VIADRUS U 22 Manual for boiler operation and installation

Similar documents
HERCULES U 32 Manual for boiler operation and installation

VIADRUS HERCULES U 26 Manual for boiler operation and installation

VIADRUS HERCULES U26 ECO Manual for boiler operation and installation

VIADRUS HERCULES Hercules U U26 AND INSTALLATION

VIADRUS HERCULES U 24 Manual for boiler operation and installation

VIADRUS P7C Manual for boiler operation and installation

HERCULES Gre H e e n rc E u c l o e s T e 2 r 6

UNI. Cast-iron solid fuel boiler. Installation and operating instructions

VIADRUS A0C Manual for boiler operation and installation

Hercules U2 LIGNAT 6

VIADRUS A2C Manual for boiler operation and installation

Installation & Manual. Model T-25

VIADRUS HERCULES ECO Manual for boiler operation and installation

PANTHER P Automatic Boiler Operator's Manual

VI He ADrcules U26 RUS G 350 CALOR SRL -

VIADRUS A0C Manual for boiler operation and installation

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

VIADRUS A0C Manual for boiler operation and installation

Hercu Wle o s o U dp2

PER-EKO type KSW & KSW PLUS Instruction Manual

PELLETS BURNER 15-60kW MOC

MANUAL FOR BOILER OPERATION AND INSTALLATION VIADRUS HERCULES U 24

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

HE H R e C rc U u L le E s S U D 2 U 6

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

SOLID FUEL HEATING UNIT TYPES NPS 35 AND NPS 70 ORIGINAL INSTRUCTION MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID

INSTRUCTION. for installation and operation of solid fuel fireplace

1. Order and Auxiliaries

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

SOLID FUEL RANGE COOKERS TYPE 9105 TYPE 9107 OPERATION & MAINTENANCE MANUAL INSTALLATION MANUAL

1. Contents Principle General information Parts list Assembly Technical drawing... 18

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE

REV.01 /

W W W. A T T A C K. S K

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

FLUIDIZED BED BOILERS

VIADRUS CLAUDIUS K 2 Manual for boiler operation and installation

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17

MANUAL FOR ASSEMBLY OF BOILER VIADRUS G 300

SAEY 92 (TOP) WOOD/COAL

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

CONVENIENCES FEATURES ADVANTAGES APPLICATIONS

KALVIS-2-20, 2-25, 2-30, 2-40

MANUAL. Page 1/44

Operating and installation instructions for Fire Lotus H586

Varde Aura. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

PELLET BURNER PV 350

Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095

Combined boiler. for solid fuel and pellets

TECHNICAL AND OPERATIONAL DOCUMENTATION

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4

version 1.2 Made by NARVI Oy Finland Aito 16 / 20 / 24 / 16 VS / 20 VS / 24 VS Installation, user and maintenance instructions

Operation and maintenance manual. for charging boilers: KSW Alfa, KSW Alfa Plus, KSW Master, KSW Prima

User and maintenance manual

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14

INSTRUCTIONS FOR INSTALLATION AND USE OF ZINO 700,900,1100

SOLID FUEL RANGE COOKER TYPE 9114 TYPE /2016 0

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK

SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100

OSC... INSTRUCTION MANUAL - KITCHEN EXTRACTOR HOOD

SOLID FUEL RANGE COOKER

THE WOOD GASIFYING BOILER ATTACK SLX PROFI / LAMBDA TOUCH INSTRUCTIONS FOR USE

INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE

GUH90 90 cm Canopy Hood

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1

BW Type Solid Fuel Boilers Installation and Maintenance Instructions

V-ZUG Ltd. Range hood. Levante. Operating instructions

IN 900 BIC UK INSTRUCTION MANUAL - KITCHEN EXTRACTOR HOOD

Technical certificate, instruction for installation and use. Sauna heater VIENYBĖ- P K6M ĮST :2003 ГОСТ

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

Owner s Manual. A flame to light up your palate! Table of Contents. Warranty card inside

TERMOCAST MAXI. Cast iron boiler for solid fuel firing. Installation and User Manual

Varde Shape. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

WHE 2.24 / WHE 2.24 FF

AUTOMATIC MODULAR ICE-CUBE MAKER

Instructions for use

Pioneers of heating with biomasses

Operation and installation manual

Instruction manual - GB. Contents

Rocket heater GAMERA

USER MANUAL FOR SOLID FUEL STOVE VOLCANO - 24kW

TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE MANUAL

Installation and Operating Instructions

Cooker Hood Instruction Manual

AUTOMATIC MODULAR ICE-CUBE MAKER WITH VERTICAL EVAPORATOR SYSTEM

VIADRUS K 5 Manual for boiler operation and installation

TABLE OF CONTENTS. Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2

Troubleshooting Guide

Index. Operating Instructions. Installation Instructions

Ladan. Wood gasification boiler. Instruction for use, installation and assembly of boiler.

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

Central heating. Central k W, Central k W SN-EN-9/16

GUH52SD 52 cm GUH75 75 cm Canopy Hood

Transcription:

VIADRUS U 22 Manual for boiler operation and installation GB_2017_14 LP GB_2015_24

Contents page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 3 3 Description... 4 3.1 Construction of the boiler... 4 3.2 Regulating and security elements... 5 4 Placing and installation... 5 4.1 Regulations and instructions... 5 4.2 Placing possibilities... 5 5 Order, delivery and assembly... 7 5.1 Delivery and accessories... 7 5.2 Assembly techniques... 8 5.2.1 Boiler drum installation... 9 5.2.2 Jacket assembly... 10 5.2.2.1 Mounting of the side part of the jacket and the rear part of the jacket... 10 5.2.2.2 Mounting of the upper part of the jacket and control box... 11 5.2.3 Mounting of the draw bar of smoke flap control... 12 5.2.4 Changing the direction of opening of the ash door... 12 5.2.5 Draught controller... 13 5.2.6 Assembly tools for brush... 13 5.2.7 Filling of the heat system with water... 14 6 Putting into operation instructions for a contractual service organization... 14 6.1 Control operation before starting... 14 6.2 Putting the boiler into operation... 14 7 User s boiler service... 14 7.1 Heating up... 15 7.2 Operation... 16 8 Maintenance... 16 9 IMPORTANT NOTICE... 16 10 Instructions for product liquidation after its operating life... 17 11 Warranty and defect liability... 17 12 Product fiche... 18

