Application technology, 5th edition. Volume III: Fonterra radiant heating and cooling

Similar documents
Sanpress Inox G. Instructions for Use. Year built: from 02/2004 en_int

Radiant Ceiling. Metawell Klimadecke 1

Cooling and heating systems. Static cooling ceiling system SKS-5/3 for visible installation

Installation Guide. Heating cables. Thin concrete (< 3 cm) Intelligent solutions with lasting effect. Visit DEVI.com

INSTALLATION GUIDE - FURRINGS OF WOOD

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

Metal Cassette Ceiling with BEKA Heating and Cooling Mats

Regulux. Radiator lockshield with drain-off facility. To be precise.

INSTRUCTIONS FOR LAYING OF WOOD FLOORING ON UNDERFLOOR RADIANT HEATING AND COOLING

FIREPRO FIRESTOPPING AND PENETRATION SEALS PRODUCT GUIDE

ELECTRIC HEATING THERMOSYSTEM

Multibox. Flush Individual Room Control for Floor Heating Systems. To be precise.

Smoke extraction duct of sheet steel

C o o l i n g a n d h e a t i n g s y s t e m s

Krantz. Multifunction exposed ceiling AVACS. Cooling and heating systems

BEKA ceiling heating versus traditional underfloor heating

Static cooling ceiling system SKS-4/3 DS 4094 E /1. Technical Selection

regulux Radiator lockshield with drain-off facility Pressurisation & Water Quality Balancing & control thermostatic control engineering ADVANTAge

Tradition. made in Germany

Viega Pressguns. User comfort made easy.

ANLAGENBAU HEAT EXCHANGER w w w. a nla g enba u-b oehm er. d e Version 05/2015

Intelligent Temperature Management. ThermaCool - Say goodbye to inefficient temperature peaks. GeoClima Inclusive Technical Package

Regulux. Return Lockshield Radiator lockshield with consistent presetting and drain-off facility

Standard. thermostatic valve body without presetting

Dynalux. Floor Heating Manifolds Underfl oor heating circuit manifold

V-exact II. Thermostatic Radiator Valves Thermostatic valve body with stepless precision presetting

Heating and cooling ceiling systems Zehnder ZIP Planning document. Heating Cooling Fresh Air Clean Air

aquatherm black Heating and cooling system for ceiling, wall and other applications aquatherm state of the pipe

Viega Profipress. Press technology made of copper. Always a fitting solution.

Thermostatic valve bodies

Installation Guide. Heating cables. Pipe tracing. Intelligent solutions with lasting effect. Visit DEVI.com

The Laboratory is qualified to update standards identifying the test procedures.

The Laboratory is qualified to update standards identifying the test procedures.

Standard. Thermostatic Radiator Valves Thermostatic valve body without presetting

Flush individual room control for floor heating systems

Thermostatic head K. with contact or immersion sensor. Thermostat-Köpfe For medium temperature control

HEATING. COOLING. COMFORT. For a cosy home.

1. Contents Principle General information Parts list Assembly Technical drawing... 18

Decorative radiators Comfortable indoor ventilation Heating and cooling ceiling systems Clean air solutions Zehnder ZBN

Documentation. Parallel Heating Cable. Type: ELP

Ultraflex Ceiling Grid (UFR)

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT

Maintaining electrical supply on wood

Installation and operation instructions Solar stations SolarBloC midi Premium DN 20 SolarBloC maxi Premium DN 25

Unibox Individual room temperature control and limitation of return temperature in surface heating systems

HeATING. VENTILATION. COOLING. in ONE SYSTEM.

INSTALLATION INSTRUCTIONS ONE LARGE ZONE

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation

RADIANT HEATING AND COOLING SYSTEMS Produced by FRENGER SYSTEMEN BV

Technical Concept. Ultraflex Ceiling Grid (UFR) All Types Cleanroom Ceiling Systems

Zehnder ComfoAir flat 150

Heating and cooling ceiling systems Suspended ceiling systems. Heating Cooling Fresh Air Clean Air

INTERNAL FRAMING PROFILES

Method Statement. General Site preparation by others: Preparation for screed system by others: Preparation for plate system by others:

Standard. Thermostatic Radiator Valves Thermostatic valve body without presetting

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

Annex of the certificate (Page 1/5) Accreditation Scope

Multibox. Floor Heating Controller Flush individual room control for floor heating systems

Technical Sheet. Hybrid concealed radiator System Insulated Rubber Pipe

Multibox 4. Floor Heating Controller Flush individual room control for floor heating systems with supply shut-off

E-Z Valve. Thermostatic valves with radiator connection systems For single and two-pipe heating systems

UPONOR Ltd. Specification for UPONOR Q&E PEX Shrinkfit Plumbing Systems

EMO T. Thermal actuator for heating, ventilation, and air conditioning systems. To be precise.

