NAH Series HYDRONIC AIR HANDLER 2 TO 5 TONS. Submittal Data English Language IP/Metric Units SD1028HG1 05/17

Similar documents
AIR HANDLER R-410A Refrigerant 2-5 Tons. Submittal Data English Language/IP Units SD1008HN 07/15

SPECIFICATION CATALOG

Envision Air Handler Specification Catalog

NAH Series. NAH Series Hydronic Air Handler Installation Manual. Air Handler. Installation Information. Water Piping Connections

INSTALLATION MANUAL AFFORDABLE RENEWABLE CLEAN ASTON SERIES AIR HANDLER GEOTHERMAL HEAT PUMPS

CWA4 Chilled & Hot Water Fan Coil

MERIT SERIES Up Flow / Horizontal

CWA2 Chilled Water Fan Coil With or Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000-60,000 BTUH

GUIDE SPECIFICATIONS AQUARIUS ii

MERIT Series R-410A - Upflow / Horizontal

MHCCW Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH

MERIT Series R-410A - Upflow / Horizontal

MHCCW Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH

MX Series Indoor Modular Blowers Electric Heat, Hot Water Heat, or No Heat

GUIDE SPECIFICATIONS AQUARIUS ii

Cooling/Heat Pump Convertible Air Handlers

The Premium Quality Fan Coil Units for Vertical, Horizontal (Left or Right) Application with Direct Expansion, Hydronic or Electric Heat

Advance Release September 2009

GTIP60 ISO GT Series, Inch Pounds - 60 Hz GT (iso) Spec Guide Drawings Spec Sheets Low Temp Heating P/T Charts

FLD = Furnished by Trane U.S. Inc. / Installed by Equipment Submittal Page 3 of 13

36,000-62,000 BTUH Nominal Capacity

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

Rheem High Efficiency Air Handler

DH SERIES HORIZONTAL DIRECT DRIVE CHILLED WATER/DX AIR UNITS. OPTIONAL ACCESSORIES Two Row Hot Water Coil

MAC N-407 Air-Cooled Chiller

MIN. CCT. QTY RLA LRA HP FLA AMPACITY /1/ /3/

MHNCCW (4-Pipe) Chilled/Hot Water Ceiling Concealed 208/230V 4-Pipe Heating & Cooling Fan Coil 12,000 BTUH

DSV Model Air Cooled Self Contained Indoor Packaged Units 3-5 Tons Preliminary Application Data

Cooling/Heat Pump Convertible Air Handlers

2TEH3F18A1000A 2TEH3F24A1000A 2TEH3F30A1000A 2TEH3F36A1000A 2TEH3F42A1000A 2TEH3F48A1000A 2TEH3F60A1000A 1½

HIGH EFFICIENCY AIR HANDLER

Rheem High Efficiency Air Handler

Technical Data Manual Model Nos. and pricing: see Price List

CB18/CBS18 Bulletin # September 1994 Supersedes August 1986

Product Specifications. Vertical Floor Consoles By First Co.

Cooling/Heat Pump Convertible Air Handlers

HIGH EFFICIENCY AIR HANDLER

B24/C22/24 COILS BLOWER COIL UNITS ENGINEERING DATA. Bulletin # June 1994 Supersedes August B24 Blower Unit (With Optional Electric Heat)

Commercial High-Efficiency Condensing Units

WH1T SERIES Constant Torque Motor (ECM) Efficiencies up to 14 SEER. FORM NO. H REV. 1 Supersedes Form No. G Rev. 3

TECHNICAL GUIDE VARIABLE SPEED AIR HANDLERS DESCRIPTION FEATURES Rev. A (0105)

Rheem High Efficiency Modulating EcoNet Enabled Air Handler

TECHNICAL GUIDE SINGLE PIECE VARIABLE SPEED AIR HANDLERS DESCRIPTION FOR USE WITH SPLIT-SYSTEM COOLING & HEAT PUMPS FEATURE MODELS: AVG24 THRU 60*(C)

