OSSGA Student Design Competition

Similar documents
PLANNING, DESIGN & DEVELOPMENT OPEN HOUSE

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

2018 CALL FOR ENTRIES: DESIGN AWARDS

PANSHANGER QUARRY, Hertfordshire

ARTICLE VI: SITE PLAN REVIEW

Greenwood Aggregates Proposed Violet Hill Pit Peer Review Visual Assessment OUR FILE 1767 B

2.5.1 Mineral aggregate resources shall be protected for long-term use

CULTURAL HERITAGE IMPACT ASSESSMENT TERMS OF REFERENCE

CALL FOR ENTRIES FOR PROFESSIONAL LANDSCAPE ANALYSIS AND PLANNING

COUNCIL POLICY 19(35) AND 19(35A) RELATING TO THE URBAN DESIGN AWARDS PROGRAM

Town of Newmarket 395 Mulock Drive P.O. Box 328, Newmarket, Ontario, L3Y 4X7. Website: newmarket.ca Phone:

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

McCormick Pit Category 1 Class A License, Pit Below Water For Blueland Farms Limited. Visual Impact Assessment Report February 2013

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

64 Mineral Extraction Area Rules

Rempstone Extension - East Leake 2014

January 02, 2019 RE: 2019 CENTRAL STATES ASLA AWARDS PROGRAM CALL FOR ENTRIES

Cultural Landscape Heritage Impact Statement Terms of Reference

Cultural Heritage Landscape Heritage Impact Statement Terms of Reference

VISUAL IMPACT ASSESSMENT

WISCONSIN LANDSCAPE CONTRACTORS ASSOCIATION. Excellence. in landscaping awards

Chapter 1: General Program Information

F2. Draft Archaeological and Cultural Heritage Net Effects Analysis & Comparative Evaluation Report

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

TEXAS CHAPTER AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS 2019 PROFESSIONAL AWARDS GUIDELINES

City of Kingston Heritage Commemoration Program Guidelines: 7 May 2010

Non-Metallic Mining Reclamation Checklist

TRCA Field Staking Protocol December 2016

BEYOND JUST GREEN SILA Student Design Awards 2016

Master Environmental Servicing Plan & Secondary Plan

CELEBRATING DESIGN EXCELLENCE

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

11. BALLANTRAE-MUSSELMAN LAKE AND ENVIRONS SECONDARY PLAN

6 PORT SYDNEY SETTLEMENT AREA

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

Draft Rhode Island Stormwater Design and Installation Standards Manual

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

CHAPTER NATURAL RESOURCE EXCAVATION

Call for Digital Designers Requests for Proposals (RFP) for Frostburg Lamppost Banner Design

Official Plan Review: Draft Built Form Policies

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

OFFICE CONSOLIDATION By-law Number 30-92

BBC Local Radio and RHS My Garden Competition Terms and Conditions

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

North Oakville East Parks Facilities Distribution Plan. November, 2009

RE: 2018 CENTRAL STATES ASLA AWARDS PROGRAM CALL FOR ENTRIES

Huntington Stormwater Utility

Sustainably Designed Structures in an Urban Woodland

CITY OF KELOWNA MEMORANDUM. Date: June 20, 2001 File No.: Z City Manager Planning and Development Services Department

2.1.4 Roof Downspout Rain Gardens

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

A/E REVIEW CHECKLIST SITE & LANDSCAPE

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

MERIDAN PLAINS SAND RESOURCE AREA

GUIDELINES FOR CULTURAL HERITAGE IMPACT ASSESSMENTS

PLANNING RATIONALE. Shadow Ridge Estates Subdivision, Phase Two. In Support of a Proposed Zoning By-Law Amendment. Report Number: R

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

BUD Brampton Urban Design Awards CELEBRATING DESIGN EXCELLENCE

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

FARMING PROTECTION. The Farming Protection Development Permit Guidelines are organized into five main categories:

Virginia Jackson Design Competition

ONTARIO TIRE STEWARDSHIP 2016

6Natural. Environment Development Permit Guidelines

Winston-Salem State University Campus Master Plan 2016 Update

2019 Landscape Awards

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

SITE PLAN REVIEW APPLICATION AND CHECKLIST

a) buildings, structures and artifacts of historical significance;

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

CITY OF ZEELAND PLANNING COMMISSION

Student Design Competition 2011 REAL & SIMPLE. A place for the range of what our lives are about. Imagine the difference

James Dick Construction Limited Erin Pit Extension

C ity of Grande Prairie Development Services Department

Application for Site Plan Review

DAVENPORT VILLAGE SECONDARY PLAN

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

TO BE COMPLETED BY APPLICANT

REQUEST FOR PROPOSAL RFP PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE

Chapter 6 cultural heritage

E16: MAINTENANCE OF LANDSCAPED AREAS

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

URBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507

Site Development Plan (SDP) Checklist

Tom Peters Memorial Mine Reclamation Award. (Industry Trophy)