Heating and cooling ceiling systems Zehnder ZBN Planning document. Heating Cooling Fresh Air Clean Air

thermostatic valve body with stepless precision presetting

INSTALLATION INSTRUCTIONS

INDIVIDUAL HEATING. Installation Manual e Skirting Heating Classic. Skirting Heating Delta. HEATING. COOLING. COMFORT.

Thermostatic valve bodies

Introduction. Please read the following instructions carefully before commencing installation.

Notices for installation

Modula Standard Performance

Zehnder ZIP Radiant Ceiling Panels

Technical information Installation instructions. Modul-plus (F21-52) High performance calorifiers

Air Excellent. Straightforward, effective air distribution

VC-1, VC-1-SL, VC-2-L, VC-2-SL

UNDERFLOOR HEATING SYSTEMS BY SCHÜTZ.

HANDBOOK FOR COMFORTABLE WARM FLOORS

TECHNICAL SPECIFICATIONS AND INSTALLATION

Calypso exact. Thermostatic Radiator Valves With stepless precision presetting

Performance Specifications LSF LIFT-SMOKE-FREE

VARICOOL Velum. System description/applications 4 Design and application 5 Planning and dimensioning 7 Technical features 8

Modular Wall-, door- and CEIlInGSyStEM. Premium quality customized room concepts directly from the manufacturer.

Overview Frost Heave Prevention for Freezer floors on ground.

Heating Installation Guide published by

Concepts. Products. Service. DryMode Simply install tiles dry

Danfoss Self-limiting Heating Cables SLPG-10/26/33, SLPG-18, SLHW-55/70, SLPH-10

Comfortline Ceiling Heating Foils INSTALLATION INSTRUCTIONS. Rev Mar-2016

INSTALLATION INSTRUCTIONS FOR. ProTek RIGID VINYL WALLCOVERING

Model ESFR-17 Dry Type Pendent Sprinklers Early Suppression Fast Response 16.8 K-factor General Description

Heated tools. Semiconductor equipment

For reversed flow direction. Thermostatic Radiator Valves Thermostatic valve body with and without presetting

FIRST-CLASS IN TRAINS

Mounting and Operating Instructions EB 2231 EN

INSTRUCTION. Danfoss heating cable mats type 100/150 Danfoss heating cable mats for thin floors. Danfoss heating cable mat type 100/150

Design-Edition. Design-Edition Thermostatic valves and lockshields, sets

The right temperature worldwide NEW. LAUDA Integral XT. Professional thermostating for pilot plant and mini-plant purposes. Product information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Supply air unit VEKA Installation & Maintenance

Control valves for floor heating systems. Floor Heating Manifolds

Thermostatic three-way valve body. Thermostatic Radiator Valves without presetting, with automatic bypass control

Transcription:

Application technology, 5th edition Volume III: Fonterra radiant heating and cooling

Fonterra Top 12 Planning Fonterra Top 12 Planning System description Heating/cooling ceiling system for closed, suspended ceiling installations Fonterra Top 12 is a jointless heating and cooling system for ceilings. It is ideal for use in office, administrative, and public buildings, but also for private residential buildings. The prefabricated plaster boards available in various sizes are mounted to the ceiling on an on-site, acoustically decoupled metal sub-construction (CD profiles) with a minimum carrying capacity of 23 kg / m². They are fastened with 30 mm drywall screws for plaster boards in dry construction. Since they are installed with the smooth side of the boards facing the room, they are ready for painting after the joints and fastenings have been smoothened. Non-active residual areas are closed up with non-milled 18 mm Fermacell boards. The pipelines for the Top 12 boards are laid in the suspended hollow floor space. To this end, the connection pipes are likewise made of 12 x 1.3 mm PB pipes and guided to the manifold or zone valve. The small pipe coverage of approx. 6 mm guarantees high performance and quick reaction of the Fonterra Top 12 heating and cooling ceiling. Ceiling construction Abb. 190: Ceiling construction 227

