City of Green Administration Building. Brian Koze November 12, Lighting Schematic Design Presentation

Similar documents
Duke Tower Main Entrance Lobby Overview

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

THE AUGUST WILSON CENTER FOR AFRICAN AMERICAN CULTURE PITTSBURGH, PENNSYLVANIA. PERKINS + WILL chematic Design Presentation MICHAEL P.

Lighting System Conceptual Design

Erin McCauley The Gateway Building

Eric Anderson. Technical Report 1. Existing Lighting Conditions

Lindsey Beane. Executive Summary

Café DUSON- Overview

TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA

Advanced Lighting For Office

Shepherd University Wellness Center AE 481 Revised Thesis Proposal

University of California, San Diego Cal IT 2 Brian Smith. Schematic Design Presentation 06 December 2005

Main Lobby Area (North Vestibule thru South Vestibule):

Thesis Proposal Update #2

Shepherd University Wellness Center AE 481 Thesis Proposal

Towson West Village Commons

2.0 Lighting Depth Introduction

Schematic Design Ideas for the Westlake Recreation Center. Presented by: Summer Padgett At Lutron Electronics On December 9, 2003

University of California Santa Barbara. Student Resource Building

Lighting Existing Conditions and Design Criteria Report EXECUTIVE SUMMARY

SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA

Lighting Existing Conditions and Design Criteria Report Brian Regan Ltg./Elect. Virginia Historical Society 10/8/03

Executive Summary. Houston Museum of American Art New York, New York

[Lighting Proposal Memo ] Hotel and Conference Center Virginia, USA

Lighting Depth: Courtyard Franklin Care Center, Franklin Lakes, NJ

Existing Area Description: The area is an angle around the North point of the building. It is a wide patio wrapping the façade of the building.

Schematic Design Presentation December 15, 2006 David Smith

LIGHTING EXISTING CONDITIONS SUMMARY EXECUTIVE SUMMARY Sara Lappano Ltg./Elec. Corron Cultural Center Middletown, VA

Lighting Existing Conditions and Design Criteria Report

Jennifer Mers. Rio Hondo Library and Learning Resource Center. Executive Summary. General Building. Lighting/Electrical Option

Lord Stirling Community School

Center for Health Research and Rural Advocacy

Technical Report I. jack risser lighting/electrical. s. good the nerman museum. overland park, kansas sept 16 th, 2013.

Lighting Depth Study. Exterior Departure/Canopy Area

University Park, PA. The Pennsylvania State University Architectural Engineering Lighting and Electrical Faculty Advisor: Dr.

Tech Report 1, Part 1: Lighting Proposal Memo TO: Shawn Good

Marie Ostrowski Lighting/Electrical Dr. Mistrick Science Building Phase 1 Buffalo State College Buffalo, NY Monday, October 5, 2009 Technical Report

Duke University Medical School. Duke School of Nursing

HARRY RANSOM HUMANITIES RESEARCH CENTER

Gathering Space. Function and Orientation. Space Characteristics Gregory Wolfe 2004 Senior Thesis Lighting / Electrical

Chandler City Hall Chandler, Arizona

Lighting Existing Conditions and Design Criteria Report

Lighting Proposal Memo

Executive Summary. CNBC Global Headquarters Christine Cajilig

Dorrance H. Hamilton Building

LIGHTING NORTH FAÇADE AND PLAZA

Tech Report. September 9,

Lobby Lighting Design

Inspiration. Wall Street. Innovative Dynamic. Original. Established. Powerful Enlightened. Competitive. Modern. Intrigue

Lobby Lighting Redesign

Lighting Existing Conditions and Design Criteria Report

Franklin Square Hospital Center

Lighting Design Criteria: Codes and Standards

The Sterling and Francine Clark Art Institute. Asher Harder

Quality of the Visual Environment

The Children s storytelling area

Lighting Concepts: Residential

L ig h t in g Dept h 8

The New York University Concourse Project. New York City. Existing Conditions and Design Criteria

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

UNIVERSITY OF PENNSYLVANIA NEURAL AND BEHAVIORAL SCIENCES BUILDING 415 University Ave, Philadelphia, PA 19104

Steve Neimeister 8 October 2003 AE 481W AstroPower Headquarters Newark, Delaware Lighting/Electrical Option Consultant: M. Moeck

Lighting Depth CAL IT 2. Brian Smith. Introduction

Thesis Proposal Sherrerd Hall, Princeton University, NJ

A Building Area: (sf) 10,567 SF 20,321 SF total building. Cost per Square Foot: $ Construction Cost $4,424,163

1.0 Introduction to Lighting Depth. 1.1 Hotel Tower Facace and Porte Cochere

South Nassau Communities Hospital North Addition

Perot Museum of Nature and Science Final Lighting Design Presentation. Yucheng Lu, Lighting Electrical, Adviser: Shawn Good

4.9 Mendocino Avenue Corridor Plan Design Guidelines

B. Blocks, Buildings and Street Networks

Kimberly Morton The Pennsylvania State University Architectural Engineering Program Lighting/Electrical Faculty Advisor: Dr.

Shepherd University Wellness Center AE 481 Thesis Lighting Technical Report 1

Windows Influence on Room Daylighting in Residential Buildings

Program Summary: A ,000 SF Program Statement: $46.41 $11,000,000 August 2013

Hawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr.