Dear customer, thank you for buying the general purpose VIADRUS U 22 (LP) boiler and thus showing belief in the company VIADRUS a.s. At first read this operating manual (especially Chapter Nr. 7 User s boiler service and Chapter Nr. 9 Important notice) to get used to a proper usage with your new product from the very beginning. We request to maintain the further mentioned information and particularly to perform the prescribed annual checks by an authorized specialized company by which a long time failure free operation of your boiler - to your and our satisfaction - is secured. The boiler VIADRUS U 22 (LP) is a general purpose cast iron sectional low pressure boiler intended for burning of solid fuels (coal, wood). Burning of other materials such as plastic is unallowable. The boiler VIADRUS U 22 (LP) is not intended for the Czech market. 1 Usage and advantages of the boiler The boiler meet the requirements of heating the family houses, shops, schools, etc. The boiler is produced as hot water with natural and forced circulation of heat water and operational overpressure to 800 kpa (8 bar). Advantages of the boiler: 1. High operating life of cast iron exchanger and all other parts with respect to the quality of used materials. 2. Design approved in the long term. 3. Elaborate production technology on automatic forming lines with consistent and approved quality of the production process (ISO 9001, ISO 14 001). 4. Efficiency of coal burning 75 80 %, efficiency of wood burning 75 %. 5. Simple service and maintenance. 6. Low demandingness for chimney draught 7. Power gradation according to the sections 8. Possibility of boiler transformation of burning of solid fuels to gas or liquid fuels or vice versa. 2 Technical data of the boiler Tab.. 1 Dimensions, technical parameters of the boiler Section number pieces 4 5 6 7 8 9 10 Weight kg 244 277 311 344 377 411 444 Water space volume l 34 38,5 43,1 47,6 52,2 56,8 61,3 Firing chamber volume l 47 60 73 86 99 112 125 Firing chamber depth mm 339 434 529 624 719 814 909 Diameter of smoke socket mm 156 176 Boiler dimensions: - height x width mm 1007 x 545 (version with the box) - depth mm 817 912 1008 1104 1200 1296 1392 Water operating overpressure kpa (bar) 400 (4) Testing water overpressure kpa (bar) 800 (8) Hydraulic loss - See Fig.. 1 Recommended heat water operating temperature C 60-90 Recommended return water C 60 temperature Noise level db Not exceeding the level of 65 db (A) Minimum chimney draught mbar 0,16 0,18 0,20 0,22 0,24 0,26 0,28 Boiler connections - heat water DN 40 Tab.. 2 - returnable water Heat - technical parameters of the boiler at COAL burning (c) granularity 30 60 mm heating value: 26-30 MJ. kg -1 Section number 4 5 6 7 8 9 10 Rated power kw 23,3 29,1 34,9 40,7 46,5 52,3 58,1 Efficiency % 75-80 Orientation fuel consumption kg.h -1 3,95 4,93 5,92 6,9 7,88 8,87 9,85 Heating value MJ. kg -1 28,31 Product of consumption max. 280 C temperature Energy efficiency class C C C B B B B Energy efficiency index 76 78 79 82 82 82 82 Season energy efficiency % 79,0 80,8 82,1 84,7 85,0 84,9 85,1 DN 40 3

Tab.. 3 Heat technical parameters of the boiler at WOOD burning (A) humidity 15-25 % heating value: 12-15 MJ. kg -1 Section number 4 5 6 7 8 9 10 Rated power kw 20 25 30 35 40 45 49 Efficiency % 75 Orientation fuel consumption kg.h -1 6,4 8,0 9,59 11,19 12,79 14,39 15,67 Heating value MJ. kg -1 15,01 Product of consumption temperature C max. 320 Energy efficiency class B B A A+ A B A Energy efficiency index 89 92 95 98 94 89 92 Season energy efficiency % 63,6 65,6 67,6 69,7 66,6 63,5 65,5 300 Pa 250 200 150 100 50 0 15 20 25 30 35 40 45 50 55 60 Power in kw Fig.. 1 Hydraulic loss of the boiler drum 3 Description 3.1 Construction of the boiler The main part of the boiler is the cast iron section boiler drum made of grey cast iron according to ČSN 42 2415 or ČSN 42 2420. Pressure parts of the boiler correspond to the demands on solidity according to CSN 07 0240, CSN 07 0245. The boiler drum consists of sections with the help of pressured boiler nipples and is secured with boiler screws. The sections create burning and ash space, water space and a convective part. Heat water input and output are situated at the back part of the boiler. The back section of the boiler has a smoky chimney pot and a heat water flange in the upper part, and a returnable water flange with a socket for impregnating and clearing plug. Stoker and ash door and a firebox door under them are fixed to the front section. The whole boiler drum is isolated with a stifling, mineral isolation that reduces losses by sharing heat into the surroundings. The steel jacket is fitted in colour with a quality comaxite paint. 1. Boiler drum complete with valves 2. Complete boiler jacket according to the given size 3. Heating water flange 4. Return water flange 5. Tow bar 6. Slant bushing 7. Suspension pin 8. Sealing Ø 90 x 60 x 3 9. Choker screw 10. Label of smoke flap control 11. Plastic ball M10 12. Control box 13. Thermomanometer 14. Bushing HEYCO 15. Washer 6,4 16. Screw M5 x 12 17. Connecting plug 18. Ash-pan 19. Washer 10,5 20. Nut M10 21. Spring clip 22. Lock 2,5 x 32 23. Fig.. 2 Assembly of VIADRUS U 22 boiler with the box 4

