SET-2000 Oil/Sludge. Alarm Device for Oil Separators. Installation and Operating Instructions

Similar documents
SET-2000 Hi Level/Oil

SET-2000 Oil/Sludge 12 VDC

OilSET Installation and Operating Instructions. Oil Separator Alarm Device

OilSET-1000 (12 VDC)

OilSET Installation and Operating Instructions. Oil Separator Alarm Device with SET/DM3AL sensor

SET Installation and Operating Instructions. Level switch for one sensor

AND INSTALLATION MANUAL

SolarSET GSM SolarSET GSM with a Beacon

Operating Instructions

OSA 3. Level alarm for oil separator. Afriso Ema AB. Kilvägen 2 SE Arlöv Sweden T +46-(0) F +46-(0)

Labkotec automatic warning devices for separators protecting the environment

DB5 Intrinsically Safe Sounder Type DB-5

Labkotec SET. Labkotec separator alarm system protecting our environment. Measure your success

Inductive slot sensor

RADAR LEVEL GAUGE SPECIAL SAFETY INSTRUCTION

Alarm system For oil-water separator

Labkotec Ice Detector

INSTRUCTION MANUAL IS-mB1 Minialite Intrinsically Safe Round LED Beacon

4) Intrinsic Safety Certification

SBEx-4 BISTATE SEPARATOR 1, 2, 3 or 4 channels in rail housing (TS35, 22,5mm width)

INTRINSICALLY SAFE S314X AND S315X

MAINS KLARGESTER SEPARATOR ALARM INSTALLATION & OPERATIONS MANUAL

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-nA.

LevelSET S GSM Functionalities Instructions for Commissioning and Use

Snifter ATEX22 VERSION. User Manual. Distributor

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

14300 MAINS SEPARATOR ALARM MANUAL

Safety instructions VEGADIF DF65.GX*****H/Z/P/F***** IECEx BVS

OPTIBAR P 1010/2010 C Supplementary instructions

Technical Data. Dimensions

INSTRUCTION MANUAL. SIL 3 - SIL 2 IIB Group Power Supply for Hazardous Area Equipment DIN-Rail Model PSD1001C PSD1001C

Technical Data. General specifications Switching element function Rated operating distance s n 5 mm

PEPPERL+FUCHS GmbH

0-2 m/s Lo Alarm 0-6 m/s Hi Alarm Signal Stregth EASZ-12 Doppler Flow Switch Measuring Flow Worldwide

Technical Data. General specifications Switching element function Rated operating distance s n 4 mm

INSTRUCTION MANUAL (ATEX)

INSTRUCTION MANUAL. SIL 2 Load Cell/Strain Gauge Bridge Isolating Converter DIN-Rail Power Bus and Termination Board Model D5264S D5264S

Installationsmanual GWSL1100/2100, GWML3100

FX FIRE DETECTION SYSTEM

OMC Ex interface unit. Manual. Version 1.2 August Author: Observator Instruments

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-d.

Technical Data. General specifications Switching element function Rated operating distance s n 5 mm

User s Manual YTA610 and YTA710 NEPSI Certification

PROTECT SRB 200EXi-1A

ISOMETER IRDH375. Insulation monitoring device for unearthed AC, AC/DC and DC systems (IT systems)

OPTIWAVE X500 Supplementary Instructions

OPTIBAR DP 7060 Supplementary Instructions

Technical Data. Dimensions

MANUAL Oil Level Sensor

ISOMETER IRDH275BM-7 with coupling device AGH675-7 and AGH675-7MV15

Pressure sensors. Ex ia I / IIC T6 acc. to ATEX. Features. Description. Measuring ranges. Applications

Technical Data. General specifications. Rated operating distance s n 5 mm

IECEx Certificate of Conformity

Battery Powered Separator Alarm Type Standalone Unit. Installation, Operation & Maintenance

OilMatic Pro / 230 V AC

E2S Datasheet v10a. The IS-mA1 is suitable for all intrinsically safe signalling applications including fire, security and process control.

