Exercises: Using LID Feasibility Worksheets

Similar documents
Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

New Tools/Resources for

Selecting Appropriate Stormwater Control Measures for Your Development Project

I.A.10 Total Area of Site: acres Total Area of land disturbed during construction (include clearing, grading, excavating and stockpile area: acres.

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects

Stormwater Requirements Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

Site Design Measures. Chapter

Low Impact Development Site Design

APPENDIX G: TOWN ORDINANCE REVIEW

3. Are there any projects exempt from the definition of Regulated Projects?

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

What Are We Inspecting? Stormwater Treatment Measure Type and Design

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Appendix E: Illustrative Green Infrastructure Examples

Green Infrastructure and Low-Impact Development Technologies

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

A P P E N D I X D. Project Stormwater Plan Worksheets

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

Rainwater Harvesting Basics

Site Design for Protecting Water Quality 2013 Award Winning Projects

General Technical Guidance for Treatment Measures

Post - Construction Hydromodification Development Requirements

BOROUGH OF HADDONFIELD GREEN DEVELOPMENT PRACTICES CHECKLIST November 15, 2013

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

General Technical Guidance for Treatment Measures

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Background / Regulatory Requirements

General Technical Guidance for Treatment Measures

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

City of Langford Green Development Checklist

An evaluation of the reduced environmental impact from high density development

SEE:

Introduction Post Construction Stormwater Management Performance Requirements

Urban Sustainability Area Designation

understanding Green Infrastructure In Zoning

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

West Virginia Stormwater Management Manual: Methods.

Park Types and Attributes

Preparing Permit Application Submittals

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Introduction Post-Construction Stormwater Management Performance Requirements

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Can Urban Redevelopment Restore Aquatic Resources

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

What does LEED characterize?

Rhode Island Stormwater Design and Installation Standards Manual

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS

Small Project Guidance Document

ORDINANCE NO. City of Bellingham City Attorney 210 Lottie Street Bellingham, Washington INFILL HOUSING ORDINANCE Page 1

Kristin Kerr EOA, Inc. February 1, 2017

A Context-Based Design Code for Pedestrian & Transit-Oriented Development RAIL~VOLUTION NOVEMBER 2006

Planning, Design, and Construction of Green Infrastructure.

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL

Scorecard. WaterQuality. Appendix B USEPA WATER QUALITY SCORECARD APPENDIX B

Rainwater Harvesting Devices

Green Infrastructure in the Greater Lansing Area

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

Renewable Energy 101

Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011

Stormwater Technical Guide

The scale of intervention:

Getting Started On Your Green Infrastructure (GI) Plan

Rainwater Harvesting Requirements Living Well Community October 2016/Harvey Harman

Structural Stormwater Best Management Practices

San Mateo County Storm Water Resource Plan

RESIDENTIAL STORM WATER PERMIT & CREDIT APPLICATION WORKSHEET AND CHECKLIST

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

Project Specific Water Quality Management Plan

UBC URBAN STUDIO, FALL 2002 PEDESTRIAN ORIENTED

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

NEPONSET WATERSHED TOWN BYLAWS AND REGULATIONS THAT ARE CONSISTENT WITH PROPER STORMWATER MANAGEMENT

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

City of Vallejo. Stormwater Control C.3 Compliance Information. Addendum to C.3 Guidebook by Contra Costa Clean Water Program

Appendix C: Interim Mixed-Use Evaluation Criteria

6.2 Flow-Through Planter

Appendix I. Checklists

Pollutant Removal Benefits

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Zoning Technical Review Presented by Camiros. November 10, 2015

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

ions nts July 1, 2019 The utility answers to some increase: Q: A: rainwater Q: A: areas any the total by

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015

Transcription:

Exercises: Using LID Feasibility Worksheets Laura Prickett, EOA, Inc. Thanks to Lisa Austin, Geosyntec, for help with Case Studies November 17, 2011

Case Studies 1. Fremont Commercial Project Screening Worksheet Rainwater Harvesting/Use Worksheet 2. Unincorporated San Mateo County Subdivision Screening Worksheet 2