3.2 Regulating and security elements The smoky flap of the smoky chimney pot regulates the climb of the product of consumption from the boiler to the chimney. It is regulated with the handle with a rod in the upper left part of the boiler next to the stoker hole. Stifling of the ash door regulates the inflow of the combustion air under the grate of the boiler. It is regulated by the draught governor or manually with an adjusting screw of the stifling. The air rose of the stoker door serves for carrying the secondary air to the burning space. To control the rose it is necessary with respect to the higher surface temperature of the stoker door to use an instrument that is part of the delivered tools. The cleaning cover of the smoky chimney pot located in its bottom part serves for cleaning the embedded waste product caused by burning. A thermomanometer in the control box serves as an associated device for measuring the temperature of the heat water and water pressure in the heat system. The sump of the thermomanometer sensor is located in the upper part of the back boiler section. 4 Placing and installation 4.1 Regulations and instructions The boiler for solid fuels can be installed by a company with a valid authorization to perform its installation and maintenance. For installation a project in accordance with valid regulations must be executed. The heating system must be filled with water, that meets the ČSN 07 7401 requirements, especially its harness must not exceed the required parameters. Tab.. 4 Recommended values Hardness mmol/l 1 Ca 2+ mmol/l 0,3 Concentration of total Fe + Mn mg/l (0,3)* *) recommended value WARNING!!! The use of anti-freeze mixture is not recommended by the manufacturer. a) to the heating system ČSN 06 0310 Heating systems in buildings Designing and installation ČSN 06 0830 Heating systems in buildings protecting device CSN 07 0240 Warm water and low-pressure steam boilers. Basic regulations CSN 07 0245 Warm water and low-pressure steam boilers. Warm water boilers with output up to 50 kw. Technical requirements. Testing. ČSN 07 7401 Water and steam for thermal energy equipments with working pressure up to 8 MPa. b) to the chimney ČSN 73 4201 Chimneys and flue gas ducting designing, implementation and connection of fuel consumers. c) regarding the fire regulations ČSN 06 1008 Fire safety of heat installations. EN 13501-1 +A1 Fire classification of construction products and building elements Part 1: Classification using test data from reaction to fire tests d) to the system of HWS heating ČSN 06 0320 Heating systems in buildings Hot water preparation Designing and planning ČSN 06 0830 Heating systems in buildings Safety devices. ČSN 75 5409 Water installations inside buildings. 4.2 Placing possibilities Boiler positioning in the living space (including corridors) is prohibited! The installation of the boiler must comply with all requirements of ČSN 06 1008. Boiler placing with regard to fire regulations: 1. Placing on floor of flame resistant material (Fig.. 3) - boiler to be put on a flame resistant backing exceeding the boiler platform over 20 mm at sides and only on the boiler drum depth. - if the boiler is situated in a cellar we recommend to place it on a bedding of minimum 50 mm height. 2. A safe distance from the combustible materials: - when installing and operating the boiler it is necessary to keep a safety distance of 200 mm from the materials of combustibility grade A1, A2, B and C (D); - for easily combustible materials of combustibility grade E (F), which quickly burn and burn themselves even after removal of ignition source (such as paper, cardboard, asphalt and tar paper, wood and wood-fiber boards, plastics, floor coverings) the safe distance has to be doubled, i.e. to 400 mm; - safe distance should be doubled as bulb where the grade of reaction to fire has not been proved. 5

Fig.. 3 Section number 4 5 6 7 8 9 10 A [mm] 550 645 740 835 930 835 930 Bedding dimensions Tab.. 5 Grade of reaction to fire Grade of reaction to fire Examples of building materials and products included in the reaction to fire (Extract from EN 13 501-1 + A1) A1 incombustible Granite, sandstone, concrete, bricks, ceramic tiles, mortars, fireproof plasters, A2 combustible with difficulty acumin, izumin, heraklit, lignos, boards and basalt felt, fibreglass boards,... B hardly combustible Beech and oak wood, hobrex boards, plywood, werzalit, umakart, sirkolit,... C (D) medium combustible Pinewood, larch, whitewood, chipboard and cork boards, rubber flooring,... E (F) easily combustible Asphaltboard, fibreboards, cellulose materials, polyurethane, polystyrene, polyethylene, PVC, The boiler placing with respect to the necessary handling space: - basic surroundings of AA5/AB5 according to ČSN 33 2000-1 ed. 2; - handling space of minimum 1000 mm in front of the boiler must be maintained; - a minimum distance of 400 mm between the back part of the boiler and the wall; - to maintain space for access to the back part of the boiler of minimum 400 mm at least from one lateral face; - minimal distance from the wall at the left side of boiler is 100 mm. In a case of modification with left opening of the door, the distance from the wall must be bigger because of door opening in sufficient action range. Fig.. 4 Modifications of ash door opening Fuel placing: - it is disallowed to store fuel behind the boiler or to unload it beside the boiler in the distance smaller than 400 mm; - it is disallowed to store fuel between two boilers in a boiler room; - the producer recommends to keep distance of minimum 1000 mm between the boiler and fuel or to place the fuel to a another room than that where the boiler is installed. Fig.. 5 6 Boiler placing in a boiler room

5 Order, delivery and assembly 5.1 Delivery and accessories The boiler is covered in the transfer packing and must not be turned over during the transit, only a declination into sides for taking down of the boiler drum packing is allowed. The accessories are stored inside the boiler drum and is available after opening the stoker hole. Standard accessories for the VIADRUS U 22 boiler: boiler on a pallet, with an adequate number of sections - flange of heat water DN 40 1 pc - flange of returnable water DN 40 1 pc - sealing φ 90 x 60 x 3 2 pcs - washer 10,5 8 pcs - nut M10 8 pcs - impregnating and clearing plug Js 1/2 1 pc - well of thermostat 1 pc - capillary spring 1 pc - corrugated spring 1 pc - draught regulator complete 1 pc - closure Js 6/4 1 pc - sealing φ 60 x 48 x 2 1 pc the shell, adequately sized. incl. insulation - console 1 assembly 2 pcs - console 2 assembly 2 pcs - washer 10,5 4 pcs - nut M10 4 pcs - connecting plug 4 pcs - bushing HEYCO SB 625 8 1 pcs - oblique bushing 1 pcs - straight bushing 10 pcs - rubber stopper 6 pc - screw M5 x 12 4 pcs - washer 6,4 4 pcs - screw into metal ST 4,2 x 9,5 6 pcs - spring clip 4 pc - thermomanometer 1 pc - blind flanges 15,9 3 pcs - blind flanges 19 1 pc control box 1 pc - upper part of the control box 1 pc - lower part of the control box 1 pc - screw M5 x 12 4 pcs - screw ST 4,2 x 9,5 4 pcs - serrated washer 5,3 4 pcs - large bushing 57,2 1 pc - screw M5 x 10 4 pcs - fan-shaped washer 5 4 pcs - screw M5 x 20 2 pcs - serrated washer 5,3 2 pcs - nut M5 2 pcs - screw M4 x 10 4 pcs - washer 4,2 4 pcs - nut M4 4 pcs rod 1 pc - control mechanism lever 1 pc - split pin 2,5 x 32 1 pc - plastic ball M10 1 pc control label of the smoky flap 1 pc stifling screw 1 pc cleaning tools - hook 1 pc - brush with shaft 1 pc - point 1 pc - holder for cleaning tools 1 pc operating key 1 pc commercial& technical documentation 7

