Building Operations. Associate Director: Lou Galante;

Similar documents
I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

Facilities Services Utilities Shutdown Request Form

Planned, Limited Notice and Emergency Outage Guidelines

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Date Issued: December 14, 2017 Revision: 2.1

Austin Independent School District Police Department Policy and Procedure Manual

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

FIRE IMPAIRMENT NOTICE

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

Fire Protection System Impairment Procedure

Programmatic Policy and Procedure

Skilled Healthcare Documentation Requirements Life Safety and Fire Protection

Builders Risk - Fire Prevention Inspection Checklist

Environmental Health & Safety (EHS) and Public Safety s General Requirements for Contractors

Plan Submittal Checklist

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

U N I V E R S I T Y O F HOUSTON

September 30, Dear Fire Suppression System Contractor/Designer:

ELEVATOR RESCUE PROCEDURE

UNIVERSITY. Facilities Management

B. The Facility Emergency Planners and Alternate Planners will successfully complete the in-house DJJ Fire Prevention course.

Clark County Department of Building & Fire Prevention 4701 West Russell Road, Las Vegas, NV (702) FAX (702)

Fire Watch Program. Building Administrators Building Administrators will inform building occupants about fire watch events and building evacuations.

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Fire System Impairment Policy

Bold items are particular to the City of Euless

Facility Manager Training

Chapter 4: Fire Protection Systems

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

Codes and Standards FFP1510, BFST1510, ATCP1510

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

GOLDEN FIRE DEPARTMENT FIRE & LIFE SAFETY DIVISION

CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY

Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety

HOW COMMERCIAL FIRE PROTECTION SPRINKLER SYSTEMS REALLY OPERATE

Fire Prevention Plan

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Mr. Burke presented the Airport and Boeing s badging process and public safety issues as outlined in the attached meeting agenda.

JEFFERSON COUNTY PUBLIC SCHOOLS FIRE WATCH PROGRAM

Arc Flash Protection Training - NFPA 70e Electrical Safety

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Fire Department Fees.

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

Annual Water-Based Fire Protection Systems Inspection

May 1, Dear Fire Suppression System Contractor/Designer:

SECTION ELECTRICAL SYSTEMS COMMISSIONING

Fire Prevention Plan for Alter Hall 3743 Ledgewood Drive

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Fire Prevention Plan for Campus Services Building 1630 Musketeer Drive

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Purpose: To establish procedures for identifying fire hazards and preventing fires. Scope: All Central New Mexico Community College (CNM) Community.

Maintaining Your Private Water System Non-Residential Properties. Water and Waste Department

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) INTRODUCTION

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

Tennessee Department of Health Bureau of Health Licensure and Regulations Division of Health Care Facilities

Understanding and Applying NFPA 25

Fire Prevention Plan

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS

Animals:Goats:Bleat.Calls,Warbling.Baa,Movements.Rubbing,Barn,Medium.Close,Interior,BG.Dog.Barks 01:21.618

Fire Prevention Plan for Residence Life 1625 Musketeer Drive

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Fire Suppression Introduction Contact Information

SECTION EMERGENCY POWER SYSTEMS

Fire Prevention Plan. California State University, Chico

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

WHEA FSE inspections.

Established /10/2015. Doran Pruisner Dan Wood

WEST VIRGINIA UNIVERSITY

Fire Prevention Coffee Break Training November 2014

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

Florida Building Code 2010

Brighton Area Fire Authority

Xavier Field Office Fire Prevention Plan. for. Xavier Field Office Dana Avenue

Prefunctional Checklist

The blank report forms are enclosed. If additional blank forms are needed you may contact my office at (210) and ask for Maria Castoreno.

FACILITIES PLANNED UTILITY OUTAGES POLICY

MAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS

Management Practices: Fire Protection Impairments November 2015

Presentation Outline

Application for Certification for an Alarm System Contractor

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

University Design Standard Fire Alarm Systems

Friday, November 10, 2017

Procedure for Performance of Fire/Emergency Evacuation Drills

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

INSPECTOR I SKILLS ADMINISTRATION

New Fire Codes and Your Business 2018 WPA Annual Meeting Palm Springs, CA

Life Safety Code and Informal Review Process Updates

RISK ENGINEERING GUIDELINE.

