Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Similar documents
Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Master Facility Planning Update School Board Meeting May 26, 2016

Forest Hills Facilities Plan

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

2014 Bond Project Guide

New High School Concept

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Design Presentation. Chief Operations Officer Willie Burroughs

Briar Crest Elementary

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Master Project List Report

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ohlone College Measure G Project Scope Revisions

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

School District of Milton 5- Year Capital Maintenance and Improvement Plan

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Proposed Bond Construction Projects

2014 Bond District-wide Facility Repairs

REPORT CARD TO THE COMMUNITY MAY 15, 2018

5 Year Capital Improvement Plan Update

Updated: 8/16/ Facilities Profile

PLATTEVILLE MIDDLE SCHOOL

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Tillamook High School Bond Projects

2014 Bond District-wide Facility Repairs

Florence High School / Middle School Page 1 of 3 Florence, WI

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Facility Improvements

Cherry Hill Public Schools BUILDING A SOLID FUTURE

GOCO Grants Awarded to Projects in Arapahoe County through June 2015

Edward Jenner Elementary Academy of the Arts

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

29 Bella Fontaine Park

Oxford Hills School District Capital Renewal Plan Updated March 2017

Facilities Management Services

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

Charles W Earle Elementary School

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Calmeca Academy of Fine Arts and Dual Language

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Special Revenue Funds

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

Measure R Summary Through February 28, 2015 Board Meeting March 17, 2015

Richard Henry Lee Elementary School

Measure R Summary Through April 30, 2015 Board Meeting May 19, 2015

Genevieve Melody Elementary School

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Joseph Brennemann Elementary School

SPLOST I, II, III,IV

Washington Irving Elementary School

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

Josefa Ortiz De Dominguez Elementary School

Doing Business with Bartlett Cocke General Contractors

Agustin Lara Elementary Academy

Warren County Schools Plant and Operations

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

George B Swift Elementary Specialty School

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

Oscar DePriest Elementary School

John Palmer Elementary School

Alessandro Volta Elementary School

NYC Department of Education

NYC Department of Education

NYC Department of Education

Community Response Buchanan Elementary. December 13, 2016

MH Non-Residential Permit Fees All Commercial Permit fees require a 3% BBS State Tax and are subject to a plan review and base fee.

Sidney Sawyer Elementary School

North Elevation Existing trees along Pike Street were preserved and enhanced with extensive planting.

Fall 2017 Construction Update

DeWitt Clinton Elementary School

Program Summary: A ,000 SF Program Statement: $46.41 $11,000,000 August 2013

2005 Proposition II. Bond Construction & Projects Report

Updated: 5/6/16. Facility and Property Information Package

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

NYC Department of Education

City of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List

Francis M McKay Elementary School

NYC Department of Education

NYC Department of Education

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS

SCHOOLS + COMMUNITY rehabs, renovations, new construction

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

Oconomowoc Area School District Facility Construction Update August 25, 2017

Transcription:

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170 Asphalt and concrete work; fire protection system, mechanical system, and plumbing upgrades; roof replacement; track resurfacing; traffic redesign Classroom, media area, cafeteria and gymnasium addition; technology lab 1990 and administrative area renovation 1999 Building renovation and addition 2003 Mechanical controls and boiler replacement Front entry, science labs, HVAC system, and music room renovations; lighting system, electrical system, technology infrastructure, 2008 door/hardware, plumbing, and structural upgrades; storage area additions; carpet/flooring, back-up generator, sewage ejection system, and emergency lighting replacements Security camera and DVR to digital IP system, exterior lighting, elevator, main gymnasium, locker room and office upgrades; hallway floor repairs 109

Challenge School Magnet School for Grades K-8 9659 East Mississippi Avenue Denver, Colorado 80247 Year Opened 2002 Current Square Footage 62,000 Site Acreage 9.65 challenge.cherrycreekschools.org $500,000 Innovation $ 81,920 Asphalt and concrete work; door/hardware and fire protection system upgrades 2002 Original construction Security camera and DVR to digital IP system, plumbing, and science classroom neutralization tank upgrades; interior painting; wallpaper replacement; glazing and framing of doors at main entrance 110

Falcon Creek Middle School 6100 South Genoa Street Aurora, Colorado 80016 Year Opened 1999 Current Square Footage 140,000 Site Acreage 24.82 falconcreek.cherrycreekschools.org $376,420 Asphalt and concrete work; door/hardware, electrical system, and fire protection system upgrades 2008 Underdrain system expansion Relief fan variable frequency drive and security camera and DVR to digital IP system upgrades; block/brick resealing; hallway carpet and track surface replacement; main gymnasium floor and pond stormwater repairs; cooling tower refurbishment; crawlspace drainage improvement 111

Fox Ridge Middle School 26301 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2008 Current Square Footage 172,000 Site Acreage 11.91 foxridge.cherrycreekschools.org $195,900 Asphalt and concrete work; track resurfacing 2008 Original construction Security camera and DVR to digital IP system upgrades 112

