UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

Similar documents
Board of Regents SPECIAL MEETING AGENDA AND MATERIAL November 19, 2012

The site to the south of Tanana Loop, east of the Botanical Gardens was evaluated but deemed too small for the array size required.

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

11.0 TRANSPORTATION ELEMENT

Public may provide comments on the GDP within the next two weeks (December 24)

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

CAMPUS MASTER PLAN, AMENDMENTS

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

The transportation system in a community is an

38 Queen s University Campus Master Plan Part 1

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

CAMPUS MASTER PLAN UPDATE

City of Nogales General Plan

Chapter Master Planned Communities (MPC) District

COUNTY COURT HOUSE REDEVELOPMENT AREA PLAN

Figure 1- Site Plan Concept

178 Carruthers Properties Inc.

The University District envisions, in its neighborhood

South fields. Community Architectural Design Guidelines. The Planning Partnership

CITY COUNCIL AGENDA REPORT

Institutional Overlay Zone (IOZ) Regulatory Framework

Stafford County Strategic Plans

U n i v e r s i t y o f A l a s k a A n c h o r a g e C A M P U S FA C I L I T I E S M A S T E R P L A N

Technical Appendix L, University Community Plan Town Center

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

12 February CAMPUS MASTER PLAN UPDATE Focus Group - Wayfinding & Signage

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

ESTABLISH AN EFFICIENT TOWN CENTER

4.1.3 LAND USE CATEGORIES

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Staff Report to the North Ogden City Planning Commission

4.0 Future Land Use Element

Developer s Program. The Station at East 54

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

Agenda. 7 Wright Crescent Urban Design Study. Public Meeting and Urban Design Workshop. 1 INTRODUCTION AND BACKGROUND (City of Kingston)

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

South Davis County COMMUNITY SPOTLIGHT

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

The principal elements of the NTC Strategic Vision plan are as follows.

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

WESTERN ILLINOIS UNIVERSITY

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

Implementation Guide Comprehensive Plan City of Allen

ARLINGTON COUNTY, VIRGINIA

Planned Development Review Revisions (Project No. PLNPCM )

KEIZER STATION PLAN INTRODUCTION

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Right-of-Way Acquisitions and Relocations Technical Memorandum

COMPREHENSIVE PLAN & UNIFIED DEVELOPMENT ORDINANCE

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

Asbury Chapel Subdivision Sketch Plan

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

CITY OF PUYALLUP. Background. Development Services

Draft Memorandum #1: Goals and Vision for Revitalization

Staff Report and Recommendation

Chapter 13: Implementation Plan

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

University of Denver Land Use Plan Update I. Executive Summary

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Pedestrian and Bike Bridge LOGO

Lambeth Main Street Streetscape Improvements

SHEFFIELD PARK Paulding County, GA DRI #588

1 Welcome! UBC Okanagan Master Plan Update - Open House

I615. Westgate Precinct

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

4-Town Comprehensive Plan DRAFT 7/30/07

From: Sent: To: Subject: Zoning: Landscaping:

Commissioners Road West Realignment Environmental Assessment

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

Transportation. Strategies for Action

ULI St. Louis Technical Assistance Panel

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

Overview of the Plan. The Building Blocks of Centers, Neighborhoods and Network INTERNAL DRAFT

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

North York Centre South Service Road

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

1.0 VISION STATEMENT. December 6, PRINCIPLES

Planning Districts INTRODUCTION

6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS 6.1. OBJECTIVES FOR REGIONAL AND COMMUNITY FACILITIES LAND USE DESIGNATIONS

K. SMART ASSOCIATES LIMITED

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

SECTION 1 Introduction...1. SECTION 2 Regional Context Criteria for Planning Districts Description of Planning District...

