MASTER PLAN IMPLEMENTATION COSTS. Appendix A

Similar documents
MER BLEUE URBAN EXPANSION AREA

Heritage Park Master Plan. Heritage Park Master Plan

CHAPPLES PARK MASTER PLAN

Charles P. Johnson and Associates. Annapolis Landscape Architects

CHAPPLES PARK MASTER PLAN. Presentation to Council April 10, 2017

Canal Winchester Parks Master Plan. Public Meeting 2 Thursday, February 2 6:30pm

North Oakville East Parks Facilities Distribution Plan. November, 2009

Update on Angus Glen. Community Park. Development Services Committee. December 6, Part A ANGUS GLEN PARK MASTER PLAN. Town of Markham & LA+ED

russell+mills studios

Rotary Park / Railroad Lake

New Park / Entry Court & Plaza Concept Design

Proposed Park Master Plan: The Master Plan has been revised to incorporate suggestions received in response to the Park Survey:

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Appendix A. Park Land Definitions

Park Types and Attributes

PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES

4.0 Concept Plan Implementation

Design Specifications & Requirements Manual

Southward Community Recreation and Sports Park Southward Community Recreation and Sports Park Concept Design Images and Information.

Burrus Old Mill Park

South East Sports Complex Phase I

Long Branch-Wayne Local Park Renovation Project

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

The Corporation of the TOWN OF MILTON

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Appendix C Park Design Guidelines

REVISED & PROPOSED MASTER PLAN NEW MEADOWS PARK. A revised design for your neighborhood park 5:30-7:00 PM. Wednesday

APPENDIX E: CITY OF HAMILTON* STANDARD REQUIREMENTS FOR PARK OR OPEN SPACE DEVELOPMENT

CARMODY PARK MASTER PLAN

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Preferred Riverwalk Alternative Components August 17, 2017:

SOUTHEAST SPORTS COMPLEX MASTER PLAN

City of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

Las Colonias Park Master Plan

Fair Oaks Ranch Homeowners Association Parks and Trails Master Plan & 2019 Budget Planning

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

MADISON MANOR PARK RENOVATIONS

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

Special Revenue Funds

master plan hodge park

Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.

Silver Creek Subdivision Public Park

VEHICULAR AND PEDESTRIAN CIRCULATION

Forest Grove Park Master Plan

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 25, 2013

APPENDIX F: DETAIL DRAWINGS

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

ACADEMY AREA CONCEPT PLAN

Memo Preliminary. City of Miamisburg Parks Site Reconnaissance

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

Recreation Facility Evaluation - Conclusions

Design Specifications & Requirements Manual

Neighborhood Districts

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

Open Space Planning Capital Project Update

for Master Planned Development Framework Design Standards & Guidelines

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

The ParksPlan is not focused on Recreation programs and services, nor is it a recreation

Parks Plan Overview. City of Toronto Parks, Forestry and Recreation Division

Marshview Park. Concept Briefing and Feedback Session. Aquarium/Owls Creek Plan Steering Committee March 20, 2012

Pukerua Bay School Landscape Masterplan

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

29 Bella Fontaine Park

Implementation plan. 3.1 Staging

City of Talent Capital Improvements Plan

Landscape and Streetscape Design 2.5

South th E ast Communit ity Centre (SECC)

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

REQUEST FOR COUNCIL ACTION

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

I-70 Highway Cover Study MARCH 4, 2015 COMMUNITY WORKSHOP SUMMARY

OPEN SPACE TYPES. SIZE 8 acres. SIZE 20 acres. SIZE 1 acre

SOUTH PARK. Construction of a Portion of South Park at Fresh Kills Park, Staten Island

2011 ASLA Design Awards. Centennial Park Merit Award Design Concepts CLA, Inc. Design over $500,000 Construction Budget

North Shore Trail. Council Meeting June 10, 2002

The Recreational Heart of Cannington - MacLeod & Claire Hardy Parks

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

Waterlily Playscape Committee Waterlily Playscape, Waterlily Park, Ocean Shores Draft Concept Plan. G Issue D 14/07/16

Village Park Master Plan. March 13, 2013

Parks & Recreation. Michael Versen & Associates Landscape Architecture Land Planning

Sherwood Forest Park REVITALIZATION PLAN. Public Meeting (P.I.C) # 3 JUNE / 25 /2015

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

More than 30 adults and 19 children were involved in these community workshops.

