FOR IMMEDIATE RELEASE Contact: Dyana Koelsch

Similar documents
THE TOWN OF WASAGA BEACH

DRAFT PLAN PRESENTATION

C. Westerly Creek Village & The Montview Corridor

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

ARLINGTON COUNTY, VIRGINIA

SOUTHEAST SPORTS COMPLEX MASTER PLAN

Comprehensive Plan ADOPTED APRIL 2014

Public Meeting March 10 th 2011

St. Louis Park Wooddale LRT Station Site development guidelines

TEMPLE MEDICAL & EDUCATION DISTRICT

Open and transparent Ground-breaking, national demonstration project Golden Run is committed to Erie Growth can be profitable to the Town of Erie

Developer s Program. The Station at East 54

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Sahuarita District & Phase 1 Master Plan. Town Council December 11, 2017

Vision for Irvine: a self-confident town where people aspire to live and work and which they are proud to call home

PARTNERSHIP FOR COLLABORATIVE INNOVATION

Small Area Plan. South Gateway

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

May 4, Via electronic mail

DRAFT Land Use Chapter

City of Heath. Town Center Concept

City Council Presentation November 6, 2017

Policies and Code Intent Sections Related to Town Center

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Tauranga City Centre Spatial Framework

FUNDING CORRIDOR REVITALIZATION

THE GAS PLANT DISTRICT MASTER PLAN SCENARIO 2. COMMUNITY MEETING August 6, 2018

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

Dyersville Downtown Plan. Open House October 24, 2017

Technical Appendix L, University Community Plan Town Center

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Germantown Forward Status Report to the Planning Board M NCPPC

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Bourne Downtown Site Planning

Cities are dynamic and ever changing places with buildings, infrastructure and outdoor spaces constantly being improved and buildings replaced.

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

HE VISION. Building a Better Connected Place

Description of Preferred Alternative

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

WELCOME TO THE CHOUTEAU GREENWAY ECONOMIC DEVELOPMENT WORKING GROUP!

SOUTH NATOMAS COMMUNITY PLAN

Examples of Asset Based Approaches to Development. Economic and Community Development Suffield, CT

Beaverton City Council: Work Session. SIDEDistrict. May 6, 2014

WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP!

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

East Central Area Plan

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Developer Panel Summary Report

MEMO 1. INTRODUCTION PURPOSE & PROCESS REQUEST

Executive Summary. NY 7 / NY 2 Corridor

Fort McPherson Master Plan

Somers Point Master Plan

Al Hansen, Director of Parks and Recreation City of Petoskey, Michigan

Chapter 1.0 Introduction

South Norfolk Municipal Facilities Study

Jodie Milkman, Vice President for Communications, Delaware River Waterfront Corporation (o) , (c) ,

8implementation. strategies

MAYFIELD WEST SECONDARY PLAN PHASE 2

STAFF REPORT NATIONAL MEDAL OF HONOR MUSEUM

Taming Tysons Corner Transforming the Quintessential Edge City

Town Center (part of the Comprehensive Plan)

Los Angeles Harbor Commission Approves a New Wilmington Waterfront

MAGALIESBURG DEVELOPMENT INITIATIVE (MDI)

12600 S Existing Conditions

hermitage town center

Envision Front Royal Workshop 1 of 2

Exeter, RI Technical Assistance Panel (TAP)

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

From: Sent: To: Subject: Zoning: Landscaping:

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

Moody Centre Station TOD Area Today

The Village of Shirlington

M E M O R A N D U M January 6, 2017

ORANGE LINE TRANSIT NEIGHBORHOOD PLANS VAN NUYS NEIGHBORHOOD COUNCIL, PLUM COMMITTEE DEPARTMENT OF CITY PLANNING, CITY OF LOS ANGELES

A P P E N D I X B - O P P O R T U N I T Y S I T E S

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

1 October Dear Citizens of Charlotte and Mecklenburg County,

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

The Lower SaLuda Greenway

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE GEORGE KOTSIFAS MANAGING DIRECTOR, DEVELOPMENT & COMPLIANCE SERVICES & CHIEF BUILDING OFFICIAL

