Objectives. To review updated IBC and fire test requirements when designing for life safety.

Similar documents
Questions related to specific materials, methods, and services will be addressed at the conclusion of the presentation.

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

Code Technologies Committee Report Fire Rated Glazing Group A changes: Fire rated glazing


1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ]

FIRE/SMOKE BARRIER FUNDAMENTALS

ICC CODE TECHNOLOGY COMMITTEE Area of Study Labeling of Fire Rated Glazing

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperLite TM I-XL minute SuperLite TM I-XL IGU minute PART 1 GENERAL

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

Fire-Rated Glazing Changes in 2012 International Building Code (IBC)

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperClear 45-HS (patent pending)

PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY

Fire Rated Door Assemblies: Compliant Designs

January 1, 2014 Mandatory Effective Date

2007 CBC & CFC Residential Care Facility Requirements (24 hour care only)

PART 1 GENERAL 1.01 SUMMARY

Developing a Healthcare Facility Fire Door Inspection Program

By: Russell Bainbridge March 18th, 2016 FPE 596

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

Basic Fire Door Requirements

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

Building Description Applicable Codes & Standards Prescriptive Requirements. Performance Based Design

NFPA 45 NFPA 211 NFPA 1600

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

Fire and Smoke Door Inspections Qualified Training 02/03/17

2018 NICET Code Transition Changes

FIRE PROTECTION KEY DESIGN CONCEPTS IN HEALTHCARE FACILITIES Scott Twele, Aman Shah Steven Dannaway. AIA Healthcare Group

JOINT COMMISSION PREPAREDNESS / STATEMENT OF CONDITIONS DRAWINGS WSSHE SOUTHWEST CHAPTER NOVEMBER 19, 2015

Open to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP

INITIAL FIRE SAFETY ASSESSMENT

FIRE-RESISTANCE-RATED CONSTRUCTION A Primer on IBC Chapter 7

2015 Recommended Building Code with Amendments. The Executive Committee of the Central Iowa Code Consortium does ordain as follows:

AHC Meeting #7 July 12-13, Occupancy WG Report

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

Fire and Life Safety Committee

GENERAL FIRE SAFETY TERMS & DEFINITIONS

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

Common Building Code Misinterpretations

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1

F, T, L and W Ratings - What are the Code & Testing Requirements?

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #6

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

Fire Protection. Fire-resistant glasses. Pilkington Pyrostop Fire Resistance Glass Pilkington Pyrodur Fire Protection Glass

FOLD EXIT REQUIREMENTS MAX.TRAVEL DISTANCE ALLOWED: (TABLE ) MAX. COMMON PATH TRAVEL: (CBC ) MAX. DEAD ENDS: (TABLE 1018.

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

Life Safety - Means of Egress/Exits NFPA 101

Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

INITIAL FIRE ASSESSMENT REPORT (FAR)

FIRE SAFETY INSPECTION REPORT

Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015. Peter McDonnell, PE, LEED AP BD+C McClure Engineering

INITIAL FIRE SAFETY ASSESSMENT

CHAPTER 7 ALTERATIONS LEVEL

Richard B. Alpert, P.E. Senior FPE, Clark Nexsen

ICC CODE CORNER 2012 IFC Code & Commentary

Agency for Health Care Administration

BCAC Egress Work Group

COMPLIANCE ALTERNATIVES

Fire Protection Coffee Break Training May 2016

COMPLIANCE ALTERNATIVES

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Hands On Training for Fire Door Products and Fire Door Assemblies

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

PERFORMANCE COMPLIANCE METHODS

FIRE SAFETY REQUIREMENTS FOR PRE RESIDENTIAL BUILDINGS OF THREE OR MORE STORIES (DOROTHY MAE ORDINANCE - NO. 158,963)

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

Taming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes JENSEN & HALSTEAD LTD.

PERFORMANCE COMPLIANCE METHODS

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

The Residences at Christina Landing Wilmington, DE

Following are code change proposals submitted through Adhoc Health from General study group and related changes. General. Position.