3.0 Community Consultation. BW Land

urban design Introduction

TWAIN HARTE COMMUNITY SERVICES DISTRICT

BISCUIT RUN PARK MASTER PLAN

Preliminary Sketch Plan for Fort Hunter Park

February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax

REPORT TO COUNCIL City of Sacramento

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

Presented by Meg Parker Public Health Outreach Coordinator

Transcription:

Appendix A MASTER PLAN IMPLEMENTATION COSTS

Town of Bradford West Gwillimbury HENDERSON COMMUNITY PARK MASTER PLAN IMPLEMENTATION COSTS Draft Order of Magnitude Costing Revised 5/27/2014 ITEM DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT SECTION TOTAL A SHORT TERM (1-3 YEARS) 1.0 DEMOLITION, SITE PREPARATION & SERVICING 1.1 SWM facility (pond) 1 L. sum $ 550,000.00 $ 550,000.00 1.2 Parking lot bioswales (Parking Lots 1 & 3) 1 L. sum $ 75,000.00 $ 75,000.00 1.3 Earthworks/grading 1 L. sum $ 300,000.00 $ 300,000.00 1.4 Storm MH & CB's (NIC) 1.5 Water service 1 L. sum $ 50,000.00 $ 50,000.00 1.6 Electrical servicing including transformer 1 L. sum $ 75,000.00 $ 75,000.00 1.7 Parking lot light fixtures & pole assemblies, including roadway lighting 1 L. sum $ 55,000.00 $ 55,000.00 TOTAL DEMOLITION, SITE PREPARATION & SERVICING $ 1,105,000.00 2.0 HARDSCAPE & SITE STRUCTURES/AMENITIES (PHASE 1) 2.1 Woodland trail - wood chip 1,528 m 2 $ 20.00 $ 30,560.00 2.2 Main trails - limestone fines trails/walkways 1,903 m 2 $ 30.00 $ 57,090.00 2.3 7.0m wide asphalt roadway 3,175 m 2 $ 66.00 $ 209,550.00 2.4 Granular parking lots (Parking Lots 1 & 3) with curb stops 1 l.sum $ 250,000.00 $ 250,000.00 2.5 Signage (entrance and trail) 1 l.sum $ 10,000.00 $ 10,000.00 2.6 Site amenities (waste receptacles, park benches, bike racks) 1 l.sum $ 15,000.00 $ 15,000.00 TOTAL HARDSCAPE & SITE ACCESSORIES $ 572,200.00 3.0 SPORTS FIELDS & RECREATIONAL FACILITIES 3.1 Platform for 2 premium (Senior) soccer fields (sub drainage included).1 Imported sandy loam mix (200mm depth) 3125 m3 $ 60.00 $ 187,500.00.2 Sod (incl. setback zone) 15,620 m2 $ 5.00 $ 78,100.00.3 Sub drainage -pvc weeper pipe 3540 l.m. $ 20.00 $ 70,800.00.4 Irrigation 1 L.sum $ 40,000.00 $ 40,000.00.5 Line painting 1 L.sum $ 1,500.00 $ 1,500.00.6 Goal posts 2 Sets ea. $ 4,000.00 $ 8,000.00.7 Sportsfield lights 9 ea. $ 25,000.00 $ 225,000.00 TOTAL SPORTS FIELDS $ 610,900.00 4.0 SOFTSCAPE 4.1 Nucleation planting (naturalization) (every 100 m2 incl. 50% shrubs/whips @1m spacing & 100% naturalization seeding). Approx. 17,770m2 1 allow $ 450,000.00 $ 450,000.00 4.2 Deciduous tree planting (50mm cal.) 1 allow $ 25,000.00 $ 25,000.00 4.3 Open lawn seeding 21,100 m 2 $ 1.25 $ 26,375.00 4.4 Native grass/meadow seeding (inc. fine grading) 6,085 m 2 $ 3.00 $ 18,255.00 TOTAL SOFTSCAPE $ 519,630.00 TOTAL SHORT TERM (1-3 YEARS) $ 2,807,730.00 Permit and Testing Allowance $ 10,000.00 Construction Contingency (@7%) $ 197,241.10 Design Contingencies (@8%) $ 240,397.69 TOTAL HENDERSON COMMUNITY PARK SHORT TERM (1-3 YEARS) $3,255,368.79 Dillon Consulting Limited Page 1 of 4

