INDOOR POOL DEHUMIDIFIERS CERTIFICATION PROGRAM

Similar documents
WATER-SOURCE HEAT PUMPS CERTIFICATION PROGRAM For 50 Hz Products

RESIDENTIAL WATER HEATER CERTIFICATION PROGRAM

ANSI/AHRI Standard 911 (SI) 2014 Standard for Performance Rating of Indoor Pool Dehumidifiers

Performance Rating of Commercial and Industrial Unitary Air-Conditioning Condensing Units

Sound Performance Rating of Outdoor Unitary Equipment

Performance Rating of Heat Pump Pool Heaters

Performance Rating of Heat Pump Pool Heaters

FULL AND LEGAL NAME OF CORPORATE ENTITY

Performance Rating of Automatic Commercial Ice-makers

AHRI Certification Program Scopes - COOLING

Performance Rating of Computer and Data Processing Room Air Conditioners

AHRI Standard 751 (SI) 2016 Standard for Performance Rating of Thermostatic Refrigerant Expansion Valves

Flow Capacity Rating of Suction Line Filters and Suction Line Filter Driers

AS/NZS :2014

Standard for 2006 Performance Rating Of Positive Displacement Ammonia Compressors and Compressor Units

Performance Rating of Refrigerant Pressure Regulating Valves

AHRI Standard 870 (I-P) Standard for Performance Rating of Direct Geoexchange Heat Pumps

Specifications for Fluorocarbon Refrigerants

Specifications for Fluorocarbon Refrigerants

ANSI/AHRI Standard 620 (I-P) 2014 Standard for Performance Rating of Self-contained Humidifiers for Residential Applications

ANSI/AHRI Standard Standard for Performance Rating of Indoor Pool Dehumidifiers

Australian/New Zealand Standard

Sound Performance Rating of Non-ducted Indoor Airconditioning

Performance Rating of Unit Ventilators

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

FORM ACCL-PC1 ACCL WITNESS TEST PROCEDURE AND CHECKLIST

Residential HVAC Program Guide WARMAdvantage & COOLAdvantage Programs. For Fiscal Year 2018 (7/1/2017 through 6/30/2018)

AS/NZS :2009. Performance of household electrical appliances Refrigerating appliances AS/NZS :2009

Performance Rating of Active Chilled Beams

How to Obtain an AHRI Certificate

M1200 Series Limited Warranty Dependability Promise

Request for Qualifications For Administration of the 2016 Summer Sprout Program

2013 Guideline for Specifying the Thermal Performance of Cool Storage Equipment. AHRI Guideline T (I-P)

AIR CONDITIONERS MINIMUM ENERGY PERFORMANCE, LABELLING AND TESTING REQUIREMENTS FOR LOW CAPACITY WINDOW TYPE AND SINGLE-SPLIT

SECTION SECURITY TESTING AND COMMISSIONING

Australian/New Zealand Standard

Australian/New Zealand Standard

AHRI Guideline N Guideline for Assignment of Refrigerant Container Colors. ARI Standard 1200

AS/NZS 3111:2009. Approval and test specification Miniature overcurrent circuitbreakers AS/NZS 3111:2009. Australian/New Zealand Standard

ARKANSAS FIRE PROTECTION LICENSING BOARD ACT 743 OF 1977

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

DEPARTMENT OF PUBLIC SAFETY. Division of Fire Prevention and Control 8 CCR

AMCA Publication

2019 Smart Energy Existing Homes Program Manual

Energy Efficiency Requirements for Air Conditioners, Chillers and Close Control Units

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

REBATE. Ductless Mini-Split Heat Pump

ENERGY STAR Program Requirements Product Specification for Commercial Water Heaters. Eligibility Criteria Version 1.0: Draft 1

The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.

PQS Independent type-testing protocol

NFPA Fire Inspector I Study Guide

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

AHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency

2018 Program Manual. Lighting and Appliances Program Program Manual. Lighting and Appliances PREPARED BY:

SBEC Residential Energy Efficiency 2019 Rebate Programs for Existing Homes

Australian/New Zealand Standard

RULEBOOK ON ELECTROMAGNETIC COMPATIBILITY

CITY OF LOCKPORT FIRE SPRINKLER & FIRE ALARM SYSTEM INSTALLATION ASSISTANCE PROGRAM

AHRI Standard 1360 (I-P) 2017 Standard for Performance Rating of Computer and Data Processing Room Air Conditioners

Performance Rating of Commercial and Industrial Humidifiers

Abu Dhabi Conformity Assessment Scheme for Fire Pumps

Medical Gas and Vacuum Systems

Shipboard incinerators with capacities up to 4000 kw

Australian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS

Massachusetts COOL SMART

AS/NZS :2012. Regulatory compliance mark for electrical and electronic equipment AS/NZS :2012. Part 1: Use of the mark

A Glossary of HVAC Terms

Substations and high voltage installations exceeding 1 kv a.c.

