Tumble dryer PT 5136 PT en - GB. Installation plan

Similar documents
Tumble dryer PT 5135 C PT 7135 C. en - GB. Installation plan

Washing machine PW 5064 MOPSTAR 60. en - GB. Installation plan

Tumble dryer PT 5137 WP PT 7137 WP. en - GB. Installation plan

Washing machine PW 6055 AV/LP PW 6065 AV/LP. en - GB. Installation plan

Installation plan Commercial Washing Machine PW 413 PW 418

Installation Plan Washing Machine PW 811 PW 814 PW 818

Installation Plan Commercial Rotary Iron PM 1210 PM 1214 PM 1217

Installationsplan / Installation plan PW 6161 EL

Installation plan PG 8581 PG 8582 PG en - US

Installation plan Heat pump dryer PT 8203 SL WP

Installation plan: PG Mat. no Version 00 US

Installation Plan. Laboratory Glassware Washer. en US PG 8583 CD. M. Nr

Installation plan: PG 8581 PG Mat. no Version 02 GB, IE, AU, NZ

Operating instructions Rotary iron HM

Installation Plan. Professional Dishwasher PG Mat. no.: en - US

Installation Specifications Laundry Care System

Installation Plan. Professional Dishwasher PG Mat. no.: en - US

Installation recommendations. Washer-extractor PW 6080 EL AV/LP. en - GB Mat. no / 04

Installation plan. Washer disinfector. en AU, NZ PG 8583 CD. M. Nr

Fan-and-filter units 4.3. Features. Fast assembly. Application diversity and functions

Installationsplan / Installation plan PG 8059

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents

28 1/2"* 72.4 cm. (*28 1/2 " to include hinges.) 41 3/4" 106 cm. 27" 68.6 cm. 28 1/2"* 72.4 cm. (includes hinges.) 28 1/2"* 41 3/4" 106 cm

Installation and Operating Manual Drying Cabinet

Installationsplan / Installation plan PG 8056

BOILING PANS GAS & ELECTRICS

Installation manual W365H, W375H, W3105H, W3130H, W3180H, W3240H, W3300H Exacta & Clarus Control

Warnings, Safety Information and Guidance

11,000 BTU Portable Air Conditioner with dehumidifier & Fan PE4-11R-03 Operating Instructions. Model No. PE4-11R Soleus Air International

>40 80 mm. Dishwasher EN Installation instructions. Appliance components >40. Recess for pipes >80. Front panel/decorative system.

Installation manual Tumble dryer

Installation manual. Tumble dryers T4290, T4530, T4650. Selecta Control

INSTRUCTIONS FOR USE TUMBLE DRYER

INSTRUCTIONS FOR USE TUMBLE DRYER

Installation manual Washer extractor

INSTRUCTIONS FOR USE TUMBLE DRYER

Professional Laundry Solutions

Instruction Manual. B Issue B. next Pump Accessories

Installation manual. Tumble dryers T4130. Compass Control

Operating instructions for the DA 8-2 Extractor

Contents. Dryer description, 4 The front The back Control panel

Installation Operation Maintenance

Installation manual Washer extractor

INSTRUCTIONS FOR USE TUMBLE DRYERS

Vacuum cleaner Instruction manual

Model No.: PS08-01 PS10-01 Ref: KY80 KY100

Drying Cabinet Installation and Operating Manual

Mobile Air Conditioner Instruction Manual Model TC-N9KM

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4

INSTRUCTIONS FOR USE

Installation instructions

BWT6.3GL Cooker Hood 60 cm Glass chimney hood

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50

CENTRAL AIR CONDITIONER SPLIT SYSTEM

DRYER INSTALLATION INSTRUCTIONS

Installation instructions for vented tumble dryer DOMESTIC. Dear Customer,

INSTALLATION INSTRUCTIONS TD75. Vented tumble dryer DOMESTIC. Carefully read the instructions for use before using the dryer.