THE COUTURE AT A GLANCE $122 MILLION TOTAL PROJECT COST 44 STORIES / 700,000 SQUARE FEET PUBLIC PLAZAS, PARK & PEDESTRIAN BRIDGES 302 MARKET RATE

Transit-Oriented Development

The Five Components of the McLoughlin Area Plan

Arlington County Retail Plan

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Welcome to our exhibition

The Corporation of the TOWN OF MILTON

A NEW LOOK FOR THE BISHOP CENTRE. Land Securities. Our environment. Our communities

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Agenda. 3. Outstanding Items. How it would work (DRP) Urban Design Guidelines language in Sector Plan (Concepts) vs. Guidelines Document (Detail)

Urban Planning and Land Use

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

City of Woodinville Planning Commission Study Session. Development Regulations 101: An Overview of Specific Regulatory Items To Help You in 2012

Transcription:

FOR IMMEDIATE RELEASE Contact: Dyana Koelsch 401.831.1200 dkoelsch@nharbor.com Revised Gateway Plan Decreases Retail, Adds 70% More Office Space and Improves Entrance to Quonset Business Park Incorporating feedback from state and town leadership, revised proposal puts forth significantly enhanced vision for development of the Quonset Point Gateway (August 8, 2007) The Quonset Development Corporation (QDC) announced today that it has submitted a revised proposal to Statewide Planning for an improved mixed-use development on the 72.5 acre entryway to the Quonset Business Park. The revised plan marks a major step forward in the state s effort to create an entryway to the park that integrates office and R&D space, pedestrian walkways and outdoor space, with amenities including a hotel and restaurants. The revised plan will enhance the park s ability to serve as an engine for job creation and economic growth. The revision reflects changes made to address concerns and suggestions raised by state and local leadership to the initial Gateway Development proposal. Working with site developer New Boston Development Partners, QDC redesigned the proposal to reduce the percentage of retail, add more office, and to improve the entrance to the business park. The revised Gateway plan reduces the amount of retail space by 21,000 square feet and increases the amount of office and R&D space by 160,000 square feet. The new plan now includes 391,900 square feet of office with the capacity for 1,200 new office jobs in the park. The majority of buildings are now designed as multi-story structures, increasing the total density of the site by 18.4 percent. The revised plan also calls the construction of two-story office buildings on Post Road and Gate Road that dramatically improves the streetscape along the entrance to the park. The revised plan maintains two anchor retail stores (Lowes and Kohls) as economic drivers for the Gateway, making the $144 million private sector investment and the entire project possible. In both cases, the store size is smaller than is typical for the two chains (Lowes 168,000 sq. ft., Kohls 89,000 sq. ft.). In the revision, Lowes is positioned two thirds of a mile from the entrance of the Gateway development and now includes an extensive berm as a buffer from the Newcomb Road neighborhood.

