CURRICULUM VITAE. 1. Personal Details Vincent Rudzani Rambuwani 31 October 1975, South Africa Education University of Venda, South Africa, 2002

Similar documents
SUMMARY CURRICULUM VITAE FOR DR. MCEDWARD MURIMBIKA

!"#"$%&'"()*%+*,*-.%/"0.%(,$*&$,(*+%/*)1"* 2"314314("*!.2)/.5)* 0/%-$"/2!,$*+./"*2),).%(*-%,/!/%%'6*78*',/51*9:7;*

CURRICULUM VITAE MAGNUS VAN ROOYEN

M07/11 CURRICULUM VITAE Kelly Tucker

CURRUCULUM VITAE OFFICE UNIT D40, BLOCK D, FIRST FLOOR, BROOKLYN OFFICE PARK, 1109 JAN SHOBA STREET, BROOKLYN, PRETORIA CONTACT

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries?

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

Rapid Transit Implementation Working Group September 14, 2017

VCA Guidance Note. Contents

for Biosphere Reserves

TSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009

Subject: Identification and Confirmation Procedure for Areas of Natural and Scientific Interest Compiled by Branch Ontario Parks

Botanic Gardens Conservation International (BGCI)

Date of Birth Senior Transportation Engineer. Start date with ARCUS GIBB 2003 Permanent full-time staff member

Assessing the integration of biodiversity priorities in local land-use planning using international and local case studies.

On the way to HARMONY. Ewa Kaczmarczyk

Mafikeng Local Municipality Fire Fighting Posts

Summary of Action Strategies

BCRC-SEA s PROJECT: DEVELOPMENT OF REGIONAL TECHNICAL GUIDELINES FOR E-WASTE INVENTORY AND ESM 5R OF E-WASTE

The GLTFCA - Greater Kruger processes 9 October 2018 Marisa Coetzee, Greg Martindale, Wehncke van der Merwe

Iran s Efforts for Progressive of Environmental Impact Assessment In a Transboundry Context

Rural Environment and Conservation

Annex D: Project Logframe Matrix

We provide exceptional solutions to help our clients achieve success.

Slope Stability Management Framework

The BION Biodiversity Network linking stakeholder from local, national, and international organizations

Philadelphia Water Department, Green Infrastructure Implementation Graduate Internship Opportunities Summer 2017

IMPLEMENTATION STRATEGY: GOAL 1: TO SUSTAIN A HEALTHY NATIVE PRAIRIE GRAZING RESOURCE

CHAPTER 4: CONTEXTUALISING THE PROPOSED PROJECT ENVIRONMENT WITHIN THE NATIONAL AND LOCAL

RURAL TRANSPORT TRAINING MATERIALS

Position Description

Stephen Berrisford Planning law and policy consultant Concise CV

Born: 20 April 1950 Place of Birth: Durban, South Africa ACADEMIC EXPERIENCE OTHER RELATED EXPERIENCE PERSONAL INFORMATION

Catherine Rwamba Githuku

Describing the Integrated Land Management Approach

Letcombe Brook Project Officer

1 Introduction. Chapter. In this chapter:

U N. United Nations Decade on Biodiversity. Convention on Biological Diversity. Ref.: SCBD/SPS/DC/SBG/JL/JA/ November 2017

Rocky Areas Project Guidance HABITAT

Presented by: Remy Norbert DUHUZE Director/ER&PC REMA

First Nation of Na-Cho Nyak Dun

CONSULTANT VACANCY ANNOUNCEMENT

Biodiversity: My Hotel in Action

TRANSPORTATION: Roads and Highways Services

REPORT on the implementation of the CoE/EU Joint Programme Emerald Network of Nature Protection Sites, Phase II in Belarus in 2013

INDEX INTRODUCTION. The development encompasses multifaceted living and will include the following:

WWF International Danube-Carpathian Programme is seeking to contract an

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

Heritage Master Plan. A new participative planning instrument for heritage and landscape in Flanders

Cape Environmental Assessment Practitioners(Pty)