PERFORMANCE COMPLIANCE METHODS

INITIAL FIRE SAFETY ASSESSMENT

Agency for Health Care Administration

For the Florida Building Commission And the Fire Code Advisory Council

EXIT ROUTES, EMERGENCY ACTION PLANS, AND. FIRE PREVENTION PLANS. PART 1: INTRODUCTION

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

Building Codes & Standards for Healthcare. Healthcare Construction Certificate - Level 1

Agency for Health Care Administration

INITIAL FIRE SAFETY ASSESSMENT

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Temperature Rise Door Framing

KEEP THE FIRE FROM SPREADING

ELEVATORS. Integration of Codes between Fire Alarm, Sprinklers, and Elevators 12/5/2017

Report on First Revisions with Statement June 2014 NFPA 101

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

INITIAL FIRE SAFETY ASSESSMENT

Fire Protection Engineering Culminating Project. Analysis of the Seattle Customer Delivery Center. Prepared by Cynthia Wernet

AHC MEETING # 4 K-TAG CODE CHANGE PROPOSALS (Covers all Work Groups)

FIRE SAFETY INSPECTION REPORT

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

Family Foster Home Fire Safety Evaluation Checklist Instructions

INITIAL FIRE ASSESSMENT REPORT (FAR)

Are there any policies regarding outlets that contain USB ports?

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

Transcription:

Objectives To review updated IBC and fire test requirements when designing for life safety. To understand the relationship of fire safety and human impact safety. To clarify the difference between fire protective vs. fire resistive glazing products as it relates to protecting people and property. To provide you with the latest fire rated glazing product information. 3

Does Fire Rated Mean Safety Rated?

Does a fire rating ensure that a product meets human impact safety standards? No, a fire rating only indicates that the glass has been tested to a fire standard, not an impact safety standard. 4

Hazardous Locations (Illustration) 5

What is Consumer Product Safety Commission 16 CFR 1201? A federal safety glazing minimum standard established in 1977 to protect people from injuries due to accidental impact with glazing. Two categories were established: Cat. I = for small glazing areas (less than 1296 square inches) to survive impact of 150 foot pounds - a small child. Cat. II = for large glazing areas (more than 1296 square inches.) to survive an impact of 400 foot pounds - an adult. 6

Fire Protective vs. Fire Resistive

Fire-rated tests are created for specific applications depending upon the level of protection required by code 8

Fire-Resistive vs. Fire Protective Glazing 9

Fire Rated Glazing Code Applications

Glazing Marking Requirements 2012 IBC Table 716.3 (New) Marking Fire-Rated Glazing Assemblies Fire Test Standard Marking Definition of Marking ASTM E119 or UL 263 W Meets wall assembly criteria. NFPA 257 or UL 9 OH Meets fire window assembly criteria including the hose stream test. NFPA 252 or UL 10B or UL 10C D H T Meets fire door assembly criteria. Meets fire door assembly Hose Stream test. Meets 450º F temperature rise criteria for 30 minutes XXX The time in minutes of the fire resistance or fire protection rating of the glazing assembly 11

20 min. door with 45 min. sidelites 60 min. doors, sidelites and transoms 45 min. door with 45 min. sidelites 90 min. door with 120 min. sidelites/transoms

Stairwell Enclosures 2 hour Stairwells with 90 min. full vision door and 120 min. wall glazing 13

EXCERPT from 2012 IBC Table 716.5 (rev. 715.4) Opening Fire Protection Assemblies, Ratings and Markings TYPE OF ASSEMBLY REQUIRE D WALL ASSEMBL Y RATING (HRS.) MINIMUM FIRE DOOR VISION DOOR AND FIRE PANEL SIZE SHUTTER ASSEMBLY RATING (HRS.) FIRE RATED GLAZING MARKING DOOR VISION PANEL e MINIMUM SIDELITE/TRANSOM ASSEMBLY RATING (HRS.) Fire Protection Fire Resistance FIRE RATED GLAZING MARKING SIDELITE/TRANSOM PANEL Fire Protection Fire Resistance Shaft, exit enclosures and exit passageway walls Fire Barriers having a required rating of 1 hour: Enclosures for shafts, exit access stairways, etc. Fire Partitions / Corridor Walls Other Fire Partitions 2 1-1/2 100 sq. in c,d 1 1 100 sq. in c,d 1 1/3 b 0.5 1/3 b 1 3/4 Maximum Size Tested Maximum Size Tested Maximum Size Tested Maximum Size 100 sq. in. = D-H-60 >100 sq. in. = D-H-T-60 or D-H-T-W-60 100 sq. in. = D-H-60 >100 sq. in. = D-H-T-60 or D-H-T-W-60 Not Permitted Not Permitted 2 1 Fire Protection Not Permitted Not Permitted D-20 3/4 b D-H-OH-45 D-20 1/3 D-H-OH-20 D-H-45 3/4 D-H-45 W-120 W-60