Town of Bradford West Gwillimbury HENDERSON COMMUNITY PARK MASTER PLAN IMPLEMENTATION COSTS Draft Order of Magnitude Costing Revised 5/27/2014 ITEM DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT SECTION TOTAL B SHORT TERM (4-7 YEARS) 1.0 DEMOLITION, SITE PREPARATION & SERVICING 1.1 Parking lot bioswales (Parking Lot 2) 1 L. sum $ 25,000.00 $ 25,000.00 1.2 Earthworks/grading 1 L. sum $ 100,000.00 $ 100,000.00 1.3 Storm MH & CB's (NIC) 1.4 Water service 1 L. sum $ 10,000.00 $ 10,000.00 1.5 Electrical servicing 1 L. sum $ 10,000.00 $ 10,000.00 1.6 Walkway light fixtures & pole assemblies 1 L. sum $ 45,000.00 $ 45,000.00 1.7 Parking lot light fixtures & pole assemblies 1 L. sum $ 60,000.00 $ 60,000.00 TOTAL DEMOLITION, SITE PREPARATION & SERVICING $ 250,000.00 2.0 HARDSCAPE & SITE STRUCTURES/AMENITIES 2.1 Concrete paving on granular base (recreational zones) 4,000 m 2 $ 85.00 $ 340,000.00 2.2 Granular parking lots (Parking Lot 2) with curb stops 1 l.sum $ 180,000.00 $ 180,000.00 2.3 Boardwalk at pond 1,038 m2 $ 150.00 $ 155,700.00 2.4 Pedestrian bridges (large) 1 ea. $ 150,000.00 $ 150,000.00 2.5 Lookout 1 l.sum $ 50,000.00 $ 50,000.00 2.6 Shade Shelter (recreational zone) 1 l.sum $ 25,000.00 $ 25,000.00 2.7 North Park building with washrooms 1 allow $ 750,000.00 $ 750,000.00 2.8 Playground 1 L.sum $ 125,000.00 $ 125,000.00 2.9 Splash pad 1 L.sum $ 150,000.00 $ 150,000.00 2.10 Signage (trail) 1 l.sum $ 10,000.00 $ 10,000.00 2.11 Site amenities (waste receptacles, park benches, bike racks) 1 l.sum $ 15,000.00 $ 15,000.00 TOTAL HARDSCAPE & SITE ACCESSORIES $ 1,950,700.00 3.0 SPORTS FIELDS & RECREATIONAL FACILITIES 3.1 Platform for 2 premium (Senior) soccer fields (sub drainage included).1 Imported sandy loam mix (200mm depth) 3125 m3 $ 60.00 $ 187,500.00.2 Sod (incl. setback zone) 15,620 m2 $ 5.00 $ 78,100.00.3 Sub drainage -pvc weeper pipe 3540 l.m. $ 20.00 $ 70,800.00.4 Irrigation 1 L.sum $ 40,000.00 $ 40,000.00.5 Line painting 1 L.sum $ 1,500.00 $ 1,500.00.6 Goal posts 2 Sets ea. $ 4,000.00 $ 8,000.00.7 Sportsfield lights 9 ea. $ 25,000.00 $ 225,000.00 3.2 Multi-use court ea. 1 $ 60,000.00 $ 60,000.00 3.3 Tennis court ea. 2 $ 30,000.00 $ 60,000.00 3.4 Beach volleyball courts ea. 4 $ 25,000.00 $ 100,000.00 TOTAL SPORTS FIELDS $ 830,900.00 4.0 SOFTSCAPE 4.1 Nucleation planting (naturalization) (every 100 m2 incl. 50% shrubs/whips @1m spacing & 100% naturalization seeding). Approx. 14,200m2 1 allow $ 200,000.00 $ 200,000.00 4.2 Deciduous tree planting (50mm cal.) 1 allow $ 30,000.00 $ 30,000.00 4.3 Open lawn seeding 21,100 m 2 $ 1.25 $ 26,375.00 TOTAL SOFTSCAPE $ 256,375.00 TOTAL SHORT TERM (4-7 YEARS) $ 3,287,975.00 Permit and Testing Allowance $ 15,000.00 Construction Contingency (@7%) $ 231,208.25 Design Contingencies (@8%) $ 281,534.66 TOTAL HENDERSON COMMUNITY PARK SHORT TERM (3-5 YEARS) $ 3,815,717.91 Dillon Consulting Limited Page 2 of 4