5.2 Assembly techniques Section number 4 5 6 7 8 9 10 L 764 860 956 1052 1148 1244 1340 L1 778 874 970 1066 1162 1258 1354 Fig.. 6 Connecting dimensions of VIADRUS U 22 boiler with the control box Every heat source in an open heat system must be connected with an open expansion tank positioned at the highest point of the heat system. The expansion tanks must be rated in the way that they can contain the changes in water volume resulting from heating and cooling. The open expansion tanks must be equipped with non-closable bleeder and a overflow pipes. The overflow pipe must be designed in the way that it safely drains off the maximum flow volume entering the system. This can be achieved by rating the overflow pipes by one DN higher than that of the filling piping. The expansion tanks and their connecting pipes must be designed and positioned in the way that freezing is reliably inhibited. 1 Heat source 2 Expansion tank 3 Safety piping 4 Expansion piping 5 Overflow piping 6 Filling piping 7 Water level limiter 8 Reverse piping Fig.. 7 The examples of open expansion tanks connection 8

5.2.1 Boiler drum installation 1. Put the boiler drum on an embedding. 2. Put a sealing φ 90 x 60 x 3 on the upper flange part of the back section and fix the flange DN 50. 3. Put a sealing φ 90 x 60 x 3 on the bottom flange part of the back section and fix the flange DN 50. 4. Screw the well of thermostat into the hole in the top part of the rear section. 1 Check valve for the manometer 2 Well of thermostat Fig.. 8 5. To put the stove pipe to the smoky chimney - pot and penetrate it into the chimney hole. 6. To screw the draught controller to the hole in the upper part of the front section. 7. Hole with a Js 6/4 thread in the front section to blind with Js 6/4 closure. Insert the sealing φ 60 x 48 x 2 under the plug. 1. Sealing φ 90 x 60 x 3 2. Heating water flange 3. Washer10,5 4. Nut M10 5. Sealing φ 90 x 60 x 3 6. Return water flange 7. Washer 10,5 8. Nut M10 Fig.. 9 Boiler drum installation 9

5.2.2 Jacket assembly 5.2.2.1 Mounting of the side part of the jacket and the rear part of the jacket 1. Remove the jackets from the cardboard cover. 2. Put the consoles 1 (1) and 2 (4) on the thread of the right upper anchor screw and screw them by means of two nuts M10 (6) and two washers 10,5 (5). 3. Put the consoles 1 (1) and 2 (4) on the thread of the left upper anchor screw and screw them by means of two nuts M10 (6) and two washers 10,5 (5). 1. Console 1 assembly 2. Washer 10,5 3. Nut M10 4. Console 2 assembly 5. Washer 10,5 6. Nut M10 Fig.. 10 Assembly of jacket consoles 4. Mount two connecting plugs (2) on the right side part of the jacket (1) and then insert the insulation see Fig.. 11. Put the jacket on the lower anchor bolts and connect upper part with consoles 1 and 2 by means of two screws M5 x12 plus two washers 6,4. 1. Side part of the jacket 2. Connecting plug 1. Side part of the jacket 2. Bushing HEYCO 3. Slant bushing 4. Draw bar of the smoke flap control 5. Connecting plug Fig.. 11 Right side part of the jacket Fig.. 12 Left side part of the jacket 5. Mount two connecting plugs (5), into the left side part of the jacket (1), insert the bushings (2, 3), then insert the draw bar of the smoke flap control (4) and the insulation see Fig.. 12. Put the jacket on the lower anchor bolts and connect the upper part with consoles 1 and 2 by means of two screws M5 x12 and two washers 6,4. 6. Mount the insulation of the rear part of the jacket (9 Fig.. 15) and screw to the side parts of the jacket by means of screws ST 4,2 x 9,5 (10 Fig.. 15). 10

5.2.2.2 Mounting of the upper part of the jacket and control box 1. Insert the bushing (3) to the lower part of the control box (2). 2. Insert the thermomanometer and slip the capillaries through the bushing in the lower part of the control box. Insert the thermometer sensors into the thermometer well and screw the manometer sensor into the manometer well (Fig.. 8). 3. By means of 4 pcs screws M5 x 12 (5), 4 pcs serrated washers 5,3 screw the lower part of the control box to the upper part of the jacket. 4. Put a holder for cleaning tools on the side part of the jacket (11 - Fig.. 15). 5. Insert the insulation into the upper part of the jacket and put the whole assembly on the boiler. 6. Put and screw the upper part of the control box (5) by means of 4 pcs screws ST 4,2 x 9,5 (5) (see Fig.. 13) 7. Complete the smoke flap control according to chap.. 5.2.3. 1. Upper part of the control box 2. Lower part of the control box 3. Bushing 4. Thermomanometer 5. Screw ST 4,2 x 9,5 1. Upper part of the jacket 2. Spring clip Fig.. 13 Mounting of the control box Fig.. 14 Upper part of the jacket 1. Right side part of the jacket 2. Screw M5 x 12 3. Washer 5,3 4. Left side part of the jacket 5. Screw M5 x 12 6. Washer 5,3 7. Upper part of the jacket 8. Thermomanometer 9. Rear part of the jacket 10. Screw ST 4,2 x 9,5 11. Holder for cleaning tools 12. Control box 13. Serrated washer 5,3 14. Screw M5 x 12 15. VIADRUS logo Fig.. 15 Jacket assembly of the boiler 11

