Technical Specification

Similar documents
Technical Specification

Technical Specification

Technical Specification

Technical Specification

Technical Specification

Savile Plus. Steam Boiler. Suitable for Pressure Jet burners Oil, gas or dual fuel firing. Outputs kg/h

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h

SAMPLE SPECIFICATIONS

MX RANGE PACKAGED STEAM BOILERS

BOILER HOUSE PRODUCTS GMS

MOHICAN. MOHICAN 4-Pass Water Boiler, HP, PSI Section

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

FT14 and FT14HC. SG Iron Ball Float Steam Traps (1" HC, 1¼", 1½" and 2")

FEEDWATER TANK WITH DEAERATOR DATASHEET. Capacity 1000 to lt Operating Pressure 0,5 bar

Zeeco, Inc. Doc. No Tulsa, Ok Cover Page GLSF-14 Free-Jet and RWSF-4 Radiant Wall Burners. Range Fuels Soperton Plant, LLC

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

Direct Fired Heater Model AD Specification

SECTION PLUMBING EQUIPMENT

MULTIPLEX SELF RECUPERATIVE gas burner

Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to 8 bar. Heatpack boilers. to 2900kW.

Module 3: Liquid Fossil Fuel (Petroleum) Lecture 25: Refinery Equipments

BuildingName The Description of the Project P DOCUMENTS

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

Design and Construction Standards SECTION PLUMBING EQUIPMENT

SECTION HEATING BOILERS

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Assessment Schedule - TS.6

Waste/Multi Oil Boilers from Flexiheat

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

Rental Boiler Specifications (Nebraska Boiler)

FUEL-FIRED VERTICAL TUBELESS BOILERS

Ball Float Steam Trap with Integral Spiratec Sensor and Flanged Connections

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS)

THW-I NTE. Description THW-I NTE. Industrial Hot Water Boiler THW-I NTE for Oil or Gasfiring. Industrial Hot Water Boiler

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

INDITHERM. Low temperature gas burners

Drum Level Instrumentation and

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

DIVISION FINNED WATER-TUBE WATER HEATERS

LOW SURFACE TEMPERATURE RADIATORS

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

Miniature Hobby Boiler Inspection and Certification Requirements

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

Installation and Commissioning Instructions FMU3 Floor Mixing Unit with Grundfos UPM3 Pump

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

Boiler Basics. Design and operation

THE ALLIANCE FOR BANGLADESH WORKER SAFETY BOILER SAFETY

Drum Level Instrumentation and. The ASME Boiler Code Requirements. Presented by: Jim Kolbus. Topics

HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008

INSTALLATION AND OPERATION INSTRUCTIONS OVERHEAD RADIANT TUBE HEATERS

Clyde CK40. Cast Iron Boiler. Engineering Data Sheet 663/8 May Natural gas Class D oil Dual Fuel. 350 kw to 500 kw

Single stage operation oil burner

Synergy Grill User & Engineer Installation & Conversion Guide

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

FT14 Ball Float Steam Trap (Screwed)

S and SF Inverted Bucket Steam Traps Installation and Maintenance Instructions

OWNER S GUIDE ETERNITY. MODEL 540C (GC No ) INSET BALANCED FLUE GAS FIRE

Flash Condensing De-aerator Heads Installation and Maintenance Instructions

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

STR-Series Indirect-Fired Air Turnover Units

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

BAXI BOSTON ALL MODELS FLOOR STANDING OPEN FLUE (OF) CENTRAL HEATING BOILERS INSTALLATION AND SERVICING INSTRUCTIONS. GAS TYPE G20 (Natural Gas)

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS DU/DUH DUAL OUTPUT RANGE INFRARED TUBE HEATERS

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

Steam Fundamentals. (in heating & processing applications)

Technical information. Remeha P200. Pressurized boiler. Heat output: kw

SERIES 24. Series 24 Features. Commercial, Forced Draft, Hot Water or Steam Boiler. The right fit for any commercial job

HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008

Fuel-Fired Vertical Tubeless Boilers

TECHNICAL INSTRUCTIONS

OPX INDUSTRIAL RANGE THERMAL OIL

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Inverted Bucket Steam Traps

GFT-060/40/H2. Designed and built According AD-2000 regulation Homologation and branded CE According to the European Directive CE

Heating system service plans that provide total peace of mind.