Case Study 1 Fremont Screening Worksheet Neighborhood Commercial Infill NOT Pedestrian Oriented, NOT within ½ mi. of transit hub or within Priority Development Area 3 Area of Project Total Project: 0.36 acre (15,700 sq.ft.) Existing impervious surface (IS): 0.18 acre (7,800 sq.ft.) Replaced IS: 0.18 acre (7,800 sq.ft.) New IS: 0.14 acre (6,100 sq.ft.) Post-project landscaping: 0.04 acre (1,800 sq.ft.) Ksat within 0.3-0.4 range

Fremont: LID Feasibility Screening Worksheet Is project potentially a Special Project? 4

Special Projects Category A: Infill Must Meet All Criteria to be a Special Project Located in central business district or comparable pedestrian oriented district. Built as part of objective to preserve or enhance pedestrianoriented environment. Creates or replaces ½ acre or less of impervious surface. No surface parking except for emergency access, ADA or loading requirements. 85% of lot is covered by buildings; remaining 15% is for safety access, trash/recycling, public uses, etc. If ALL criteria are met, receives 100% LID treatment reduction credit.

Special Projects Category B: High Density Must Meet All Criteria to be a Special Project Located in central business district or comparable pedestrian oriented district. Built as part of objective to preserve or enhance pedestrian-oriented environment. Creates or replaces > ½ acre, but no more than 2 acres, of impervious surface. No surface parking except for emergency access, ADA or loading requirements. 85% of lot is covered by buildings; remaining 15% is for safety access, trash/recycling, public uses, etc. If ALL criteria are met, a graduated system of LID treatment reduction credit is applied.

Special Projects Category C Transit Oriented Development Non-auto oriented project. (No stand-alone surface parking lots, car dealerships, auto and truck rental facilities with onsite surface storage, etc.) Within ½ mile radius of existing or planned transit hub, or within a Priority Development Area. For commercial or mixed use projects, a minimum floor area ratio of 2:1 is required. For residential projects, min. density is 25 dwelling units/acre. If above criteria are met, a graduated system of LID treatment reduction credit applies. Location credit Density credit Minimize surface parking credit

Fremont: LID Feasibility Screening Worksheet 8 Is the project potentially a Special Project? No Project is not in a pedestrian-oriented district, Is not built as part of a stated objective to preserve or enhance a pedestrian-oriented area, and Is not within ½ mile of a transit hub, or within apriority development area

Fremont: LID Feasibility 2. Do site soils either: Have a Saturated Hydraulic Conductivity (Ksat) rate of LESS THAN 1.6 inches/hour, or Consist of Type C or D soils? Yes Screening Worksheet 9

10

Fremont: LID Feasibility Screening Worksheet 3. Check box if the project is installing and using a recycled water plumbing system for indoor non-potable use If recycled water system will be used, rainwater harvesting is infeasible Box not checked. 11

Screening Worksheet Table 1 (sq.ft.) 1 2 3 4 Pre-Project Impervious Surface Proposed Impervious Surface Replaced Created Post-Project landscaping a. Enter totals for the area to be evaluated b. Sum of replaced and created impervious surface c. Area of existing impervious surface that will NOT be replaced 12 7,800 7,800 6,100 1,800 N/A 13,900 N/A 0 N/A N/A

4.2 Is the amount of impervious surface replaced or added by the project equal to 50% or more of the existing area of impervious surface? 13 Fremont: LID Feasibility Screening Worksheet Yes [C.3 requirements apply to whole site, including areas of impervious surface that will remain in place] 4.3/ 4.4 Enter the square footage and and acreage of the Potential Rainwater Capture Area: 13,900 square feet 0.32 acre

Fremont: LID Feasibility Screening Worksheet 5.1 Is landscaped area LESS THAN 3.2 times the acreage of Potential Rainwater Capture Area 14 Landscaping & open space = 1,800 s.f. 3.2 * rainwater capture area = 3.2 * 13,900 = 44,480 1,800 is LESS THAN 44,480 Yes

