INSTALLATION GUIDE AND CHECKLIST

Similar documents
Qualification Procedures for making PE 3408 Extra High Molecular Weight Polyethylene Heat Fusion Joints

TH01 Molding, Bodyside

5 Maintenance. A November

APPLICATION INSTRUCTIONS FOR MASCOAT SOUND CONTROL-dB

Instructions for Coating Fimbel Garage Door Panels

Socket Heat Fusion Techniques. A Guide for Instruction and Training in Vanguard Socket Heat Fusion

Heat Exchanger Tube Change Procedure

CBT LW MAINTENANCE GUIDE

ENRGY CURB APPLICATION GUIDE FOR TPO ROOFING SYSTEMS

Corr/Guard PRESSURE RATED VENTING SYSTEM IMPORTANT: DO NOT INSTALL WITHOUT FIRST READING THESE INSTRUCTIONS VERY CAREFULLY.

INSTALLATION INSTRUCTIONS. WOOD BLINDS 1-3/8, 2 and 2-3/8 SLAT SIZES. COMPOSITE FAUX WOOD BLINDS 2 and 2-1/2 SLAT SIZES

Ekopel 2k. 2K bathtub resurfacing coating. pabrec.com. Description. Package. Advantages. Technical data sheet

HE120, HE160 Humidifier Installation Kit

HEDMAN DI-50. Endorser Instructions. Hedman DI-50 Operators Guide

PVC Ductwork Model. Installation and Maintenance for

TECHNICAL INSTRUCTIONS

Silverware Pre-washing System INSTALLATION

MEGABAND MICA INSULATED BAND HEATERS

Roofing Adhesive SARNACOL 2172 Spray

Mariner Microspray and Low-Flow Electrospray Fused Silica Spray Tip and Capillary Kit. Operating Instructions. 1 Product Description.

OWNER S MANUAL CAVS SERIES SELF CONTAINED RETRACTABLE NOZZLE VACUUM SEALER

BAND HEATERS TYPICAL APPLICATIONS: SPECIAL OPTIONAL FEATURES: Plastic Injection Molding. Two piece construction. Plastic, Food, or Candy Extruders

HE360 Humidifier Installation Kit

CLEANCUT CONVERTIBLE INSTALLATION GUIDE

LS-JRE OPERATION & INSTRUCTION MANUAL

OWNER S MANUAL CAVN SERIES SELF CONTAINED RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE

Installation Guide. Pedicure Spa D K-163, K-1006, K-1011, K-1012

INSTALLATION INSTRUCTIONS. WOOD BLINDS 1-3/8, 2 and 2-3/8 SLAT SIZES. FAUX WOOD BLINDS 2 and 2-1/2 SLAT SIZES

Installation. Leveling

INSTALLATION. Glass Panel Doors (select models) CAUTION

OPERATING MANUAL Gfp 255C Please read this manual carefully before operating!

OWNER S MANUAL AVN SERIES RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE

How To: PREPARATION REPLACE A KITCHEN SINK

Installation and Maintenance Instructions

CAUTION CAUTION HCWB2 & HCWP2 SERIES IAQ HUMIDIFIERS USER S MANUAL FOR HCWB2 AND HCWP2 HUMIDIFIERS. Table Of Contents

MEGABAND * MICA INSULATED BAND HEATERS. Construction overview Clamping mechanisms Termination styles Construction styles Watt density information

RG1,5SA Self Adhesive

ONE PIECE TOILET LT3. Model: MPN: B0940 INSTALLATION INSTRUCTIONS. Version: 1.0

Installation Guide. Beveled Stainless Steel Sinks K-3388 K-3387 K-3389 K A

Wagner Product Training

GEMINI TM DYNACONTROL TM HOSES Automatic & Manual Versions FOR DYNAMELT & DYNAMINI TM ADHESIVE APPLICATION SYSTEMS