8implementation. strategies

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Glenborough at Easton Land Use Master Plan

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

Winston-Salem State University Campus Master Plan 2016 Update

Transcription:

UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding the UA Engineering program have been made. In 2007, the UA Board of Regents adopted the Engineering Expansion Initiative with the primary goal the University of Alaska will produce 200 undergraduate trained engineers annually. In 2010, UA hired Ira Fink and Associates, Inc. to provide a summary progress report on the accomplishments made to meet the objectives of the 2007 Engineering Expansion Initiative; an indicator report identifying details of the engineering enrollment, engineering education and engineering employment in the State of Alaska; a summary of projected engineering enrollments and graduates and the resultant need for facilities to meet the Board of Regents goals in engineering education; and a statement of the importance that engineers have in the economy of the State of Alaska and the role that the University of Alaska has in assisting in meeting the demand for engineering employment in the State. In September of 2011 we submitted and you approved a Master Plan amendment for the Engineering Building location. The purpose of this master plan amendment is to address the Parking Garage, which is part of the Engineering Building project, and its connection to the main campus. This amendment refers to the 2004 Plan as updated in 2009 with the Amendments for the Health Science District, the Sports and Housing District and the Engineering and Industrial Building Ph 1. Although the 2009 Campus Master Plan Update (not adopted) included the sites under consideration for future parking, a Traffic analysis was part of locating this specific garage. Increasing density for the campus core, moving parking to the periphery and connecting the campus with spine connections are themes that are carried forward from the 2009 Campus Master Plan Update and this amendment. 2. Site Consideration: Multiple sites (10) were considered as possible sites for the new Engineering Parking Garage. See Figure 1. The project team did traffic analysis of all sites. In order to evaluate each site s appropriateness for this project, the entire precinct around the proposed sites was studied to identify the traffic flow of the area and the appropriateness to engineering. Site selection criteria was developed and used for considering characteristics of the sites.

Thesee criteria are: Master Plan Goal Adherence Reflected in two criteria: Reduce Core Traffic Demonstrates the effectiveness off the site to lessen vehicular traffic in central campus to improve safety and the pedestrian environment. Periphery Parking Considers the degree to which parking is shifted to the edges of campus. Consistent with Master Plan Use Evaluatess whether a parking structure at the site is consistent with the long term land use for that location put forth in the master plan. Existing Demand Reflects the effectiveness s of serving parking needs. Proximity Considers the walkability from the parking structure to likely destinations. Boundary Access Evaluates the ease of access and capacity of primary campus access points from periphery roadways. Campus Circulation Considers the distancee and ease off travel on campus roadways between the parking structure and the roadway network. Though this parking structure is being built primarilyy to meet the additional parking demand generated by the new School of Engineering (SoE) building, the structure will not be limited to users of the building and will add to the campuss wide parking supply. The utilization of

this parking structure, as with existing parking facilities, will be determined as users select where to park based on proximity, and availability. The Municipality of Anchorage (MOA) Title 21 Code specifies parking be supplied within 800 feet of the proposed SoE building. Since this site selection is more than the prescribed 800 foot walking distance from the front door of the new SoE building, a variance must be sought to justify the location of the parking garage. (An argument can be made that the existing engineering building is part of the engineering complex and students and staff will use this parking structure if they have business in the engineering building or the core of campus.) 3. Description Tract B site is the location that best meets the stated criteria and Master Plan guidance. The key differentiators for the site are: The site will relieve existing campus deficiencies by improving access to the campus from UAA Drive and reducing traffic traveling through central campus. By not displacing existing parking, the Tract B site requires only 475 spaces and reduces the cost of the structure by approximately 20 percent. Site improvements associated with the garage are (based on availability of funding): New driveway connection between Mallard Lane and the Engineering Building service area. Closure/reconfiguration of the Engineering Building maintenance driveway to UAA Drive. A new Spine pedestrian connection to the Engineering Building. Intersection improvements at the Mallard Lane/UAA Drive, Career Center Drive/Mallard Lane, and West Campus Drive/Seawolf Drive intersections. Any required Class C wetlands mitigations. Relocation of the temporary Engineering structures. Mallard Lane realignment and upgrade. This plan meets the spirit, objectives, and intentions of the campus master plan.