Irrigation Demand Feasibility Threshold Source: Table 11, LID Feasibility Report (page 33) EIATIA = Ratio of Effective Irrigated Area to Impervious Area

Curves from Appendix F, for Palo Alto Rain Gauge (drawdown time = 360 hrs)

Fremont: LID Feasibility Screening Worksheet 17 5.2.b. Commercial Projects: What is the square footage of of interior floor area per impervious acre? Proposed interior floor area: 6,000 sq.ft. Acres of impervious surface: 0.32 acre Interior floor area/acre = 6,000/0.32 = 18,750 sq.ft. LESS THAN 84,000 sq.ft./impervious acre? Yes

Fremont: LID Feasibility Screening Worksheet Sections 6 and 7. Are all questions in Sections 2 and 5 answered Yes? Yes Implement biotreatment 18

Fremont: Rainwater Harvesting/Use Worksheet 1.6. Enter square footage of nonresidential interior floor area 6,000 square feet 19

Fremont: Rainwater Harvesting/Use Worksheet 1.7. To calculate potential rainwater capture area, start with total area of project: 15,700 square feet 20 1.8 & 1.9. Account for any Special Project LID treatment reduction: No Special Project LID treatment reduction

Fremont: Rainwater Harvesting/Use Worksheet 2.1. Enter square footage of selftreating area: 21

Self-Treating Areas Reduce the Area that Requires Treatment Stormwater from pervious portions of the project can flow directly to the storm drain (no mixing with runoff from impervious areas): Landscaping Green roof Properly-designed pervious paving

Fremont: Rainwater Harvesting/Use Worksheet 2.1. Enter square footage of selftreating area: 1,800 square feet 23

Fremont: Rainwater Harvesting/Use Worksheet 2.2. Enter square footage of any selfretaining area: 2.3 Enter the square footage of the area contributing to the self-retaining area (if any): 24

Self-Retaining Areas Reduce the Area that Requires Treatment Concave area of landscaping that retains runoff from adjacent impervious surface (e.g, roof) Sized at 2:1 ratio (area of tributary impervious surface: area of landscaping) 3-inch ponding depth No special soils required

Fremont: Rainwater Harvesting/Use Worksheet 2.2/2.3. Enter square footage of any self-retaining area & area contributing to the self-retaining area (if any): None / None 2.4. Pre-set formula will total the selftreating and self-retaining areas & areas that drain to self-retaining area. Total = 1,800 sq. ft. 26

Fremont: Rainwater Harvesting/Use Worksheet 3.1/3.2. Subtract self-treating and self-retaining area & contributing area from potential rainwater capture area : 15,700-1,800 = 13,900 square feet = 0.32 acre 27

Fremont: Rainwater Harvesting/Use Worksheet 4.2 Divide the non-residential interior floor area by the adjusted potential rainwater capture area. 6,000 / 0.32 = 18,750 4.4 Refer to Worksheet Attachment 2 and identify the square feet of non-residential interior floor area per impervious acre needed in your Rain Gauge Area to provide the toilet flushing demand needed for rainwater harvest feasibility 28 Palo Alto Rain Gauge: 84,000 square feet

Office/Industrial Toilet Flushing Demand Feasibility Threshold Office/Retail also applies to industrial toilet use. Square footage derived from State plumbing code occupant load factors for toilet use. IA = Impervious Acre

Fremont: Rainwater Harvesting/Use Worksheet 4.6. Is the project s square footage of nonresidential interior floor area per acre of adjusted Potential Rainwater Capture Area LESS than 84,000 square feet? Yes. 30

Fill Out the LID Feasibility Screening Worksheet: Case Study 2 San Mateo County 31 Residential development: 12 singlefamily homes Includes landscaping & private road 7.5 acre site New impervious surface (buildings, driveways, private roadway): 2.6 acres (113,256 sq.ft.) No existing impervious surface Post-project landscaping: 4.9 acres (213,444 sq.ft.) Ksat is less than 1.6 inches/hour

