Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Similar documents
Report Date: April 27, 2018 Contact: Steve Brown Contact No.: RTS No.: VanRIMS No.: Meeting Date: May 16, 2018

WELCOME WHY A TEMPORARY PATHWAY? WE WANT TO HEAR FROM YOU

Shift Rapid Transit Public Participation Meeting May 3, 2017

Vancouver Towers + Podiums. West End to Abu Dhabi

Key Themes and Responses May 2016

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

The Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

Welcome to the Oakridge Centre Open House

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Building Great Neighbourhoods. Strathcona

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Old Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015

BROADWAY-ARBUTUS POLICIES. Adopted by City Council on July 7, NOTE: To be considered in combination with applicable guidelines

38 Queen s University Campus Master Plan Part 1

Johnson Street Bridge Public Realm Update

Engagement Summary Gastown Streets: Local Business Visioning Workshop

Evergreen Line Rapid Transit Project

St. Clair Avenue West Area Transportation Master Plan

Denver Moves: Transit Task Force

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

WELCOME NEIGHBORS! April 11, 2019

Lakeview and Port Credit District Policies Review Public Engagement Process

WELCOME AREA 2 AREA 1 AREA 3 AREA 4 WHAT HAPPENS AT THE END OF THE PROCESS? AREA 5

Green Line North Centre City Alignment

Figure 3-1: Public Realm Plan

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Toronto Complete Streets Guidelines

Rapid Transit Implementation Working Group September 14, 2017

COMMUNITY HEART HEATHER STREET LANDS

MOUNT PLEASANT COMMUNITY PLAN

Cambie Corridor Planning Program Phase One. Standing Committee on Transportation and Traffic January 19, 2010

Town of Oakville Streetscape Strategy

implementation r expression in landscape

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

HS2 Interchange Station Design

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

Issues Requiring Future Study

PUBLIC MEETING April, 20161

Town Center (part of the Comprehensive Plan)

REVIEW AND EVALUATION OF REGIONAL LAND USE

Introduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback.

Harlem Avenue Corridor Plan: Corridor Planning Across Municipal Boundaries

History: a Grand Urban Boulevard

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

CAMBIE CORRIDOR PLAN

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

CHAPTER 7: Transportation, Mobility and Circulation

Cambie Corridor Planning Program Phase Two Draft Plan. Standing Committee on City Services and Budgets May 5, 2011

Marpole Community Plan. Parks and Open Space

BeltLine Corridor Environmental Study

Plan Framework Report. Attachment A

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

TRANSIT RICH DEVELOPMENT

Evaluation Criteria. Detailed Evaluation Criteria

Building out the Regional Growth Strategy in Surrey: a Strong Centre & a Connected Transit City

Executive Summary. NY 7 / NY 2 Corridor

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

U Boulevard Area, 2018 Update. U Boulevard Area Update. Public Consultation Summary Report

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

California Environmental Quality Act (CEQA) Environmental Review Process

Planning for TOD Implementation at a Corridor Scale

Relief Line Project Assessment

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

BAYFRONT INDUSTRIAL AREA RENEWAL STRATEGY

TEMPLE MEDICAL & EDUCATION DISTRICT

Northeast False Creek : Past, Present and Future

Queensborough Eastern Neighbourhood Node. Community Open House

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

Aldershot GO Draft Mobility Hub Concepts. East Plains United Church September 13, :30 8:30 pm

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

City of Vancouver Regional Context Statement Official Development Plan. (Adopted by By-law No , September 24, 2013)

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

SLIDE TITLE. TRANSIT AGENCIES AND COMMUNITY PLANNING Case Study in Supporting TOD with the Chicago Transit Authority TRANSPORT CHICAGO 2017

WHAT WE HEARD REPORT - Summary Bonnie Doon Mall Redevelopment Application (LDA )

Planning for TOD Implementation at a Corridor Scale

Project Overview. Get Involved. Public Information Meeting. Contact Information

WELCOME! WHAT IS A GREENWAY?