Application technology: Fonterra radiant heating and cooling Features Dry construction system made of 18 mm plasterboard system panels with integrated oxygen-sealed 12 x 1.3 mm PB pipe Variable combination of all prefabricated ceiling panels Connection of the system panels connected in series up to 5 m² per heating/cooling circuit Installation of the connection pipes in the hollow floor space Use of tested Viega press connecting technology with SC-Contur Quick reactivity thanks to small pipe coverage Can be combined with all commercially available ventilation systems System components System areas/pipe Fonterra Cooling ceiling panel 620 x 2000 mm 310 x 2000 mm 620 x 1000 mm Non-milled plaster board 620 x 2000 mm PB pipe 12x1.3 mm PB pipe in protective pipe Accessories Joint adhesive Drywall screws Pipe protection 12x18 for movement joints 228

Fonterra Top 12 Planning Name Article number PB pipe 12 x 1.3 mm, 120 mm 707712 System components PB pipe 12 x 1.3 mm, 240 mm 615680 PB pipe 12 x 1.3 mm, 650 mm 616502 PB pipe 12 x 1.3 mm, 120 m in protective pipe Fonterra cooling ceiling panel 620 x 2000 mm, pipe volume 16.5 m Fonterra cooling ceiling panel 310 x 2000 mm, pipe volume 8.5 m Fonterra cooling ceiling panel 620 x 1000 mm, pipe volume 8.0 m 609658 636753 636746 636760 Non-milled plaster board 620 x 2000 mm 615673 Drywall screws 30 mm 669362 Joint adhesive 624897 Movement joint-protective pipe 12 x 18 668945 Pipe guide 12 609498 Connection screw fitting ¾ inch x 12 614508 Connection screw fitting with SC-Contur ¾ inch x 12 614584 Press connector 12 x 1.3 614676 Tab. 91: System components 229

Application technology: Fonterra radiant heating and cooling Tools Name Article number Pipe shears for plastic pipes 652005 Hand press tool 12 401436 Viega press jaw 12 616915 Press machine, e.g. Pressgun Picco 735470 Tab. 92: Tools Technical data Technical data system panels Dimensions W x H x D System panels e.g. 620 x 2000 x 18 mm Material Gypsum board Fire rating class A1 acc. to EN 13501-1 A2 acc. to DIN 4102-1 Weight 21.5 kg /m 2 Pipe clearance 75 mm Max. permissible supply temperature 50 C Max. heating circuit length 80 m / 5 m 2 Movement joint Damp rooms from 6.5 m active ceiling surface suitable for residential areas* Tab. 93: Technical data system panels * Note Brochure 5, Bundesverband der Gipsindustrie e. V.»Bäder und Feuchträume im Holz- und Trockenbau«(Bathrooms and damp rooms in timber and dry construction) and the data sheet of the Zentralverband des deutschen Baugewerbes ZDB (Association of the German Building Trade). Technical data system pipe System pipe PB 12 x 1.3 Dimensions [mm] 12 x 1.3 Minimum bending radius Operating condition acc. to ISO 10508 Class/ [MPa] 5 x d a 4 / 1 5 / 0.8 Max. operating temperature [ C] 95 Mounting temperature [ C] > -5 Water volume [l/ m] 0,069 Heat conductivity λ [W /(m K)] 0,22 Linear coefficient of length expansion [K -1 ] 1.3 x 10-4 Weight [g/ m] 50 Tab. 94: Technical data system pipe 230

Fonterra Top 12 Planning Pipe clearance Installation data for Fonterra system Top 12 7.5 cm Pipe requirement and mounting times Max. heating circuit area 5 m² Max. heating circuit length up to 80 m Mounting time in group minutes 25 min / m² Tab. 95: Pipe requirement and mounting times System components PB pipe 12 x 1.3 mm Fonterra cooling ceiling element 620 x 2000 mm Fonterra cooling ceiling element 310 x 2000 mm Fonterra cooling ceiling element 620 x 1000 mm Available quantities/ packing units incl. Pro-rata requirement Supply lines supply/return flow 30 pieces 0.80 pc./ m² 30 pieces 1.60 pc./ m² 30 pieces 1.60 pc./ m² Drywall screws 30 mm 1000 pieces 30 pc./ m² Joint adhesive 310 ml 20 ml / m Material requirement Press connector with SC-Contur 12x1.3 mm 5 pc. 1.00 pc./ m² Tab. 96: Material requirement Connection lengths to the manifold must be considered. 231