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

Slope Stability Management Framework

2.4 COMMERCIAL POLICIES

SOIL EROSION AND SEDIMENT CONTROL

Rocky View County Plans

ARTICLE IX SPECIAL PERMIT USES

2016 Landscape Queensland Construction Excellence Awards Entry Requirements & Guidelines, and FAQ s

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Peel Region. Greenbelt Plan Conformity. Plan Review. Background & Approach

1 Introduction. Chapter. In this chapter:

APPENDIX K WINDSOR OFFICIAL PLAN

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Transcription:

Aggregate Property Rehabilitation Student Design Competition OSSGA Student Design Competition BACKGROUND: Ontario consumes approximately 164 million tonnes of aggregate annually more than any other natural resource. This is equivalent to approximately 12 tonnes - or 1 truck load - per person per year. Progressive and final rehabilitation of aggregate properties plays an important role in land stewardship and enhances the quality of life in communities where aggregate is produced. The Student Design Competition was established to educate students with respect to compatible after-uses of former aggregate properties and to promote public and academic awareness of the potential of former aggregate sites in Ontario. Each year, a different aggregate property in Ontario is chosen for the competition by the s (OSSGA) Rehabilitation Committee and thousands of dollars in cash prizes are awarded. ELIGIBILITY: Students who are enrolled in one of the following programs: landscape architecture; planning; ecology; environmental design; engineering; hydrology; geography; or, related program, in a postsecondary institution in Ontario may enter the competition. SUBMISSION DEADLINE: See webpage (http://www.ossga.com/student_design_competition) SUBMIT ENTRY TO: SITE INFO: 5720 Timberlea Blvd., Suite 103 Mississauga, ON L4W 4W2 See webpage (http://www.ossga.com/student_design_competition) FOR FURTHER INFORMATION: Cynthia Robinson Environment & Education Manager 5720 Timberlea Blvd., Suite 103 Mississauga, ON L4W 4W2 Email: crobinson@ossga.com Phone: (905) 507-0711 x 6 Web: www.ossga.com The information requirements, as outlined below, have been adapted from Ontario s Provincial Standards pursuant to the Aggregate Resources Act (ARA). All operators with licenced aggregate sites in Ontario are required to comply with these Standards. Last Amendment: March 6, 2015 Page 1 of 5

ENTRY REQUIREMENTS: Format: Students (individually or in groups of no more than 3) are required to submit 3 panels (minimum 24 by 36 in size) and a 250 word written Design Brief describing the design intent of the entry including a an electronic copy of the panels and Design Brief, in PDF format. At least one panel must include the logo of The Ontario Aggregate Resources Corporation (TOARC) as an acknowledgement of their sponsorship of the competition. Each panel must be numbered and indicate the total number of drawings submitted (i.e., 1 of 3). The panels must also remain anonymous to the judges, see below for instructions on how to provide contact information. Panels containing information identifying the academic institution and/or entrant(s) will be disqualified from the competition. Criteria: 1. EXISTING CONDITIONS: The Existing Conditions panel should illustrate the site and facilities as they currently exist. OSSGA will provide electronic site plans showing the existing conditions of the site, surrounding land uses and other information. To receive a set of site plans please contact: Cynthia Robinson Environment & Education Manager Email: crobinson@ossga.com The Existing Conditions panel should illustrate the entrant s interpretation of the site, along with any assumptions that the entrant has made that will direct decisions for the design of the progressive and final rehabilitation plans. In addition, the panel should include: A key map showing the pit/quarry location A description of the site by lot and concession, municipality, county, or region A scale using both ratio and graphic methods, between a scale of 1:1,000 and 1:5,000 A north arrow A legend The boundary of the project, including the dimensions and hectarage of the site The existing zoning and land uses within 120 metres of the site The topography of the site illustrated by contour lines (including any existing berms ) The location and use of all structures existing on and within 120 metres of the site The location of existing entrances to the site Main internal haul roads on the site The assumed elevation of the groundwater table Existing surface water drainage and drainage facilities on and within 120 metres of the site The location and type of fences on the site The location of existing vegetation (i.e., woodlots and hedgerows) on the site and within 120 metres of the site The location of existing stockpiles of topsoil and overburden on the site Significant natural or man-made features on and within 120 metres of the site Existing excavation faces & rehabilitated areas The location of processing areas and equipment Section lines and any view locations Last Amendment: March 6, 2015 Page 2 of 5