Local Authority Involvement in the Historic Environment

The UK National Radon Action Plan From Directive to Publication

Location: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE

NON-TECHNICAL SUMMARY

Franciska Lake Associate Partner

Wildlife and Planning Guidance: Neighbourhood Plans

BOTSWANA LIBRARY ASSOCIATION IFLA /BSLA GLOBAL MEETING MANILLA,PHILLINES 30 th MAY-2 ND JUNE 2016

THE MINISTRY OF INFRASTRUCTURE AND THE ENVIRONMENT OF THE KINGDOM OF THE NETHERLANDS

Biodiversity Action Plan Background Information for discussion purposes

HS2 Environment. Protecting the environment

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

Fostering Indigenous Relationships Within Canada - How Far We Have Come: A View from Walpole Island First Nation

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

The Jigsaw: Legal Instruments for Biodiversity Planning in South Africa

GREEN NETWORK APPLICATIONS IN ESTONIA

Environmental Impact Assessment

LANDSCAPE ARCHITECTURE

Management Standard: Fire Safety

CEN/TC 391 Business Plan Revision Nov 2010 Page 1 EXECUTIVE SUMMARY

Our mission is to provide innovative, appropriate planning solutions, which is cost effective and conducted in a professional way.

IFLA Strategic Plan

A proposal for using the potentials of citizen science programmes in urban bird. studies. Dhanya R*, Ranjini J and P A Azeez

A.3. Preliminary Environmental Information Report. Riverside Energy Park EN STATEMENT OF COMPETENCY. June 2018 Revision 0

SCIENCE AND RESEARCH INTERNAL REPORT NO.75 DATABASES AND THEIR APPLICATION TO MANAGEMENT PLANNING. W. Mary McEwen

INTERNATIONAL SEMINAR

LIST OF APPENDICES. Appendix A Terms of reference and descriptions of the services. Appendix B Key Criterions for Selection

Expert Workshop on Integrating Protected Areas into wider Land and seascapes- Costa Rican case

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Wise use of floodplains - a demonstration of techniques to evaluate and plan floodplain restoration LIFE99 ENV/UK/000203

Bachelor of City Planning [BCP] (Hons)

Anglo American Platinum; Mogalakwena Mine: Construction of Bridge and Gravel Road. Consultation with community members 26 July 2016

Pathway to 2020 Protected Areas Workshop for New Brunswick

Branch Fire Rescue Services

Green infrastructure: the urban dimension Chantal van Ham EU Programme Officer IUCN - International Union for Conservation of Nature

Community Conservation Workshop. Saranac River Basin Communities

Indonesia: Towards Habitat III and the New Urban Agenda

Coordinadion and Cooperation. The Czech Republic Experience

ENVIRONMENTAL SERVICES

GGB Learning & Teaching Program:

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

Recognising & encouraging conservation in the areas where we live & work

1 Introduction: 2 Current situation and gaps in EcIA

Central Lake Ontario Conservation Conservation Lands Master Plan

Nature & Biodiversity

FIRE SAFETY MANAGEMENT PLAN

Urban Green Space Management (Horticulture) FdSc Course outline

Marizanne Vos Curriculum Vitae

BCGEU JOB DESCRIPTION MINISTRY OF FORESTS

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Transcription:

CURRICULUM VITAE 1. Personal Details Full Name Vincent Rudzani Rambuwani Date of birth 31 October 1975, South Africa Education University of Venda, South Africa, 2002 2. Qualifications BSc. Hons. Earth Sciences UNIVEN (2002), South Africa Certificate in Geohydrological Principles and Tools for Environmental Managers, Centre for Environmental Science, Potchestroom, 2004 Member - Member of South African Council for Natural Scientific Profession (SACNASP) Pri Sci Nat 400161/06 Member - Geological Society of South Africa (GSSA) Associate - Water Institute of South Africa (WISA) 3. Skills Project Management Client liaison and contract administration Geohydrological investigations, borehole drilling and testing supervision. Environmental assessment and remediation Geotechnical investigations 4. Current Employer and position in enterprise 5/2006 present DIGES Position Managing Director 5. Post Graduate/Diploma Experience 5/2006 present, DIGES Managing Director 1/2003 4/2006, Africa Geo-Environmental Services (AGES) Project Manager 6. Recent Assignments Client liaison, contract administration and financial management for ten schools water supply projects in Sekhukhune District, Limpopo Province, funded by the national office of the Department of Basic Education and implemented by The Mvula Trust; Client liaison, contract administration and financial management for six schools water supply projects in Sekhukhune District, Limpopo Province, funded by the provincial office of the Department of Basic Education and implemented by The Mvula Trust; Client liaison, contract administration and financial management for six schools water supply projects in Capricorn District, Limpopo Province, funded by the provincial office of the Department of Basic Education and implemented by The Mvula Trust; Client liaison, contract administration and financial management for seventeen schools water supply projects in Vhembe District, Limpopo Province, funded by the national office of the Department of Basic Education and implemented by Ages and CSIR; Project management and reporting for groundwater protocol investigation of 23 villages in Aganang and Molemole Local Municipalities