Application technology: Fonterra radiant heating and cooling System description Fig. 191: System description Description of the heating and cooling function As cold water temperature in cooling mode, Viega recommends a supply temperature of approx. 16 to 17 C with an inclination of 3K; this means that temperatures of 16/19 C or 17/20 C should be expected. Accordingly, the mean surface temperature of the ceiling is 21 to 22 C. Generally, it must be ensured that the temperature cannot fall below the dewpoint. Viega recommends an on-site supply regulation under consideration of the room air humidity which automatically adjusts the supply temperature to the requirements. An on-site humidity sensor can serve as a so-called "emergency stop" only. It eliminates the cold water circulation of the cooling ceiling, thus preventing condensate formation. With this control, reduced performance of the ceiling must be expected before the condensate has dried since the cooling ceiling is separated from the water flow. In heating mode, the Fonterra Top 12 ceiling is operated with a mean heating water temperature of approx. 33 C. The mean ceiling surface temperature should not exceed 29 C to ensure unobstructed heat dissipation at head height of persons in the room. 232

Fonterra Top 12 Planning Performance data W/m 2 Performance diagram: Heating 1 Fig. 192: Performance diagram: Heating 2 K Key 1 Heat flow density [W/m2] 2 Overtemperature of fluid [K] Determination of the overtemperature of the fluid: Supply temperature + return temperature 2 - Room temperature Example: (35 C + 31 C / 2) - 20 C = 13 K overtemperature of fluid W/m 2 Performance diagram: Cooling 1 Fig. 193: Performance diagram: Cooling 2 K Key 1 Heat flow density [W/m2] 2 Overtemperature of fluid [K] Determination of the undertemperature of the fluid: Supply temperature + return temperature Room temperature - 2 Example: 26 C - (16 C + 19 C / 2) = 8.5 K undertemperature of fluid 233

Application technology: Fonterra radiant heating and cooling Performance parameters The output parameters of the systems specified below apply under consideration of the comfort criteria defined in DIN EN ISO 7730 and the resulting radiation asymmetry. Performance parameters Heating and cooling ceiling Fonterra Top 12 Operating mode Heating Cooling Operative room temperature [ C] 20 26 Heating fluid temperature [ C] 33 17,5 Mean ceiling temperature [ C] approx. 28 approx. 21.5 Max. heating/cooling performance net [W/ m 2 ] approx. 58 approx. 42 Tab. 97: Performance parameters Pressure loss diagram for PB pipes 12 x 1.3 Pa/m 1 kg/h Abb. 194: Pressure loss diagram for PB pipes 12 x 1.3 Key 1 Pressure gradient R [Pa/m] 2 Mass flow m [kg/h] (fluid: water) 2 234 Notes on dimensioning Dimensioning the cooling ceiling surface according to the calculation of the on-site cooling load. The sub-construction (suspension height 12 cm) made of metal profiles is mounted diagonally to the longitudinal axis of the panels. The maximum panel surface of active ceiling panels without expansion joint must not exceed 6.2 m x 4.0 m (corresponding to 2 rows of panels each with 10 panels 62 x 200 cm). Planning of the heating/cooling ceiling areas corresponding to the situation onsite, with a max. panel surface of approx. 5.0 m² with a connection length of 2 x 10 m per heating/cooling circuit. A passive region of min. 120 mm in the area of the expansion and connection joints and of 200 mm in the area of the supply lines must be ta-

Fonterra Top 12 Planning ken into consideration. Connection of the Fonterra Top 12 ceiling elements to Fonterra manifold DN25 or Fonterra zone valve model 1286. Dimensioning for heating and for cooling is based on the same volumes of water. Checking the pressure losses over the installed pipe length according to the pressure loss diagram. On-site calculation of the total pressure loss incl. supply lines. The use of oxygen-sealed Viega polybutene pipes makes system separation, e.g. by means of heat exchanger, redundant. The installation plans for the construction site are generated by the planning office in coordination with the Viega planning department. The cooling and heating ceiling does not meet the fire protection requirements. To fulfil these requirements, suitable on-site measures must be taken. According to EnEV 2014 Appendix 5 table 1 and para. 2 and 4, connection lines to the manifold and manifold lines must be insulated. Where the EnEV does not specify the thickness of the insulation layer, the connection pipes must be laid in the protective pipe as a minimum requirement. Viega recommends on-site central dewpoint monitoring (e.g. at the manifold). Dimensioning Dimensioning example Fig. 195: Installation example (see»assembly steps«on page 238) 235