HAWK GAS STOVE. Installation and Servicing Instructions

VORTEX BLUE OIL RANGE

VORTEX BLUE OIL RANGE

Grant Spira 6-26kW and 9-36kW Wood Pellet Boilers

Power Boiler Design, Inspection, and Repair

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

Easyfire Standalone biomass pellet boiler

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

WATER-TUBE POOL HEATERS

30e, 40e, 50e, 60e, & 80e, fanned balanced flue gas fired boilers

5 Series. Firetube Boilers Horse Power Dry Back Horizontal Fire Tube Design. Installation, Operation and Maintenance Manual

PARAGON GAS FRYER INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS MODEL : PDGF/PDGFP

E1808, E1838, E1848 DEEP FAT FRYER INSTALLATION, SERVICING and USER INSTRUCTIONS

MFP14 Automatic pumps for condensate and other industrial fluids

SECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS

Twin Wall Installation Instructions And Maintenance Guide

PACKAGED COMMERCIAL WATERTUBE BOILERS

STREBEL S-CB + Cascade Kits

.2 Section Waste Management and Disposal..4 Section Vibration Isolation and Seismic Control Measures.

Installation and maintenance instructions

Transcription:

Cochran Ltd Newbie Works, Annan, Dumfries & Galloway, Scotland, UK DG12 5QU Telephone: +44 (0)1461 202111 Fax: +44 (0)1461 205511 Email: info@cochran.co.uk www.cochran.co.uk Three Pass Wet Back Reverse Flame COCHRAN BORDERER Package Steam Boiler Technical Specification A Cochran Group Ltd Company Registered Office: Newbie Works, Annan, Dumfries & Galloway DG12 5QU Company Number: SC379382 Registered in Scotland Page 1 of 11

COCHRAN BORDERER PACKAGE STEAM BOILER SPECIFICATION The COCHRAN BORDERER PACKAGE STEAM BOILER is of horizontal three pass wet back reverse flame design and constructed in accordance with BS EN 12953. It complies with the requirements of the Factories Act (1961) and Arrangement 1 of Guidance on Safe Operation of Boilers Ref: BG01 developed by the Safety Assessment Federation (SAFED) and the Combustion Engineering Association (CEA), the latter being the acceptance criteria for compliance with HSE and UK Inspection Authority requirements. Additionally, the Boiler is CE Marked to meet the requirements of: Pressure Equipment Directive Low Voltage Directive Electro-Magnetic Compliance Directive Machinery Safety Directive Throughout the manufacturing process, the BOILER is subject to inspection by a leading Independent Insurance Company. In addition, COCHRAN apply their own quality procedures that comply with the requirements of ISO 9001:2008. The attached schedules detail the specification of the Boiler proposed in the tender enclosed. Schedule Description Page Number Number 1 Boiler - Pressure Parts 3 2 Boiler Mounted Fabrications 5 3 Steam and Water Mountings 6 4 Feed Pump & Water Level Controls 7 5 Combustion Equipment / Control Panel / Wiring 8 6 Painting 9 7 Terminal Points 10 8 Tools / Documents 11 We reserve the right to amend or alter this Specification during the tender validity period or the manufacturing stage of any subsequent order to comply with any alteration or amendment to applicable Standards, Safety Codes, Guidance Notes or Revisions in Manufacturing Techniques. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 2 of 11