BWTC6510GL Cooker Hood 60 cm Glass cooker hood in stainless steel. BWTC9510GL Cooker Hood 90 cm Glass cooker hood in stainless steel

Instruction manual for downdraft hood

Installation instructions for the T 9820 Gas Dryer

Installation and maintenance instructions for cabin units type vertical IDAC (V50)

EDS6051 TUMBLE DRYER USER MANUAL

VERSAFLOW VORTEX Supplementary instructions

1 SAFETY INSTALLATION OPERATION FAULT DIAGNOSTICS COMPONENTS FUNCTIONS TECHNICAL SPECIFICATIONS...

INSTALLATION GUIDE NZ AU GB IE

Original instructions AR

Model No. PE2-07R / PE2-09R / 9000 BTU Portable Air Conditioner with dehumidifier & Fan PE2-07R-62 / PE2-09R-32 Operating Instructions

INSTRUCTIONS FOR USE - TUMBLE DRYER AWG 367

INSTALLATION MANUAL. Split-type Air Conditioner (Cooling and Heating) Outdoor Unit UQB09JJWC UQB12JJWC. Indoor Unit AQB09JJWC AQB12JJWC

Model MKFT 115 Dynamic climate chambers for rapid temperature changes with humidity control and extended low temperature range

AirStar Clinical Air Compressor AS60, AS90 and AS120. Installation & Operating Instructions

MRXBOX95-WH1. Mechanical Ventilation Unit with Heat Recovery for Wall Mounting Installation and Maintenance. Bracket

Commissioning, Programme chart and Settings PT 7137 WP Vario

Operation Manual Portable Room Air Conditioner Models: RPC26WA / RPC35WA / RPC41WA

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

HEAT RECOVERY AIR HANDLING UNIT

User and maintenance manual

Trimbox Mixed Flow Fans. Product Manual. ventilation systems TP220T TP221T TP222T TP223T

GARAGE HEATER WITH REMOTE INSTRUCTION MANUAL MODEL: HA24-100E HA24-150E. Figure 1

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 21 to 39 kw

Air Conditioner PORTABLE. Instruction Manual. Your Guarantee. Portable Air Conditioner / Heater. For model WA-7500M

Electronically controlled instantaneous water heater. MCX: 27300, and models. Installation instructions

IF IN DOUBT, INSTALLATION SHOULD BE MADE BY A QUALIFIED ELECTRICIAN IN ACCORDANCE WITH CURRENT WIRING REGULATIONS.

Equipment Information

GAS FR25 IR FRYERS. Grande Carte SPECIFICATIONS CONSTRUCTEUR. Part A: Technical characteristics Part B: Technical instructions for installation

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

MRXBOX95-LH1/LH2. Mechanical Ventilation Unit with Heat Recovery for Loft Mounting Installation and Maintenance. Spigot 4.

VERSO Air Handling Units

Operating Instructions Condenser Dryer T 1570 C. To prevent accidents and machine damage read these instructions before installation or use.

Portable Air Conditioner 6,000 BTU 8,000 BTU 10,000 BTU

Technical information for installation and operation

Product Dimensions Large Capacity Vented Dryer Angled control T8003 / T8005

Installation, operating and servicing instructions

Instruction Manual. Alarm Unit For Low Gas Level # Read manual before use! Observe all safety information! Keep manual for future use!

GIRBAU HIGH-PERFORMANCE HARD-MOUNT WASHER-EXTRACTORS FOR VENDED LAUNDRIES RMG033 RMG040 RMG055 RMG070 VENDED WASHER-EXTRACTORS

Operating and Installation Instructions

Installation manual. Tumble dryer T5675. Type N /AU Installation manual in original language

GETTING STARTED? EASY.

Installation and Maintenance

Transcription:

Installation plan Tumble dryer PT 5136 PT 7136 To avoid the risk of accidents or damage to the machine, it is essential to read operating and installation instructions before installation and commissioning This prevents both personal injury and damage to the machine. 10 145 460 / 01

Legend: Connection required AL Vented KLZ Cooling air Connection optional or required, depending on model ASK Condensate drain hose PA Equipotential bonding B Machine anchors SLA Peak-load connection EL Electrical connection UG Box plinth F Machine feet, adjustable UO Open plinth KG Payment system WTV Washer-dryer stacking kit KGA Payment system connection XKM Communication module KLA Cooling air ZL Air intake All rights reserved. 12/1410 2 10 145 460 / 01