Application technology: Fonterra radiant heating and cooling Dimensioning of Fonterra heating surfaces Project no. Sheet Building project Date Q F Number Heating circuits Processor Δp max m H manifold ϑ V,Ausl. m H manifold Room number Room designation Available ceiling surface m² Operative room temperature heating C Operative room temperature cooling C Standard heating load (or residual heating output) W Standard cooling load (or residual cooling load) W Overtemperature of the fluid K Undertemperature of the fluid K Design heat flow density heating W/m² Design heat flow density cooling W/m² Max. active surface required m² Heating circuit no. Cooling ceiling element Top 12 62 x 200 cm (1.24 m 2 ) Piece Cooling ceiling element Top 12 31 x 200 cm (0.62 m 2 ) Piece Cooling ceiling element Top 12 62 x 100 cm (0.62 m 2 ) Piece Active surface per circuit m² Heating output per circuit W Cooling output per circuit W Total output heating W Total output cooling W Residual output heating W Residual output cooling W Dimension mass flow per circuit kg/h Installed pipe length incl. connection line per circuit m Pressure loss circuit mbar Pressure loss manifold mbar Total pressure loss mbar Target value at manifold l/min Tab. 98: Cooling and heating ceiling Fonterra Top 12 - Dimension sheet 236

Fonterra Top 12 Planning Dimensioning of Fonterra heating surfaces Project no. Sheet Building project Date Q F Number Heating circuits Processor Δp max m H manifold ϑ V,Ausl. m H manifold Room number 1 Room designation Sample Available ceiling surface m² 30,9 Operative room temperature heating C 20 Operative room temperature cooling C 26 Standard heating load (or residual heating output) W 1100 Standard cooling load (or residual cooling load) W 800 Overtemperature of the fluid K 12,5 Undertemperature of the fluid K 8,5 Design heat flow density heating W / m² 58 Design heat flow density cooling W / m² 42 Max. active surface required m² 19 Heating circuit no. 1 2 3 4 Cooling ceiling element Top 12 62 x 200 cm (1.24 m 2 ) Piece 3 4 4 3 Cooling ceiling element Top 12 31 x 200 cm (0.62 m 2 ) Piece 2 2 Cooling ceiling element Top 12 62 x 100 cm (0.62 m 2 ) Piece Active surface per circuit m² 4,96 4,96 4,96 4,96 Heating output per circuit W 287 287 287 287 Cooling output per circuit W 208 208 208 208 Total output heating W 1148 Total output cooling W 832 Residual output heating W 0 Residual output cooling W 0 Dimension mass flow per circuit kg / h 69 69 69 69 Installed pipe length incl. connection line per circuit m 81,5 73 81,3 72,7 Pressure loss circuit mbar 143 128 142 128 Pressure loss manifold mbar 3 Total pressure loss mbar 146 Target value at manifold l / min. 1,15 1,15 1,15 1,15 Tab. 99: Dimensioning example 237

Application technology: Fonterra radiant heating and cooling Assembly steps Fig. 196: Suspend base profile and mount edge profile Fig. 197: Mount the carrier profile with the cross connectors Fig. 198: Apply the adhesive and lay the first row of panels Fig. 199: Lay the second row of panels offset by 310 mm Fig. 200: Piping Fig. 201: Mount the passive elements and the wall connection joint 238

Fonterra Top 12 Planning Fig. 202: Expansion joint Fig. 203: Finish the surface, remove any protruding adhesive and smooth the surface Fig. 204: Dimensioning example (complete with panels) Key 1 Base profile 2 Carrier profile 3 Passive elements 4 Active elements 5 Connection lines 6 Expansion joint 239

Application technology: Fonterra radiant heating and cooling Joint implementation In the Fonterra cooling and heating circuit, wall connections to vertical components, such as plastered brick wall, sight concrete, wood or dry construction walls, must generally be implemented as expansion joints. Wall connection joint, passive Connection with end elbow <150 mm* 20-30 mm 10 mm >120 mm Fig. 205: Connection with end elbow * Dimension applicable for passive ceiling panels only Connection with UD profile <100 mm* 20-30mm 5-7mm >150 mm Fig. 206: Connection with UD profile * Dimension applicable for passive ceiling panels only Wall connection joint, active/passive As shown above, the wall connection joints can be implemented with a visible connection elbow, or open with a UD profile mounted behind them. A rigid connection (screw) between cladding and connection elbow or UD profile is not possible. The open joint (width 5 to 7 mm) can be sealed with an elastoplastic sealing material (no silicone) with an approved continuous motion absorption of minimum 15 to 20%. The panel edge must be primed before sealing. 240