Schedule 1: Boiler Pressure Part GENERAL All plate used in the construction of the boiler is cut and profiled by computer controlled equipment. The shell and furnace plates are then rolled, assembled, machine welded and subjected to NDT (either radiographic or ultrasonic) to ensure compliance with the latest construction standard requirements. Tube plates are drilled by computer controlled equipment to ensure the correct ligament is maintained and a satisfactory tube hole finish is achieved. Design The boiler shell, depending upon size is constructed in suitable sections. Following the rolling process, longitudinal and circumferential seams are machine welded and subjected to inspection to comply with the latest construction code requirements. Furnace The furnace is constructed in suitable sections dependent on furnace size. Following the rolling process, longitudinal and circumferential seams are machine welded and subjected to X-Ray and NDT Inspection to comply with the latest construction code requirements. Convection Tubes The boiler incorporates one pass of convection tubes fitted with purpose made turbulators. The required number of stay tubes and stay bars are fitted in all boilers. All stay tubes are lightly expanded before being welded in the main boiler tube plates Access and Inspection Access to the front tubeplate and furnace are by means of a large hinged door. Access to the rear tubeplate is by means of removable lift off doors. Waterside access is provided by a manhole or headhole as appropriate at the top of the boiler and a muddoor on the rear tubeplate. For inspection purposes, openings are provided to gain access to the steam/water side of the boiler. One 420 x 320mm elliptical manway opening is provided on the top of the boiler. One 125 x 90mm elliptical handhole opening is provided on the rear boiler tubeplate. To permit observation of the burner flame, a flame viewing sight port is provided. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 3 of 11

Seatings Mountings and controls are fitted to pads, standpipes and bosses welded to boiler shell. Materials Specification Shell and Shell Attachments Shell, Furnace, Reversal Chamber and Tube Plates: Furnace Access Tube: Stay Bars: Plain and Stay Tubes: Mandoor Head Holes Muddoor Lifting Lug: Pads (Valves): Standpipes: BS EN 10025-2 P265 GH ASTM A106 GR B BS EN 10273 P235 GH BS EN 10216-1-TR2 BS EN 10216-2 BS EN 10217-1-TR2 BS EN 10217-2 BS EN 10025-2 P265 GH BS EN 10025-2 P265 GH ASTM A106 GR B Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 4 of 11

Schedule 2: Boiler Mounted fabrications Casings; Insulation & Supports Front and Rear Casings The front casing incorporates a hinged, insulation lined door, which carries the combustion equipment and provides access to the boiler furnace and convection tubes. The rear casing is fabricated from mild steel plate and incorporates a horizontal flue gas outlet, welded to the rear of the boiler shell. Lift-off doors for access to the convection tubes are provided. The front and rear casings are provided with screen plates to further minimise heat losses. Insulation and Sheeting The boiler shell is insulated with 50mm thick high density insulation to reduce radiation loss then clad in 20G (0.812mm thick) "Stucco" aluminium sheeting to BS1470 SICH.H. Tubeplates, pads and standpipe penetrations are finished with aluminium collars. To aid access for inspection purposes inspection doors and valves are not provided with insulation, this is available on request as an added option. Pipework is provided uninsulated as the client may find it easier to insulate on site with other connecting pipework between the package and the system. Supports The boiler supports are an integral part of the front and rear casings and are provided with outriggers for feed pump and also incorporate jacking points. The front and rear supports are connected together using tie sections to provide rigidity and assist in installation. Jacking points are provided on the support structure to assist in offloading, positioning and manoeuvring the boiler. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 5 of 11

Schedule 3: Steam & Water Mountings General As standard, the valves and gauges we offer comply with BS EN 12953 and are fitted to the boiler standpipes with suitable joints and flanges drilled to BS EN 1092. Flange fixing is by metric studs and nuts or bolts. Standard valves and fitting are tabulated below: Quantity Description Manufacturer Material 1 Steam Stop Valve, Angle pattern type Ari Armaturen Cast steel 1 Single Spring High Lift Safety Valve sized to Spirax Sarco SG Iron provide 100% discharge capacity 1 Feed water isolation, Angle pattern type Ari Armaturen Cast steel 1 Feed water, wafer pattern non-return Gestra Flowserve Stainless steel 1 Multi stage, fixed speed, centrifugal feed pump Grundfos Stainless steel 1 Manual Blowdown Valve, ball type RTK Control Carbon steel 2 Reflex type water gauge assembly with steam & Klinger Carbon steel water cocks fitted to a plate type column 1 Standard integrity Probe type controls. Flowserve - 1 Flush mounted, rear entry Pressure Gauge Stewart Buchanan Aluminium 1 DN25 Blanked connection for TDS Control or Chemical injection - - Drain pipework from the water gauge drain cocks and safety valve drain are extended in suitably sized pipework terminating individually at boiler centre line. NOTES Valve materials are provided for the rating, pressure and temperature requirements. For multi-boiler installations an additional steam non-return valve will be required to comply with the requirements of Guidance Notes BG01. Cochran can provide this additional valve on request if not being supplied by your Installation Contractor. Please refer to quotation for any additional valves or mountings offered. Schedule 4: Feed Pumps & Water Level Controls WATER LEVEL CONTROLS - DIRECT MOUNTED PROBE TYPE Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 6 of 11