PT 5136/7136 Machine dimensions 10 145 460 / 01 3

PT 5136/7136 Installation 4 10 145 460 / 01

PT 5136/7136 Washer-dryer stack 10 145 460 / 01 5

PT 5136/7136 Installation 6 10 145 460 / 01

PT 5136/7136 Installation 10 145 460 / 01 7

PT 5136/7136 Technical data PT 5136 PT 7136 Drying system Vented Vented Drum volume l 130 130 Load capacity kg 6.5 6.5 Door opening diameter mm 391 391 Electrical connection (EL) Standard voltage 3N AC 400 V 3N AC 400 V Total rated load kw 6.4 6.4 Fuse rating (B trip rating according to EN 60898) A 3 x 10 3 x 10 Supply lead min. cross-section mm² 5 x 1.5 5 x 1.5 Supply lead without plug for hard-wired connection Alternative voltage (convertible by Service) 1N AC 230 V 1N AC 230 V Total rated load kw 3.24 3.24 Fuse rating (B trip rating according to EN 60898) A 1 x 16 1 x 16 Supply lead min. cross-section mm² 3 x 1.5 3 x 1.5 Alternative voltage (convertible by Service) 3 AC 230 V 3 AC 230 V Total rated load kw 6.4 6.4 Fuse rating (B trip rating according to EN 60898) A 3 x 16 3 x 16 Supply lead min. cross-section mm² 4 x 1.5 4 x 1.5 Non-standard voltage OS 440 (Offshore) 3 AC 440 V 3 AC 440 V Frequency Hz 60 60 Total rated load kw 6.4 6.4 Fuse rating (B trip rating according to EN 60898) A 3 x 16 3 x 16 Supply lead min. cross-section mm² 4 x 1.5 4 x 1.5 Supply lead without plug for hard-wired connection Non-standard voltage OS 400 (Offshore) - 3N AC 400 V Frequency Hz - 60 Total rated load kw - 6.4 Fuse rating (B trip rating according to EN 60898) A - 3 x 10 Supply lead min. cross-section mm² - 5 x 1.5 Supply lead without plug for hard-wired connection - Length of supply lead mm - 2000 Non-standard voltage OS 230 (Offshore) - 3 AC 230 V Frequency Hz - 60 Total rated load kw - 6.4 Fuse rating (B trip rating according to EN 60898) A - 3 x 16 Supply lead min. cross-section mm² - 4 x 1.5 Supply lead without plug for hard-wired connection - Length of supply lead mm - 2000 Variations in the follow ing countries: Standard voltage 13A (GB only) 3N AC 400 V 3N AC 400 V Total rated load kw 5.47 5.47 Fuse rating (B trip rating according to EN 60898) A 3 x 13 3 x 13 Supply lead min. cross-section mm² 5 x 1.5 5 x 1.5 Supply lead with plug = standard, = optional, + = only on request, - not available 8 10 145 460 / 01

PT 5136/7136 Technical data PT 5136 PT 7136 Standard voltage 13A (GB only) - 1N AC 220-230 V Total rated load kw - 50 Fuse rating (B trip rating according to EN 60898) A - 2.76 2.99 Supply lead min. cross-section mm² - 3 x 1.5 Supply lead with plug - Length of supply lead mm - 2000 Standard voltage 25A (GB only) 1N AC 220-230 V 1N AC 220-230 V Total rated load kw 5.03 5.47 5.03 5.47 Fuse rating (B trip rating according to EN 60898) A 1 x 25 1 x 25 Supply lead min. cross-section mm² 3 x 2.5 3 x 2.5 Supply lead with plug Standard voltage (DK only) 3N AC 400 V 3N AC 400 V Total rated load kw 6.4 6.4 Fuse rating (B trip rating according to EN 60898) A 3 x 10 3 x 10 Supply lead min. cross-section mm² 5 x 1.5 5 x 1.5 Supply lead without plug for hard-wired connection Alternative voltage (convertible) - 3 AC 230 V Total rated load kw - 6.4 Fuse rating (B trip rating according to EN 60898) A - 3 x 16 Supply lead min. cross-section mm² - 4 x 1.5 Alternative voltage (convertible) - 1N AC 230 V Total rated load kw - 3.24 Fuse rating (B trip rating according to EN 60898) A - 1 x 16 Supply lead min. cross-section mm² - 3 x 1.5 Standard voltage (N only) 3 AC 230 V 3 AC 230 V Total rated load kw 6.4 6.4 Fuse rating (B trip rating according to EN 60898) A 3 x 16 3 x 16 Supply lead min. cross-section mm² 4 x 1.5 4 x 1.5 Supply lead with plug Alternative voltage (convertible) 1N AC 230 V 1N AC 230 V Total rated load kw 3.24 3.24 Fuse rating (B trip rating according to EN 60898) A 1 x 16 1 x 16 Supply lead min. cross-section mm² 3 x 1.5 3 x 1.5 Standard voltage (USA only) 3 AC 208 V - Frequency Hz 60 - Total rated load kw 6.4 - Fuse rating (B trip rating according to EN 60898) A 3 x 30 - Supply lead min. cross-section mm² 4 x AWG10 - Supply lead with plug - Length of supply lead mm 2000 - Alternative voltage (convertible) 2 AC 208 V - Total rated load kw 4.3 - Fuse rating A 2 x 30 - Connection cable 3 x AWG10 - = standard, = optional, + = only on request, - not available 10 145 460 / 01 9