5.2.3 Mounting of the draw bar of smoke flap control 1. Complete the smoke flap control according to Fig.. 1. 2. Fasten the smoke flap control draw bar (2) to the smoke flap (1) by means of lock 2,5 x 32 (3). 3. Screw the plastic ball M10 (4) to the front part of the draw bar 4. Stick the label of smoke flap control (8). 1. Smoke adapter with the smoke flap 2. Smoke flap control draw bar 3. Lock 2,5 x 32 4. Plastic ball M10 5. Screw of choker 6. Suspension plug 7. Draught controller 8. Label of smoke flap control Fig.. 16 Smoke flap control 5.2.4 Changing the direction of opening of the ash door 1. Remove the ash door (1) by pulling 2 door pins (5). 2. Pull the pin 8 x 40 (3) and the latch (2) out from the ash door and mount them on the right side of the door. 3. Dismount the cover plate 2 (17) by unscrewing 2 screws M8 x 16 (19) with the washers 8,4 (18) and mount them in the inversed manner on the left side of the door (see Fig. 18). 4. Dismount the cover plate 1 (4) by unscrewing 2 screws M8 x 16 (7) with the washers 8,4 (6) and 4 screws M6 x 10 (9) with the washers 6,4 (8). 5. Remove the support for the latch (9) by unscrewing 2 screws M8 x 12 (8) and mount on the right side of the boiler. 6. Dismount the upper shell stiffener (10) by unscrewing 1 screw M8 x 16 (14) with the washer 8,4 (13) and 2 screws M6 x 10 (12) with the washers 6,4 (11) and mount on the right side of the boiler. Mount the lower shell stiffener in the same manner. 7. Mount the cover plate 1 (4) in the inversed manner on the left side of the boiler. 8. Mount the ash door on the cover plate 1 (4) and secure with two door pins (5). 12

1 Ash door 2 Latch 3 Pin 8 x 40 4 Cover plate 1 5 Door pin 6 Washer 8,4 7 Screw M8 x 16 8 Washer 6,4 9 Screw M6 x 10 10 Shel stiffener 11 Washer 6,4 12 Screw M6 x 10 13 Washer 8,4 14 Screw M8 x 16 15 Latch support 16 Screw M8 x 10 17 Cover plate 2 18 Washer 8,4 19 Screw M8 x 16 Fig.. 17 Changing the direction of opening of the ash door Fig.. 18 Left-hand door 5.2.5 Draught controller The instructions for the draught controller setting are given in the manual attached to the particular controller. 5.2.6 Assembly tools for brush Use the leather gloves and common assembly tools for mounting or dismounting of the brush and the spike point (if they are included in the delivery). 13

5.2.7 Filling of the heat system with water Water for filling of the boiler and the heat system must be pure and colourless, without suspended substances, oil and chemically aggressive substances. Its hardness must correspond to ČSN 07 7401 and in case it does not correspond it is necessary the water to be adjusted. Even multiplying heating of the water with higher hardness does not prevent from excluding of soils on the boiler drum walls. The precipitation of 1 mm of limestone reduces in the given place the heat transfer from metal to water by 10 %. Heat systems with an open expansive tank allow direct contact of the heat water with atmosphere. In the heat period the expansive water in the tank absorbs oxygen that increases the rust effects and at the same time a considerable vaporization of water occurs. Only water adjusted to values according to ČSN 07 7401 can be used for fill up. The heat system is needed to be rinsed so as all impurities have been washed out. During heat period it is necessary to keep consistent water volume in the heat system. While filling up of the heat system with water it is necessary to prevent the air from leeching onto the system. The water from boiler and heat system must never be impregnated or taken out for use except for cases necessarily needed such as repairs, etc. By draining the water and filling with new one the risk of rust and scale creation is increased. If it is needed to fill water into the heat system we fill it only to a cooled down boiler to prevent section cracking. After filling of the boiler and heat system checking of tightness of all joints is needed. The finishing of assembly and the heat test performance must be recorded in the warranty card. 6 Putting into operation instructions for a contractual service organization Putting the boiler into operation can be performed only by a contractual service organization authorized for performing of this operation. 6.1 Control operation before starting Before starting the boiler it is needed to check: a) filling the heat system with water (thermomanometer check) and system tightness. b) connection to chimney this connection can be performed only with consent of a relevant chimney company according to ČSN 73 4201. 6.2 Putting the boiler into operation 1. Performance of fire in the boiler. 2. Setting the boiler on the necessary operating temperature. The recommended temperature of the output water is 80 C. 3. Adjustment of the draught controller chainlet length (according to the enclosed draught controller instruction). 4. Operating of the boiler in the operating condition according to the competent standards. 5. Repeatedly check the boiler tightness. 6. Introduction of the user with servicing. 7. Making a record into the Warranty card. 7 User s boiler service Incorrect operation and improper combustion of fuel leads to damage to the product. During the first ignition of the cold boiler, water condenses therein and then flows down its inner walls. This condensation of the boiler body ends when the boiler reaches operating temperature. During the operation of the boiler at the temperature lower than 60 C, condensing of water on the boiler body or the so called low temperature corrosion can take, which shortens the life of the boiler exchanger. Therefore we recommend to operate the boiler at 60 C and higher. WOOD Guarantee of clean and good combustion is to use only dry and wood in the natural state. It is necessary to keep the wood max. humidity 20%. If the humidity is higher than 20%, output of the boiler decreases. Combustion of the damp wood releases water which condenses on the walls of the boiler and chimney body, this leads to an increased formation of tar and water vapor, which reduces the life of the heat exchanger. Furthermore, improper combustion causes corrosion of cast iron called "Metal dusting", which leads to carbon diffusion into the material, and thus disintegration of the material to a powder (dust). This process is gradual and long-term. Flue gas stream with solid particles then causes abrasion or erosion of material from the surface, thereby gradually thinning the wall thickness of the elements, and this can cause perforation of the boiler body. Fuel must be stored in a dry place. For heating, do not use plastics, household waste, chemically treated wood residues, waste paper, wood chips, brushwood, garbage from boards pressed from the bark or chipboards. Follow the instructions for operating the boiler. When operating the boiler follow the recommended operating temperature. Operate the boiler with an approved fuel. Tab.. 6 Recommended dimensions of wooden logs Section number 4 5 6 7 8 9 10 Log average [mm] φ 40 to 100 Log length [mm] 270 360 450 540 630 720 810 Cleaning of the grate is performed so as the hot fuel would not get through to the ashtray. 14