Ruud Standard Efficiency Air Handler

PC SERIES 50 Hertz PRODUCT SPECIFICATIONS. Self-Contained Packaged Air Conditioners. 4 and 5 Ton [14.1 kw to 17.6 kw]

MACH N-407 Heat Pump Air-Cooled Chiller

Ruud Standard Efficiency Air Handler

TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED EVAPORATOR BLOWER 25, 30, 40 & 50 TON LA300, LB360, 480 & 600 (50 Hz) PROVEN PERFORMANCE GENERAL FEATURING

Rheem Standard Efficiency Air Handler

CROWN. Boiler Co. Santa-Fe Series. Hydronic Air Handlers INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*

Guide Specifications PART 1 GENERAL 1.01 SUMMARY

PACKAGE AIR CONDITIONER

EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons

CFFWA4P-08-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 24,000 BTUH

Concealed Ducted Split Series R-407C MBH

Condensing Units & Air Handlers

Commercial High-Efficiency Condensing Units

BCE4 PRODUCT SPECIFICATIONS ENHANCED AIR HANDLER WITH VARIABLE SPEED APPLICATION INSTALLATION CABINET COMPONENTS CONTROLS WARRANTY

700A11. Geothermal Heat Pump 3-5 ton (variable speed) Submittal Data English Language/IP Units SD2700AN 12/17

Rheem High Efficiency Two-Stage EcoNet Enabled Air Handler

AIR HANDLERS AIR HANDLERS RBHP- Models featuring R-22 Refrigerant Models featuring Earth-Friendly R-410A Refrigerant

T-SERIES SPLIT SYSTEM UNITS R-410A - 60 HZ. EER up to to 20 Tons Cooling Capacity - 71,000 to 236,000 Btuh AIR CONDITIONERS TS

SPLIT-SYSTEM EVAPORATOR BLOWERS K2EU060, K4EU090, K3EU120 & K1EU180 5 Thru 15 Nominal Tons DESCRIPTION ACCESSORIES FIELD INSTALLED

PGB SERIES 3thru5Ton 10 SEER CONVERTIBLE SINGLE PACKAGE GAS/ELECTRIC UNIT

Rheem High Efficiency Two-Stage EcoNet Enabled Air Handler

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

Technical Guide DESCRIPTION ACCESSORIES FIELD INSTALLED SPLIT-SYSTEM EVAPORATOR BLOWERS. 7-1/2 and 10 NOMINAL TONS LA090 & LA120 SUPPLY AIR PLENUMS

PGF SERIES 7-1/2 Ton. Belt Drive CONVERTIBLE SINGLE PACKAGE GAS/ELECTRIC UNIT

XC80 TUD2B060ACV32A TUD2B080ACV32A TUD2C080ACV42A TUD2B100ACV32A TUD2C100ACV52A TUD2D120ACV52A TUD2D140ACV52A

Premier Installation Manual

CFFWA4P-16-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 48,000 BTUH

Your safety and the safety of others are very important.

CFFWA4P-12-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 36,000 BTUH

Versatec Base Series Installation Manual

TECHNICAL GUIDE MODELS: MV MODULAR VARIABLE SPEED AIR HANDLERS FOR USE WITH SPLIT SYSTEM COOLING & HEAT PUMP DESCRIPTION FEATURES

HIGH EFFICIENCY TWO-STAGE ECONET ENABLED AIR HANDLER

Multi-position, Upflow, Horizontal Left, or Horizontal Right, Modular Air Handlers

Rheem Air Handlers. RHML- Series X-13 (ECM) Motor

INSTALLATION INSTRUCTION

Submittal. Date: January 8, Customer P.O. Number: Customer Project Number: CARROLLTON, TX 75006

DVPEC. Multi-Position, Variable-Speed air handler. Comfortnet Compatible ECM-based Internal EEV, Inverter-tuned 2 to 5 Tons