PLANNING BOARD REPORT PORTLAND, MAINE

Technical Report One

NRG SYSTEMS, HINESBURG, VT

Schematic Design Proposal Presentation

Technical Report #1 Existing Lighting Conditions and Design Criteria

Mezzanine Youth Area:

CEILING DESIGN: WHAT is it? and what DOES IT DO?

High Performance Lighting. Terry Egnor Senior Consultant NBI

Advances in Non-Residential Lighting Technologies

Technical Assignment I

Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 Lighting Proposal Memo September 11, 2009

13-15, 2001 USING LIGHTING SIMULATION TO ASSESS THE PERFORMANCE OF AND INDIRECT OFFICE LIGHTING SYSTEMS IN DYNAMIC WORKPLACES

ARCHITECTURAL DESIGN REVIEW ORDINANCE DESIGN GUIDELINES DECEMBER 2000 PREPARED FOR THE MEREDITH PLANNING BOARD BY CHRISTOPHER P. WILLIAMS, ARCHITECTS

The Bahen Centre for Information Technology. Meeting Room Lighting Redesign. Introduction. University of Toronto ~ Toronto, Ontario, Canada

Momo Sushi. Robert Blecker ABS 643

Senior Thesis Presentation

RETAIL DESIGN GUIDELINES

Wilshire Grand Reaching New Heights

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

Lightruss Rail HIGH PERFORMANCE LOW PROFILE. Modern Indirect Lighting System

WATERFRONT DISTRICT DESIGN STANDARDS

Multipurpose Room. Existing Conditions General Overview. Mark W. Miller Sibley memorial Hospital Grand Oaks Washington, DC

A Building Area: 10,567 SF 20,321 SF total building

Battersea, St Mary. Internal Lighting Project Lighting Design Concept Report [R2v1] July 2018

Transcription:

City of Green Administration Building Brian Koze November 12, 2010 Lighting Schematic Design Presentation

Building Statistics Location City of Green, Ohio Occupant City of Green Administration Size 53,671 Gross Square Feet Levels Three total, two above grade Cost 8.2 Million USD Date of Construction August 2008 October 2009

Project Team Architect Hasenstab Architects Inc. MEP Engineer Scheeser & Buckley Mayfield, LLC Construction Manager Welty Building Company Civil Engineer Floyd Brown Group

Occupancy and General Building Layout City Administrative Offices Engineering, Planning & Development, Human Resources, etc. Green Local School s Administration

Occupancy and General Building Layout City Administrative Offices Engineering, Planning & Development, Human Resources, etc. Green Local School s Administration

Occupancy and General Building Layout City Administrative Offices Engineering, Planning & Development, Human Resources, etc. Green Local School s Administration

Lighting Concepts & Design Visually pleasing and functional Improve appearance of architecture Relate spaces Guide and direct occupants

Four Design Spaces Introduction Entrance Structure Main Lobby Council Chambers Planning & Engineering Workspace

Space Introduction: Entrance Structure Ground Floor Plan

Space Introduction: Main Lobby Ground Floor Plan

Space Introduction: Main Lobby Second Floor Plan

Space Introduction: Council Chambers Ground Floor Plan

Space Introduction: Planning & Engineering Workspace Second Floor Plan

Entrance Structure

Description Covered 10 foot wide walkway leading to clock tower Walkway cover is 13 at highest point Clock tower is 43 tall at highest point Brick matches façade, white painted fiberglass columns Walkway glazing transmittance is.44 Section Of Walkway and Tower

Lighting Design Criteria Highlight points of interest Clock tower and walkway leading to entrance Guide occupants into the building Avoid direct and reflected glare from luminaires Reduce light pollution

Schematic Design Luminance contrast Inside to out Complements Architecture

Schematic Design Luminance contrast Inside to out Complements Architecture

Schematic Design

Main Lobby

Description Introduces occupant to interior spaces Pulls together three wings of building 2 stories Spiral staircase surrounding central elevator Skylight

Description Ground Floor Plan Reflected Ceiling Plan

Description Second Floor Plan Reflected Ceiling Plan

Lighting Design Criteria Create a psychological impression of spaciousness Use distribution of light on surfaces to guide occupants Luminance contrast of and appearance of surfaces

Schematic Design

Schematic Design

Schematic Design

Schematic Design

Council Chambers Three Schematic Designs

Description Space for large meetings, sometimes televised 2,060 SF Seating for 109 audience members and 17 officials Three different ceiling heights Ceiling materials are white GWB and acoustic ceiling tile Wood paneling on perimeter walls

Description Floor Plan Reflected Ceiling Plan

Description Floor Plan 9-4 Ceiling

Description Floor Plan 10-4 Ceiling

Description Floor Plan 11 Ceiling

Lighting Design Criteria Minimize glare for cameras, television screens, and speakers Flexible control system Enhance spaces architectural appearance Vertical illuminance Reinforce professional nature of the chamber

Schematic Design

Schematic Design

Schematic Design

Schematic Design

Workspace: Planning & Engineering

Description Simple space 8-4 high ceiling Wall material is painted GWB Ceiling material is acoustic ceiling tile

Lighting Design Criteria Flexibility of use Luminance contrast between task plane and space Eliminate distracting glare and shadows Uniformity

Schematic Design

Schematic Design Floor Plan Showing Indirect Light