Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Similar documents
Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Public Information Centre. Welcome

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Commissioners Road West Realignment Environmental Assessment

Heritage Road Improvements from Steeles Avenue to Rivermont Road

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Burloak Drive Grade Separation

APPENDIX F: DETAIL DRAWINGS

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

TABLE OF CONTENTS Page

Portage Parkway Environmental Assessment Public Information Centre No. 1

Cottage Grove Road Reconstruction. City of Madison Engineering

Commissioners Road West Realignment Environmental Assessment

December 11, December 10, 2015

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Clay Street Bridge Replacement Project

City of Grande Prairie Development Services Department

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Land Use Policies. North Aldershot Area Land Use Policies. 10 North Aldershot Area

Waterdown Road Widening Detailed Design Wildlife Crossing Safety Plan

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

OP Council Resolution June 16, Planning and Development Services

TABLE OF CONTENTS. Building Great Neighbourhoods. Working together to make the most out of your neighbourhood.

St. Clair Avenue West Area Transportation Master Plan

APPENDIX F: EXTERNAL APPROVALS

Master Environmental Servicing Plan & Secondary Plan

SECTION 4(f) DE MINIMIS DOCUMENTATION

5-Year Street Reconstruction Plan ( )

WELCOME TO OPEN HOUSE TWO November 28, 2018

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

5. Spring Garden Planning Area (Secondary Plan added by OPA #05 11/29/2002)

Purpose of Open House #3

Public Meeting #3 May 9, 2009 MVVA Team

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

JOB CREATION PROJECTS

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

Victoria Bridge Municipal Class EA Civic Works Committee

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Transportation Master Plan Schedule B Projects Road Name From To Description of Works Southcote Road Garner Road Twenty Road Extension

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

Drexel, Barrell & Co.

Capital Improvement Program. Development Services Staff Recommended Projects

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Integration of Trees into Roads Policy - the road to success -

Citizen Information Meeting

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Red Fox Commercial Outline Plan

Commissioners Road West. Municipal Class Environmental Assessment. City of London

Drexel, Barrell & Co.

THAT Site Development Application DA (Villa Charities Inc./Villa Colombo DiPoce Campus) BE APPROVED, subject to the following conditions:

Neighbourhood Guide. For Cambridge Residents In New Neighbourhoods

168 & 170 BRADFORD STREET

Dundas Street (Regional Road 5) Improvements Class Environmental Assessment Study

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

Public Information Centre #1

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

The petition proposes to rezone 3.17 acres to allow all uses in the TOD-M (transit oriented development mixed-use) district.

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

9 th Street Sub Area Plan

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

Mavis Road Class Environmental Assessment

Prince William Street Project (Grant Avenue to Wellington Road)

Elevated Water Storage Facility and Pumping Station Municipal Class EA for Pressure District 7: PIC # 1 Summary

5.0 Community Design Plan

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

Grandview area secondary school FAQ

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Appendix K. Stormwater Management Plan

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

WELCOME TO OPEN HOUSE # 3

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

elcome Public Information Centre No. 3 May 12, 2009 Burnhamthorpe Road East From Arista Way to Dixie Road Class Environmental Assessment (EA) Study

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Red Hill Valley Project More Than A Road October 16, 2006

PLANNING COMMISSION. Submitted

TABLE OF CONTENTS 1.0 INTRODUCTION GENERAL OBJECTIVES LAND USE DESIGNATIONS, OBJECTIVES AND POLICIES 4

2019 Development Charges Background Study Draft Local Service Policy (Draft Appendix E to D.C. Study)

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Transcription:

Welcome Public Information Centre No.2 City of Burlington, City of Hamilton, Region of Halton Waterdown Road Widening Detailed Design Craven Avenue to Mountain Brow Road Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m. 1

Agenda for today s PIC Sign-in and review display boards Presentation Welcome Project environmental component update Project 90% design overview Property acquisition Tentative schedule Participation Review Roll Plans Review Display Materials Complete Comment Sheets Ask Questions 2

MOECC Conditions of Approval Update Mitigation measures to minimize environmental impacts within Sassafras- Waterdown Woods Provincial Life Science Area of Natural and Scientific Interest include: tree protection fencing/hoarding, respecting timing windows for species-at-risk and monitoring during construction. Explicit details pertaining to species-at-risk and implications of the Endangered Species Act, 2007 are still being finalized with the Ministry of Natural Resources and Forestry, and will be sorted prior to construction. Consultation with Conservation Halton, Region of Halton, Ministry of Natural Resources and Forestry, Niagara Escarpment Commission and the Bruce Trail Conservancy are ongoing, and will continue through to and during construction. Additional measures for enhancement strategies (e.g. creating new wildlife habitat features) have been discussed with the regulatory agencies and will be implemented prior to construction. 3

MOECC Conditions of Approval Update A Wildlife Crossing Safety Plan has been drafted which will implement the following but not limited to: Improved sight lines due to changes in the vertical profile and straightening of the horizontal alignment; Improved visibility along the eastern edges, and increased lighting; Reduced lane widths of 3.3m; Reduced speed limit from 60km/h to 50km/h; Incorporation of plants along the eastern edge that may deter deer and other wildlife from foraging; Incorporation of retaining walls along the east side of Waterdown Road that may limit crossing of some wildlife; Incorporation of increased signage with some form of flashing beacon, LED lighting, and/or display messages; and, Increased public awareness and education via the City s websites. 4

Proposed Works General Overview The proposed works will include: Road widening to accommodate an ultimate 4 lane cross section. The road will be marked as a 3 lane cross section with on-road bike lanes initially until traffic volumes increase; Installation of a series of retaining walls along the eastern side of the road; Installation of curb and gutter, a multi-use pathway on the west side and sidewalk placement in certain sections along the east side; Storm sewer installation; New traffic signal at Waterdown Road and Mountain Brow Road; New street lighting; Watermain replacement including replacement on Flatt Road and Ireson Road. Extensive boulevard tree plantings and other revegetation; and, Other utility relocations as required (e.g. Bell, Hydro, gas etc.). 5

90% Design Additional Details Design along the road will include: Full reconstruction of the road base with the road widening; Lowering the vertical profile of the south half of the road to minimize ditching and grading impacts to the frontages; Extensive driveway regrading and tie-ins at the expense of the Municipalities; Replacement and enlargement of the creek culvert at 1761/1772 Waterdown Road; New light emitting diodes (LED) streetlights with flat lens fixtures along the entire length of the road, which will reduce the harshness of the lights and direct the light towards the roadway; The retaining walls along the east side of the road include an attractive concrete wall at the north end by the Bruce Trail, a terrafix (vegetated) wall along the south end by Sassafras Woods and additional armour stone or concrete walls to assist with grading and tree impacts along residential frontages; Individual residential mailboxes along the roadway will be relocated to community mailboxes as per Canada Post; H.S.R. Bus services: New bus pads and some bus stop relocations; 6

90% Design Additional Details Design along the road will include: Constructing an underground stormwater storage unit at the south end of the road along the west side. Storm sewers and various oil/grit separators will also be incorporated along the roadway as part of the design. These storm works will mitigate erosion impacts in the ravine areas and improve the water quality of roadway drainage discharging into the creeks; Off-road drainage swales: Many front yards and driveways will continue to have off-road natural drainage swales and watercourses; Utilities relocations including a new Burlington Hydro Pole line on the east side boulevard; MountainBrow Road Intersection is being widened and matched to a future widening of MountainBrow Road to the east to accommodate the future traffic demand from the new Waterdown South subdivisions; Extensive tree planting and landscaping has been proposed to create a rural parkway appearance. The landscaping and tree planting plans have been designed as a continuous corridor and in accordance with agency regulatory requirements using native species; and, For additional details and cross-sections see the boards and design plans. 7

Watermain Replacement Locations 8

Property Acquisition Property requirements for the project have been identified on the 90% design. Appraisal of property requirements will take place beginning in Quarter 2, 2017. Separate appraisals will be prepared for each property to be acquired. The appraiser will contact an affected land owner to arrange a mutually convenient time to inspect the property if needed for appraisal purposes. A representative from either the City of Burlington or the City of Hamilton Real Estate division will contact each affected land owner to arrange a meeting to discuss property requirements and proposed compensation for those requirements. Meetings with each affected land owner are expected to take place in Quarter 2 and Quarter 3 of 2017, once the appraisal process is complete. These meetings will be scheduled at a time and location that is convenient for the affected land owner. 9

Project Schedule No. Task Proposed Date 1 Land Acquisitions 2017 2018 2 Utility Relocations and Critical Retaining Walls 2018 2019 3 Public Information Centre No. 3 Construction Notice 2019 4 Construction 5 Watermain and Water Services Replacement 2019 2020 6 Road Works 2019 2020 Note: the dates identified are tentative. The project may be delayed pending receipt of respective permits, approvals and land acquisitions. 10

Previous PIC No. 1 Inquiries Q: Will something be done about potential damage to my home due to vibration from construction? A: A pre and post construction condition assessment of the properties in close proximity to the construction will be completed. Arrangement of this assessment will be done closer to construction. Q: Will the water wells along horning road be affected by the proposed construction? A: A precondition assessment has been completed and as it is now, there are no anticipated impacts associated with the planned road and watermain works due to the depths of the excavation planned. A future assessment post construction will be made to assess the wells condition again. Q: How will the mail along Waterdown Road be affected? A: Consultation with Canada Post indicates that current rural type individual post boxes will be consolidated into community group mailboxes. This will take place prior to construction. It is anticipated that expanded community group mailboxes will be provided at Old Waterdown Road, Flatt Road and Craven Avenue. Please see the listing on the wall by the roll plans for further details by address. 11

Previous PIC No. 1 Inquiries Q: There are tags on my trees. What do they mean? A: All the trees within the impact area of the project, or within close proximity have been tagged by a Certified Arborist. An assessment of those trees will be made by the Certified Arborist to determine which will be removed, preserved or pruned. Additional confirmation for some of the trees will be made in the field at the time of construction by a Certified Arborist. Q: Will we be getting serviced by sanitary sewers? A: Development within the North Aldershot Central Sector Community, within areas Eligible for Urban Services, must be on the basis of full municipal services. The Regional Municipality of Halton and other agencies are currently reviewing two development applications, Eagle Heights and Taylor lands, within this area. These applications are currently before the Ontario Municipal Board (OMB). In relation to this project, as noted at the previous PIC, the Region does not have plans to extend local mains to the area. Any changes will be based on the Region s Master Servicing Plan, to coincide with development. Note, local infrastructure can be extended by property owners, either individually or as a group. Information on the Region s Service Extension Policy can be obtained by going to the Region s web site at www.halton.ca, under The Regional Municipality of Halton, Extension of Municipal Water and Wastewater Services (Service Extension Policy) Report No.: CS-62-06. 12

Remain Involved in the Project We appreciate the time you have taken to learn more about our plans. Your comments are important in informing the Project Team. Please fill out and submit your comment sheet in the comment box provided and/or provide it by March 16, 2017. For additional inquiries please contact: Mr. Jeff Thompson, Project Manager City of Burlington Ms. Melissa Torchia, Environmental Planner Hatch 426 Brant Street, P.O. Box 5013 5035 South Service Rd., 6 th Floor Burlington, ON L7R 3Z6 Burlington, ON L7L 6M9 Telephone: 905-335-7600, ext. 7669 Telephone: 289-288-2740 jeff.thompson@burlington.ca melissa.torchia@hatch.com Presentation and materials can be found online on the following City webpages: City of Burlington: https://www.burlington.ca/en/services-for-you/waterdown-road-n-craven-to-mountain-brow.asp City of Hamilton: www.hamilton.ca/waterdowntmp 13

Participation Please proceed to the following Tables based upon your address: Table I.D. Address Table A 7 Craven Avenue 1340 to 1390 Waterdown Road 38 Flatt Road Table B Table C 1545 to 1680 Waterdown Road 1681 to 1920 Waterdown Road 10 and 15 Ireson Road Table D 1934 to 2002 Waterdown Road 8 Mountain Brow Road 323 to 345 Mountain Brow Road 265 to 280 Mill St. S Thank you for attending and offering your input! 14