PERSONAL DETAILS Name : Shorai Brenda Makanza Year of birth : 1981 Nationality : Zimbabwean Mobile : +27820756685 Email : brendada24@gmail.com Resident in : Randpark Ridge, Gauteng, Johannesburg, South Africa PROFILE & OBJECTIVES High personal integrity, and able to relate to and create trust in all. Possess first-class analytical, design and problem solving skills. Dedicated to maintaining high quality standards. Able to work on own initiative and as part of a team. Persistent and flexible approach to the mutually beneficial achievement of business plans and personal goals of staff and customers. PROFESSIONAL QUALIFICATIONS Honours Degree: Post Graduate Certificate: Environmental Science (NUST, Zimbabwe) Integral Water Management (Saxion University, The Netherlands) Introduction to Geo-informatics (University of Johannesburg, South Africa) COMPUTER LITERACY Software type ArcGIS 9.3 & 10.1 Microsoft Office Use Analysis and Map Production Reporting WORK EXPERIENCE Skills and Experience - Environmental Impact Assessments; - Groundwater Quality Analysis; - Geographic Information Systems; - Natural Resources Management; - Environmental Monitoring & Audits. - Great communication ability on all levels. - Project Management. Company: Dynamic Integrated Geo-Environmental Services Country: South Africa Position: Senior Environmental officer Period: 2009-present Roles: - To carry out the assessment of Environmental Statements, including interpretation of technical reports and appendices which may comprise part or all of the ES; - Study the environmental impacts developments on soil, groundwater, rivers, lakes, wildlife habitats, and all sorts of ecosystems; - Site surveys, as well as anticipating future ecological developments; - To ensure that the EIA register is maintained and kept up-to-date;

- To prepare and give evidence at public inquiries, as required; - To prepare and present reports to the relevant stakeholders - To comply with relevant legislation, policies and stakeholder department instructions and resolutions Projects worked on include - EIA for various Townships, Residential Complexes and Office Parks South Africa - EIA for various Electricity Power lines- ESKOM (South Africa) - EIA and Monitoring for various Roads, bridges and pipelines South Africa; - Formulation of Municipality s policies and State of the Environment Reporting; - Licensing, monitoring and auditing of Landfills- South Africa Other Responsibilities - Project Management; - Contract administration and billing of clients; - Liaison with clients/local authorities/professionals/contractors. Company: Ministry of Environment & Natural Resources Management Country: Zimbabwe Position: Southern Africa Biodiversity Support Programmes Assistant Period: 2006-2007 Role - Packaging and disseminating targeted biodiversity materials to stakeholders; - Liasing with the Programme Management Unit (PMU) in Gaborone and host institutions on regional databases for up to date information on Programme outputs; - Working closely with Convention Biological Diversity National Focal Point and National Programme Coordinator to ensure that national Clearing House Mechanisms (CHMs) access information on biodiversity related documents and outputs; - Convening meetings of the National Biodiversity Forum, expert working groups and other key stakeholders on specific biodiversity topics; - Documenting specific activities undertaken by National Biodiversity Task Forces and Expert Working Groups and their outcomes; - Conducting a stock take of relevant biodiversity initiatives/projects underway in the country and the SADC region; and - Assist the National Programme Co-ordinator in raising awareness on the Programme at different national fora; Other Responsibilities - Development of Biodiversity proposals for funding; - Liaison with clients/local authorities/professionals/contractors. Company: IUCN-ROSA- The World Conservation Union Country: Zimbabwe Position: Intern: Ecosystems Programme Period: 2002-2003 Roles - Work with regional, national, and international environmental organizations to help develop environmental management policies that takes into account economic, social, and environmental values; - Production of summary documents and preliminary reports used in project formulation and design; - Developing environmental project proposals for Southern Africa; - Seek funding for the developed proposals; - Develop situation analyses; - Preparation of work plans and related key result areas; - Preparation of implementation schedules, activity tasks, programme material requirements and itinerary for regional workshops. - Documenting specific activities undertaken by the Ecosystems Programme PROJECTS EXPERIENCE Borrow Pits