Fonterra Top 12 Planning Expansion joints Generally, expansion joints are required wherever there are movement joints in the building, or where the heating/cooling ceiling area is larger than 6.2 x 4.0 m. <150 mm* Expansion joint with additional profile >120 mm Fig. 207: Expansion joint with additional profile * Dimension applicable for passive ceiling panels only <100 mm* Expansion joint with plate strip mounted behind it, glued on one side, with screw connection 20 mm >150 mm Fig. 208: Expansion joint with panel strip mounted behind it, glued on one side, with screw connection * Dimension applicable for passive ceiling panels only The expansion joint is formed as shown in the illustrations above. Make sure that the cladding (Fonterra ceiling panels Top 12) as well as the sub-construction of the two ceiling areas are separate from each other. 241

Application technology: Fonterra radiant heating and cooling Section drawing of the ceiling construction Mounting Mounting instructions Mounting of the cooling ceiling panels according to the installation plan of the planning office. Arrange the on-site sub-construction made of metal CD profiles at a distance of 333 mm and a carrying capacity of min. 23 kg / m² diagonal to the installation direciton of the panels. The minimum suspension height is 120 mm. By means of drywall screws, the panels are fastened to the sub-construction at the specified fixing points. Stress-relieved mounting of the ceiling elements from the centre of the elements to the edge, or from one panel edge continuously to the other edge. In this process, press the system panels tightly to the sub-construction. To form the wall connection joint, provide a circumferential passive strip of at least 120 mm. In the area of the pipeline arrangement (piping of the TOP 12 panels and the supply lines), provide a passive edge area of 200 mm. Generally, double planking is possible; however, make sure that the fixing screws are bolted all the way through to the sub-construction. A glue joint (width max. 1 mm) must be provided to connect the panels with each other. Before removing any protruding joint adhesive, allow the adhesive to cure fully (approx. 18 to 36 hours, depending on the room temperature). When installing the panels, avoid cross joints (offset at least 200 mm). Finish the joints and screws with Fermacell filler. Fig. 209: Section drawing of the ceiling construction Key 1 Ceiling fastening with direct or nonius suspension (optional suspension height) 2 Cross joint 3 Cooling ceiling panel Top 12 4 Base profile CD 60x27 5 Carrier profile CD 60x27 242

Fonterra Top 12 Mounting Before smoothing the surface, the room humidity must be smaller 70% and the room temperature greater 5 C. Furthermore, the Top 12 ceiling panels and the collecting pipes must be leakage-tested. Since the Fonterra Top 12 ceiling elements are subject to changes in length (expansion and shrinking) when in heating or cooling mode or when exposed to a changing room climate, an expansion joint of 6 to 7 mm must be provided after approx. 6.5 mm active ceiling length. It should be designed open or with expansion joint profiles, so-called Göppinger profiles. The wall connection of the ceiling panels or the connection to other building materials must generally be implemented as an expansion joint. Sealing with acrylic joint filler (no silicone) is possible. The connection from active to passive panels must be made by means of an adhesive joint. For connection to gypsum plaster boards, an expansion joint must generally be provided. Connection lines should not be arranged behind the cooling ceiling elements because they must be accessible for leak tightness testing during the pressure test. Filling the system with water and flushing of the individual circuits. Leakage test of the Top 12 ceiling panels incl. connection lines according to the instruction below. Recording of the results by the executing company, and handover to the building owner or the authorised planning office. The drywall builder can mount non-active ceiling elements made of 18 mm plaster board along the edges or in the corners. The ceiling elements must be free of frost at any time; this must be documented when the system is handed over. In addition to these mounting instructions, the handling instructions of the company Xella Trockenbausystem GmbH (Fermacell) must be observed. Use only Fermacell adhesive or "greenline" joint adhesive. 243