The new Gateway configuration creates a platform for adding 2,165 jobs to the park, more than half of which are made possible by the increased office capacity. Additionally, buildings are moved closer to roads, land is provided for the expansion of a day care center, pedestrian access is improved, and bus stops are better incorporated. Outdoor cafes, small parks, open spaces and water features have been added to enhance the pedestrian experience. The revised plan also better incorporates the Seabee Memorial Museum, Chapel and Park by adding a welcome plaza, tour bus parking and turn around, pedestrian connections, and walking trails. A new element in the Gateway is a sports fitness complex that will enhance the mix of uses on the site. In addition to supporting greater job growth within the park, the revised plan leverages private sector dollars to create a mixed-use site that will enhance the quality of the surrounding neighborhoods both today and in the years to come, says Governor Donald L. Carcieri. We can be proud of the vision for development at Quonset included in the revised Gateway plan. It has been achieved by incorporating suggestions made by my office, Statewide Planning, the town of North Kingstown, and other stakeholders. The plan represents $144 million in private investment and neither requires nor seeks any public funds to complete the project. The revised Gateway Development plan was submitted to Statewide Planning on Monday, August 6, 2007. Statewide Planning will evaluate the proposal and make a recommendation to the Statewide Planning Council regarding the compliance of the revised proposal with the Statewide Guide Plan. QDC and New Boston Development Partners relied heavily on input from Statewide Planning, the town of North Kingstown, and the Quonset Community Advisory Council to craft a revised proposal. QDC and New Boston Development partners have submitted a significantly revised and improved Gateway proposal to Statewide Planning for its consideration, says Michael Embury, Town Manager of North Kingstown. The revised proposal makes substantial site improvements in both utilization of the land and the manner in which pedestrians access and move throughout the development. The proposal responded positively to a majority of the issues raised by the Town Council upon its review of the first presentation. The addition of a multi-story office building along Post Road and substantial design improvements in the interior of the development ensure that the Quonset Gateway is visually appealing and an economic catalyst to the Post Road corridor planning process. The Town looks forward to continuing our discussion and dialogue with QDC as the review process continues.

The 961,660 square foot development now includes 391,900 square feet of office space, 333,960 square feet of retail space, a 81,700 square foot, 160 room Hilton Hampton Inn hotel, and 154,100 square feet of non-retail space. More balanced mixed uses have been integrated into the project including community meeting space above retail space and the inclusion of a multipurpose corporate fitness and recreation center. The revised Gateway plan, and the collaboration required to move this important project forward, is a promising example of what we can accomplish when state and municipal leadership works together, says Saul Kaplan, executive director of the Rhode Island Economic Development Corporation and chair of the QDC Board of Directors. By working together to create a better plan for the Gateway that benefits all Rhode Islanders, we are building a foundation for collaboration that will help us unlock Quonset s full economic development and job growth potential. The revised Gateway plan is a better deal for Rhode Island, North Kingstown, and Quonset, says Kaplan. New Boston and QDC did a good job of translating concerns about the initial proposal into a redesign that makes better sense and will accelerate our job creation effort at Quonset and throughout the state. Representative Larry Ehrhardt, whose North Kingstown district includes the Gateway site, stated, "I am delighted to see an agreement to move forward with the Gateway project in its improved format. This will be a landmark event in the development of Quonset and North Kingstown. This construction is an important step in providing more good jobs for Rhode Islanders." Summary of Gateway Plan Revisions Multi-story buildings have been incorporated along Post Road, Gate Road, and within the in-line retail component. Stand alone office buildings are all multi-story. Greater mixes of uses have been integrated into the project including community meeting space above retail space and the inclusion of a multi-purpose corporate fitness and recreation center. Project retail space has been reduced from 355,900 sf to 333,960 sf (a reduction of 6%). Office space has been increased from 231,000 sf to 391,900 sf (an increase of 70%). Project building square footage has increased from 714,700 sf to 961,660 sf with a 6.5 acre increase in the project area. The Project F.A.R. has increased from 0.2486 to 0.3045, representing an 18.4% in project density. The project employment profile has been changed with the introduction of more office space. This proposal has an employment profile that is more balanced and relies less on retail. The new configuration projects 2,165 jobs, with 1,200 dedicated to office, 750 to retail, 85 to restaurant, 50 to sports complex, and 80 to hotel. Office use represents 55% of the job creation.

Projected employment land utilization is 29.88 jobs/acre A new element, a sports fitness complex, has been added to the project. It will enhance the mix of uses on the site and provide for more opportunities to walk between uses. Buildings have been moved closer together and closer to street frontage throughout the project to create a streetscape along Post Road and Gate Road with multi-story buildings. The Seabee Museum and Chapel have been better integrated into the project with new parking, bus turn off, and walking trails. Land has been set aside for expansion of the existing daycare center. Provisions for public transportation stops have been incorporated into the site plan. Outdoor cafes, pocket parks, open space and water features have been added to the plan to enhance the pedestrian experience. Available Images: