MULTI-FAMILY LAND FOR SALE

Similar documents
Southern Gateway Project and Public Green

City of Hermosa Beach Administrative Policy #

Whittier Greenway Trail. Est. 2009

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

Description of Proposed Station Area Planning Project

California Environmental Quality Act (CEQA) Environmental Review Process

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

CHAPTER 10 AESTHETICS

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

NORTH, NORTH REDWOOD BOULEVARD CORRIDOR STUDY

West Midlands Local Transport Plan ( ) Making the Connections

4 C OMMUNITY D ISTRICTS

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

Planning Commission Retreat March 23 rd Comprehensive Plan Update Discussion

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

Green Level West Road Cary, NC 27519

EXECUTIVE SUMMARY. Introduction

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Policies and Code Intent Sections Related to Town Center

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

A Plan for the Heart of the Region: Tukwila, WA

Port Lavaca Future Land Use

The transportation system in a community is an

New Rail Hubs along High Speed Rail Corridors The Urban Design Challenge

Call to Artists Public Art for Los Angeles Metro Stations

1.0 VISION STATEMENT. December 6, PRINCIPLES

SECTION I: VISION. The Preserve Specific Plan

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

NOTICE OF PREPARATION

Development Land with Freeway Visibility and Access for Sale

The Ambassador Bridge/ Gateway Project

PLANNING BACKGROUND SOCIO-ECONOMIC CONTEXT A. Demographics B. Business Environment

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

ALI-ABA Course of Study Land Use Institute: Planning, Regulation, Litigation, Eminent Domain, and Compensation

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Visioning Statement and Guiding Principles

Brian Madigan, RLA, CPESC Director Land Planning & Design

ORANGE COUNTY IMPLEMENTING THE FOUR C s

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

Places29: List of Implementation Projects

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

The Role of Cities in Planning Transportation Megaprojects

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Strategic Plan. Updated April City of St. Augustine

CHAPTER 3 Policies and Development Plans

THEMES, VISION, + PRINCIPLES

2017 STRATEGIC PLAN CITY OF ST. AUGUSTINE

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology

DRAFT Civic Center Station Area Plan. Executive Summary

MAYFIELD WEST SECONDARY PLAN PHASE 2

Memorandum CITY OF DALLAS

TORTI GALLAS and partners, inc. How to Retrofit Your Suburb to Make a Downtown

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

FOR SALE Bannister /- Acres Residential/Multifamily Urban Infill

or there is no smart city without smart citizen

FUTURE LAND USE PLAN 7

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

Lee Lake Community: Mixed-Use Area (MUA) Highest Density Residential (HHDR) Neighborhoods

MOUNT ROSE AND WASHOE VALLEY SCENIC BYWAY CORRIDOR MANAGEMENT PLANS

IH35 Corridor Plan Amendment to the Comprehensive Plan

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Glenborough at Easton Land Use Master Plan

Public Hearing April 12, Information as of April 12, 2018

Wasatch CHOICE for 2040

Broadway District Specific Plan. Community Workshop #2 February 23,2016

Union Station, Los Angeles Dec. 4-9, 2011

This page left intentionally blank.

WELCOME TO OPEN HOUSE TWO November 28, 2018

ALTERNATIVES WHAT ELSE IS POSSIBLE?

5.9 LAND USE Existing Conditions Historic Land Use Trends Existing Land Use Distribution

CHAPTER 7: Transportation, Mobility and Circulation

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

5 Land Use Element49

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design

Living in Albemarle County s Urban Places

RE-Imagining the Downtown Colorado Springs Master Plan

Appendix G Response to Comments

The West Vaughan Employment Area Secondary Plan Policies

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Downtown Huntersville in 2030

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

III. PROJECT DESCRIPTION

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane

Northside Interjurisdictional Specific Plan and EIR

TRANSPORTATION ELEMENT

This Review Is Divided Into Two Phases:

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Strategic Growth Area #1 Northampton Boulevard Corridor Area

Project Profile BAR HARBOR

UNIVERSITY OF CALIFORNIA, SAN DIEGO

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

City of Long Beach. creating vibrant and exciting places

I-70 Corridor Enhancement Plan

Corridors. Re-vitalize our Corridors and Gateways

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

Transcription:

An opportunity to acquire Multi- Family land with 1600 sft of Freeway frontage for a medium density apartment project up to 468 units. Several key economic factors make this a strategic asset that will appreciate well into the future.

Caltrans begins construction on Freeway Off Ramps Short Term Added Value (1-5 Years) In March 2016, Caltrans started work on the reconstruction and wideing of Stoddard Wells Rd, D Street and E Street interchanges.this $71 Million dollar project will signifigantly increase the traffic flow in anticipation of the future growth of the surrounding area.

Milestone Reached for E-220 Freeway Coridoor Mid Term Added Value (5-10 Years) The E-220 coridoor is a vital east / west trucking and logistics freeway linking the greater Los Angeles basin with the High Desert. June 2016, the Final EIS / EIR has been approved. The 63-mile multi-modal link between the Victor and Antelope valleys will address current and future regional growth, bolster east-west mobility and improve connections between regional airports and increase efficiency in the movement of goods. The corridor includes several transit components in addition to high-speed rail, including a highway with toll lanes, a bikeway and a solar-generating option.

Future High Speed Train Station Planned Linking Las Vegas and Los Angeles Mid Term Added Value (10-15 Years) XpressWest strategically selected Victorville as the optimal location for their Southern California Station. Its is located within a 30 to 45 min dive of 4-5 million people who live in the Inland Empire, and eastern Los Angeles County. All East / West freeways serving Southern California basin merge with the I-15 south of Victorville, requiring all drivers to pass through Victorville en-route to Las Vegas.

Victorville s Master Plan Long Term Added Value (15-20 Years) Desert Gateway a 10,000 acre master plan for Victorville situated on the I-15 Fwy just north of the towns center and part of the subject site, represents a vision for a new community in the High Desert A city with much potential, Victorville has implemented this plan to foster development and tourism. More mixed use, higher density residential projects are essential to attracting the work force that will lead to diversified economic development. The economies of Southern California and Las Vegas are becoming closely linked. Located between these two metropolitan areas, Victorville is positioned to capitalize. The master plan is intended to guide future opportunities to the benefit of Victorville and its citizens.

Victorville Demographics

The High Desert is gaining distinction with a brand new 1.3 million sft distribution center just approved for development in Apple Valley, near an existing 1 million sft Walmart distribution center less than 5 miles from the subject property. Nearby projects include the E-220 High Desert Corridor linking Palmdale to Victorville. The new freeway will provide east/west link to the Los Angeles region, with empathise on goods movement and access to the Southern California Logistics airport 5 miles to the west. The proposed Xpresswest Bullet Train Station located to the north of the subject property to have a route between the Victor Valley and Las Vegas. Currently under construction to the south of the subject property is the widening and improvement of the Stoddard Wells Rd Off-ramp. APN SIZE ZONING TOPOGRAPHY VISABILTY FEATURES PRICE 0472-061-25 39.57 Acres Medium Density Residential (12 units/acre) 468 potential apartment units Gentle Slope 1600 ft Freeway Frontage New I-15 Fwy Offramp (Stoddard Wells) to be complete 2018 directly south. E-220 Freeway Project (Major East West Corridoor) off ramp located to the north. XpressWest (Los Angeles to Vegas High Speed Train) Station Planned to the north. $1.14 /psft $1,950,000.00