Ameristar SUBMITTAL M4AH4E26B1A00AA. 2.0 Ton Multi-position Air Handler M4AH4E26B1A00AA TAG:

TECHNICAL GUIDE. Description SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS YD360, 480 & THRU 50 NOMINAL TONS YTG-B-0811

FF1DNA, FF1DNE FAN COIL UNITS. Sizes 018, 024, 030. Form No. PDS FF1D.18.3 FEATURES FF1D

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Today s Value-Added Performers. The DRY-40A Series Dehumidifiers from DryAire Systems.

ENGINEERING GUIDE. Water-Cooled Self-Contained Units C-Series, Vertical

SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION ACCESSORIES - FIELD INSTALLED. K5EU090 and K4EU Hz 7.5 and 10 NOMINAL TONS SUNLINE 2000 (WORLD 50 HZ)

Upflow/Horizontal 2-Stage, Communicating Variable Speed Gas Furnace Platinum SV

Ruud High Efficiency Air Handler

SECTION FAN COIL UNITS

TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED EVAPORATOR BLOWER 25, 30, 40 & 50 TON LA300, LB360, 480 & 600 PROVEN PERFORMANCE GENERAL FEATURING

SKYPAK II, 3 Ton Series, gives you a

Bosch BVA Series Air Handler

Product Data PF4MNA DIRECT EXPANSION FAN COIL FOR R -410A REFRIGERANT SIZES 018 THRU 061 FEATURES/BENEFITS AVAILABLE SIZES:

Product Data PF4MNB DIRECT EXPANSION FAN COIL FOR R -410A REFRIGERANT SIZES 019 THRU 061 FEATURES/BENEFITS AVAILABLE SIZES:

Greensource Residential Water Source Heat Pumps. Simply Smart. i Series: SV Model. boschheatingandcooling.com

ARBOR COMPACT SERIES COMMERCIAL. Arbor Compact Series Installation ti Manual

EC MODEL. EC Model & Split Systems Water Source Heat Pump. 6 to 30 tons

Transcription:

HYDNI AI HANDLE T TNS Submittal Data English Language IP/Metric Units SD0H 0/

ontractor: Model Nomenclature - Tons 0Hz - - - 0 NAH 0 * 00 0 H Model NAH Unit apacityacity 0 MBTUH 0 MBTUH 0 MBTUH 00 MBTUH Air oil H Hydronic Variable Speed EM Disconnect 0 No Breakers Installed (only on k & 0k Heaters) Breakers Installed (only on k & 0k Heaters) Vintage * = Factory Use nly Electric Heat 00 None 0 k (0 0 only) No Breakers 0 0k (0 00 only) No Breakers k (0 00 only) with Breakers 0 0k (00 only) with Breakers Note: Kit NAHB must be ordered to field convert NAH0-00 to bottom flow air discharge if air handler is to be used for cooling. SD0H 0/ Page of

ontractor: Dimensional Data - - Tons 0Hz Top Flow/Horizontal Unit onfiguration TP VIE FNT VIE IHT SIDE VIE DD EE FF D HH II E BTTM VIE K J L AA BB N M F JJ P Q S H I B LL MM T U V A Topflow/ verall abinet efrigerant/ater ater onnections onnections Horizontal D E F onfiguration A B /" cond /" cond eturn H I J K L M N P Q S Power Low Air Duct Suction / Liquid / idth Depth Height Supply Voltage Flange ater ut ater In in..0...0. 0.........0. 0.. 0.. 0-00 cm............ 0..0 0...0... HH II S T U V X Y Z AA BB DD EE FF " cond /" cond JJ KK LL MM Power Supply Low Voltage..0. 0.........0..0.0.0.0..0......0... 0............0..0 ondensate is stainless steel /".D Discharge flange is field installed and extends " (. mm) from cabinet ev: // SD0H 0/ Page of