SAAB 99 Series H Type Engine. Installation Guide Silicone Cooling System Hoses. Classic Silicone Hoses

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

Band Heaters W A T L O W. Special Mica Barrel and Nozzle

Application Tooling Specification Sheet

Things you might need for the installation: vessel sink, plumber's putty(home depot), liquid nails(home depot), Bucket silicone caulk(home depot),

OWNER S MANUAL WISTERIA

Operating Instructions for the BBO-1 and BBO-2 Basket Blasters

INSTALLATION INSTRUCTIONS

Products That Work. Products That Last. Since The Professional s Choice APPLICATION MAINTENANCE INSTRUCTIONS

O W N E R S MANUAL ROUGE

Gen II Entree Bath. Maintenance Manual. All Models. Important Safety Instructions Read & Follow All Instructions Thoroughly

CLEANCUT ULTRA-LOW INSTALLATION GUIDE

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

CUSHIONWALK PAVERS OUTDOOR RUBBER SURFACING INSTALLATION / MAINTENANCE GUIDELINES

Non Woven Wallcoverings with or without Crystals Installation and Maintenance Guidelines

SERVICE/INSTALLATION MANUAL ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250

Data Sheet. Self regulating heating tapes. RS stock numbers

Installation Guide. Install your new sink with step-by-step instructions.

SMALL DIAMETER CORR/GUARD & SLEEVED CORR/GUARD

ROTARY TUMBLER LORTONE INSTRUCTIONS AND PARTS LIST. Model 3-1.5B. Model 45C. Model 33B Cyrus Way Mukilteo, WA (425)

INSTRUCTIONS AND PARTS LIST. Model 3A LORTONE Cyrus Way Mukilteo, WA (425)

CryoFit. Handling of Flow Cell and Capillaries. User Guide. Version 002

Mineral Insulated Band Heaters

600 Floor Stripper Applicator

owner s manual produitsneptune.com Do not discard. Save these instructions for further use.

XB-EFA-8L-BK & XB-EFA-8R-BK

ACQUITY UPLC HT Column Heater Instructions

Safety. Rinse Kit for Multi-Pro 1200 and 1250 Turf Sprayers Model No Safety and Instructional Decals. Installation Instructions

User s Manual WS-69TB30 / WS-69TB36 (22 ) WS-69TB42 / WS-69TB48 (22 ) WS-69TS30 / WS-69TS36 (18 ) WS-69TS42 / WS-69TS48 (18 )

Mineral Insulated Band Heater

STOP ACRYLIC TUB WITH INTEGRAL DRAIN PLANNING BEFORE YOU BEGIN TOOLS AND MATERIALS: GETTING STARTED INSTALLATION INSTRUCTIONS.

MANUAL VERSION SERIAL # X-1 MINI PRO OWNER S MANUAL ASSEMBLY & OPERATOR INSTRUCTIONS 1.0

OPERATING & SERVICE PARTS MANUAL HDS-215 COMBINATION SHRINK SYSTEM

THE GOOD GUIDE TO BUTT FUSION JOINTING....Connect

Viking Installation Guide

Compression Dies: Part 2

BYPASS AND POWER HUMIDIFIER OWNER S MANUAL

Data Sheet. Self regulating process heating tapes RS stock numbers ,

I-VICFLEX.AB4. Victaulic VicFlex Style AB4 Sprinkler Fitting for Hat Furring Channel Ceiling Systems WARNING INSTALLATION INSTRUCTIONS

SAFETY ZONE SHEET & TILE MAINTENANCE

918 Clock Gauge Installation, Operation, and Maintenance Instructions

Hoshizaki America, Inc.