Application technology: Fonterra radiant heating and cooling Design of the glue joint Fig. 210: Design of the glue joint Maximum joint width Abb. 211: Max. joint width To create the glue joint, the glue tip of the joint adhesive is moved to the centre of the panel edge of the mounted Fonterra Top 12 ceiling element. Make sure to apply a sufficient amount of adhesive. Then, the second Fonterra Top 12 ceiling element is pressed tightly against the panel edge of the first element. When pushing the two panel edges together, the edge must be completely filled with adhesive. The maximum joint width is 1 mm. Escaped adhesive can be removed after full curing of the adhesive (approx. 18 to 36 hours). Do not install Fonterra Top 12 panels with a mean relative humidity of > 80%. The room temperature must be at least +5 C. For application, the adhesive must have a temperature of > +10 C. Transport, storage, and handling conditions The ceiling elements should be stored laying flat on a clean, dry, and frost proof underground. Top 12 ceiling elements are supplied on pallets and must be protected from soiling and damage. Wait until immediately before mounting the panels before you remove the packaging foil to prevent the plasterboard material from absorbing moisture. 244

Fonterra Top 12 Mounting Allow the panels to adjust to the surrounding room climate which should not change significantly in the 12 hours following installation. Lower temperatures and relative humidity prolong the curing time for the adhesive. Transport the panels in vertical position. For execution of the smoothing work, the humidity must be < 70% and the room temperature > 5 C. Since building moisture prevents drying of the filler, plastering and screed work must have been completed and sufficiently cured. The ceiling elements must be free of frost at any time; this must be documented when the system is handed over. Flushing of the pipelines Before executing the pressure test, all heating/cooling circuits of the Fonterra Top 12 system must be flushed until the leaking water contains no more air. Close the supply and return flow at the manifold as well as all supply valves Open the first supply valve Via the KFE tap at the manifold, flush the circuit with filtered water until the leaking water contains no more air. Close the valve again and repeat the process for all supply valves Open the supply and return flow locks at the manifold again and do a pressure test Pressure test Carry out the pressure test at a pressure of max. 0.6 MPa (0.6 bar) (also refer to the separate pressure log). When the work lot is handed over to the drywall builders, the pressure must be increased to double the operating pressure. This pressure must be maintained until the end of the drywall work. It is mandatory that system components not designed for this pressure, such as expansion vessels, safety valves etc., are shut off or removed. Please note that a 10K change of the pipe wall temperature occurring during the pressure test will change the test pressure by 0.5 to 1 bar. 245

Application technology: Fonterra radiant heating and cooling Commissioning Setting of the calculated flowthrough volumes via the flow sensors at the manifold Mounting the actuators Setting the operating temperature Checking the heating and cooling function of the Fonterra Top 12 ceiling elements Fonterra Top 12 panels are factory-primed. After smoothing, their surface is ready for painting. Surface finish Before starting to work, check the surface to be treated including the joints: It must be dry, firm, and free of spots and dust. Furthermore, plaster or grout splatters must be removed, grooves and connecting end must be filled with Fermacell filler and sanded or smoothed. After smoothing, the surface of Fonterra Top 12 panels is ready for painting. Additional priming is only necessary if required by the manufacturer of finishing systems for use on plaster board. The moisture of the Top 12 panels on the construction site must be under 1.3%. This corresponds to a curing time of approx. 48 hours at 70% humidity and a min. room temperature of 15 C (caution is required with previously applied wet screeds). Application of coats of paint To apply coats of paint on Fonterra Top 12 ceiling panels, proceed as with traditional plaster boards. You can use any type of commercially available paint, e.g. latex or water-based paint, or varnish. Before applying mineral paints such as whitewash and silicate paint or other special paints, check that they have been approved for this use by the manufacturer of the painting system. Apply the paint according to the manufacturer's information in at least two worksteps. Plastering dry construction systems If plastering of the Fonterra Top 12 ceiling panels (e.g. with acoustic or textured plastering) is necessary or desirable for structural reasons, the ceiling panels must be impregnated with blocking primers with a low water content belonging to the plaster system. In the area of the corner and wall connections, textured plasters (max. thickness 4 mm) must be cut with the trowel. Textural plasters with mineral binding agents suitable for plasterboards or synthetic resin plasters can be used in compliance with the plaster manufacturer's processing instructions. During plastering, the surface temperature should be approx. 22 C. 246