Town of Bradford West Gwillimbury HENDERSON COMMUNITY PARK MASTER PLAN IMPLEMENTATION COSTS Draft Order of Magnitude Costing Revised 5/27/2014 ITEM DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT SECTION TOTAL C MEDIUM TERM (7-10 YEARS) 1.0 DEMOLITION, SITE PREPARATION & SERVICING 1.1 Earthworks/grading 1 L. sum $ 200,000.00 $ 200,000.00 1.2 Storm MH & CB's (NIC) 1.3 Water service 1 L. sum $ 50,000.00 $ 50,000.00 1.4 Electrical servicing 1 L. sum $ 15,000.00 $ 15,000.00 1.5 Parking lot light fixtures & pole assemblies, including roadway 1 L. sum $ 65,000.00 $ 65,000.00 TOTAL DEMOLITION, SITE PREPARATION & SERVICING $ 330,000.00 2.0 HARDSCAPE & SITE STRUCTURES/AMENITIES 2.1 Main trails - limestone fines trails/walkways 2,115 m 2 $ 30.00 $ 63,450.00 2.2 7.0m wide asphalt roadway 3,400 m 2 $ 66.00 $ 224,400.00 2.3 Roadway crossing (culvert) 1 L. sum $ 50,000.00 $ 50,000.00 2.4 Granular parking lots 4,075 m 2 $ 35.00 $ 142,625.00 2.5 Concrete curb stops 125 ea. $ 80.00 $ 10,000.00 2.6 Pedestrian bridge (small) 1 allow $ 50,000.00 $ 50,000.00 2.7 Shade shelter at picnic area 1 l.sum $ 40,000.00 $ 40,000.00 2.8 Stage & shelter 1 l.sum $ 250,000.00 $ 250,000.00 2.9 BMX course 1 l.sum $ 90,000.00 $ 90,000.00 2.10 Amphitheatre 1 l.sum $ 80,000.00 $ 80,000.00 2.11 Signage (trails and trailhead) 1 l.sum $ 15,000.00 $ 15,000.00 2.12 Site amenities (waste receptacles, park benches, bike racks) 1 l.sum $ 30,000.00 $ 30,000.00 TOTAL HARDSCAPE & SITE STRUCTURES/AMENITIES $ 1,045,475.00 3.0 SOFTSCAPE 3.1 Nucleation planting (naturalization) (every 100 m2 incl. 50% shrubs/whips @1m spacing & 100% naturalization seeding) Approx. 23,300m2 1 allow $ 500,000.00 $ 500,000.00 3.2 Deciduous tree planting (50mm cal.) 1 allow $ 45,000.00 $ 45,000.00 3.3 Open lawn seeding 11,780 m 2 $ 1.25 $ 14,725.00 3.4 Native grass/meadow seeding (inc. fine grading) Approx. 42,700m2 1 allow $ 1.00 $ 100,000.00 TOTAL SOFTSCAPE $ 659,725.00 TOTAL MEDIUM TERM $ 2,035,200.00 Permit and Testing Allowance $ 10,000.00 Construction Contingency (@7%) $ 143,164.00 Design Contingencies (@8%) $ 174,269.12 TOTAL HENDERSON COMMUNITY PARK MEDIUM TERM $ 2,362,633.12 Dillon Consulting Limited Page 3 of 4