Certification Programs, Standards,

AS/NZS :2015. Conduit systems for cable management AS/NZS :2015. Part 1: General requirements. Australian/New Zealand Standard

CHAPTER The title of P.L.1983, c.337 is amended to read as follows:

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS

Under Section 608 of the CAA, EPA has established regulations (40 CFR Part 82, Subpart F) that:

HEATING AND COOLING REBATES

HEATING AND COOLING REBATES

TEXAS DEPARTMENT OF TRANSPORTATION PORTABLE FIRE EXTINGUISHER SERVICES ANNUAL INSPECTION MAINTENANCE, REPAIR, AND RECHARGING

SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS

Design & Construction Standards, Revised January

Town of Cochrane Policy

2018 Smart Energy Existing Homes Program Manual

Australian/New Zealand Standard

Warranty Manual. Espar Products, Inc. Tel: Fax: QSF-60 Rev. 7

DRAFT COMBINED POSTAL BALLOT/ AUSTRALIAN / NEW ZEALAND STANDARD FOR COMMENT

ANSI/AHRI Standard 1360 (I-P) 2016 Standard for Performance Rating of Computer and Data Processing Room Air Conditioners

AS Australian Standard. Portable fire extinguishers Guide to servicing. This is a free 7 page sample. Access the full version online.

AS/NZS :1995. Emergency escape lighting and exit signs for buildings AS/NZS :1995. Part 2: Inspection and maintenance

Issue Update: Revised Recommended Language for Verification Contracts and Statements for Recycling Appliances and Vehicles

Australian/New Zealand Standard

Australian Standard. Fixed fire protection installations Pumpset systems AS AS 2941

Australian/New Zealand Standard

RULES OF THE TENNESSEE ALARM SYSTEMS CONTRACTORS BOARD CHAPTER GENERAL PROVISIONS TABLE OF CONTENTS

AS/NZS :2015. Conduit systems for cable management AS/NZS :2015. Part 21: Particular requirements Rigid conduit systems

Request For Quotations. For The. Fire Sprinkler Retrofit Program For Licensed Small Or Rural Retirement Homes. October 11, 2017

2018 Rebate Catalog and Application

Australian Standard. Degrees of protection provided by enclosures (IP Code) AS IEC Ed 2.1:2001 AS 60529

Medical electrical equipment

Capital Projects Group Fire Extinguishers Specification

INTERNATIONAL STANDARD

Design & Construction Standards, Revised January

Transcription:

OPERATIONS MANUAL INDOOR POOL DEHUMIDIFIERS CERTIFICATION PROGRAM AHRI IPD OM - JANUARY 2018 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 Sponsored and administered by:

PREFACE The following manual outlines the procedures and policies of the AHRI Indoor Pool Dehumidifiers (IPD) Certification Program operated by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI). This manual is to be used in conjunction with the AHRI General Operations Manual for AHRI Certification Programs. Where the AHRI General Operations Manual and this product-specific manual differ, this product-specific operations manual shall prevail. The revision of this manual supersedes all previous revisions. The current edition of this manual, as well as the AHRI General Operations Manual, can be accessed through the AHRI website, www.ahrinet.org. The IPD Certification Program by AHRI provides for independent verification of the performance of the Indoor Pool Dehumidifiers Participant s equipment. Safety criteria are not within the scope of this program. Participation in the program is voluntary. Any manufacturer, regardless of AHRI membership, may obtain approval of Program Ratings and use of the AHRI IPD Certification Mark hereinafter referred to as the Mark. The Mark is the Participant s public representation that the ratings of randomly selected units have been verified by an independent laboratory in accordance with test procedures prescribed by this operations manual. A License Agreement is executed between the manufacturer and AHRI specifying the conditions under which such Ratings and the Mark may be used. No manufacturer has the right to use Program Ratings or to state that their products have been tested in conformance with the procedures outlined in this Rating Procedure unless and until they have received written authority from AHRI to use the Marks as applied to the specific approved Program Ratings. This Operations Manual has been prepared to assure that administration of the program is carried out in a uniform manner. It is an amplification of the license agreement signed by licensees and AHRI. General information, procedural details, and copies of forms are included in this Operations Manual. Provisions of the Operations Manual may be amended as provided in the Certification Agreement. This certification program complies with requirements of the ISO/IEC Standard 17065:2012, General Requirements for Bodies Operating Product Certification Systems. Note: This manual supersedes AHRI IPD Operations Manual - January 2017 Printed in U.S.A. Copyright 2018, by Air-Conditioning, Heating, and Refrigeration Institute Registered United States Patent and Trademark Office