Fonterra Top 12 Mounting After filling the joints and screws, the surface of the Fonterra Top 12 ceiling elements is ready for painting. According to Data sheet 2.1 of the Bundesverband der Gips- und Gipsbauindustrie e. V. (Association of the German gypsum industry), this corresponds to quality level 1. Terms like "Ready for painting" or similar used in tender documents do not sufficiently define the surface quality to be provided. Unless specified otherwise in the contract, the levelness tolerances of DIN 18202 Table 3 line 6 apply. Worksteps required to reach Q2: Gluing of the joints Removal of any protruding adhesive after curing Filling of the visible connection elements by means of Fermacell or gypsum filler Smoothing of the joints and connection elements until free of burrs or unevenness Quality level 2 does not exclude visibility of the joints, above all in raking light. For quality level 3, the increased requirements should be agreed upon according to Table 3, line 7. Worksteps required to reach Q3: Gluing of the joints Removal of any projecting joint adhesive after curing Smoothing of the visible connection elements with joint filler Extended filling of the joints Use filler to amply coat the entire surface, and smooth it sharply. A surface quality of quality level 3 goes beyond the standard requirements and must therefore be specifically agreed in the contract. It is not fully excluded that unevenness may be visible in raking light (e.g. visible joints). However, the unevenness is smaller than with Q2. The surface texture must not have any visible differences. If the surface is to be assessed at raking light or artificial lighting, the customer must ensure that these lighting conditions are available during execution of the works. The highest quality level 4 requires a filler coat over the entire area; it must be contracted out or agreed separately. The relevant processing guidelines of the individual system providers must be observed. 247

Application technology: Fonterra radiant heating and cooling Single room regulation The cooling and heating ceiling Fonterra Top 12 uses a heating/cooling room thermostat for single room regulation. This room thermostat is used for heating and cooling; in connection with the basic unit heating/cooling, it acts on the actuators of the manifold station. To switch to cooling mode, a "changeover" contact is used, e.g. from the central instrumentation and control engineering system. If the room temperature exceeds the value preset at the room thermostat due to external or internal loads, the so-called self-regulation effect of thermally active surfaces comes into play: Energy is transmitted only due to the prevailing temperature differences. The self-regulating effect of surface heating/cooling systems occurs independent of control systems and simultaneously with a change in room temperature. Example: Room situation: 24 C RT Surface temperature of the cooling ceiling 22 C Output-defining temperature difference 2K If the room temperature increases (as in the example above) from 24 C to 26 C, the output-defining temperature difference increases from 2K to 4K. While the surface temperature remains at 22 C, the output of the cooling ceiling doubles. To ensure this functionality, Viega recommends 24-hour operation of the Fonterra Top 12 system. Supply of fresh air Fonterra Top 12 heating/cooling circuits are used for room heating and cooling exclusively. This means that they cover the function of energy transport but not of air exchange. Hygienic air exchange need to be ensured. To this end, the Fonterra Top 12 systems can be combined with all commercially available ventilation systems. Since the cooling ceiling takes over the major part of the energy load, a smaller-dimensioned ventilation system can be used, which significantly reduces the operating costs. 248

Fonterra Top 12 Mounting Pressure test After completion of the pressure test, this document must be handed over to the planner. We recommend to retain the document. Building project Date Building owner's address Address of the qualified installation company Before mounting the passive ceiling elements, the leak tightness of the heating circuits is tested with water. The leakage test is carried out at the finished but not yet covered pipelines. Notes on the test procedure Fill the system with filtered water and vent it completely. In case of major differences (~10 K) between the ambient temperature and the filling water temperature, wait for 30 minutes after filling the system for the temperatures to adjust. The leakage test is done with a test pressure of min. 0.4 MPa (4 bar) and max. 0.6 MPa (6 bar). When the work lot is handed over to the drywall builders, the pressure must be increased to double the operating pressure. Visual inspection of the piping system/check per manometer*. This pressure must be maintained until the end of the drywall work. Take suitable measures to exclude freezing, for example room heating or addition of anti-freeze to the heating water. If the anti-freeze is not required for normal operation, the system must be cleaned by emptying and flushing with at least three water exchanges. The water temperature must be kept constant during the test. * Use pressure gauges which clearly indicate pressure changes of 0.01 MPa (0.1 bar). Materials used Pipes 12x1.3 mm Pipe connectors Pressing Clamping Log of the pressure test Start of the pressure test: Start pressure: Water temperature [ C]: End of the pressure test: Final pressure: Water temperature [ C]: Visual inspection of pipe connectors carried out? yes no Leak tightness was established, no permanent form changes identified in any component? yes no Has the operating pressure been set on system handover? yes no Comments Building owner Site management Qualified installation company Date/signature/stamp 249

Viega Technology GmbH & Co. KG Viega Platz 1 57439 Attendorn Germany Phone +49 (0) 2722 61-0 viega.com INT 709 365 2018-05 VPN 170369