INSTRUCTION MANUAL & 8200 Monitor. Manual Issue 06

Tank Gauging System Special Safety Instruction

INSTRUCTION MANUAL (ATEX / IECEx)

USER GUIDE FOR GASSONIC SURVEYOR ULTRASONIC GAS LEAK DETECTOR

Operating Instructions Edition 02/2007

Local Control Panels for VG9000H LCP9H Series. Installation, Maintenance and Operating Instructions

Intrinsically Safe Solutions

DIESEL ENGINE CONTROL UNIT DCU USER S MANUAL - N-2000 Lillestrøm, Norway Tel: (+47) Fax: (+47)

IECEx Certificate of Conformity

EUROFLAT SERIES TYPES C... S... M...

VERSAFLOW VORTEX Supplementary instructions

Mobrey MCU900 Series Universal Control Unit

KHA6-GT*-Ex1. Thermocouple trip amplifiers. Composition. Hazardous area. Safe area. Function. 230 V AC 1-channel. Input EEx ia IIC

MSM400 Ultrasonic Suspended Solids Monitoring and Control System

LC1350 Level Controller

MANUAL Overflow sensor NVF-104/34-PF

Operating Instructions. For. Alarm Control Module. Model SSR 500

Safety instructions VEGAPULS 64

OPTISENS TUR 2000 Technical Datasheet

Connection. e. g. Pt100. reference limit. yellow Output I. Composition

Quick Start Manual July pointek CLS100

Local Control Panels for VG9000H LCP9H Series. Installation, Maintenance and Operating Instructions

SEPARIX. Technical Documentation. SEPARIX-C/-T and SEPARIX-Control CT. Edition: Version: 5 Art. no.:

RTK Instruments Limited St James Business Park, Knaresborough, North Yorkshire, England. HG5 8PJ

ED820-24V MODEL INSTRUCTION MANUAL. fire DETECTOR

POINTEK CLS 100 OINTEK CLS 100 CAPACITANCE LIQUIDS/SOLIDS. Instruction Manual March 2001

EUROBOX SERIES TYPES CM... SM... MM...

Instruction Manual. Alarm Unit For Low Gas Level # Read manual before use! Observe all safety information! Keep manual for future use!

Technical Data. General specifications Switching element function Rated operating distance s n 8 mm

Earth-Rite II PLUS Static Earthing System

5.1 Safety instructions for system configuration and explosion protection. Zone-specific conditions for system configuration

INSTRUCTION MANUAL. DECKMA HAMBURG GmbH. Type OMD-12. Oil-in-Water Monitor

Ultrasonic Level Measurement nivopuls FDU 10 S

E2S Datasheet v10a

Instruction Manual. Electronic gas and smoke detector GRM

Intrinsically Safe Flame Detector Installation Guide

INTRODUCTION / TABLE OF CONTENTS

Universal Tank Alarm Type Installation, Operation & Maintenance

D SYSTEM CONTROL DWG. APPROVED BY. OrCAD 6 ROSEMOUNT 2410

Installation and Operating Instruction

YTA Series Temperature Transmitters [Style: S3] EN :2006, -11:2007, -26:2007. Supply circuit: Ui=30 V, Ii=165 ma,

Technical Data. General specifications Switching element function DC Dual NC Rated operating distance s n 3 mm

EU DECLARATION OF CONFORMITY

PROZESSAUTOMATION. Manual SEGMENT PROTECTOR R-SP-!12. Zone 1 Zone 2 / Div 2 FNICO

Transcription:

SET-000 Oil/Sludge Alarm Device for Oil Separators Copyright 007 Labkotec Oy We reserve the right for changes without notice

TABLE OF CONTENTS GENERAL... INSTALLATION... 4. SET-000 Oil/Sludge Control Unit... 4. Probe installation... 5. Junction box... 5 OPERATION AND SETTINGS... 6. Operation... 6. Factory settings... 8 4 TROUBLE-SHOOTING... 9 5 REPAIR AND SERVICE... 0 6 SAFETY INSTRUCTIONS... 0 7 TECHNICAL DATA... SYMBOLS Warning / Attention Pay attention to installations at potentially explosive atmospheres Device is protected by double or reinforced insulation Copyright 007 Labkotec Oy / We reserve the right for changes without notice