Horizon Community Middle School 3981 South Reservoir Road Aurora, Colorado 80013 Year Opened 1982 Current Square Footage 168,500 Site Acreage 27.08 horizon.cherrycreekschools.org $ 750,000 Innovation Breezeway renovation; asphalt and concrete work; windows/caulking, $1,302,000 electrical system, mechanical system, and plumbing upgrades; track resurfacing 1990 Building addition 1999 HVAC system replacement 2008 Lighting system and temperature control system upgrades; fire alarm system, sound system and plumbing fixture replacements Security camera and DVR to digital IP system, fire alarm notification system, PA system, elevator, exterior lighting, and plumbing upgrades; power and data (in former open classroom area), and carpet (in hallway, media center and all classrooms) installation; bridge concrete and metal, all single pane windows, door hardware/keying, roof, and horizontal ceiling grid replacements; restroom floor repairs; auxiliary gym floor replaced with wood; interior painting 113

Laredo Middle School 5000 South Laredo Street Aurora, Colorado 80015 Year Opened 1974 Current Square Footage 171,954 Site Acreage 81.76 laredo.cherrycreekschools.org $764,670 Asphalt and concrete work; door/hardware and fire protection system upgrades; track resurfacing; cafeteria renovation 1990 Building renovation and addition; HVAC system replacement Lighting system and ceiling partial replacements; minor HVAC system and 2008 plumbing upgrades Security camera and DVR to digital IP system, fire alarm notification system, PA system, sewage lift, exterior lighting, mechanical system and plumbing, exterior door, window/frame, classroom and restroom flooring upgrades; power and data (in former open classroom area) installation; door hardware/keying and roof replacements; interior and exterior painting 114

Liberty Middle School 21500 East Dry Creek Road Aurora, Colorado 80016 Year Opened 2002 Current Square Footage 145,500 Site Acreage 26.8 liberty.cherrycreekschools.org $223,070 Asphalt and concrete work; fire protection system upgrade; track resurfacing 2002 Original Construction Security camera and DVR to digital IP system, exhaust fan variable frequency drive, gym sound system, and trap seal upgrades; caulking; main gym floor and pond stormwater repairs; interior painting 115

Prairie Middle School 12600 East Jewell Avenue Aurora, Colorado 80012 Year Opened 1977 Current Square Footage 176,656 Site Acreage (included in OHS campus) 66.99 prairie.cherrycreekschools.org $2,149,800 Cafeteria renovation; asphalt and concrete work; carpet/flooring, electrical system, and roof replacement; track resurfacing 1989 Building addition 1999 Building renovation; administration addition Lighting system upgrade; back-up generator, domestic heating water 2008 system, water heating boiler, rooftop HVAC system, and air terminal equipment replacements; plumbing fixture repairs Security camera and DVR to digital IP system, exterior lighting, fire alarm notification system, PA system, elevator, mechanical system and plumbing upgrades; power and data (in former open classroom area) installation, exterior door, window/frame, classroom flooring, second story wall covering, door hardware/keying and roof replacements; interior and exterior painting 116

Sky Vista Middle School 4500 South Himalaya Street Aurora, Colorado 80015 Year Opened 2005 Current Square Footage 156,245 Site Acreage 27.2 skyvista.cherrycreekschools.org $307,150 Asphalt and concrete work; mechanical system and plumbing upgrades; track resurfacing 2005 Original Construction Security camera and DVR to digital IP system and cooling tower upgrades 117

Thunder Ridge Middle School 5250 South Picadilly Street Aurora, Colorado 80015 Year Opened 1992 Current Square Footage 176,000 Site Acreage (included in EHS) 89.02 thunderridge.cherrycreekschools.org $ 43,240 Asphalt work; fire protection system upgrade 2008 Lighting system upgrade; plumbing fixture replacements Security camera and DVR to digital IP system, fire alarm notification system, PA system, elevator, exterior lighting and mechanical system upgrades; plumbing, roof, deteriorating doors, window/frame, classroom flooring, door hardware/keying replacements; partial track resurfacing; main gym floor repair; interior and exterior painting 118

West Middle School 5151 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1966 Current Square Footage 158,500 Site Acreage 18.03 west.cherrycreekschools.org $ 750,000 Innovation $1,130,120 Asphalt and concrete work; fire protection system upgrades; roof replacement; track resurfacing 1990 Classroom, gym, and cafeteria additions; technology lab and administrative area renovations 2003 Windows, HVAC system, and roof replacements 2008 Classroom, science area, technology infrastructure, flooring/carpet, door/hardware, lighting, electrical system, and plumbing upgrades; ceiling and sanitary sewer replacements; HVAC system renovations; fire suppression system installation Security camera and DVR to digital IP system upgrades; mechanical system replacements; tennis court resurfacing 119