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Maplewood Avenue Downtown Complete Street Project

The West Vaughan Employment Area Secondary Plan Policies

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Jenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Burnside Gorge Neighbourhood Plan. Engagement Summary

Transcription:

WELCOME Welcome! MILLENNIUM LINE BROADWAY EXTENSION Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs. The Broadway Corridor is home to the second largest employment centre in B.C. and the largest hospital and university in Western Canada. The corridor is home to the 99 B-Line, the busiest bus route in Canada and the United States, and Commercial-Broadway Station, the biggest transit bottleneck in the region. Rapid transit along this busy corridor will ensure that our region stays connected, efficient, and economically strong. The Millennium Line Broadway Extension was prioritized in the 10-Year Vision created by the Metro Vancouver Mayors Council on Regional Transportation. The Broadway Extension is the City of Vancouver s number one transportation priority, and one of the most significant infrastructure investments for the region s future. As a direct extension of the existing Millennium Line SkyTrain service, the Broadway Extension will start at VCC Clark on an elevated guideway for 800 metres, then travel approximately 5 km beneath Broadway to six new stations, ending at Arbutus Street.

PROCESS In fall 2016, the Mayors Council approved Phase One of the 10-Year Vision for Metro Vancouver Transit and Transportation, including funding to advance planning and design work for the Broadway Extension. 2016 2017 2018 DEVELOPMENT OF DESIGN PARAMETERS PROCUREMENT & FINAL DESIGN Public & Stakeholder WE ARE HERE ENVIRONMENTAL & SOCIO-ECONOMIC REVIEW Engagement Close Inform Engage Ongoing Communications the Loop Inform Re-engage on issues and opportunites related to the Broadway Extension. Engage Identify potential construction impacts and mangagement strategies. Gather feedback on station features. Close the Loop Report back with findings from our studies and listen to ideas for mitigating impacts. Engagement with Musqueam, Squamish, Tsleil-Waututh First Nations

KEY FACTS Broadway Extension 6 km extension primarily tunneled under Broadway. 6 underground stations near major intersections. Will take 10 minutes from Commercial-Broadway Station to Arbutus, half the time of the B-Line today. Serves Central Broadway jobs. Future Rapid Transit Extension to UBC Gets through most congested part of Broadway. Direct underground connection between Canada Line and Millennium Line: improved connectivity between YVR/Richmond with Burnaby and the Legend Canada Line W BROADWAY ARBUTUS ST GRANVILLE ST OAK ST CAMBIE ST MAIN ST FRASER ST VCC Clark KNIGHT ST Northeast Sector. Expandable capacity to serve the long-term needs of the corridor. Expo Line Millennium Line Millennium Line Broadway Extension Elevated SkyTrain Tunneled SkyTrain and Stations km Underground SkyTrain is the most reliable transit service and has the lowest operating costs, compared to other options considered.

LEARNING What we ve heard so far In January and February 2017, we engaged with stakeholders STRONG SUPPORT FOR THE BROADWAY EXTENSION THE PROJECT BENEFITS MOST TO QUESTIONNAIRE RESPONDENTS INCLUDED: and the community to raise awareness about the Broadway Extension. 4200 questionnaires 70+ workshop attendees 100% 75% 50% 25% 0% 92% Questionnaire KEY THEMES 77% Telephone Poll: Broadway Corridor Construction methods and impacts Project route (including an interest to extend to UBC) and station design 61% Telephone Poll: Region Percent of Responses (Between 3,830 and 3,860 responses for this question) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 4% 7% 9% 80% Reduces congestion along one of North America s busiest bus corridors. Provides fast, frequent and reliable transit service along the Broadway corridor. 77% 75% Contributes to sustainable transportation in Metro Vancouver. Enables economic growth in the region. 25% 26% 28% 30% 57% 57% 55% Provides continuous access to area businesses and services during construction. Addresses environmental impacts of construction. 52% Uses underground tunneling technology to minimize construction impacts. Important Not Important Don t Know Quick completion of project Cost and funding sources Please refer to 400+ open house attendees Lessons learned from Canada Line Cycling and walking integration Land use and housing on translink.ca/broadwayextension for more information on previous consultation on this project, including findings from the Broadway Corridor UBC Line Rapid Transit Study. 800+ independent telephone poll

LEARNING What we learned from Canada Line construction Ensure business access and visibility. Set up a Business and Community Liaison Office early with dedicated staff and ongoing community engagement. Develop and implement plan to address impacts of dust. Ensure security and adequate lighting around construction. Develop and implement parking and loading strategies for businesses. Avoid long-term open excavations through commercial, congested, or confined right-of-way. Work with community and businesses to leverage opportunities for programming and events.