ontractor: Dimensional Data - - Tons 0Hz Bottom Flow Unit onfiguration TP VIE FNT VIE A X IHT SIDE VIE I B JJ T V U 0. F S KK LL MM H Y BTTM VIE DD EE J K FF AA BB N M L D E P HH II Z Q verall abinet efrigerant/ater ater onnections onnections Bottomflow D E F onfiguration A B /" cond " cond eturn H I J K L M N P Q 0-00 idth Depth Height Low Voltage Power Supply Air Duct Flange Suction / ater ut Liquid / ater In in..0.... 0............ 0. cm............ 0..... 0.. DD EE S T U V X Y Z AA BB " cond /" cond FF HH II JJ KK LL MM Power Supply Low Voltage. 0...0. 0.... 0..0.0.0.0..0...0........0 0.0............0..0 ondensate is stainless steel /".D ev: // Discharge flange is field installed and extends " (. mm) from cabinet SD0H 0/ Page of

ontractor: Physical Data - Tons 0Hz Air Handler Model Number (Hydronic) NAH0 NAH0 NAH0 NAH00 Air oil Total Face Area, ft [m] Tube outside diameter - in. [mm]. [0.] / [.] Hydronic oil Number of rows Fins per inch ater In connection - in. [mm] sweat ater ut connection - in. [mm] sweat / [.] / [.] Nominal cooling capacity - tons [k]. [.] [0.] [.0] [.] ondensate drain connection - (.D) in. [mm] heel Size (Dia x ), in. [mm] motor type/speeds / [.0] x 0 [ x ] Variable Speed EM motor output - hp [] / [] [] Filter Standard - " [mm] MEV disposable, in. [mm] Electrical characteristics (0hz) Shipping weight - lbs. [kg] perating weight - lbs. [kg] 0 x [0 x ] 0/0 - ph 0 [.] 00 [0.] TE: ater connection dimensions are.d. //0 Pressure Drop ater Pressure Drop - Hydronic oil Flow Pressure Drop (PSI) gpm 0 F 0 F 0 F 00 F 0 F 0 F 0 F.0 0. 0. 0. 0. 0. 0. 0.. 0. 0. 0. 0. 0. 0. 0..0........0........0....0.0.0..0.0...0.0.. SD0H 0/ Page of

ontractor: Performance Performance Variable Speed EM Model 0 0 0 Max ESP (wg) (hp) - Tons 0Hz HP FM Setting Normal Mode Htg & lg Dehumidification Mode lg Aux FM Setting Aux Emerg S S Stg Stg S Stg Stg S S Mode 0.0 / n n 00 00 ff 0 00 n n 0 0.0 / ff n ff 0 0 ff n 0 0.0 / n ff 00 ff 0 0 n ff 0.0 / ff ff 0 00 ff ff 0.0 / n n 00 0 0 ff 0 0 n n 00 0.0 / ff n 0 ff 0 0 ff n 0 0.0 / n ff 0 0 0 ff 0 0 0 n ff 0.0 / ff ff 0 00 0 ff ff 00 0. n n 00 00 ff 00 00 n n 00 0. ff n 0 ff 0 0 ff n 0 0. n ff 0 00 0 ff 00 00 0 n ff 0. ff ff 00 000 ff ff 00 0. n n 0 0 ff 0 0 n n 0 0. ff n 0 00 ff 0 0 00 ff n 0 00 0. n ff 0 0 ff 00 0 n ff 0. ff ff 0 ff ff 00 0/0/0 Factory FM settings are in boldface FM is controlled within % up to maximum ESP Maximum ESP includes allowance for wet coil and standard fi lter DIP switch must be 'FF' to select dehumidifi cation mode Air Handler DIP Switches DIPS Switch Description Used to set normal FM Not used Used to set aux./emergency heat FM Not used Used to set dehumidification FM 0 Not used SD0H 0/ Page of