Borrow Pit Application for Upgrading of gravel road from Praktiseer to Taung village within Greater Tubatse Local Municipality. Borrow Pit Application for road upgrading from Lebowakgomo to Tooseng village Borrow Pit Application for road upgrading from Polokwane to Matlala village within Aganang local Municipality Capricon District, Limpopo Province (18 months). Bridges Basic Assessment for the proposed construction of an access bridge at Tidintitsane village within Greater Tubatse Local Municipality, Sekhukhune District, Limpopo Basic Assessment and EMP for the proposed construction of an access bridge at Mareseleng village within Greater Tubatse Local Municipality, Sekhukhune District, Limpopo 24G Application for the construction of an access bridge at Manyaka village within Greater Tubatse Local Municipality, Sekhukhune District, Limpopo 24G Application for the construction of an access bridge at Tutakgomo village within Greater Tubatse Local Municipality, Sekhukhune District, Limpopo Bulkwater Supply Pipelines Basic Assessment and EMP for the proposed construction of 7km bulkwater supply pipeline from Mavambe village to Malamulele CBD within Thulamela Local Municipality, Vhembe District, Limpopo Province; Basic Assessment and EMP for the proposed construction of 15km bulkwater supply pipeline from Maandagshoek to Diphale village within Greater Tubatse Local Municipality, Vhembe District, Limpopo Province Cemeteries Basic Assessment, EMP, Geotechnical survey and Geohydrological survey for the proposed establishment of a cemetery in Seshego within Polokwane Local Municipality of Capricon District, Limpopo Province Demarcations Demarcation of 100 stands at Mtititi Plange within Thulamela Local Municipality of Vhembe District Demarcation of 100 stands at Mtititi Lombard within Thulamela Local Municipality of Vhembe District EMP and Basic Assessment Report of Mahatlani village within Makhado Local, Vhembe District, Limpopo (Demarcation of Residential Stands). EMP and Basic Assessment Report of Ga-matshubeng village within Greater Tubatse local Municipality, Sekhukhune District, Limpopo Province (Demarcation of Residential Stands). EMP and scoping report and EIA for the proposed township establishment at Praktiseer within Greater Tubatse Local Municipality (demarcation of stands). EMP and Basic Assessment Report of Malokela village within Greater Tubatse Local Municipality,Sekhukhune District, Limpopo Province (Demarcation of Residential Stands). EMP and Basic Assessment Report of Mulodi village within Mutale Local Municipality, Vhembe District, Limpopo (Demarcation of Residential Stands). Natural Resources Management Compilation of SADC Biodiversity Strategy; Proposal for the Integration of HIV/AIDS in Natural Resources Management in Southern Africa; Research article on Forest certification: A tool for sustainable development: Pumula Forest Block, Bulawayo, Zimbabwe;

Situation Analysis on the status of Biodiversity in Southern Africa; Patenting of natural resources in South Africa. Power Lines Proposed construction of a 132Kv loop in loop out power line from Makonde T-off point to the proposed Tshilamba substation within Thulamela and Mutale Local Municipality. Proposed construction of a 132kV power line from PPRUST substation to the proposed Akanani substation within Mogalakwena Local Municipality. Proposed construction of a 45 km 132kV power line from Jane Furse substation to the proposed Mamatsekele substation within Makhuduthamaga Local Municipality, Greater Sekhukhune District, Limpopo Province Proposed construction of a 30 km 132kV power line from Amandla substation within Elias Motsoaledi Local Municipality, Greater Sekhukhune District to Kwaggafontein substation within Thembisile Hani Local Municipality, Nkangala District. Roads Environmental Management Plan for the maintenance of P1/6 road within Polokwane Local Municipality. EMP and Basic Assessment Report for Upgrading of gravel road from Praktiseer to Taung village within Greater Tubatse Local Municipality. Environmental monitoring for road upgrading from Lebowakgomo to Tooseng village (18 months). Environmental monitoring for road upgrading from Polokwane to Matlala village within Aganang local Municipality Capricon District, Limpopo Province (18 months). Environmental monitoring for road maintenance from Hoedspruit (R527) to Kamperus (R531) within Maruleng Local Municipality of Mopani District.