Two top mounted probe type water level elements are fitted, one to operate the on/off feed pump, first low water alarm and system lockout, the other to provide a second low water alarm and system lockout as follows:- One Water Level Control will provide the following operational signals: Pump On Pump Off First Low Water Alarm and System Lockout One Water Level Control will provide the following operational signals: NOTE Second Low Water Alarm and System Lockout High Water Alarm As standard, the water level control probes do not have self-monitoring capability but this facility can be offered if required. FEED WATER PUMP The feed water pump is of the multistage type sized to suit the boiler working pressure and rating. The pump is fitted to the boiler support brackets and connected to the boiler feed valve in suitably sized mild steel pipework. A feed water inlet strainer is supplied loose. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 7 of 11

Schedule 5: Combustion Equipment/Control Panel/Wiring & Testing COMBUSTION EQUIPMENT The Boiler is fitted with a pressure jet burner matched to the Boiler and suitable for the fuel(s) specified in our tender. The burner is a complete unit pre-wired and includes fuel atomiser, ignition equipment, windbox and control linkage, etc. In the case of gas fired units a matched gas train is supplied. All burners are fully automatic pressure jet type and have been designed specifically for gas and/or oil applications. Primarily designed for use when firing natural gas, our burners can be adapted to suit gases such Towns gas and liquefied petroleum gas. They have also been designed to operate with distillate and residual oils as defined by British Standards Specification BS2869 as Classes D, E, F or G. CONTROL PANEL A Boiler control panel is fitted to the Boiler supports and includes the necessary control equipment, starters, water level alarms, controls for feed pump and mains isolation. ELECTRICAL WIRING Heat resistant cabling is used for wiring between water level controls and the control panel, all other wiring is in PVC covered wiring carried in flexible conduit. Colour Coding to BS EN 60204-1:2006. FUNCTIONAL TESTING An electrical functional test of the boiler safety and control system is carried out and witnessed by the Cochran Q.A. Department Inspectors. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 8 of 11

Schedule 6: Painting Surfaces are degreased prior to painting and one coat of primer, one coat of undercoat and one finishing coat is applied. Standard Colours are as follows:- Baseframe, all Valves, Platform and Ladder (when fitted) Front and Rear Casings Screen Plates Sheeting Burner Control Panel Feed Pump Black Black Blue Unpainted Stucco Aluminium Manufacturer s Standard Manufacturer s Standard Manufacturer s Standard Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 9 of 11

Schedule 7: Terminal Points Flanges to BS EN 1092 except where otherwise stated. Screwed connections BSP except where otherwise stated. DESCRIPTION Stop Valve (Outlet) Safety Valve (Outlet) Blowdown Valve (Outlet) Feed Water (Inlet) Drain Pipework (Outlets) Flue Gas (Outlet) Oil Flow (Connection) Oil Return (Connection) Gas (Inlet) when applicable Pilot Gas (Inlet) when applicable Flanged Flanged Flanged Flanged Screwed Horizontal Screwed Screwed Flanged Screwed Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 10 of 11

Schedule 8: Tools/Documents TOOLS Tube cleaning brushes and rod handle are provided. DOCUMENTS General Arrangement Drawing and Electrical Wiring Diagrams are provided. Certificate of Compliance is provided, certified by independent Inspection Authority. Operation and Maintenance Manual is provided. NOTE: In order to take advantage of all Technical Developments, we reserve the right to amend details given in this Specification. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 11 of 11