ontractor: Electrical Data - Tons 0Hz Model 0 0 0 Electric Heat apacity Supply ircuit Aux. Heat Minimum FM ated Voltage Voltage Min/ Max FLA Heater Ampacity Total Unit FLA Minimum ircuit Ampacity Maximum Fuse/ HA K BTUH 0v 0v 0v 0v 0v 0v 0v 0v 0v 0v 0 0 -.0 - -.0.0.0.0 0 0., single 0.0. 0.0..0. 0.0 0 0 0 0 -.0 - -.0.0.0.0 0 0., single 0.0. 0.0..0. 0.0 0 0., single 00.0. 0.0..0..0 0 0 0 0 -.0 - -.0.0..., single 00.0. 0.0..0.. 0 0., single.0.0 0.0.0.0.. 0 0., L/L,.0. 0.0..0.. 0 0 0-0/0/ / L/L -. 0.0. 0.0..0 0 0 -.0 - -.0.0..., single 00.0. 0.0..0.. 0 0., single.0.0 0.0.0.0.. 0 0 00., L/L,.0. 0.0..0.. 0 0 L/L -. 0.0. 0.0..0.,0 single.0. 0.0..0. 0. 00 0.,0 /0/0 L/L,00.0. 0.0..0.. 0 0 L/L -. 0.0. 0.0. 0.0 0 0 ated Voltage of 0/0/0/ HA circuit breaker in USA only Low Voltage Point to Point iring To Air From Handler Thermostat Y Y Y Y L Air Handler transformer must be VA. SD0H 0/ Page of

ontractor: iring Schematics - Tons 0Hz Air Handler iring Schematic - 0-0/0/ P-0 TS L Factory Low voltage wiring Factory Line voltage wiring Field low voltage wiring Field line voltage wiring ptional block D Voltage PB traces Internal junction Quick connect terminal Thermal Limit Switch Field wire lug round N.., N.. E to E - Aux heat stage relays Legend P Notes: To operate in 0V mode replace the blue transformer wire connected to PB-L with red transformer wire. Jumper wires are Factory Installed, and are needed for electric heat operation. Dip switches are used to select the air flow. Use manufacturer s part number P-0 (jumper bar assembly) when single source power is required. Low voltage wiring LASS. EH EH PB - S - HE - Light emitting diode - reen 0-0V elay coil Electric Heat ontactor Polarized connector Power block DIP package 0 position Heater element Breaker Dual Power Supply onnections If two separate circuits are used to supply power to the auxiliary heat kit, the Installer will need to verify that each leg of the auxiliary heat circuit breakers are wired from the power supply correctly in order for the electric heat kit to operate properly. This can be done by measuring the supply side voltage of the auxiliary heat circuit breakers. Put a voltmeter on the L side of ircuit Breaker ne and on the L side of ircuit Breaker Two. The voltmeter should read approximately 0 volts. If the meter reads high voltage, the auxiliary heat breakers need to be rewired so that breakers in the auxiliary heat kit match the wiring of the Disconnect Panel breakers. Meaning, L and L from one breaker in the disconnect panel must connect to L and L at one of the auxiliary heat circuit breakers and L and L from the other breaker in the disconnect panel must connect to L and L of the other auxiliary heat circuit breaker, making sure that the L and L from each disconnect breaker matches the L and L at each of the auxiliary heat breakers. Yel Thermostat Y Y rn/yel() V Transformer Blk/h XFM SE P DD Y Y /B Black Blue ed TE Note 0 S n 0-0/0/ L LED Air Handler No Electric Heat PB L 0 P Black () Black () Black () Black () Black () Black () Black () Black () Black () Black (0) Black () Black () Black () Black () Black () Black () Brown range 0 rn PM grnd PM BK L ADJUST HEAT DELAY Y Y /Y n/ff / EM / EM SD0H 0/ Page of