STAY INVOLVED Stay involved! In spring 2017, the Federal and Provincial There will be more opportunities to get involved: governments each committed to support transit investment in Metro Vancouver, 2016 2017 2018 2019 2019 2025 including the Broadway Extension. DEVELOPMENT OF DESIGN PARAMETERS PROCUREMENT & FINAL DESIGN CONSTRUCTION The Mayors Council is in discussions to ENVIRONMENTAL & SOCIO-ECONOMIC REVIEW determine the regional funding source by late 2017 or early 2018. Public & Stakeholder Engagement WE ARE HERE Ongoing Communications Ongoing Communications Once all funding is secured for the Broadway Extension, the project team We ll be back later There will be opportunities Communications and will begin the procurement process to this year to share for public input into the engagement will be ongoing select a qualified contractor to complete what we heard, and final design of the project, throughout the construction gather further input on including construction phase to address issues as the final design and construction of the mitigation measures. requirements and they arise. extension. mitigation measures. Construction could begin as early as 2019, with an expected duration of 5 to 6 years. Engagement with Musqueam, Squamish, Tsleil-Waututh First Nations Visit translink.ca/broadwayextension to stay involved.

DESIGN Inside the Stations The following features will inform design and construction inside the stations. What do you think? Did we miss anything? Please use a sticky note to describe... Up and down escalators Accessible platforms and surfaces Easy to access information Clear wayfinding and passenger information Plan stations to accommodate long-term passenger volumes Open, transparent design to maximize visibility and safety Well lit stations Provision for future washrooms Retail opportunities Public art integrated inside stations

DESIGN Outside the Stations To help us inform the design of stations, tell us what you think of the following considerations. Please use one sticky dot per item. UN UN UN UN UN Secure bike parking Public bike share station Use public art to reflect neighbourhood character Waiting space with weather protection Street furniture, like waste & recycling bins and benches Did we miss anything? Please use a sticky note to describe...

UN DESIGN Outside the Stations To help us inform the design of stations, tell us what you think of the following considerations. Please use one sticky dot per item. UN UN UN UN UN Walking Cycling Transit Shared Vehicle Private Vehicle Recognizable as a rapid transit station Include public space opportunities at each station Prioritize access to stations considering the City s hierarchy for moving people & the needs of local communities & businesses Locate station features such as vents and emergency exits to minimize impacts on sidewalks and public space Integrate with the existing and planned walking & cycling network Did we miss anything? Please use a sticky note to describe...

CONSTRUCTION What might construction be like? TIMEFRAME CONSTRUCTION Construction will take 5 to 6 years. Construction will begin once full funding is in place and a contractor is selected through the procurement process. TUNNELS most of the project is planned to be bored tunnel to reduce disruption. Start of Tunnel (Great Northern Way Area): Activities will include launching the tunneling equipment, removal of soils, and the staging MINIMIZING IMPACTS of construction equipment and materials. End of Tunnel (Arbutus Area): Activities will Work with businesses and residents early to ensure that they know about impacts in advance, include removing the tunneling equipment and staging. and address the impacts with the contractor. TransLink, the City, and the contractor will work to minimize disruption during construction. Detailed traffic management plans will be completed to maintain traffic flow, alert people STATIONS Construction will occur at the six station sites. Some construction will take place at night. Business access, pedestrian needs, bike lanes, traffic flow, and noise will be planned for and managed to mitigate impacts. to changes in travel patterns, ensure business access, and to adapt quickly when needed.