3 Scotch Mini-Weld Adhesive System User s Manual

Product Manual. Scotsman. Models: 10150, and 10250

Things you might need for the installation: vessel sink, plumber's putty(home depot), liquid nails(home depot), Bucket silicone caulk(home depot),

BAND HEATERS component parts

KE-Series Constant-Wattage Heating Cable

YCIV Hz & Hz

INSTALLATION INSTRUCTIONS

Sanitise Syrup Lines & Valves. Taylor PH61 Cleaning every 14 days

Service Bulletin No.: DAC Rev 0 Date Issued: November 9, 1999 Title: Powerplant Cooling Page: 1 of 10

Dimensions: 39 1/2" w x 22" D x 35.5 H. kk25 installation. Things you might need for the installation: vessel sink,

Installation Instructions for. WaterMaster Series Fountains

Installation Instructions for. WaterMaster Series Fountains

Frequently Asked Band Heater Questions Plus

HVS S Splice Series

MAYFIELD CEILING FAN LISTED E ITEM # MODEL #BTH44ABZC5C BTH44BNK5C Español p. 20 ATTACH YOUR RECEIPT HERE.

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

ICED CAPPUCCINO MACHINE Taylor MODEL: 390

Transcription:

INSTALLATION GUIDE AND CHECKLIST CLOCK SPRING SNAP WRAP November 2017 Copyright Clock Spring Company, L.C.

TABLE OF CONTENTS a Snap Wrap Information...i Inspection Checklist...iii Snap Wrap Contents...1 Minimum PPE...2 Prepare Pipe Surface...3 Install Snap Wrap Sleeves...5 Tighten Snap Wrap Sleeves...13 Complete Installation...15

REPAIR INFORMATION i General Data Date: Repair ID #: Snap Wrap Serial #: Adhesive Lot #: Activator Batch #: (Blue) Expiry Date: Filler Lot #: Activator Batch #: (Salmon) Expiry Date: Pipe Temperature: Ambient Temperature: Pipeline Data Location: Pipe Diameter: Wall Thickness: Pipe Grade: Pipe Type: Operating Pressure: Installation Pressure: Coating Type: Defect Data Defect Type: Defect Dimensions: (ERW, DSAW, EFW, Seamless, Etc.) (Length, Width, Depth)

ii

INSPECTION CHECKLIST iii The following items should be verified by pipeline inspectors not participating in the Snap Wrap installation, to confirm that key aspects are being completed. Pre-Installation Inspection Repair Information is recorded correctly on the form provided in the Installation Guide. Adhesive and filler are within expiry dates. Surface preparation of the repair area meets NACE #3 standards or equivalent. Ambient and pipe surface temperature are recorded correctly. Installation guidance marks are made to ensure a 2-inch (50 mm) margin beyond either side of the defect. Pipe condensation is removed as needed using acetone and contact spray at the defect location.

INSPECTION CHECKLIST iv Installation Inspection Appropriate amount of activator is mixed with adhesive and filler materials. Filler layer in defect area and along longitudinal seam is adequate. (Filler should extend at least 2 inches [50 mm] above and below longitudinal seam, the entire distance between installation guidance marks.) Sufficient adhesive coverage is applied to the entire surface and filler layer. Installers continuously confirm adequate adhesive application on the bottom quadrant of the pipe. Installers continuously confirm good Snap Wrap sleeve fit to the pipe at the 6 o clock position. Adequate adhesive coverage is applied to installed sleeves as wrapping progresses.

INSPECTION CHECKLIST (CONT.) v Sleeve Tightening Hose clamps/ratchet straps are in good condition. Steady pressure is applied throughout tightening with hose clamps or ratchet straps. Completion Inspection Installers remove extruded filler and adhesive from both edges of the Snap Wrap. Installers should verify there are no gaps or voids between sleeves or between pipe and first sleeve. After adhesive has cured, verify hardness with either durometer (40 Shore A) or thumbnail print. Metallic marker bands are placed upstream and downstream of the repair area, if desired. Repair is coated as a standard repair. Opaque coating is used for aboveground piping.

