsibility Overall implementation of the LMP Inspection of site areas prior to, during and after construction Implement methodology for landscaping and vegetation treatment Collate and maintain records of complaints, respond to complainant Identify remediation areas/maintenance needs and notify Construction Manager/EMR Authorise and confirm the implementation of mitigation measures and reporting Woodlawn Eco Project Site Management and EMR or nominee Construction Manager and EMR and/or nominee Woodlawn Eco Project Site Management, Construction Manager and EMR or nominee EMR and/or nominee Construction Manager, Contractor and EMR and/or nominee Construction Manager, EMR or nominee Landscaping Management Plan Page 5 of 9

3 Site Description and Background 3.1 Local and Regional Setting The proposed MBT Facility site is located approximately 40 kilometres (km) southwest of Goulburn, near the town of Tarago in the Goulburn Mulwaree Council Local Government Area (LGA). The LGA is characterized primarily by grazing land, dense forested areas and plantations (EA) (Environmental Assessment Woodlawn Alternative Waste Technology Project, Unwelt, 2006). In the local area surrounding the MBT Facility site, the landscape is dominated by cleared land, predominantly used for grazing, and disturbed areas remnant from the historical mining use at the Woodlawn Mine. Areas of vegetation occur sporadically on the northern, eastern and southern locations adjacent to the site. This vegetation has been used to screen the existing evaporation dams on the Woodlawn Eco Project site (Unwelt, 2006). The area is further characterized by rolling hills associated with the Southern Tablelands landform, with gradients between 690 and 1000 metres Australian Height Datum (Umwelt, 2006). 3.2 Visual Assessment Findings The findings of the visual assessments undertaken both in the original EA (Unwelt, 2006) and the modification EA (Veolia, 2013) indicate that the MBT Facility will have low visibility from the local road network and surrounding properties, which have been identified in Table 3.1. T a b l e 3. 1 L o c a t i o n o f S u r r o u n d i n g P r o p e r t i e s Property and Location Approximate distance from MBT Facility (km) Collector Road (directly to the north of the Development) 1.2 Somerset Property on Collector Road (Top of ridge North, North West of the Development) 5.9 Collector Road (North West of the Development) 4.7 Nardoo Property on Taylors Creek Road (South East of the Development) 9.4 Landscaping Management Plan Page 6 of 9

Dowling on Taylors Creek Road (South East of the Development) 9.2 An assessment of the potential visual impact of the proposed MBT Facility location was undertaken from each of the properties listed above; it was considered that the built environment of the MBT Facility would pose low to moderate impact due to the relative distance of the properties. 3.3 Treatment Requirements Any landscaping treatment, as necessary, undertaken during the course of and following construction of the MBT Facility, will need to the address the construction activities undertaken. Any of the vegetation removed around the MBT Facility, the site access road and the land adjacent to the site access road shall have to be re-contoured to reflect the extended upgraded road alignment; Topsoil will need to be placed over the new planting areas to improve the establishment and vigour of the new plantings. New plantings may be required to replace the removed vegetation; Hydroseeding of native grasses may also be applied. The following section discusses how the components above have been considered and incorporated into this LMP. Landscaping Management Plan Page 7 of 9

4 Landscape and Vegetation Management Plan 4.1 Vegetation and Topsoil Removal Vegetation to be removed during the course of construction of the MBT Facility may include shrubs; Any fallen trees may be chipped into mulch and stockpiled and composted for use as mulch on planting areas; Tree trunks and heavier branches maybe disposed of in the Woodlawn Bioreactor or removed offsite as practicable; Grass cover will be stripped off areas for construction and may be stockpiled with the local topsoil for reuse, where possible; and Stripped grass may provide mulch and a source of grass seed to aid revegetation. 4.2 Planting Plantings maybe installed as tube stock or via hydroseeding to increase plant survival; All planting, where necessary should be undertaken by hand or small machinery to minimise disturbance to the local soils; If appropriate, topsoil may be imported from other areas of the Eco Project Site to improve the soil conditions; Organic matter may also be utilised to improve soil fertility and should be dug into the planting area prior to planting; An application of slow release fertiliser may be required at the time of planting; Where possible, the chipped and composted vegetative material cut on-site could be used a mulch around each plant; and A typical selection of suitable local native plant species will be utilised for any planting that is undertaken as part of the MBT Facility landscaping. Landscaping Management Plan Page 8 of 9

4.3 Treatment of Other Areas Following the completion of the earthworks for the upgraded site access road alignment, any adjacent areas may need to be regraded to an even, stable grade; Any topsoil stockpiled during earthworks from the MBT Facility site, if not required elsewhere on the Eco Project Site, may be spread over the nominated planting areas; Any available organic matter may be mixed into the topsoil during the spreading operation to improve soil fertility; Local native trees and shrubs may be planted, as necessary at appropriate spacings in the nominated planting areas. Where possible, the intervening spaces between the planted trees and shrubs may be mulched with a layer of suitable chipped vegetative material including the chipped material from the trees and shrubs removed from the mounded area. The mulch will improve growing conditions for the plants and reduce soil erosion of the mounded slopes. 4.4 Maintenance A maintenance establishment period will be necessary to ensure the successful development of all planting areas. On-going maintenance will be less intensive than the establishment period and will be limited to occasional plant replacement, and slashing the grassed areas to reduce fire hazard and weed proliferation. Landscaping Management Plan Page 9 of 9