GENERAL SET-000 Oil/Sludge is an alarm device for monitoring the thickness of the oil layer accumulating in the oil separator and the accumulation of sludge or sand layer on the bottom of separator. Depending on the order, the delivery consists of SET-000 Oil/Sludge control unit, SET DM/ probe, SET/S probe, junction box and installation supplies. 4 System components: (depending on the order) SET DM/ probe 5 SET/S probe Junction box LJB 4 5 SET-000 Oil/Sludge control unit Installation supplies Figure. Oil separator alarm system with SET-000 Oil/Sludge The SET DM/ probe is installed into the light liquid storage chamber and gives an alarm when the chamber is filled to a pre-determined degree. The function is based on the measurement of the electrical conductivity of the surrounding liquid water conducts electricity much better than oil. The probe is normally immersed in water. SET/S probe is installed in the separator or tank and it gives an alarm when the sludge reaches the probe. The principle of measurement is ultrasonic. When sludge, sand or other solid particles accumulate between the two probe heads, the signal strength weakens, causing an alarm. The probe is normally immersed in water. Oil separator is regarded as a potentially explosive (Ex) area. The probes can be installed in zone 0, or potentially explosive atmosphere but the control unit must be mounted in a safe area. The LED indicators, push buttons and interfaces of the device are described in figure. SET-000 Oil/Sludge user interface features: 4 4 5 6 LED indicator for mains LED indicators of alarm and fault for both probes Reset button for alarm and fault Test button Connectors for two Labkotec SET level probes [EEx ia] Potential-free relay outputs for monitoring and control purposes 6 5 Figure. SET-000 Oil/Sludge features Copyright 007 Labkotec Oy / We reserve the right for changes without notice

Mounting dimension 0 mm + + SET-000 Oil / Sludge INSTALLATION. SET-000 Oil/Sludge Control Unit The SET-000 Oil/Sludge control unit can be wall-mounted. The mounting holes are located in the base plate of the enclosure, beneath the mounting holes of the front cover. The connectors of the external conductors are isolated by separating plates. The plates must not be removed. The plate covering the connectors must be installed back after executing cable connections. The cover of the enclosure must be tightened so, that the edges touch the base frame. Only then do the push buttons function properly and the enclosure is tight. Before installation, please read the safety instructions in chapter 6! Mounting dimension 60 mm SET-000 Alarm Oil Device / Sludge Supply voltage 0 VAC, 50/60 Hz L = phase conductor N = neutral conductor Fuse 5 mat Mains Alarm Alarm Fault Fault RELAY (Channel ) = common pole 4 = opening pole when alarm 5 = closing pole when alarm FUSE 5 mat Reset Test OIL OIL WARNING! VAROITUS! Intrinsically safe circuits. Luonnostaan vaaraton virtapiiri. Close protection plate when Kiinnitä suojalevy kun kaapelit the cables are connected. ovat kytketyt. Do not open when energized! Ei saa avata jännitteisenä! N L 4 5 6 7 8 9 0 4 + - + - 0 V RELAY RELAY 50/60 Hz PROBE PROBE 7 4 RELAY (Channel ) 6 = common pole 7 = opening pole when alarm 8 = closing pole when alarm Relays are in alarm positions, when the mains voltage is off. Mounting holes diameter 4.5 mm Enclosure depth 75 mm 5 CHANNEL 9 = auxiliary connection () 0 = + supply pole to probe = - supply pole to probe N L N L 5 mat Mains switch CHANNEL CHANNEL 4 5 6 + - + - 4 5 6 7 8 RELAY RELAY 8 Shield of probe cable 9 0 4 6 7 8 CHANNEL = auxiliary connection () = + supply pole to probe 4 = - supply pole to probe Cover plate Separating plates of the connectors, 4 pcs. SET-000 Oil/Sludge Channel Channel - - 9 0 4 SAFE AREA HAZARDOUS AREA JUNCTION BOX LJB-78-8 Common shield Pair shield SHIELD SHIELD Check the correct installation depth from the instructions of the separator. SET DM/ PROBE SET/S PROBE The lowest tip of SET DM/ probe has to be always installed above the lowest level of the separator's outlet pipe. SET DM/ probe alarms latest when it is totally immersed in a non-conductive liquid; in other words: it is totally away from the water. To equipotential ground SET DM/ probe: Wires and are connected together. SET DM/ PROBE All shields and excess wires to be connected to the same point. Shield of probe cable SET/S PROBE Figure. Installation of SET-000 Oil/Sludge alarm device. Copyright 007 Labkotec Oy 4/ We reserve the right for changes without notice