SNAP WRAP CONTENTS 1 1. Composite Sleeves (Each layer will be marked; ¾ to 6 inches [19 to 127 mm] are blue, 8 to 56 inches [20 to 142 cm] are yellow.) 1 2. Accessory Kit (Includes 5 hose clamps for tightening sleeves, or 2 ratchet straps for diameters above 18 inches [46 cm].) 2 3. Adhesive 4. Adhesive Activator (Blue) 5. Filler 6. Filler Activator (Orange) 3 4 5 6

MINIMUM PPE 2 The following list is the recommended minimum PPE while installing Snap Wrap. It is not intended to supersede installer or site requirements. 1. Safety Glasses 2. Hard Hat 3. Steel-toed Boots 4. Rubber Gloves 5. Disposable VOC Mask (optional) 6. TYVEK Suit (optional)

PREPARE PIPE SURFACE 3 1. In the event of adverse weather conditions cover the repair area, if necessary. For severe weather conditions or if condensation persists on the pipe surface, refer to the Clock Spring Training Manual or contact Clock Spring Company, L.P., for assistance. 2. Remove pipe coating, corrosion residue, primer, and adhesive by sandblasting or grit blasting from an area extending 4 to 6 inches (102 to 152 mm) from either side of the area to be repaired. 3. If the area cannot be sandblasted, use a hand grinder with a 24 to 80 grit disk. Wire brushing is not recommended. Confirm pipe surface meets NACE #3 standards or equivalent.

PREPARE PIPE SURFACE (CONT.) 4 4. Wipe repair surface with MEK or Acetone. Do not use any other type of solvent during these repairs. Handle these highly flammable liquids with care, per their material safety data sheets. 5. Dry-apply the first level of Snap Wrap sleeves around the pipe, ensuring that the sleeves are centered over the intended application area with at least 2 inches (50 mm) on either side of the defect. Mark the sleeve edges for future reference and remove the sleeve(s). If girth weld exists and conflicts with the Snap Wrap corrosion barrier application, follow the Girth Weld Bead Application Procedure in the Girth Weld installation manual.

INSTALL SNAP WRAP SLEEVES 5 NOTE: For deformation defects or extensive cluster corrosion, refer to the Clock Spring Training Manual for single wrap mold instructions. 1. Knead filler packet and both activator packets with thumbs to soften. 2. Determine the correct amount of activator to use for the filler and adhesive, based on the chart found on the filler packet, the adhesive quantity chart below, and the higher temperature measured (ambient or pipe surface). Installation Adhesive Quantity (grams) Approximate Temperature 650 1200 1700 2400 3000 Working Time Cure Time (minutes) (hours) C F Activator Quantity (grams) 0 32 80 150 215 300 380 45 2.5 3 10 50 65 120 175 245 310 45 2.5 3 21 70 50 95 135 190 240 45 2.5 3 27 80 40 75 105 145 180 45 2.5 3 32 90 35 70 95 135 170 35 2 2.5 38 100 35 60 90 120 150 23 1.5 2 43 110 35 60 85 120 150 22 1.5 2 49 120 35 60 85 120 150 21 1.5-2

INSTALL SNAP WRAP SLEEVES (CONT.) 6 3. On a flat surface, such as cardboard scrap, squeeze out the tube of filler and mix with the orange activator until uniform in color, with no streaks (approximately 2 to 3 minutes). 4. Premix the adhesive, then mix with the blue activator until uniform in color, with no streaks, following the guideline below. Premix adhesive in can for 30 seconds. Add activator and mix for 60 seconds. Scrape sides and mix for 90 seconds. 5. If pipe coating in the area contains zinc or coal tar, apply a small sample of the adhesive to verify the repair surface is adequately cleaned. If the adhesive changes from blue to green, the area needs to be cleaned again, or adhesive will not cure properly. Working time begins once activator is mixed. For more detailed mixing instructions and cleanup, disposal, and storage requirements for these materials, see the Clock Spring Training Manual.