PT 5136/7136 Technical data PT 5136 PT 7136 Standard voltage (CDN only) 3 AC 208 V 3 AC 208 V Frequency Hz 60 60 Total rated load kw 6.4 6.4 Fuse rating A 3 x 30 3 x 30 Supply lead min. cross-section mm² 4 x AWG10 4 x AWG10 Supply lead without plug for hard-wired connection Alternative voltage (convertible) 2 AC 208 V 2 AC 208 V Total rated load kw 4.3 4.3 Fuse rating A 2 x 30 2 x 30 Connection cable 3 x AWG10 3 x AWG10 Standard voltage (AUS only) 1N AC 230 V 1N AC 220-230 V Total rated load kw 3.24 5.47 5.93 Fuse rating A 1 x 16 1 x 25 Supply lead min. cross-section mm² 3 x 1.5 3 x 2.5 Supply lead with plug - Supply lead without plug for hard-wired connection - Alternative voltage (convertible) 1N AC 230 V - Total rated load kw 2.2 - Fuse rating A 1 x 10 - Connection cable 3 x 1.5 - Standard voltage (J only) - 1N AC 200 V Frequency Hz - 50 60 Total rated load kw - 4.0 Fuse rating (B trip rating according to EN 60898) A - 1 x 20 Supply lead min. cross-section mm² - 3 x 2.75 Supply lead with plug - Length of supply lead mm - 2000 Vented (AL) Connection (ext. diameter) mm 100 100 Max. waste air temperature C 80 80 Electrical connection, 50 Hz Max. permissible pressure loss Pa 320 320 Max. flow rate w/o counterpressure (0 Pa) in vented mode m³/h 300 300 Electrical connection, 60 Hz Max. permissible pressure loss Pa 480 480 Max. flow rate w/o counterpressure (0 Pa) in vented mode m³/h 340 340 Equipotential bonding (PA) Machine connection (with installation kit) Peak load/energ y management (SLA) Machine connection (separate kit required) Control signal voltage 230 V 230 V Pa yment s ystem connection (KGA) Connection of payment systems Communication module (XKM) RS 232 serial interface (XKM module retrofitting kit) Installation on machine feet (F) No. of machine feet No. 4 4 Machine foot, height-adjustable with thread mm +14.5 / -7 +14.5 / -7 Machine foot diameter mm 40 40 = standard, = optional, + = only on request, - not available 10 10 145 460 / 01