. Probe installation. Junction box The probe installation should be done as described in figure. SET DM/ probe gives an alarm earliest when the upper electrode is in oil and latest when the probe is totally immersed in a nonconductive liquid in other words, it is totally away from the water. SET/S probe gives an alarm when there is enough sand or sludge accumulated between the two heads of the probe. When the sludge layer on the bottom of the separator or settling tank is pretty solid, the correct installation depth can be adjusted based on the current level. In case the level is not that clear, a tryout period of couple of days may be useful. Both probes can be mounted suspended from the ceiling of the separator by their cable. Please check the correct installation depth also from the instructions of the oil separator. If the probe cable must be extended or there is need for equipotential grounding, it can be done with the cable junction box. The cabling between the SET-000 control unit and the junction box should be done with a shielded twisted pair instrument cable. The cabling in figure can be done with a two-pair shielded twisted pair cable, whereupon both pairs are equipped with their own shields. Make sure that the signal wires of the cables can never be connected to each other. LJB junction box enables cable extension in potentially explosive atmospheres. In figure the shields and excess wires have been connected to the same point in galvanic contact with metallic frame of the junction box. This point can be connected to equipotential ground thru the ground terminal. Other components of the system that need to be grounded can also be connected to the same ground terminal. The wire used for equipotential grounding must be min..5 mm² mechanically protected or, when not mechanically protected, the minimum cross section is 4 mm². Please make sure, that the probe and the cable between SET-000 control unit and the probe do not exceed the maximum allowed electrical parameters see chapter 7 Technical data. Detailed cabling instructions can also be found in the installation instructions of SET DM/ and SET/S probes. Junction box of type LJB includes light alloy parts. When installing in explosive atmosphere, make sure, that the junction box is located so, that it can not be mechanically damaged or it will not be exposed to external impacts, friction etc. causing ignition of sparks. Make sure, that the junction is closed properly. Copyright 007 Labkotec Oy 5/ We reserve the right for changes without notice

OPERATION AND SETTINGS Functionality test Functionality test SET-000 Oil/Sludge is initialized at the factory. The operation of the device should always be checked after the installation. The operation should also be checked always when emptying the separator or at least once every six months. Oil alarm (SET DM/ probe). Immerse the probe into water. The device should be in normal mode (see chapter.).. Lift the probe up in the air or oil. Oil alarm should occur. (see chapter.).. Immerse the probe back into water. Alarm should go off after 5 sec delay. Sludge alarm (SET/S probe). Immerse the probe into water. The device should be in normal mode.. Lift the probe up in air or sink it into sludge. An alarm should be generated after 0 40 seconds (see chapter.).. Immerse the probe back into water. The alarm should go off after a delay of 0 40 seconds. Clean up the probes before placing them back into the separator. A more detailed description of the operation is provided in chapter.. If the operation is not as described here, check the factory settings (chapter.) or contact a representative of the manufacturer.. Operation Normal mode no alarms Oil alarm The operation of a factory-initialized SET-000Oil/Sludge is described in this chapter. SET DM/ probe is totally in water and the two heads of the SET/S probe are totally immersed in water. Mains LED indicator is on. Other LED indicators are off. Relays and are energized. SET DM/ probe is in oil. The probe gives an alarm earliest when the upper electrode is in oil and latest when the probe is totally immersed in a non-conductive liquid, in other words, totally away from water. (Note! The same alarm takes place when SET DM/ probe is in the air) Mains LED indicator is on. Oil Alarm LED indicator is on. Buzzer on after 5 sec delay. Relay remains energized. Relay de-energizes after 5 sec delay. After removal of an Oil alarm, the alarm LED indicator and buzzer will be off and relay will be energized after 5 sec delay. Sludge alarm The two heads of the SET/S probe are immersed in sludge or sand. Mains LED indicator is on. Alarm LED indicator is on after approx. 5 sec. delay. (Delay of the probe.) Buzzer is on after 0 40 sec delay. (0 sec delay of the control unit incl.) Relay remains energized. Relay de-energize after 0...40 sec delay. (Note. The same alarm takes place when SET/S probe is in the air.) Copyright 007 Labkotec Oy 6/ We reserve the right for changes without notice