INSTALL SNAP WRAP SLEEVES (CONT.) 7 6. Use the putty knife to generously apply and compress filler into all voids, along both edges of the longitudinal weld, and to the edge of the starter pad. 7. Confirm that filler extends at least 2 inches (50mm) above and below the longitudinal seam. TRAINER TIP: You can never use too much filler.

INSTALL SNAP WRAP SLEEVES (CONT.) 8 8. Pour adhesive mixture into the application tray. 9. Use the roller to apply adhesive to the entire pipe surface to be repaired. At the same time, a second worker should use a paint brush to touch up any spots the roller misses. The film should be light enough that the pipe surface can be seen through the adhesive. TRAINER TIP: Always roll adhesive in a downward direction.

INSTALL SNAP WRAP SLEEVES (CONT.) 9 10. Apply the first Snap Wrap sleeve over the filler and adhesive, with the longitudinal seam at the 3 o clock position. 11. Gently squeeze the first layer sleeve to ensure full surface contact with the pipe surface. 12. Apply filler between the seam of the first layer.

INSTALL SNAP WRAP SLEEVES (CONT.) 10 13. Apply adhesive uniformly to the outer surface of the first-layer sleeve.

INSTALL SNAP WRAP SLEEVES (CONT.) 11 14. Position the second-layer sleeve over the first-layer sleeve with the longitudinal seam at 90-degree offset from first-layer sleeve. Each subsequent layer, rotate seam another 90 degrees. TRAINER TIP: It s best to never place seams over the defect or over each other. 15. Gently squeeze the second-layer sleeve to ensure full surface contact with the first-layer sleeve.

INSTALL SNAP WRAP SLEEVES (CONT.) 12 16. Apply adhesive uniformly to the outer surface of the second-layer sleeve. 17. Apply remaining layers as above. 18. Align the edges of all the sleeves within the marked reference lines. Use wooden alignment blocks as needed.

TIGHTEN SNAP WRAP SLEEVES 13 1. Secure the assembled Snap Wrap sleeves using the metal hose clamps or ratchet straps. 2. Tighten clamps, beginning in the middle of the sleeve and working outward in both directions.

TIGHTEN SNAP WRAP SLEEVES (CONT.) 14 3. Sequentially tighten clamps with the same pattern (from the center outward) until adhesive stops extruding from the longitudinal seams and ends of the sleeve layers. NOTE: Clamps should be firmly tightened, but should not twist off the clamp-tightening nut.

COMPLETE INSTALLATION 15 1. Remove extruded filler and adhesive from both edges of the sleeves and the longitudinal seam using the putty knife. 2. Visually inspect the installation to ensure sleeves are tight and fit snugly around the entire pipe circumference, with no voids or spaces between sleeves, or between sleeve and pipe.

COMPLETE INSTALLATION (CONT.) 16 3. Wait approximately 2 hours for adhesive to cure. 4. Check for a minimum hardness of 40 on the Shore A scale. Snap Wrap must be removed if adhesive is not hard enough. If a hardness tester is not available, it s adequate to verify that a thumbnail does not leave an indentation. 5. Treat the repaired area with external coating, just like a standard pipe repair. Snap Wrap is UV sensitive; coating applied to aboveground pipe repairs must be opaque. TRAINER TIP: No special coating is needed on the coil.

NOTES 17

USA Clock Spring Company, L.P. 621 Lockhaven Drive Houston, Texas 77032 USA (281) 590-8491 phone (800) 471-0060 toll-free (281) 590-9528 fax United Kingdom Clock Spring Company, L.P. 4A The Causeway Godmanchester, Huntingdon, Cambs PE29 2HA England ((44) 1480 414 703 phone (44) 1480 414 705 fax Asia Pacific Clock Spring Company, L.P. Kuala Lumpur Malaysia (60) 3 2282 0560 phone e-mail: clockspring@pd.jaring.my SIMPLY THE SMARTEST PIPELINE REPAIR DECISION YOU CAN MAKE! www.clockspring.com