PT 5136/7136 Technical data Anchoring (B) PT 5136 PT 7136 Standard anchoring Floor anchor kit (for 2 machine feet) Wood screws according to DIN 571 mm 6 x 50 6 x 50 Rawl plugs (diameter x length) mm 8 x 40 8 x 40 Anchoring of Miele plinths Miele plinth installation (fasteners included) Required anchor points No. 4 4 Wood screws according to DIN 571 mm 8 x 65 8 x 65 Rawl plugs (diameter x length) mm 12 x 60 12 x 60 Plinth floor anchoring (to be provided on site) Machine installation on permanent plinth (concrete or masonry) Plinth installation footprint (W/D) mm 600/650 600/650 Wood screws according to DIN 571 mm 6 x 50 6 x 50 Rawl plugs (diameter x length) mm 8 x 40 8 x 40 Machine data Overall machine dimensions (H/W/D) mm 850/600/709 850/600/709 Casing dimensions (H/W/D) mm 850/595/697 850/595/697 Site-access dimensions (H/W) Min. site-access (excl. packaging) mm 900/600 900/600 Installation dimensions Min. side gap mm 20 20 Recommended side gap - washer-dryer stack mm 300 300 Recommended min. distance to opposite wall from machine front mm 900 900 Recommended distance to opposite wall from front of machine mm 1100 1100 Weights and floor loads Machine weight (net weight) kg 58 58 Max. floor load in operation N 670 670 Emissions Sound pressure level in accordance with EN ISO 11204/11203 db(a) < 70 < 70 Heat dissipation rate to installation site W 215 215 Options / Accessories Box plinth (UG) Box plinth, H 300 mm (UG 5005) Box plinth, H 470 mm (UG 5005-47) Box plinth, H 750 mm (UG 5005-75) Open plinth (UO) Open plinth, H 300 mm (UO 5005) Open plinth, H 470 mm (UO 5005-47) Washer-dryer stacking kit (WTV) Stainless-steel kit (WTV 5062) Lotus white kit (WTV 5061) Pa yment s ystems (KG) Single unit (C 4060) Single unit (C 4065) Single unit (C 4070) Single unit (C 5200 BT) Features Galvanised plinth, stainless-steel sides Galvanised plinth, octoblue stove-finished side panels Galvanised plinth, octoblue stove-finished side panels Galvanised plinth, octoblue stove finish Galvanised plinth, octoblue stove finish Washer-dryer stacking kit Washer-dryer stacking kit Payment system (programme operation only) Payment system (time and programme operation) Payment system for tokens and euro coins, time and programme operation Payment terminal for GeldKarte transactions Accessories Peak load/energy management kit (BSS) Connection for peak-load and energy management functionalities Equipotential bonding kit Kit (Mat. no 09439350) available from Spares Communication module XKM (XKM RS 232-10) Retrofitting kit XKM module with RS 232 = standard, = optional, + = only on request, - not available 10 145 460 / 01 11