N.B. The chosen site may be partially or completely depleted. Therefore, the existing conditions panel should reflect this. Normally when applying for a licence and preparing site plans under the ARA, extraction has not yet taken place. 2. PROGRESSIVE REHABILITATION: The Progressive Rehabilitation panel should illustrate the proposed process taken to remove the resource and achieve the final design in a logical manner. Historically, this has been the most difficult section of the submission for the students to undertake. Clearly describing a process is as important as the end result itself. This panel should illustrate how the entrant plans to create the end use (i.e., the chronological order of work, the efficient use of resources and where materials for grading are coming from etc.), and in addition the panel should include: The location of the main internal haul roads on the site and how they change through the life of the site The location of entrances on site The elevation of the groundwater table Any proposed water diversions and points of discharge to surface water The location of any proposed buildings and other structures to be erected on the site The location of any proposed aggregate stockpile areas, including any recyclable materials on site The area, in hectares, to be extracted The location of all excavation setbacks from the boundary The final extraction elevation The location and height of any berms Section lines and section view locations should be shown The sequence of resource removal and the direction of rehabilitation Details on how the overburden and topsoil will be used to facilitate progressive rehabilitation The location, design, and type of vegetation (i.e., grasses, legumes, shrubs, and trees, etc.) How the slope will be established on the excavation faces and floor If proposed, details on the importation of topsoil or inert material to facilitate rehabilitation 3. FINAL REHABILITATION: The Final Rehabilitation panel should illustrate how the site will look and function once the resource has been extracted and the site has undergone final rehabilitation, and should include: If proposed, details on the importation of topsoil or inert material to facilitate rehabilitation How the final slopes will be established on all excavation faces and the pit/quarry floor The location, design, and type of vegetation (i.e., grasses, legumes, shrubs, and trees, etc.) Any buildings or structures that are to remain on the site Anticipated elevation of the groundwater table Any internal roads that are to remain on the site Final surface water drainage and facilities The final elevation of the rehabilitated areas of the site illustrated by a one metre contours Section lines and view locations should be shown on the plan Last Amendment: March 6, 2015 Page 3 of 5

4. DESIGN BRIEF: The Design Brief is a written description of the design intent of the entry including: Project title and description of site by lot and concession, and municipality or region Description of design intent, maximum 250 words (8.5 x 11, typed) The design brief information sheet should be printed and placed in the same non-identifying envelope used for the contact information sheet (see below) and attach the envelope to the panels. The project title should be written on the face of the envelope. An electronic copy (PDF) of the design brief should also be provided with the electronic copy (PDF) of your panels. 5. CONTACT INFORMATION: To maintain anonymity in the awards review process, entrants must submit contact information on a separate sheet (8.5 x 11, typed) which is to be printed and included in the same envelope as the design brief; attach the envelope to the panels for submission. Contact information will be used for administrative purposes only, by competition organizers and will not be shared with the Awards Review Panel. The contact information sheet should include the following information: Project title Description of design intent Entrant(s) contact information including, name, permanent mailing address, telephone number, email address and academic institution name for each entrant. N.B. Panels containing information identifying the institution and/or entrant(s) will be disqualified from the competition. General: Cross sections and vignettes should be used where appropriate. Whether extraction occurs below the water table, or a minimum 1.5 metres above the water table, will affect the quantity of resource that may be extracted as well as the after use of the site. In some cases there is not sufficient resource below the water table to warrant underwater extraction. However, if there is significant material below the water table, it may be reasonable to extract, but this will limit your after use options. Use text descriptions to explain your understanding of the existing conditions and how they impact your rehabilitation plans. Use text descriptions to explain your progressive rehabilitation sequencing and why you chose your final rehabilitation plan. OSSGA encourages competition entrants to visit active pits and/or quarries to inform the award submission. In addition, examples of site plans can also be viewed at the local Ministry of Natural Resources (MNR) office. Costs: To offset production and site tour costs, OSSGA will consider written requests for funding from participating academic institutions. For deadlines, please see OSSGA website (http://www.ossga.com/student_design_competition). Last Amendment: March 6, 2015 Page 4 of 5

AWARDS REVIEW: The Awards Review Panel is appointed by OSSGA s Awards Committee, and includes operators, managers and industry consultants. The Awards Review Panel will determine the number and value of the awards when evaluating the entries. Winning entries will be displayed at OSSGA s Annual General Meeting held every February. EVALUATION: 1. Existing Conditions (25%) Is the information listed on the panel complete? (15%) How effective is the panel at demonstrating to the audience an understanding of existing conditions relevant to the planning of aggregate extraction operations and rehabilitation? (10%) 2. Progressive Rehabilitation (25%) Is the information listed on the panel complete? (15%) Does the plan effectively mitigate potential negative impacts to: natural features such as wetlands, woodlands & surrounding land uses? (5%) Is the plan practical and economical? Does the plan show efficient stripping, movement, and placement of on-site topsoil and/or overburden in all phasing of the progressive and final rehabilitation (i.e., minimizes material movement)? (5%) 3. Final Rehabilitation (25%) Is the information listed on the panel complete? (5%) Does the final rehabilitation plan fit into the landscape context (i.e., will it be compatible with existing or future land uses surrounding the site? Does the final rehabilitation plan add value to the surrounding community?). (5%) Is the final rehabilitation plan innovative? (10%) Is the final rehabilitation plan practical and economically viable? (5%) 4. Design Brief (5%) Is the information listed in the brief complete? Is the design intent well articulated and is it achieved by the final rehabilitation plan identified on the panel? 5. Overall Impression (20%) The judges overall impression of the design concept and the presentation. N.B. Originality is important but the Awards Review Panel is also interested in rehabilitation plans that balance innovation with practicality. Last Amendment: March 6, 2015 Page 5 of 5