FIRE DEPARTMENT SYSTEM PERMIT APPLICATION

Similar documents
SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Fire Sprinkler Submittal Requirements and Acceptance Testing

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

To expedite the plan review and inspection processes, please refer to the information below.

Sandwich Community Fire Protection District. Plan Review Submittal Guidelines and Requirements

ENGINEERING/PLAN REVIEW - FEE SCHEDULE Exhibit A

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

ST. LUCIE COUNTY FIRE DISTRICT FIRE PREVENTION CODE

CITY OF PETALUMA FIRE DEPARTMENT. FIRE PERMIT AND HAZARDOUS MATERIALS (CUPA) FEE SCHEDULE (September 2002)

Tents and Temporary Membrane Structures Packet

Tents and Temporary Membrane Structures Permit Procedure

Meeks Bay Fire Protection District

WELLINGTON FIRE PROTECTION DISTRICT RESOLUTION #

AUTOMATIC FIRE SPRINKLER SYSTEMS

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

SPECIAL EVENTS INSTRUCTIONS AND REQUIREMENTS Must apply at least 2 weeks PRIOR to Event Date

CITY OF PASADENA FIRE DEPARTMENT

FIRE SPRINKLER SYSTEMS POLICY

May 1, Dear Fire Suppression System Contractor/Designer:

FIRE SUPPRESSION SYSTEM REVIEW APPLICATION 1. NEW PLAN REVIEW RESUBMITTAL

Brighton Fire Rescue District

FIRE SPRINKLER SYSTEMS POLICY

September 30, Dear Fire Suppression System Contractor/Designer:

Tennessee Code/TITLE 62 PROFESSIONS, BUSINESSES AND TRADES/CHAPTER 32 FIRE PROTECTION/PART 1 FIRE PROTECTION SPRINKLER SYSTEMS

ARKANSAS FIRE PROTECTION LICENSING BOARD ACT 743 OF 1977

BCCO TRAINING FOR CONTRACTORS

FIRE SUPPRESSION SPRINKLER SYSTEM

7/1/2018-6/31/2019 PROTECTION AND PLANNING FEE SCHEDULE

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

ATTACHMENT B FIRE CODE REQUIREMENTS FOR EXHIBITS AND SPECIAL EVENTS

Washington State Convention Center Fire Safety Guidelines

Fire Department Fees.

Fire and Life Safety Requirements San Mateo City Special Events

TENTS AND TEMPORARY MEMBRANE STRUCTURES PERMIT PROCEDURE

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS

OUTDOOR FIREWORKS DISPLAY

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT

Oklahoma. 265: Incorporated national codes and standards The following national codes and standards are incorporated by reference:

Permit Application Packet

Commercial Remodel/ Add On Rules and Regulations

Inspection and Life Safety Education Division. Public Safety Committee September 9,

APPLICATION FOR INSTALLATION OF SPRINKLER SYSTEM.,. :" ROCHESTER, NH FIRE DEPARTMENT FIRE PREVENTION DIVISION

Fire Prevention Coffee Break Training. February 2017

A.C.A. Tit. 20, Subtit. 2, Ch. 22, Subch. 6 Note

New Construction Fire Inspection Process

30 DAY TEMPORARY TENT APPLICATION ON EXISTING COMMERCIAL PROPERTY

City of Santa Monica Fee Schedule Effective July 1, 2012

Fire Protection Systems Plan Review

RESOLUTION NUMBER RESOLUTION SETTING SERVICE FEES FOR OF FIRE & LIFE SAFETY ACTIVITIES.

Certificate of Occupancy Application

South Davis Metro Fire Agency

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Design & Construction Standards, Revised January

NORTHWEST FIRE DISTRICT

APPLICATION CERTIFICATE OF OCCUPANCY $50.00 FEE (non-refundable)

FONTANA FIRE PREVENTION DISTRICT USER FEE LIST 2015 DEVELOPMENT SERVICES FEES PLANNING APPLICATION FEES Administrative Site Plan 516 Conditional Use

Fire Inspection FAQ s

City of Vista Fire Department

Orange County Fire Rescue Department Office of the Fire Marshal 7079 University Blvd. Winter Park, FL Phone: Fax:

South Carolina Office of State Marshal Testing, Fees, and Recommended Study Guidelines

DOUGLAS L. BARRY FIRE CHIEF

Commercial Rules and Regulations

SALT LAKE OFF-ROAD EXPO 2018 Sponsor Information Friday-Saturday April 27 th & 28 th 2018 South Towne Expo Center Hall 5 Off-Roaders Unite!