San Mateo County: LID Feasibility Screening Worksheet Is project potentially a Special Project? 32

Special Projects Category A: Infill Must Meet All Criteria to be a Special Project Located in central business district or comparable pedestrian oriented district. Built as part of objective to preserve or enhance pedestrianoriented environment. Creates or replaces ½ acre or less of impervious surface. No surface parking except for emergency access, ADA or loading requirements. 85% of lot is covered by buildings; remaining 15% is for safety access, trash/recycling, public uses, etc. If ALL criteria are met, receives 100% LID treatment reduction credit.

Special Projects Category B: High Density Must Meet All Criteria to be a Special Project Located in central business district or comparable pedestrian oriented district. Built as part of objective to preserve or enhance pedestrian-oriented environment. Creates or replaces > ½ acre, but no more than 2 acres, of impervious surface. No surface parking except for emergency access, ADA or loading requirements. 85% of lot is covered by buildings; remaining 15% is for safety access, trash/recycling, public uses, etc. If ALL criteria are met, a graduated system of LID treatment reduction credit is applied.

Special Projects Category C Transit Oriented Development Non-auto oriented project. (No stand-alone surface parking lots, car dealerships, auto and truck rental facilities with onsite surface storage, etc.) Within ½ mile radius of existing or planned transit hub, or within a Priority Development Area. For commercial or mixed use projects, a minimum floor area ratio of 2:1 is required. For residential projects, min. density is 25 dwelling units/acre. If above criteria are met, a graduated system of LID treatment reduction credit applies. Location credit Density credit Minimize surface parking credit

San Mateo County: LID Feasibility Screening Worksheet Is the project potentially a Special Project? 36 No Project is not in a pedestrian-oriented district, Is not built as part of a stated objective to preserve or enhance a pedestrianoriented area, and Is not within ½ mile of a transit hub, or within apriority development area

San Mateo County: LID Feasibility Screening Worksheet 2. Do site soils either: Have a Ksat LESS THAN 1.6 inches/hour, or Consist of Type C or D soils? Yes 37

38

San Mateo County: LID Feasibility Screening Worksheet 3. Check box if the project is installing and using a recycled water plumbing system for indoor non-potable use If recycled water system will be used, rainwater harvesting is infeasible Box not checked. 39

Screening Worksheet Table 1 (sq.ft.) 1 2 3 4 Pre-Project Impervious Surface Proposed Impervious Surface Replaced Created Post-Project landscaping a. Enter totals for the area to be evaluated b. Sum of replaced and created impervious surface c. Area of existing impervious surface that will NOT be replaced 40 0 0 113,256 213,444 N/A 113,256 N/A 0 N/A N/A

4.2 Is the amount of impervious surface replaced or added by the project equal to 50% or more of the existing area of impervious surface? No [There is no existing impervious surface to consider including in calculation of potential rainwater harvesting area.] 4.3/ 4.4 Enter the square footage and and acreage of the Potential Rainwater Capture Area: 113,256 square feet 2.6 acres 41 San Mateo County: LID Feasibility Screening Worksheet

San Mateo County: LID Feasibility Screening Worksheet 5.1 Is landscaped area LESS THAN 3.2 times the acreage of Potential Rainwater Capture Area Landscaping & open space = 213,444 s.f. 3.2 * rainwater capture area = 3.2 * 113,256 = 362,419 s.f. 213,444 is LESS THAN 362,419 Yes 42

43 Yes San Mateo County: LID Feasibility Screening Worksheet 5.2.a. Residential Projects: How many dwelling units per impervious acre? Proposed dwelling units: 12 Acres of impervious surface: 2.6 acres Dwelling units/impervious acre = 12 / 2.6 = 4.6 LESS THAN 124 dwelling units / impervious acre?

San Mateo County: LID Feasibility Screening Worksheet 4. All questions in Sections 2 and 5 answered Yes? Yes Implement biotreatment 44