PT 5136/7136 Installation and planning notes Installation requirements Electrical connection should only be made to a power supply provided in accordance with all appropriate local and national legislation and regulations. In addition, all regulations issued by the appropriate utilities as well as standards relating to occupational safety, and all applicable valid regulations and technical standards must be observed! General operating conditions Ambient temperature in installation room: +2 C to +35 C. This machine should not be operated in the same room as drycleaning equipment using perchloroethylene or solvents containing CFCs. Motor sparking may convert solvent vapours into hydrochloric acid which can lead to consequential damage. Electrical connection Depending on the model, the machine is delivered with a supply lead with/without a plug. The washer may only be connected to an electrical system that conforms to the national and local codes and regulations. The installation must be performed by a qualified electrician. The appliance data plate indicates the nominal power consumption and the appropriate fuse capacity. Compare the specifications on the data plate with those of the electrical power supply. The machine can be hard-wired or connected using a switched connection in accordance with IEC 60309-1. It is always recommended to make electrical connection via a plug and socket so that electrical safety checks, e.g. during repair or service work, can be carried out easily. If the machine is hard wired, a dual circuit breaker must be provided on-site. When switched off there must be an all-pole contact gap of 3 mm in the isolator switch (including switch, fuses and relays according to IEC/EN 60947). The plug connectors or isolator switch should be easily accessible for servicing work. If the machine is disconnected from the electricity supply ensure adequate measures are taken to ensure that the machine cannot be reconnected to the electricity supply until all work has been carried out. New connections, modifications to the system or servicing of the ground conductor, including determining the correct fuse amperage, must be carried out by a qualified electrician, as they are familiar with the pertinent regulations and the specific requirements of the electric utility company. If converting the machine to an alternative voltage, observe the instructions in the wiring diagram. Conversion must be performed by an authorised agent or a Miele service technician. The heater rating must also be properly set. The machine must be permanently connected to the electricity supply so that the door can be opened. For this reason, it must not be connected to devices such as timers which would switch it off automatically. References to cable cross-sections in the technical data refer only to the required supply lead. Please consult relevant local and national regulations when calculating any other wire gauges. Vent connection Hot moist waste air should be vented to atmosphere along the shortest possible route or connected to a suitable vent system. Depending on the duct path, the damp exhaust air can condense on the duct walls to a greater or lesser extent. For this reason it is recommended to lay ducting with a downwards slope to the air exit. If ducting slopes upwards, a condensate trap either with a drip tray or a connection to a suitable on-site drain must be fitted in the system at the lowest point. Condensate must not flow back into the machine! It is permissible to vent waste air via an external wall. In this case, measures must be taken to minimise the risk and annoyance to neighbouring buildings. The end of a waste air duct leading into the open should be protected against the elements, e.g. using a suitable hood or grille or with a 90 bend. The cross-sectional area of the vent duct must not be reduced or obstructed by built-in parts. Filters and louvres must not be fitted in the vent duct. Congestion in the line may result in a drop in machine performance or to machines being switched off to guarantee safety. Proper functioning can not be guaranteed if the max. permissible pressure loss is exceeded in the vent ducting system, When connecting several machines to a common duct, the crosssectional area of the duct must be increased accordingly. Additionally, in such a case every machine must have its own nonreturn valve to prevent machines affecting others in the system. This requires the provision of on-site additional parts. In the event that waste air ducts from several machines are merged in a single collection pipe, a non-return device should be installed in each separate line to prevent backflow. With complex ducting with many bends and additional components, or with the connection of several different machines to a common duct, it is recommended that a detailed calculation is carried out by a suitable specialist. Air intake The air supply for the machine is taken directly from the installation site. During operation, adequate ventilation of the installation site should be guaranteed. Depending on the machine version, it is necessary to ensure an intake of fresh air to compensate for the volume of waste air and waste gas extracted in order to avoid the creation of a vacuum. It should not be possible to close or otherwise obstruct air intake grilles or alternative measures should be implemented to ensure that an adequate supply of fresh air is available at all times during machine operation. Equipotential bonding If necessary, equipotential bonding with good galvanic contact must be guaranteed in compliance with all applicable local and national installation specifications. Connection material for equipotential bonding must be provided on site or using a kit available from Miele Spares. Peak load/energy management The machine can be connected to a peak-load or energy management system using an optional kit. Three signals are issued by the machine via a terminal strip. The terminal strip is labelled a, b, c, and d. a - Output signal, Start of machine operation b - Output signal, Machine heating request c - Peak-load input signal, Machine heating deactivated d - Neutral conductor When a peak-load signal is received, the heating is deactivated and the programme stopped. An appropriate message appears in the display. The programme is resumed automatically when the peak-load system reactivates the heating. 12 10 145 460 / 01

PT 5136/7136 Payment system This machine can be fitted with a single-machine payment system (optional accessory). The necessary programming should only be performed by a qualified agent or by Miele Service. Serial interface The serial interface is provided by an additional XKM RS323 module. Connected external machines must also be fused in accordance with SELV requirements. External connection units must also comply with SELV. The plug-in module is provided with a connection cable and a D-Sub plug for connection. Installation and anchoring The machine must be installed on a perfectly smooth, level and firm surface which is able to withstand the quoted loads. The floor load created by the machine is concentrated and transferred to the installation footprint via the machine feet. It is not absolutely necessary to bolt the machine to the floor. The machine should be levelled in both directions with the aid of the adjustable feet. The anchors provided can be used to bolt the machine to the floor by both front feet. The material provided is intended for use in bolting the machine to a concrete floor. Bolts and fasteners for all other floor types must be provided on site. Plinth installation The machine can be installed on a machine plinth (open or box plinth, available as an optional Miele accessory) or on a concrete platform to be provided on site. The quality of the concrete and its strength must be assessed according to the machine load. Ensure that any raised concrete plinth is adequately bonded to the concrete floor below! If the machine is installed on a concrete or masonry plinth, it must be secured using the anchors supplied with the machine. Otherwise there is the danger of the machine moving and falling off the plinth during spinning. Washer-dryer stack A Miele tumble dryer can be stacked on top of the washer-extractor. A "WTV" stacking kit (optional accessory) is required for this. Installation of the stacking kit must be performed by Miele Service or an authorised agent. 10 145 460 / 01 13