North Liberty Fire Department Permit Application Temporary Storage & Use of LPG

VIOLET TOWNSHIP ZONING & BUILDING DEPARTMENT Rustic Drive Pickerington, Ohio (614) Fax (614)

CAMP VERDE FIRE DISTRICT

PERMIT APPLICATION Central Pierce Fire & Rescue 902 7th Street NW - Puyallup, WA Telephone (253) Fax: (253) 538.

Construction and Development Guide

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT

Fire Department Fee Schedule

For additional information please contact the Chesapeake Fire Prevention Office at or at

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

Plan Submittal Checklist

S000 SITE REVIEW APPR NO. FIRE CODE COMPLIANCE ITEM

MOBILE FOOD VENDING Food Trucks & Trailers

ROSELAND FEE SCHEDULE Fees Effective: July 1, 2016

Access Aisle (Van) (Flow Test) Water Mains (Location & Sizes) Building Entrances. Building, Facilities, Element. Curb Ramps (Built-up)

Dear Exhibitor, To assist in th. and safety issues that you may encounter with your booth.

Environmental Health & Safety

Fire Safety Guidelines and Requirements CenturyLink Field and Event Center June 2015

NOTICE TO PROSPECTIVE BUSINESSES STATEMENT OF INTENDED USE

GOLDEN FIRE DEPARTMENT FIRE & LIFE SAFETY DIVISION

Brighton Area Fire Authority

APPENDIX A FEES SECTION FC A01 CERTIFICATES A01.1

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

Temporary LPG Heat for Construction Sites Work At Risk and Inspection Information Packet

C I T Y O F B A N N I N G BANNING FIRE SERVICES 3900 W. WILSON STREET (951) PHONE (951) FAX

FIRE DEPARTMENT DESCRIPTION OF SERVICE UNIT FEE I. INSPECTION FEE

(d) (e) Section Dry cleaning. Section Exhibits and trade shows

CLOVERDALE FIRE PROTECTION DISTRICT FEE SCHEDULE

FIREDEPARTMENT REGULATIONS AND GUIDELINES

Rocky Mountain Fire Protection District 4390 Eldorado Springs Drive Boulder, CO

NASSAU COUNTY FIRE PROTECTION PERMIT APPLICATION

FIRE MARSHAL REGULATIONS

RESIDENTIAL FIRE SPRINKLER SYSTEMS POLICY

Transcription:

Permit No:_ FIRE DEPARTMENT SYSTEM PERMIT APPLICATION Thank you for submitting plans for the installation or modification of a required fire protection or detection system. Typical review of system plans will be completed within 48 hours of your submittal. You may call our office during normal business hours to check on the status of this review. (817-503-1411). The permit process consists of four steps: 1) SUBMITTAL OF PLANS. We will review and stamp up to four sets of plans. At least one CD in PDF of the plans, State Fire Marshals License, and calculations etc., must be submitted. We will retain the CD copy of the plans for our records. A full set of approved plans with any attached comments must remain on the job-site until the system is inspected and approved by the Colleyville Fire Department. The remaining plans are for your records. Plans are not reviewed until the permit fee is paid. 2) PAYMENT OF PERMIT FEE. Permit fees are established by City Council. Fees are payable to the City of Colleyville in the form of cash, check, or for a percentage you may also use MasterCard or Discover. 3) ISSUANCE OF PERMIT. Upon review and acceptance of the submitted plans, a SYSTEM PERMIT is issued. This permit is signed by the Fire Marshal or his designee and indicates approval for the work to begin, according to the plans and any attached comments. Work may not begin until the PERMIT is issued. The permit must be posted on the job-site until the inspection and acceptance of the system by the Colleyville Fire Department. 4) SYSTEM ACCEPTANCE. Upon completion of the permitted work, you must call the Fire Marshal to schedule an inspection. Please allow at least twenty-four (24) hours notice for this inspection. Upon acceptance of this system, the owner, occupant or contractor may schedule a Certificate of Occupancy Inspection. Storage of material or Occupancy of the building is not allowed until the Certificate of Occupancy is issued. [ ] NEW INSTALLATION OF AN AUTOMATIC FIRE SPRINKLER SYSTEM [ ] MODIFICATION OF AN EXISTING AUTOMATIC FIRE SPRINKLER SYSTEM [ ] NEW INSTALLATION OF A FIRE ALARM SYSTEM [ ] MODIFICATION OF AN EXISTING FIRE ALARM SYSTEM [ ] INSTALLATION OF A SECURITY OR EMERGENCY ACCESS GATE [ ] OTHER Date Submitted: # of Heads or Devices: Fee Amount Paid: Job Address Company: Address: Contact # Application made by: E-mail: PERMIT APPLICATION DOES NOT CONSTITUTE APPROVAL OF YOUR PLANS, NOR DOES IT IMPLY PERMISSION TO BEGIN WORK. WORK DONE WITHOUT THE ISSUANCE OF A PERMIT IS IN VIOLATION OF THE CITY OF COLLEYVILLE FIRE CODE.