Iowa State Fire Marshal

Purpose : Project Manager. Professional. Contractor: devices/system. compatibility

Fire Prevention Plan for McGrath Health and Wellness Center 1714 Cleneay Avenue

FEO Initiation Devices Dean McLellan

CONNECTION, ENERGISING, COMMISSIONING AND PERMANENT DISCONNECTION OF HIGH VOLTAGE APPARATUS

Westminster College Fire Safety Report

What s going on with unwanted alarms?

Transcription:

Building Operations Associate Director: Lou Galante; 335-3671 Collaborative teams consisting of Zone Maintenance, Central Shops, Energy Hawk project teams that work together to ensure reliable building systems that provide safe, productive and environmental friendly working and learning environments for all who learn, research, work, and visit our university.

BLS/Building Operations 2 Area Maintenance Zones East Manager: Monte Kugley 88 Buildings North Supervisor: Durk Sterner 21 Staff: Area Mechanics, Electricians, Painter, HVAC Technicians, Pipefitters South Lead: Colby Dye 23 staff: Same

Building Operations West Manager: Monte Schooley 47 Buildings North Supervisor: Tom Moore 21 Staff: Area mechanics, Electricians, Painter, HVAC Technicians, Pipefitters South Supervisor: Jeff Goodwin 17 Staff: Same Oakdale Supervisor: Chuck Nida 10 Staff: Same

Building Operations Central Shops- Manager: Dave Longtine Carpenter Shop( Curt Fountain Supervisor) Carpentry (5 carpenters) Cabinetry (1 Cabinetmaker) Sheet Metal Welding Shop ( Curt Fountain- Supervisor) Sheet metal/welding (8 Sheet metal mechanics) Central Paint (1 Painter) Glazing (1 Glazer) Fire & Life Safety Shop ( Dustin Ripley -Supervisor Fire Alarms (6 Fire Alarm Techs) Fire Inspection(6 Fire Inspectors) Backflow Prevention (Open) Corrective Maintenance (Open)

Building Operations Central Shops (cont d) Energy Hawks - 3 Staff A quick-hit, high impact team of specialists from various Facilities Management units including maintenance services, building commissioning, controls engineering and energy management. Drawing from a rotating group of energy engineers, building controls technicians, maintenance personnel and operations engineers, the group members work in synergy to evaluate and resolve energy issues in buildings quickly and efficiently

Fire Alarm Testing, Outages and Fire Safety Power Point Inspections 2/22/16

Fire Alarm and Sprinkler system outages. Request outages 48 hours before scheduled work date. Send to scheduling email (fm-fire-safetyscheduling@uiowa.edu) and C.C. dustinripley@uiowa.edu Any hot work, will require a hot work permit. Area managers will provide the hot work permit. East = Monte Kugley West/Oakdale = Monte Schooley Project # General Contractor: FACILITIES MANAGEMENT Planning, Design & Construction Contractor Request for Outage Email Requests to: fm-fire-safety-scheduling@uiowa.edu Project Title: Person Performing Work: Cell #: Requested by: Date: Requested Outage Date: (Simplex systems cannot be shut down on Thursday.) Fire Alarm and Fire Protection system outages require a 48 hr. notice and must be submitted by 12:00 noon. Any request received after 12:00 noon will be processed the following day. (48 hrs. begin after request is processed. Week-ends and holidays are NOT included in the 48 hr. notification.) ALL OTHER OUTAGES MUST BE SCHEDULED 7 DAYS IN ADVANCE. COLLEGE OF MEDICINE REQUIRES 10 WORKING DAYS NOTICE Time of Outage: Outage Duration: hrs. System/Services being affected (i.e., Fire Alarm Sprinkler Devices): Specific Location (i.e., 3 rd Floor, Rm. 202): Reason: Service Provider: Construction Manager: Date: Date: 200 University Services Building DECEMBER 2011 EDITION Iowa City, IA 52242 319-335-5500 Fax 319-335-2722 www.facilities.uiowa.edu

Fire Alarm Testing Notifications for fire alarm testing are sent at least two weeks before the testing date. Please contact fm-fire-safetyscheduling@uiowa.edu or dustinripley@uiowa.edu if there are any questions concerning the date scheduled. Transitioning to 7-7:30 am full building alarm and limited disruption for remainder of the testing.

Fire Safety Power Points Monthly inspections, done in conjunction with extinguisher and sprinkler inspections Educate and inform building occupants to the requirements of the IFC and NFPA

Pallet and Crate Removal Working with UI Moving Services to remove unwanted pallets and crates from building loading dock areas. Currently in process.