The operational delay of SET/S (0 40 sec) prevents false alarms from occurring when garbage or other obstacles, which weaken the measurement signal momentarily, pass across the probes heads. Note! When testing SET/S probe operation in a separate vessel, the water put into the vessel should stand for about 0 minutes before testing. This prevents false alarms caused by the attachment of air bubbles on the probe heads. After removal of Sludge alarm (the two heads of the probe are in water), the Alarm LED indicator will be off and relay will be energized and buzzer will be off after a delay of 0 40 sec. Fault alarm Reset of an alarm A broken probe, probe cable break or short circuit, i.e. too low or too high probe signal current. Mains LED indicator is on. Probe circuit Fault LED indicator is on after 5 sec delay. The relay of the respective channel de-energizes after 5 sec delay. Buzzer is on after 5 sec delay. When pressing the Reset push button. Buzzer will go off. Relays will not change their status before the actual alarm or fault is off. TEST FUNCTION Test function provides an artificial alarm, which can be used to test the function of the SET-000 Oil/Sludge and the function of other equipment, which is connected to SET-000 via its relays. Attention! Before pressing Test button, make sure that the change of relay status does not cause hazards elsewhere! Normal situation Sludge or Oil alarm on Fault alarm on When pressing the Test push button: Alarm and Fault LED indicators are immediately on. Buzzer is immediately on. Relays de-energize after sec of continuous pressing. When the Test push button is released: LED indicators and buzzer go immediately off. Relays energize immediately. When pressing the Test push button: Fault LED indicators are immediately on. The Alarm LED indicator of the alarming channel remains on and the respective relay remains de-energised. Alarm LED indicator of the other channel is on and the relay de-energizes. Buzzer remains on. If it has been reset earlier, it will return to be on. When the Test push button is released: The device returns without delay to the preceding status. When pressing Test push button: The device does not react with regards to the faulty channel. The device reacts as described above with regards to the functional channel. Copyright 007 Labkotec Oy 7/ We reserve the right for changes without notice

O O O O SET-000 Oil / Sludge. Factory settings If the operation or SET-000 Oil/Sludge is not as described in the previous chapter, check that the device settings are as in figure 4. Change the settings according to the following instructions if needed. The following tasks must only be executed by a person with proper education and knowledge of Exi devices. We recommend, that when altering the settings the mains voltage is off or the device is initialized before the installation is executed. The settings of channel are made with switches S and S and potentiometer in the left. Type plate SENSITIVITY SET-000 0 V 50 Hz. VA IP65 RELAY ( µ ) 50V 5A 00VA S.No Code Labkotec Oy Finland MODE DELAY VTT04ATEX0X II () G [EEx ia] IIC Uo=4,7 V Io= 55 ma Po= 97 mw R= 404 (Ta = -5 C...+50 C) C L L / R II C 608 nf 0 mh 6,5 µh/ II B,84 µf 0 mh 466 µh/ 057 Serial number S S S S4 R8 R4 SENSITIVITY MODE DELAY SENSITIVITY F N L 4 5 6 7 8 9 0 4 MODE DELAY SENSITIVITY MODE DELAY The settings of channel are made with switches S and S4 and potentiometer in the right. Probe selection: SET DM/ -probe, channel SET/S -probe, channel Figure 4. Factory settings of SET-000 Oil/Sludge The settings are made with switches (MODE and DELAY) and potentiometers (SENSITIVITY) located in the upper printed circuit board (figure 4) and with the jumpers located in the lower board. Switches in figure 4 are as set in the factory. OPERATIONAL DELAY SETTING (DELAY) Switches S and S4 are used to set the operational delay of the device. When the switch is in low position relays de-energize and buzzer is on after 5 seconds after the probe current has reached the trigger level, and if the level still remains on the same side of the trigger level. When the switch is in high position, the delay is 0 seconds. Delays are operational in both directions (energizing, de-energizing). Alarm LEDs follow the probe current value and trigger level without delay. Fault alarm takes place after a fixed delay of 5 sec. Copyright 007 Labkotec Oy 8/ We reserve the right for changes without notice