Town of Bradford West Gwillimbury HENDERSON COMMUNITY PARK MASTER PLAN IMPLEMENTATION COSTS Draft Order of Magnitude Costing Revised 5/27/2014 ITEM DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT SECTION TOTAL D LONG TERM (10-20 YEARS) 1.0 DEMOLITION, SITE PREPARATION & SERVICING 1.1 Earthworks/grading 1 L. sum $ 200,000.00 $ 200,000.00 1.2 Storm MH & CB's (NIC) 1.3 Water service 1 L. sum $ 50,000.00 $ 50,000.00 1.4 Electrical servicing 1 L. sum $ 15,000.00 $ 15,000.00 1.5 Parking lot light fixtures & pole assemblies, including roadway 1 L. sum $ 90,000.00 $ 90,000.00 TOTAL DEMOLITION, SITE PREPARATION & SERVICING $ 355,000.00 2.0 HARDSCAPE & SITE ACCESSORIES 2.1 Main trails - limestone fines trails/walkways 3,400 m 2 $ 30.00 $ 102,000.00 2.2 7.0m wide asphalt roadway 2,000 m 2 $ 66.00 $ 132,000.00 2.3 Granular parking lots 3,615 m 2 $ 35.00 $ 126,525.00 2.4 Entrance off 10th Sideroad - road adjustments 1 l.sum $ 75,000.00 $ 75,000.00 2.5 South Park building with washrooms/changerooms 1 l.sum $ 650,000.00 $ 650,000.00 2.6 Signage (entrance and trail) 1 l.sum $ 20,000.00 $ 20,000.00 2.7 Entrance feature at round-about 1 l.sum $ 3,000.00 $ 3,000.00 2.8 Site amenities (waste receptacles, park benches, bike racks) 1 l.sum $ 30,000.00 $ 30,000.00 TOTAL HARDSCAPE & SITE STRUCTURES/AMENITIES $ 1,138,525.00 3.0 SPORTS FIELDS & RECREATIONAL FACILITIES 3.1 Platform for 2 premium (Senior) soccer fields (sub drainage included).1 Imported sandy loam mix (200mm depth) 3125 m3 $ 60.00 $ 187,500.00.2 Sod (incl. setback zone) 15,620 m2 $ 5.00 $ 78,100.00.3 Sub drainage -pvc weeper pipe 3540 l.m. $ 20.00 $ 70,800.00.4 Irrigation 1 L.sum $ 40,000.00 $ 40,000.00.5 Line painting 1 L.sum $ 1,500.00 $ 1,500.00.6 Goal posts 2 Sets ea. $ 4,000.00 $ 8,000.00.7 Alum-a-plank players benches 4 ea. $ 1,800.00 $ 7,200.00.8 Sportsfield lights 9 ea. $ 25,000.00 $ 225,000.00 3.2 Multi-use space - refer to Provisional Items TOTAL SPORTS FIELDS $ 618,100.00 4.0 SOFTSCAPE 4.1 Nucleation planting (naturalization) (every 100 m2 incl. 50% shrubs/whips @1m spacing & 100% naturalization seeding). Approx. 36,000m2 1 allow $ 300,000.00 $ 300,000.00 4.2 Deciduous tree planting (50mm cal.) 1 allow $ 20,000.00 $ 20,000.00 4.3 Open lawn seeding 14,130 m 2 $ 1.25 $ 17,662.50 4.4 Native grass/meadow seeding (inc. fine grading) Approx. 54,000m2 1 allow $ 150,000.00 $ 150,000.00 TOTAL SOFTSCAPE $ 487,662.50 TOTAL LONG TERM $ 2,599,287.50 Permit and Testing Allowance $ 15,000.00 Construction Contingency (@7%) $ 183,000.13 Design Contingencies (@8%) $ 222,583.01 TOTAL HENDERSON COMMUNITY PARK LONG TERM $ 3,019,870.64 5.0 PROVISIONAL ITEMS (NOT INCLUDED IN OVERALL COSTS) 5.1 Multi-use space - Hardball Diamond (sub drainage included) 1 L.sum $ 327,000.00 $ 327,000.00 5.2 Cricket pitch 1 L.sum $ 400,000.00 $ 400,000.00 SUMMARY TOTAL SHORT TERM (1-3 YEARS) $ 3,255,368.79 TOTAL SHORT TERM (4-7 YEARS) $ 3,815,717.91 TOTAL MEDIUM TERM (7-10 YEARS) $ 2,362,633.12 TOTAL LONG TERM (10-20 YEARS) $ 3,019,870.64 TOTAL HENDERSON COMMUNITY PARK $ 12,453,590.45 NOTES 1. All prices are for supply and installation 2. HST not included in above costs Dillon Consulting Limited Page 4 of 4

Appendix B LONG TERM MASTER PLAN

Long Term Master Plan LEGEND Entrance off 9th Line 9th Line 1 Playground 2 North park building with washrooms 3 Splash pad 4 Shade structure 5 Tennis courts (2) 6 Multi-use courts > basketball > ball hockey > ice rink Buffer planting SOCCER FIELDS Buffer planting Trail connection 1 hedgerow 3 16 OPEN SPACE AND PICNIC AREA Nature trails with fitness stations 7 Beach volleyball (4) 8 silo 9 Lookout 10 Pond trail / boardwalk 11 Stage and shelter 12 Amphitheatre style seating 13 South Park building with washrooms & change rooms 14 BMX course / landforms 15 Entrance feature 16 Community gardens 17 park support & maintenance 18 Meadow > butterfly habitat 19 Shade trellis / shelter 20 Proposed trail head 1 2 3 4 Parking Lot 1 (100 spaces) Parking Lot 2 (130 spaces) Parking Lot 3 (45 spaces) Parking Lot 4 (75 spaces) SOCCER FIELDS AND OPEN SPACE Habitat enhancement Reinforced access A RECREATIONAL ACTIVITY ZONE 1 3 4 2 5 6 7 2 8 10 9 Storm pond 17 18 Park road 6 PICNIC AREA Meadow 19 Buffer planting 20 woodlot HENDERSON PROPERTY BRADFORD BAPTIST CHURCH Parking 10th Sideroad 5 Parking Lot 5 (100 spaces) 6 Parking Lot 6 (20 spaces) Natural area with trails A 14 12 11 soccer field 15 N 4 Park road 13 Entrance off 10th Sideroad MULTI-USE SPACE FUTURE SOCCER FIELDS 5 Natural Buffer planting