Figure 2. Preferred Site 4. Developmen nt Intent The parking garage for the engineering building is part of Engineeringg Phase 1 (New Building, Parking Structure, and Renewal of old building). Funding provided in the FY13 Legislative Capital session ($ $58.6M) will allow for the design completion of the engineering building, the parking garage and the renewal; and the construction of the parking structure and site clearing and utilities for the new engineering building. This development scheme savess the University the cost associated with a temporary parking lot assuming the completion of the parking structure before the opening of the engineering building. 5. Policy Compliance Does this amendment meet the requirements of 05..12.030 B. 1. Projected Enrollment and other factors affecting the need for the Facility and Infrastructure: This amendment allows for the addition of parking required by the Municipality Title 21. The selected site allows for construction of future facilities. 2. General Areas for land acquisition and disposal: No acquisitions or disposalss are envisioned. The project must maintain an 85ft buffer between the adjacent property s house and any construction to the east of the adjacent lot.

3. The general location of new or upgraded infrastructure, including roads, parking, pedestrian circulation, transit circulation and utilities. Parking must conform to Municipality of Anchorage parking requirements Parking demand will require 475 new parking spaces To sustain the parking requirement, and master plan intent, structured parking provides the best use of space and convenient parking Multiple sites were considered on west campus 4. Demolition of buildings, structures and facilities: No building to be demolished The temporary parking lot will not be required since no parking is being impacted with this site selection and it will be constructed ahead of the Engineering facility. 5. General location, size and purpose of new buildings, structures and facilities: Planned growth for this district is shown in the 2009 UAA Campus Master Plan Update on Pages 13, 121 129 2009 2018 Engineering Building, Phase I Health Sciences Phase II Health Sciences Parking Facility and Pedestrian Bridge Honors college and classroom building 2018 2020 Administration, Alumni Relations and Visitor Center Building Student Recreation Center Expansion Engineering Phase II Health Sciences Phase III After 2028 Health Sciences Ph IV Student Life Building Expansion 6. Guidelines for landscaping: Landscaping will comply with the MOA ordinance and the Landscaping and Amenities guidelines of the 2009 UAA Campus Master Plan Update on Pages 30 31, and 37. 7. General locations and intent for open spaces, plazas, etc. There will be a shuttle bus stop, bicycle parking, a trail connection and a spine connection associated with this parking structure. 8. Guidelines for signage, both freestanding and on buildings and structures: Signage will be accomplished in accordance with MOA approved UAA Unified Exterior Sign Plan October 2007. Signage on new facilities must comply with the plan.

9. Architectural guidelines for building, structures and facilities: The parking garage will be built consistent with the 2009 UAA Campus Master Plan Update Architectural Guidelines on Pages 30 31, and 34 35. 10. Environmental and cultural issues, ADA access and Energy conservation: Will comply with the 2009 UAA Campus Master Plan Update guidance on Pages 34 36. Facilities will comply with the law on ADA access. Facilities will incorporate energy efficient lighting 11. The relationship of the campus to its surroundings and coordination with local government land use and ordinances: Will comply with 2009 UAA Campus Master Plan Update Building Siting and Orientation Guidelines on Page 34. The parking garage will be a concrete building with screening on the street side. Its features include: 3 or 4 story structure with stair and elevator access. Interior ramps, low profile energy efficient lighting, metal screening panels, concrete floor and roof, and landscaping. Orientation such as to not shadow neighbors or give views into industrial space. 12. General Priorities for Capital Projects. Projects in this district are discussed in Paragraph 5 above. Campus wide projects are discussed on Pages 121 129 of the 2009 UAA Campus Master Plan Update. 6. Approvals The President recommends that: MOTION The Facilities and Land Management Committee recommends that the Board of Regents approve the Campus Master Plan Amendment request for the University of Alaska Anchorage Engineering Parking Garage as presented. This amendment will be incorporated in the existing 2004 Campus Master Plan. This motion is effective June 8, 2012. POLICY CITATION In accordance with Regents Policy 05.12.030.C.3, a campus plan may be revised or amended from time to time. An amendment to accommodate a proposed specific capital project shall be considered and approved by the board prior to consideration of the proposed capital project.