Other sorts of wood such as wood clips, wood shavings, sawdust, granules or coal cakes can be used as additional fuel. In case of heating with smaller clogs (wood clips, wood shavings, sawdust, granules) it is necessary to put logs in the bottom part of the burning chamber so as the fuel would not get through to the ashtray. It is possible to reach smoother burning by further interlaying of the fuel. These sorts of fuel must have heating power in the range of 12 to 15 MJ.kg -1 and humidity to 20 % to prevent from reducing of the mentioned boiler power. COAL In case of sufficient chimney draught (0,15 to 0,25 mbar), also free-burning coal with the granularity of 30 50 mm (so called "nut 1") and the granularity of 50 80 mm (so called "cobbles") may be combusted. 7.1 Heating up 1. Check the water volume in the heat system on the thermomanometer. 2. Open the closing armatures between the boiler and the heat system. 3. Clean out the grate, ashtray, smoky channels and boiler walls. 4. Spread out the kindling through the ash door with the stoker hole on a cleaned grate along its entire depth. 5. Set the smoky flap in the chimney pot to position open and close the stoker door. 6. Set the kindling afire through open ash door and stoker door. 7. Close the stoker hole and ash door and fully open the stifling 8. Thinner layout of the basic fuel to be put up on the burning wood. 9. After its good burning up more fuel to be put up to the bottom part of the stoker hole, the fuel to be stacked to a uniform layout along its entire boiler depth. 10. As soon as the fuel grades to a dark red flame the air rose of the secondary air input on the stoker hole to be opened with an instrument. 11. After flames become yellow the air rose of the secondary air input to be closed. The manufacturer recommends to heat by combustion from above. This method is more difficult, but more effective. Coal fired from above heats the below situated fuel, and its gasification proceeds. Incurred flammable gases will burn off, and as a result the heat arises, which influences increase of effectiveness. Flame is decreased during combustion unless only cocked coal remains, which combustion will ensure several-hours operation of the boiler. This method of combustion increases constant heat-ability, decreases consumption of fuel, and mainly decreases emissions of pollutants into the atmosphere. 1. Pour coal to the empty fire-grate of the boiler approximately to the half-high of the heating chamber. 2. Put rough pieces of wood to the coal to the high about 5 cm so that the coal is fully covered. Put to the middle on it one more layer of narrower pieces of wood (Ø 1 cm) 3. Further place a kindling on the wood (fine chippings, straw, paper). 4. Close the ash-pan door. Lightly open the throttle valves by means of the throttle screw approximately on 1 cm. 5. Open the air rosette on the stocking door. 6. Fire the kindling and close the stocking door. 7. If the boiler is equipped with a draught regulator, set temperature to 60 C. 8. When the kindling begins to burn, you can let the boiler spontaneously burn. However, while first several burning-up, we recommend you to stay near the boiler, unless you are sure that the boiler is really burning. In case that the boiler stops to burn, it is necessary to open lightly the throttle valve. 9. During first 30 min. you can see smoke from the chimney, but it will be in smaller quantity than during typical burning. Coal will burn slower and with less intensiveness; temperature will increase slower but it is a normal phenomenon. As soon as a burning layer arises, white smoke begins to decrease. 10. As soon as the fuel passes to dark-red glow, it is necessary to close the throttle valve by about 1-2 mm and close the rosette of the stocking door. 11. From this time you can let the boiler burn. It is not necessary to go to the boiler room; we don t recommend poking the fire-grate, the whole fuel will burn off. Fig.. 19 Although burning from above is not cyclical, there is a method how to reach it. One from the possibilities is a repeated heat-up with using of remnants of the glowing fuel from the previous burning. It is far simpler method; however we have to proceed very carefully. Glowing fuel releases CO, that s why it is necessary to store it in the ash-pan for the period of repeated filling of the boiler by fuel. It is necessary to observe personal safety and use protective equipment. 1. Estimate a correct moment, when the boiler begins to burn out, but there are about 2 shovels of glowing carbon pieces on the fire-grate. Even if there are only few glowing carbon pieces, it is far simpler to burn up the warmed-up boiler. 2. Shove ash by proving tools. In case that there is only little ash, leave it on the fire-grate. 3. Pick carbon pieces from the fire-grate and put them into the ash-pan. 4. Add new fuel to the combustion chamber, put wood and kindling overhead. 5. Take out glowing carbon pieces from the ash-pan and pour above new fuel. If you carry out steps 3 and 4 quickly enough, there wouldn t be necessary to burn-up the boiler again. The fuel will start to burn from carbon pieces. 15