ontractor: iring Schematics cont. - Tons 0Hz 0-0/0/ PB Transformer Black L L ry() ry() Yel V Blk/h ed TE Blue Brown range rn rn() Thermostat Y Y rn/yel() XFM SE P DD Y Y LED Note 0 S n P 0 Black () Black () Black () Black () Black () Black () Black () Black () Black () Black (0) Black () Black () Black () Black () Black () Black () 0 PM grnd PM L ADJUST HEAT DELAY BK Y Y /Y n/ff / EM / ray E E TE P E E P ry() ry() HE TS /B EM ht() Air Handler k Electric Heat rn() Electric Heat 0-0/0/ Yel V Transformer Blk/h Black ed TE Blue L PB L Brown range ry() Yel() rn ry() Yel() rn() Thermostat Y Y rn/yel() XFM SE P DD Y Y /B LED Note 0 S n P 0 Black () Black () Black () Black () Black () Black () Black () Black () Black () Black (0) Black () Black () Black () Black () Black () Black () 0 PM BK n/ff PM grnd L ADJUST HEAT DELAY Y Y /Y / EM / EM TE P ht(0) Blu() ray E E E E P ry() HE ry() Yel() HE Yel() TS TS ht() TD Air Handler 0k Electric Heat rn() Electric Heat SD0H 0/ Page of

ontractor: iring Schematics cont. - Tons 0Hz 0-0/0/ ircuit 0-0/0/ ircuit Note L L L L rn() Yel Thermostat Y Y rn/yel() V Transformer Blk/h XFM SE P DD Y Y /B Black ed TE Blue L Note 0 S n LED PB L 0 P Black () Black () Black () Black () Black () Black () Black () Black () Black () Black (0) Black () Black () Black () Black () Black () Black () Brown range ed () Black() Air Handler w/ k Electric Heat 0 rn PM grnd PM L ADJUST HEAT DELAY BK Y Y /Y n/ff / EM / EM ht() rn() P TE TD BK Blk() Yel() ht(0) BK ry() ray E ry() Blu EH E Blu() E E P Blk() ry(0) Yel() Blk() Yel() Blu HE HE HE EH TS TS TS Electric Heat ry() Blk() Yel() 0-0/0/ ircuit 0-0/0/ ircuit Note L L L L rn() Yel Thermostat Y Y rn/yel() V Transformer Blk/h XFM SE P DD Y Y /B Black ed TE Blue L LED Note 0 S n PB L 0 P Black () Black () Black () Black () Black () Black () Black () Black () Black () Black (0) Black () Black () Black () Black () Black () Black () Brown range ed () Black() Air Handler w/ 0k Electric Heat 0 rn PM BK PM grnd L ADJUST HEAT DELAY Y Y /Y n/ff / EM / EM ht() rn() P TE TD BK Blk() Yel() Pnk() ht(0) Blu() BK P Blk() ry(0) Yel() Pnk() ry() ray E ry() Blu EH E E E Blk() Yel() Blu Pnk() HE HE HE HE EH TS TS TS TS Electric Heat SD0H 0/ 0 Page of ry() Blk() Yel() PNK()