CONSTRUCTION Transportation We think that the following construction management strategies will help to manage transportation disruptions during construction. What do you think? How effective do you think these strategies will be in managing transportation Did we miss anything? Please use a sticky note to describe... impacts? Use one sticky dot on the scale below to tell us. Minimize impacts to traffic flow and access on Broadway Maintain Broadway s function as a truck route Prioritize Broadway transit service COMPLETELY INEFFECTIVE INEFFECTIVE Minimize detours to bike and pedestrian routes Ensure pedestrian safety and security around construction zones Maintain predictable transit routes and minimize route detours EFFECTIVE EFFECTIVE Ensure dedicated staff to respond to traffic issues as they arise by adapting traffic management plans Use proactive, positive communications on websites, radio, and signage to provide advance warning of traffic changes Develop strategies to manage neighbourhood parking and traffic impacts

CONSTRUCTION Supporting Business Access & Addressing Community Needs The following construction management strategies are intended to support business access and address other community needs: How effective do you think these strategies will be in managing business Did we miss anything? Please use a sticky note to describe... access and addressing community needs during construction? Use one sticky dot on the Establish a Business and Community Liaison Office to manage the impact of construction Provide continuous and predictable access to homes and businesses, including safe sidewalks & pedestrian crossings Develop strategies to minimize and manage dust (eg. regular window cleaning) scale below to tell us. COMPLETELY INEFFECTIVE INEFFECTIVE Coordinate with businesses to ensure access to loading and parking Develop strategies to minimize and manage noise and vibration Maintain business visibility and access for customers EFFECTIVE Work with residents, business owners and stakeholders in the community to share information and promote alternative travel choices during construction Coordinate when (time of day) construction happens to reduce impacts on business and the community whenever possible EFFECTIVE

ADDITIONAL CONSIDERATIONS Great Northern Way Area The Great Northern Way area is a unique part of the Millennium Line Broadway Extension. In this area, the extension will have an elevated guideway, a portal where the guideway goes underground, and a station on the Great Northern Way Campus. Detailed decisions about the design and construction of the Broadway Extension have not been made. The construction impacts are anticipated to be greater at Great Northern Way than other stations, in order to facilitate construction staging and tunneling equipment. MAIN ST FRASER ST VCC Clark KNIGHT ST Legend Canada Line Expo Line Millennium Line Millennium Line Broadway Extension Elevated SkyTrain Tunneled SkyTrain and Stations Contruction Great Northern Way will be the launch site for the tunneling equipment and will remain active throughout construction. Removal of excavated soil and staging of construction materials typically occur near the launch site. Other equipment and activity may include tunnel ventilation and storage of tunnel segments. Design Considerations An 800 metre section of elevated guideway will extend from VCC Clark Station to the future Great Northern Way Station. The design will consider: Current and future transportation links. The configuration of the guideway and relationship to adjacent land uses. The design of the tunnel portal. Integration with the Central Valley Greenway and Great Northern Way Campus. What do we need to consider about the Great Northern Way area to guide the construction management strategies and design considerations?

ADDITIONAL CONSIDERATIONS Arbutus Street Area Arbutus Station will be the terminus station for this phase of the Broadway Extension. Passengers at this station will transfer between the Millennium Line Future Rapid Transit Extension to UBC W BROADWAY and the B-Line bus service operating between Arbutus and UBC. While we expect a similar number of 99 B-Line buses to serve the Arbutus area in the future compared to today (approximately 20 per hour), we anticipate shorter queues compared to Commercial Broadway Station. Detailed decisions about the design and construction of the Broadway Extension Legend Canada Line Expo Line Millennium Line Millennium Line Broadway Extension Elevated SkyTrain Tunneled SkyTrain and Stations ARBUTUS ST GRANVILLE ST OAK ST have not been made. However, construction impacts are anticipated to be greater at Arbutus than most stations. Special consideration must be given to the design of the bus exchange and integration with the Arbutus Greenway. What do we need to consider about the Arbutus area to guide Contruction Design Considerations the construction management strategies and design considerations? The removal of tunneling equipment is expected to take place here, which will require excavation. Bus storage and turnarounds are anticipated to be located on station property. Staging of materials and equipment may take place here. Construction of infrastructure to facilitate the terminus of the extension will occur here. The design will consider: How the bus exchange space could be used in the future when rapid transit to UBC is complete and the bus exchange is no longer needed. Pedestrians and cyclists using the all-ages-and-abilities Arbutus Greenway are expected to be affected by detours. Future Arbutus Greenway all-agesand-abilities pedestrian and bike pathway, which may include a future streetcar service.