The frequency of stocking depends on the weather, the boiler output and the fuel heating power. Provided the boiler output is correctly rated for the sizes of the heated premises, then necessity of heating-up at temperature of -20 C shouldn t be higher than twice a day at the full stocking. During first heats-up from above, we recommend to use less quantity of fuel in order to avoid overheating of the boiler in case of any problems. Afterwards you can increase fuel quantity up to the bottom edge of the stocking door. Fuel quantity has to be fitted to actual needs. For example, if at temperature about 0 C, you stocked the boiler by fuel on 1/3, and the time of burning was 6 hours, but you needed 12 h, it is necessary to stock the boiler on 2/3, and in the same way if the surrounding temperature begins to decrease. The best effect of burning can be reached if you let the whole stock burn-off without additional stocking. However, it is not easy to estimate needed quantity of the fuel according to actual atmospheric conditions, and small quantity of coal could be additionally stocked. 7.2 Operation 1. After reaching the heat water temperature the burning air input to be adjusted. The boiler power in rough limits is regulated with a chimney draught change with a help of the smoky flap in the chimney pot. Smooth power regulation is performed by a stifling by which the air output under the grate is regulated, either manually or with a help of draught controller. The draught controller to be adjusted so as the stifling in the ash door is almost closed at the time when the heat water required temperature is reached. 2. According to heat needs and burning intensity the boiler is needed to be supplied with fuel during the operation. Feeding the fire so as the fuel layout was equally high along the entire boiler depth. 3. When using the coal it is necessary the air rose of the secondary air input in the stoker hole to be partly opened for the whole time of the build up of gases and flames out of freshly fed fuel (the air rose of the secondary air input with regard to the surface temperature is necessary to be controlled with an instrument. 4. At change over to night still operation the grate to be cleaned out, the freshly fuel to be let well burnt up and then the boiler power to be suppressed by throttling of the chimney draught with chimney flap in the chimney pot and by turning down the air rose of the secondary air input. The smoky flap and air rose opening level is necessary to be tried out, it is always necessary to make sure that the product of consumption did not get away to the boiler room. In this case the draught controller to be disconnected. 5. The morning boiler operation reconditioning to be performed by opening of the smoky flap and air rose and with grate raking after opening the ash door. 6. The ash door must be during the operation permanently closed. 7. The ashtray to be emptied according to needs (gloves need to be used). 8 Maintenance 1. The ash from the ashtray to be emptied during the operation of the boiler even several times per day according to the sort of used fuel because a full ashtray hampers the right distribution of the burning air under the fuel and causes unequal burning process of fuel on the grate. All remains in the firebox especially the clinker are removed before each new burning up and at morning boiler operation reconditioning. The ash is needed to be put away into the fire resistant tanks with a cover. It is necessary to use protective facilitations and to pay attention to personal safety while operating. 2. The boiler walls inside the firebox, smoky boiler draughts and smoky chimney pot to be cleaned 1x per week if heating with coal. 3. If there is a settlement of tar silt on the walls of the burning space while using fuels with higher gas build up it can be removed with a scraper or by burning out with a help of dry wood when setting the boiler to the maximum operating temperature. 9 IMPORTANT NOTICE 1. The boiler VIADRUS U 22 (LP) is not intended for the Czech market. 2. The boiler only can be used for the purpose that it is destined for. 3. The boiler must be operated only by adults who are introduced to these operating instructions. It is unallowable to let children at the boiler unattended of adults. Interventions into the boiler design that could threaten the health of the operating staff, eventually the inmates, are disallowed. 4. The boiler is not destined for the use by persons (incl. children) whose physical, sensual or mental disability or lack of experience and knowledge prevent them from a safe use of the appliance unless they are supervised or if they were not instructed on the use of appliance by a person responsible for their safety. 5. Children should be supervised in order to ensure that they do not play with the appliance. 6. If there is a risk of rise and getting away of flammable steams or gas into the boiler room or at operations by which there is an intermediate risk of fire or blast (sticking of floor coverings, paintings with flammable colours), the boiler must be disabled from operation before the beginning of operations. 7. Using of flammable liquids is DISALLOWED for firing the boiler. 8. It is DISALLOWED to overheat the boiler during its operation. 9. Objects of flammable materials must not be put on the boiler and to a distance smaller than that of a safety distance from it 10. Flammable materials must not be in the minimal distance of 1500 mm from the boiler when emptying the ash at the boiler. 11. The space at the point of choking valve rotation of the ashtray door must be cleaned in case of clogging with fuel, ashes or other impurities in order to avoid its rubbing thus wrong functioning. 12. When the boiler operates at a lower temperature than of 60 C the retting, or the so called low temperature rust, of the boiler drum may occur that reduces the operating life of the boiler drum. Therefore we recommend to operate the boiler at a temperature of 60 C or higher. 13. After finishing of the heating period it is necessary to properly clean the boiler, smoke stack and chimney pot. The fulcrum pin, smoky flap mechanism and other movable parts to be covered with graphite grease. And the boiler room to be kept clean and dry. 14. In case the heating system is not daily used in winter season, then the water from boiler must be drained. 15. It is necessary to install a safety valve for maximum overpressure of 400 kpa (4 bar) on the system and its dimension must correspond to the rated boiler output. The safety valve must be located directly behind the boiler. Any stop valve must not be located between the safety valve and boiler. If you have any questions, please contact our contractual assembly firm and service organizations. 16. During assembly, installation and operation of the appliance it is necessary to comply with standards that apply in the relevant country of destination. If you fail to meet these conditions you cannot requisite the guarantee repairs. 16

10 Instructions for product liquidation after its operating life VIADRUS a.s. is contractual partner of firm EKO KOM a.s. with client number F00120649. The packages comply with EN 13427. With respect to the fact that the product is designed out of common materials the individual parts are recommended to be liquidated in the following manner: - exchanger (grey cast iron), by a company engaged in salvage and liquidation of waste - tube distributions, jacketing, by a company engaged in salvage and liquidation of waste - other metal parts, by a company engaged in salvage and liquidation of waste - sealing materials in common waste We recommend to dispose the packages in the following way: - plastic foil, cardboard cover, use a salvage point - metal strapping tape, use a salvage point - wooden base, is designated for a single usage and no longer can be used as a product. Its disposal is subject to Act. 477/ 2001 Sb. a 185/2001 Coll. as amended. In case that the product has lost its manufacture qualities there can be taken the advantage of product taking back (if this is established), in case that the originator has declared that this is a waste and it must be handled according to the valid legislation of the relevant country. 11 Warranty and defect liability VIADRUS a.s. provides the basic guarantee period during 24 months from the sell-by date, but not longer than 30 months from the dispatch date of the product from the production plant. The condition for validity of the guarantee is observation of instructions for mounting, mainly as following: Connection according to the schemes of the manufacturer by a qualified supply or mounting company with a valid mounting certificate. Commissioning the product by a service company with a valid service certificate. Observation of instructions specified in the Service and Installation Manual for the boiler. Performance of regular inspections given by the manufacturer by a service company with a valid service certificate. Evidencing all records about fulfilled guarantee and after-guarantee repairs and about performance of regular annual checks of the boiler in the amendment to the guarantee card of this manual. Usage of original spare parts supplied by the manufacturer. Sending information to the manufacturer about commissioning the boiler (this information is to be sent by the end user a consumer). Mainly, it is necessary to specify when and by whom the boiler was commissioned, as well as it is necessary to specify a precise address of operation of the boiler. VIADRUS a.s. provides the extended guarantee period for the boiler drum during 60 months from the sell-by date, but not longer than 66 months from the dispatch date of the product from the production plant. The condition for recognition of the extended guarantee period is the following: Observation of the conditions for recognition of the basic guarantee period. Sending information to the manufacturer about commissioning the boiler (this information is to be sent by a service company) Fulfilment of regular service inspections within the range prescribed by the manufacturer, by a service company with a valid service certificate. In case of a claim of the boiler shell, a customer is obliged to present the packaging label of the boiler shell. It is placed on the cardboard box, in which the boiler shell is transported. The user is obliged to order removing defects only to a qualified contractual service organization accredited by the boiler manufacturer VIADRUS a.s., otherwise the guarantee for appropriate function of the boiler would not be valid. Certificate of quality and completeness of the VIADRUS U 22 boiler serves after its fulfilment as a Guarantee certificate. The user is obliged to perform regular maintenance of the boiler. Each notification of defects has to be made immediately after their detection and always in written form and by phone. In case of non-observance of the above mentioned instructions, the guarantee provided by the manufacturer is not admitted. The manufacturer reserves the right for changes performed within innovation of the product, which don t need to be included to this manual. The manufacturer is not liable for possible damages, if the product is not operated in accordance with the conditions specified in this Service manual. The grant does not apply for: - Faults caused by improper assembly and improper attendance of the product and faults caused by improper maintenance see chap. 8; - Faults and damage caused by failure to observe water quality in heating system see chap. no. 4.1 and 5.3.2 or by using the antifreeze mixture; - Faults caused by failure to observe instructions stated in this manual; - Defects caused by a wrong assembly or incorrect operation of the product; - Damage of the product during transfer or other mechanical damage; - Defects caused by improper storage. 17