(f) Fire prevention: Fire alarm systems: Plans review (new, alteration, or relocation)..70.00 Inspection of system once in place.. Number of Devices Fee 1 to 10 75.00 11 to 25 100.00 26 to 100 200.00 101 to 200 275.00 201 to 500 500.00 Per device for each over 500 1.00 Fire sprinkler systems- above ground: Plans review (new, alteration, or relocation)..150.00 Inspection of system once in place.. Number of heads Fee 1 to 19 heads 75.00 20 to 100 Heads 100.00 101 to 300 Heads 200.00 301 to 1,000 Heads 400.00

Per head for each over 1,000 heads 1.00 Fire sprinkler systems- underground: Fire Sprinkler System (Relocation or modification) 3 sets of detailed plans a. Inspection is required before ditch is covered b. 2 hour/200 lb. test is required 50.00 Licensing inspections: Hospitals 100.00 Nursing/long term care homes 75.00 Day care/mothers day out 50.00 Foster and adoptive homes 10.00 Home inspection- insurance 50.00 Permits and miscellaneous fees: Fixed Fire Protection System (New, alteration, or relocation) 3 sets of detailed plans 50.00 Security Gates (Required 3 set of detail plans) Plus $25.00 per required sign. 50.00 Storage of Flammable or Combustible Liquids at Construction Sites 50.00 Installation of Compressed Natural Gas (CNG) Container or Stations 50.00 Removal, relocation of Compressed Natural Gas (CNG) Container or Station 50.00 Installation of Liquid Petroleum Gas (LPG) Container 50.00 Removal, relocation of Liquid Petroleum Gas (LPG) Container 50.00

Installation of Liquefied Natural Gas (LNG) Container or Station 50.00 Removal, relocation of Liquefied Natural Gas (LNG) Container or Station 50.00 Spray Booths (New) 3 sets of detailed plans 50.00 Spray Booths (Modification or relocation) 3 sets of detailed plans 50.00 Carnivals and fairs Site Plan & Layout of venders required 50.00 Fireworks display Site inspection is required 100.00 Flammable and combustible liquids: a. Repair or modify a pipeline 100.00 b. Product removal from Underground Storage tank 50.00 c. Status change in product facilities 50.00 d. Change type of contents in liquid tank(s) 50.00 Occupant load increase 50.00 Pyrotechnical special effects 100.00 Tents (Any Size) 50.00

Underground Fire Line FIRE PREVENTION PERMIT PROCEDURES 1) Submission of plans and payment of permit fee with at least one CD in PDF format 2) Plan review and issuance of permit 3) Underground installed 4) Test and acceptance by Public Works 5) 2 Hour 200 psi hydrostatic test 6) A minimum of a 3 inch flush 7) If FDC is connected to the underground 2.5 inch locking Knox Caps are required at hydrostatic test this is an automatic failure point 8) A hydrostatic test for the overhead will not be scheduled prior to acceptance of the underground by the fire department Fire Suppression Overhead 1) Submission of plans and payment of permit fee with at least one CD in PDF format. 2) Installation of the overhead fire suppression system, this will not be done as partials. If 20 or more heads, a 2 Hr 200 psi test will be done. 3) No ceiling or drywall may be installed prior to the hydrostatic test. This is an automatic failure if installed; the ceiling or drywall will be required to be removed. 4) If the FDC is connected to the overhead the 2.5 inch locking Knox caps are required at the hydrostatic test this is an automatic failure. 5) The system is required to remain on after the hydrostatic test. 6) A final inspection will be done at the fire alarm final. Fire Alarm 1) Submission of plans and payment of permit fee with at least one CD in PDF format. 2) No wire may be run without a permit. 3) A final will be done after all flooring and finish carpentry is done; this is an automatic failure point. 4) Fire suppression system flow switches should be set for 45 seconds. Continued

Type 1 Hood System 1) Submission of plans and payment of permit fee with at least one CD in PDF format 2) When work is done coordinate the inspection with the fire alarm final. 3) An inspection will be done testing the function of the hood system and gas shut down. A $75.00 re-inspection fee will be applied for the first re-inspection. A $125.00 re-inspection fee will be applied for any other inspections thereafter. Please submit permit to: City of Colleyville Building Inspections Department 100 Main Street Colleyville, Texas 76034 (817)503.1030 For questions please call (817)503.1411