ontractor: - Tons 0Hz Engineering uide Specifications eneral The air handler shall provide vertical upflow, downflow, or horizontal configurations in one package. Units shall be listed by a nationally recognized safety-testing laboratory or agency, such as Underwriter s Laboratory (UL) or Environmental Testing Laboratories (Intertek-ETL). Each unit shall be pallet mounted and shipped using dense cardboard corners/top and stretch wrap for easy shipping damage inspection. asing and abinet The cabinet shall be fabricated from heavy-gauge galvanized steel and polyester powder coat paint to withstand 000 hours of salt spray testing. The interior shall be insulated with / -thick, multi-density, cleanable aluminum foil coated glass fiber with edges sealed or tucked under flanges to prevent the introduction of glass fibers into the discharge air. ne large blower compartment access panel shall be provided and shall be removable with supply and return ductwork in place. The internal components layout shall provide for major service with the unit in-place for restricted access installations. The blower assembly access shall be slide-out serviceable via a works-in-a-drawer design. The cabinet shall be convertible to horizontal or downflow applications by reconfiguring the cabinet using only a nut driver. The unit shall be zero clearance approved on any of its surfaces. The cabinet shall be divided into two cubes to facilitate easy transport up attic ladders when needed. Standard-size MEV filters shall be provided with each unit. efrigeration ircuit All units shall provide a fin tube air-to-hydronic heat exchanger of the A coil design. The finned tube coil shall be sized for low-face velocity and constructed of lanced aluminum fins bonded to rifled copper tubes in a staggered pattern. The coil shall include an integral corrosion resistant e-coated galvanized steel drain pan. and Assembly The blower shall be an oversized direct drive centrifugal type with a dynamically balanced wheel. The housing and wheel shall be designed for quiet low outlet velocity operation and of galvanized or galvalume steel construction. Tight blower housing geometry shall not be permitted. The blower housing shall be removable from the unit without disconnecting the supply air ductwork for servicing of the blower motor through a works-in-a-drawer design. The high efficiency blower motor shall be a variable speed EM type. The blower motor shall be isolated from the housing by rubber grommets. The motor shall be permanently lubricated ball bearings and have thermal overload protection. Electrical A solid state electronic control module shall be provided for the control of the blower and each stage of electric heat. Single or dual circuit line voltage terminal blocks shall be provided for the air handler power supply. Fuse protection shall be provided for the VA control transformer. Units shall have knockouts for entrance of the low and line voltage wiring. The blower motor shall incorporate a harness plug-connection for easy removal. An integral circuit breaker shall be provided on all units employing or 0 k electric heat. The control shall maintain the blower operation 0 seconds after the cool, heat or electric heat have shut off to improve efficiency. Piping Hydronic connections shall be made using sweat copper joints. The condensate connections shall be a /.D. tube. SD0H 0/ Page of

ontractor: - Tons 0Hz eneral Specifications Hydronic Air oil Designed for hydronic applications. onfigured as an A coil, smooth copper tubes and enhanced corrugated lanced aluminum fins that provide increased performance. Exclusive FormiShield TM coating for added protection. Filter ack Integral filter rack holds in. or in. filters (field changeable). in. MEV disposable filter included. Drain Pans Two e-coated galvanized steel drain pans included, one for vertical and one for horizontal applications. The pans comes equipped with primary and secondary drain connections. Hydronic onnections ater in and water out lines have sweat connections extended outside the cabinet on encased models for ease of connection. abinet (Encased Models) abinets are designed for upflow, horizontal, and bottomflow applications. onstructed of heavy gauge environmentallyresponsible galvanized steel and finished with corrosion-resistant powder coating which meets ASTM B (,000 hour salt spray). Front access panel for ease of service. Insulation (Encased Models) The interior surfaces shall be lined with thick multi-density, cleanable aluminum foil coated glass fiber which meets NFPA 0A requirements, air erosion and mold growth limits of UL-, stringent fungal resistance test per ASTM-0 and ASTM, and zero level bacteria growth per ASTM. ontrols volt VA transformer, EM interface board allows for blower speed selection and thermostat inputs. Auxiliary/Emergency Heat ptional factory installed electric heat. k and 0 k heaters include circuit breakers. SD0H 0/ Page of

ontractor: evision uide - Tons 0Hz Pages: Description: Date: By: All emoved efrigerant oil Information 0 May 0 MA 0- Updated iring Schematics 0 April 0 MA,-, Drain Pan Update 0 May 0 DS/MA -, Updated Hydronic Data Aug 0 MA All Updated Dimensional Data for New Vertical ondensate Drain 0 May 0 DS All Updated Nomenclature For New EM 0 Feb 0 DS Added evision uide 0 Feb 0 DS SD0H 0/ Page of