12 Product fiche VIADRUS HERCULES U 22 4 sect. Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no Fuel Preferred fuel (only one): Other suitable fuel(s): Log wood, moisture content 25 % YES no Chipped wood, moisture content 15-35 % no no Chipped wood, moisture content > 35 % no no Compressed wood in the form of pellets or briquettes no no Sawdust, moisture content 50 % no no Other woody biomass no no Non-woody biomass no no Bituminous coal no YES Brown coal (including briquettes) no no Coke no YES Anthracite no no Blended fossil fuel briquettes no no Other fossil fuel no no Blended biomass (30-70 %) and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel: Seasonal space heating energy efficiency η s [%]: 62 Energy efficiency index EEI: 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output P n 20 kw At rated heat output ƞ n 63,6 % P p kw ƞ p % For solid fuel cogeneration boilers: Auxiliary electricity consumption Electrical efficiency at rated heat output ƞ el, n - % At rated heat output el max - kw el min - kw Of incorporated secondary emission abatement equipment, - kw if applicable In standby mode P SB - kw Contact details VIADRUS a.s. Bezručova 300 Bohumín 735 81 18

VIADRUS HERCULES U 22 5 sect. Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no Fuel Preferred fuel (only one): Other suitable fuel(s): Log wood, moisture content 25 % YES no Chipped wood, moisture content 15-35 % no no Chipped wood, moisture content > 35 % no no Compressed wood in the form of pellets or briquettes no no Sawdust, moisture content 50 % no no Other woody biomass no no Non-woody biomass no no Bituminous coal no YES Brown coal (including briquettes) no no Coke no YES Anthracite no no Blended fossil fuel briquettes no no Other fossil fuel no no Blended biomass (30-70 %) and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel: Seasonal space heating energy efficiency η s [%]: 64 Energy efficiency index EEI: 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output P n 25 kw At rated heat output ƞ n 65,6 % P p kw ƞ p % For solid fuel cogeneration boilers: Auxiliary electricity consumption Electrical efficiency at rated heat output ƞ el, n - % At rated heat output el max - kw el min - kw Of incorporated secondary emission abatement equipment, - kw if applicable In standby mode P SB - kw Contact details VIADRUS a.s. Bezručova 300 Bohumín 735 81 19

VIADRUS HERCULES U 22 6 sect. Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no Fuel Preferred fuel (only one): Other suitable fuel(s): Log wood, moisture content 25 % YES no Chipped wood, moisture content 15-35 % no no Chipped wood, moisture content > 35 % no no Compressed wood in the form of pellets or briquettes no no Sawdust, moisture content 50 % no no Other woody biomass no no Non-woody biomass no no Bituminous coal no YES Brown coal (including briquettes) no no Coke no YES Anthracite no no Blended fossil fuel briquettes no no Other fossil fuel no no Blended biomass (30-70 %) and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel: Seasonal space heating energy efficiency η s [%]: 66 Energy efficiency index EEI: 95 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output P n 30 kw At rated heat output ƞ n 67,6 % P p kw ƞ p % For solid fuel cogeneration boilers: Auxiliary electricity consumption Electrical efficiency at rated heat output ƞ el, n - % At rated heat output el max - kw el min - kw Of incorporated secondary emission abatement equipment, - kw if applicable In standby mode P SB - kw Contact details VIADRUS a.s. Bezručova 300 Bohumín 735 81 20

VIADRUS HERCULES U 22 7 sect. Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no Fuel Preferred fuel (only one): Other suitable fuel(s): Log wood, moisture content 25 % YES no Chipped wood, moisture content 15-35 % no no Chipped wood, moisture content > 35 % no no Compressed wood in the form of pellets or briquettes no no Sawdust, moisture content 50 % no no Other woody biomass no no Non-woody biomass no no Bituminous coal no YES Brown coal (including briquettes) no no Coke no YES Anthracite no no Blended fossil fuel briquettes no no Other fossil fuel no no Blended biomass (30-70 %) and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel: Seasonal space heating energy efficiency η s [%]: 68 Energy efficiency index EEI: 98 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output P n 35 kw At rated heat output ƞ n 69,7 % P p kw ƞ p % For solid fuel cogeneration boilers: Auxiliary electricity consumption Electrical efficiency at rated heat output ƞ el, n - % At rated heat output el max - kw el min - kw Of incorporated secondary emission abatement equipment, - kw if applicable In standby mode P SB - kw Contact details VIADRUS a.s. Bezručova 300 Bohumín 735 81 21

VIADRUS HERCULES U 22 8 sect. Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no Fuel Preferred fuel (only one): Other suitable fuel(s): Log wood, moisture content 25 % YES no Chipped wood, moisture content 15-35 % no no Chipped wood, moisture content > 35 % no no Compressed wood in the form of pellets or briquettes no no Sawdust, moisture content 50 % no no Other woody biomass no no Non-woody biomass no no Bituminous coal no YES Brown coal (including briquettes) no no Coke no YES Anthracite no no Blended fossil fuel briquettes no no Other fossil fuel no no Blended biomass (30-70 %) and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel: Seasonal space heating energy efficiency η s [%]: 65 Energy efficiency index EEI: 94 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output P n 40 kw At rated heat output ƞ n 66,6 % P p kw ƞ p % For solid fuel cogeneration boilers: Auxiliary electricity consumption Electrical efficiency at rated heat output ƞ el, n - % At rated heat output el max - kw el min - kw Of incorporated secondary emission abatement equipment, - kw if applicable In standby mode P SB - kw Contact details VIADRUS a.s. Bezručova 300 Bohumín 735 81 22