4 TROUBLE-SHOOTING Problem: Possible reason: To do: Problem: Possible reason: To do: MAINS LED indicator is off Supply voltage is too low or the fuse is blown. Transformer or MAINS LED indicator faulty.. Check if the two pole mains switch is off.. Check the fuse.. Measure the voltage between poles N and L. It should be 0 VAC ± 0 %. No alarm when SET DM/ probe in oil or air, or the alarm will not go off The SENSITIVITY setting is wrong in the control unit (see figure 4), or probe dirty.. Clean-up the probe and lift it up in the air or immerse it into oil.. Turn the SENSITIVITY potentiometer slowly anticlockwise until the probe gives an alarm.. Immerse the probe into water and wait until the alarm goes off. If the alarm does not go off, turn the potentiometer slowly clockwise until the alarm goes off. 4. Lift the probe up in the air or oil. The probe should give an alarm again. Problem: No alarm when SET/S probe in sludge or air, or the alarm will not go off Possible reason: The SENSITIVITY setting is wrong in the control unit (see figure 4). To do:. Lift the probe up in the air or immerse it into sludge and wait 0 seconds.. Turn the SENSITIVITY potentiometer slowly anticlockwise until the probe gives an alarm.. Immerse the probe into water and wait until the alarm goes off. If the alarm does not go off, turn the potentiometer slowly clockwise until the alarm goes off. 4. Lift the probe up in the air or sink into sludge. The probe should give an alarm again. Problem: Possible reason: To do: FAULT LED indicator is on Current in probe circuit too low (cable break) or too high (cable in short circuit). The probe might also be broken.. Make sure, that the probe cable has been connected correctly to the SET-000 control unit. See probe specific instructions.. Measure the voltage separately between the poles 0 and as well as and 4. The voltages should be between 0,.,8 V.. If the voltages are correct, measure the probe current one channel at a time. Do as follows:. Disconnect probe s [+] wire from probe connector (poles and ).. Measure short circuit current between [+] and [-] poles.. Connect ma-meter as in figure 5. Make a comparison to the values in Table..4. Connect the wire/wires back to respective connector(s). If the problems can not be solved with the above instructions, please contact Labkotec Oy s local distributor or Labkotec Oy s service. Attention! If the probe is located in an explosive atmosphere, the multimeter must be Exi-approved! Copyright 007 Labkotec Oy 9/ We reserve the right for changes without notice

Figure 5. Probe current measurement SET DM/, Channel Poles 0 [+] and [-] SET/S, Channel Poles [+] and 4 [-] Shortcircuit 0 ma - 4 ma 0 ma - 4 ma Probe in the air 9-0 ma - 4 ma Probe in the oil 9-0 ma --- Probe in the sludge or sand --- - 4 ma Probe in the water - ma 5-7 ma Factory setting for alarm point approx. 6.5 ma Table. Probe currents approx. ma 5 REPAIR AND SERVICE The probes should be cleaned and the operation of the alarm device should be tested when emptying the oil storage chamber or at least once every six months. The easiest way to check the operation is to lift the probes up in the air and put them back to the separator. The operation is described in chapter. For cleaning, a mild detergent (e.g. washing-up liquid) and a scrubbing brush can be used. The mains fuse (marked 5 mat) can be changed to another glass tube fuse 5 x 0 mm / 5 mat complying EN 607-/. Any other repair and service works on the device may be carried out only by a person who has received training in Exi devices and is authorized by the manufacturer. In case of queries, please contact Labkotec Oy s service: labkotec.service@labkotec.fi. 6 SAFETY INSTRUCTIONS SET-000 Oil/Sludge must not be installed in potentially explosive atmosphere. Probes connected to it may be installed in zone 0, or potentially explosive atmosphere. In case of installations in explosive atmospheres the national requirements and relevant standards as EN 5009 and/or EN 60079-4 must be taken into account. If electrostatic discharges can cause hazards in the operating environment, the device must be connected into equipotential ground according to requirements with regards to explosive atmospheres. Equipotential grounding is made by connecting all conductive parts into same potential e.g. at the cable junction box. Equipotential ground must be earthed. The device does not include a mains switch. A two pole mains switch (50 VAC A), which isolates both lines (L, N) must be installed in the main power supply lines in the vicinity of the unit. This switch facilitates maintenance and service operations and it has to be marked to identify the unit. When executing service, inspection and repair in explosive atmosphere, the rules in standards EN 60079- and EN 60079-9 about instructions of Ex-devices must be obeyed. Copyright 007 Labkotec Oy 0/ We reserve the right for changes without notice