2012 IBC Table 716.6 (rev. 715.5) FIRE WINDOW ASSEMBLY FIRE-PROTECTION RATINGS TYPE OF WALL ASSEMBLY REQUIRED WALL ASSEMBLY RATING (hours) MINIMUM FIRE WINDOW ASSEMBLY RATING (hours) FIRE RATED GLAZING MARKING Interior walls Fire walls Fire barriers All >1 1 NP a NP a NP a W-xxx b W-xxx b W-xxx b Incidental use areas (707.3.6), Mixed occupancy separations (707.3.8) 1 ¾ OH-45 or W-60 Fire Partitions 1 0.5 ¾ 1/3 OH-45 or W-60 OH-20 or W-30 Smoke barriers 1 ¾ OH-45 or W-60 Exterior walls >1 1-1/2 OH-90 or W-XXX b 1 ¾ OH-45 or W-60 0.5 1/3 OH-20 or W-30 Party wall All NP Not Applicable NP Not Permitted a. Not permitted except fire resistance rated glazing assemblies tested to ASTM E-119 or UL 263, as specified in Sec. 716.2 b. xxx The fire rating duration in minutes, which shall be equal to the fire rating required for the wall assembly

FIRE PARTITIONS FOR 1 HOUR CORRIDOR WALLS Product Options: 20-Minute Tempered 45-Minute (safety) wired 45-Minute (safety) ceramic 45-Minute tempered* 45-Minute fire resistive *w/o hose stream with AHJ approval 60-Minute fire resistive

Types of Fire Resistive Glazing

Fire-rated glass products that meet fire resistive (wall) requirements 18

Fire Resistive Framing Intumescent Layer layer Steel Profile Thermal Break 19

Installation

21

22

23

24

25

26

27

28

Fire Resistive Glazing and Framing Applications Wall/Window systems up to 2 hours 29

Property Line Applications (with energy efficient and sound reducing make-ups) 30

Fire Rated Door, Sidelite/Transom Guidelines Application Rating Product Limits Door vision panel 20 20-MinuteTempered Max. size tested Door, Sidelite/transom 45 45-Minute Fire Resistive Safety wired Safety ceramic Specialty tempered 1 Door vision panel 60/90 60/90 Specialty Fire Protective Safety Wired Safety Ceramic Door vision panel 60/90 60 or 90-Minute Fire Resistive Max. size tested 100 sq. ins. 2 Max. size tested Sidelite/transom 60 60-Minute Fire Resistive Max. size tested Sidelite/transom 120 120-Minute Fire Resistive Max. size tested 1 AHJ approval needed. 2 Some AHJs may allow larger sizes. Consult with the local AHJ for clarification. 31

Fire Rated Window Opening/Wall Guidelines Application Rating Product Limits Interior windows 20 Fire resistive tempered Wired glass and safety wired glass Ceramic and safety ceramic Fire protective 1 Interior and exterior windows 45 Fire resistive 45 Wired glass and safety wired glass Ceramic and safety ceramic Specialty fire protective 1 Max. size tested Is safety rating required? 25% area limits Max. size tested Is safety rating required? 25% area limits Interior exit enclosures/passageways 60 Fire resistive 60 Fire protection glazing not allowed Max. size tested Exterior windows 90 Fire resistive tempered Wired glass and safety wired glass Ceramic and safety ceramic Max. size tested Is safety rating required? 25% limits Interior 2 hour walls 120 Fire resistive 120 Max. size tested 1 AHJ approval needed. 32

Questions Represented locally by: William Zientarski Hi Performance Glazing 815-341-5167 cell phone bzinetarski@h-pglazing.com www.safti.com 888.653.3333 33