Appendix C IMPLEMENTATION STRATEGY

Implementation Strategy

Appendix D PUBLIC OPEN HOUSE PRESENTATION PANELS

PUBLIC OPEN HOUSE Henderson Community Park Master Plan EXISTING CONDITIONS

PUBLIC OPEN HOUSE Henderson Community Park Master Plan Entrance off 9th Line 9th Line Open flex space Picnic area Senior fields Playground & Tennis (2) Parking (64) hedgerow Parking (45) Silo Nature trails with fitness stations Meadow > butterfly habitat woodlot Shade/trellis structure Park support and maintenance Parking Junior fields Park Building Parking(80) Park road (64) Meadow Henderson Property Storm pond Link to park Picnic area Beach volleyball (1) Multi-use court Picnic area Parking (40) Bradford Baptist Church 10th Sideroad Park road BMX Course hedgerow Shade/trellis structure Entrance off 10th Sideroad Ball diamond Ball diamond Open flex space Parking (40) Open air pavilion soccer field Traffic calming along 10th Sideroad Parking (200) Picnic area Toboggan hill Additional soccer fields Natural area with trails N PRELIMINARY OPTION 1 Entrance off 9th Line 9th Line Open flex Parking space (42) hedgerow Picnic area Nature trails with fitness stations Senior field Mini fields Park support and maintenance Meadow > butterfly habitat Silo woodlot Junior field Tennis courts (3) Playground Parking(120) Shade/trellis structure Beach Formal volleyball lawn (2) Park Building Picnic area Natural Henderson Property Natural Picnic area Multi-use court Storm pond Natural Meadow Entrance feature Bradford Baptist Church 10th Sideroad Park road Entrance off 10th Sideroad Shade/trellis structure Traffic calming along 10th Sideroad BMX Course / land forms Open flex space Parking soccer field (70) Parking (80) Park road Picnic area Parking (80) Additional sports fields > cricket > ball diamond Additional soccer fields Natural area with trails PRELIMINARY OPTION O 2

PUBLIC OPEN HOUSE Henderson Community Park Master Plan Entrance off 9th Line 9th Line Soccer fields Parking (100) Trail connection hedgerow Community Open space Gardens and picnic area Parking (45) Park support and maintenance Nature trails with fitness stations Silo Meadow > butterfly habitat woodlot Reinforced access Playground Park building with washrooms Splash pad Parking (65) Meadow Soccer fields and Open space Shade structure Tennis courts (2) Parking (65) Henderson Property Habitat enhancement Multi-use courts > basketball > ball hockey > ice rink Beach volleyball (4) A Lookout Storm pond Park road Picnic area Shade/trellis shelter Bradford Baptist Church Parking 10th Sideroad Natural area with trails A BMX Course / land forms Stage and shelter Parking (20) Pond trail / boardwalk Proposed trail head soccer field Parking (75) Park road Amphitheatre style seating Entrance feature Entrance off 10th Sideroad Multi-use space Park buildingwith washrooms & change rooms Future soccer fields Parking (100) Natural PREFERRED LONG TERM OPTION O N Soccer fields Multi-use trail Natural Storm pond Boardwalk Creek re-alignment Land forms with natural CROSS-SECTION A - A

PUBLIC OPEN HOUSE Henderson Community Park Master Plan IMPLEMENTATION STRATEGY

PUBLIC OPEN HOUSE Henderson Community Park Master Plan Basketball Multi-use courts Beach volleyball Basketball Soccer Soccer Tennis Tennis Bioswale Universal access Butterfly meadow Beach volleyball RECREATIONAL ACTIVITIES

PUBLIC OPEN HOUSE Henderson Community Park Master Plan Performance stage and shelter Community gardens Waterplay Open parkland Snowshoeing Frisbee Playground Discovery BMX Cycling trail Interpretive trail Accessible trails Cross-country skiing Community wetland Nature trails