7 TECHNICAL DATA SET-000 Oil/Sludge Dimensions 75 mm x 5 mm x 75 mm (L x H x D) Enclosure IP 65, material polycarbonate Ambient temperature -5 ºC +50 ºC Supply voltage Power consumption Probes Max. impedance of the current loop between the control unit and a probe Relay outputs 0 VAC ± 0 %, 50/60 Hz Fuse 5 x 0 mm 5 mat (EN 607- /) The device is not equipped with a mains switch 4 VA Labkotec SET/S and SET DM/ 75 Ω. Two potential-free relay outputs 50 V, 5 A, 00 VA Operational delay 5 sec or 0 sec. Relays de-energize at trigger point. Operation mode selectable for increasing or decreasing level. SET DM/ probe (Oil alarm) Principle of operation Enclosure Measurement of conductivity Ambient temperature -0 ºC +70 ºC Supply voltage IP68, materials: AISI 6 and PVC Approx. VDC from SET control unit Cable Fixed oil resistant PVC cable x 0,5 mm, standard length 5 m. EMC Ex-classification Emission Immunity EN 5008- EN 5008- II G EEx ia IIA T4 VTT 0 ATEX 0X Electrical parameters U i = 6,5 V I i = 80 ma P i = 0 mw C i = 700 pf L i = 0 μh Special conditions concerning Ex-classification (X): - Ambient temperature -0 ºC +70 ºC - Shielded probe cable shall be connected to equipotential ground - If probe cable have to be extended, please use LJB-78-8 junction box. The junction box shall also be connected to equipotential ground. SET/S probe Principle of operation Ultrasonic Electrical safety Insulation level Probe / Mains supply voltage EN 600-, Class II 75V (EN 5000), CAT II / III Enclosure Ambient temperature 0 ºC +60 ºC IP68 Materials:PP, AISI04, AISI 6, PVC and NBR rubber EMC Ex-classification Emission Immunity Special conditions (X) Electrical parameters Characteristic curve of the output voltage is trapezoidal EN 6000-6- EN 6000-6- II () G [EEx ia] IIC VTT 04 ATEX 0X (Ta = -5 C +50 C) U o = 4,7 V P o = 97 mw I o = 55 ma R = 404 Ω Supply voltage Approx. VDC from SET control unit Cable Fixed oil resistant PVC cable x 0,5 mm, standard length 5 m. Weight EMC Ex-classification Emission Immunity Approx. 450 g EN 6000-6- EN 6000-6- II G Ex ia IIB T5 VTT 07 ATEX 05X See table. Due to non-linear characteristics of the probe voltage, the interaction of both, capacitance and inductance, must be taken into account. The table below indicates the connecting values in explosion groups IIC and IIB. In explosion group IIA the values of the group IIB can be applied. Max. permissible value Combined Co and Lo Co Lo Co Lo II C 608nF 0 mh 568nF 458 nf 88 nf 8 nf 58 nf 0,5 mh 0,5 mh,0 mh,0 mh 5,0 mh II B,84μF 0 mh,5 µf, µf,4 µf,9 µf,6 µf 0,5 mh 0,5 mh,0 mh,0 mh 5,0 mh Electrical parameters U i = 6 V I i = 80 ma P i = 0 mw C i = nf L i = 80 μh Special conditions concerning Ex-classification (X): - Ambient temperature -5 ºC +60 ºC - Shielded probe cable and extra wires shall be connected to equipotential ground - If probe cable have to be extended, please use Labko LJB-78-8 junction box. The junction box shall also be connected to equipotential ground. L o /R o = 6,5 µh/ω (IIC) and 466 µh/ω (IIB) Table. SET-000 Oil/Sludge electrical parameters - Figure 6. Dimensional drawings of SET DM/ (left) and SET/S (right) Copyright 007 Labkotec Oy / We reserve the right for changes without notice