CERTIFICATION OPERATIONS MANUAL FOR INDOOR POOL DEHUMIDIFIERS SECTION TABLE OF CONTENTS PAGE 1 Program Overview 1.1 Applicable Rating Standard... 1 1.2 Product Definitions... 1 1.2.1 Indoor Pool Dehumidifier... 1 1.2.2 Outdoor/Exhaust Air... 1 1.3 Program Scope... 1 1.4 Intended Market... 1 1.5 Basic Model Groups (BMGs)... 1 2 Qualification Process 2.1 Original Equipment Manufacturer (OEM) Applicants... 1 STEP 2.1.1 Certification Application Package... 1 STEP 2.1.2 Processing Application Package... 2 STEP 2.1.2.1 Performance Certification Agreement for Original Equipment Manufacturer (OEM Agreement)... 2 STEP 2.1.2.2 Participation and Licensing Fee Invoice... 2 STEP 2.1.3 Selection and Acquisition of Test Samples... 2 STEP 2.1.3.1 Number of Qualification Tests... 2 STEP 2.1.3.2 Acquisition of Qualification Test Samples/Selection Criteria... 2 STEP 2.1.4 Qualification Testing... 2 STEP 2.1.4.1 Operating Tests... 2 STEP 2.1.4.2 Successful Completion of All Qualification Tests... 2 STEP 2.1.4.2 First Sample Qualification Test Failure... 2 STEP 2.1.4.3 Second Sample Qualification Test Failure... 2 STEP 2.1.5 Welcome to the Program... 3 2.2 Private Brand Marketer (PBM) Applicants... 3 STEP 2.2.1 Certification Application Package... 3 STEP 2.2.2 Processing Application Package... 3 STEP 2.2.2.1 Performance Certification Agreement for Private Brand Manufacturer (PBM Agreement)... 3 STEP 2.2.2.2 OEM Agreement on behalf of the PBM Applicant... 3 STEP 2.2.2.3 Licensing Fee Invoice... 3 STEP 2.2.3 Welcome to the Program... 3 3 Equipment Selection and Testing 3.1 Annual Testing Requirement... 3 3.2 Location of Tests... 3 3.2.1 Presence of Participant Personnel... 3 3.3 Selection of Test Samples... 3 3.4 Method for Acquiring Test Samples... 3 3.5 Sample Acquisition Timeframe... 4 3.6 Operating Tests... 4 3.7 Certified Data... 4 3.8 Test Failures... 4 3.8.1 Operating Test Failure... 4 3.8.2 Options Following First Sample Failure... 4 3.8.3 Options Following Second Sample Failure... 5

4 Challenge Tests... 5 5 AHRI Directory of Certified Product Ratings 5.1 Publication of Ratings in Certified Directory... 5 5.2 Data Forms... 5 6 Assessment and Payment of Certification Fees 6.1 Equipment Delivery/Disposal Fees... 5 7 Issuance of Violations and/or Terminations... 5 8 Program Hierarchy, Complaints, and the Appeals Process... 5 9 Proper Use of the AHRI Certification Mark and Claims to Certification... 6 9.1 Publication of Non-Certified Ratings (Application Ratings)... 6 Tables Table 1 Moisture Removal Capacity, kg/h... 1 Appendices and Forms Appendix A Form IPD-DS1... 7 Appendix B Form IPD-DS2... 9

1. Program Overview 1.1 Applicable Rating Standard. It is mandatory for program Participants to comply with the provisions of the latest edition of AHRI Standard 910, Performance Rating of Indoor Pool Dehumidifiers (Standard). A copy of the Standard is available for download from the AHRI website, www.ahrinet.org. 1.2 Product Definitions. 1.2.1 Indoor Pool Dehumidifier. A type of air-cooled or liquid-cooled electrically operated, vapor compression refrigeration system; factory assembled as a single package or split system, which includes an indoor cooling/dehumidifying coil, an refrigerant air reheat coil, compressor(s) and an air moving device. It may also include a Refrigerant Heat Recovery Unit, an auxiliary refrigerant condenser, Economizer, and an air-to-air heat recovery device. It shall provide the function of dehumidifying, air circulation, air reheating and may include the function of air-cooling, air-cleaning, pool water heating and air-to-air heat recovery. 1.2.2 Outdoor/Exhaust Air. All Indoor Pool Dehumidifiers to be tested with any outdoor air or exhaust air openings used for ventilation purposes shall be blocked off by the Participant before shipment to the testing facility. 1.3 Program Scope. This program applies to all production line OEM and PBM production models of residential, commercial, and industrial IPDs, as defined in Section 1.2 and rated below a Moisture Removal Capacity (MRC) of 25.0 kg/h at Standard Rating Conditions per Table 2 of AHRI Standard 910. For external resistance, refer to Table 3 of AHRI Standard 910. 1.4 Intended Market. The Intended Market for this certification program, where the Standard applies, includes all products defined in Section 1.3 that are sold for use in North America (U.S., U.S. Territories, Canada, and Mexico). 1.5 Basic Model Groups (BMGs). A Participant s listing shall be grouped for the IPD program as categorized in Table 1. Table 1. Moisture Removal Capacity, kg/h - BMG 1 5.0 5.0 > BMG 2 10.0 10.0 > BMG 3 15.0 15.0 > BMG 4 20.0 20.0 > BMG 5 25.0 2. Qualification Process 2.1. Original Equipment Manufacturer (OEM) Applicants. With the additions noted below, the OEM qualification process shall proceed according to the AHRI General Operations Manual, Section 4. STEP 2.1.1 Certification Application Package. In addition to the Application for AHRI Certification and Annual Sales Volume Form noted in the AHRI General Operations Manual, Section 4, STEP 1, Applicants shall submit the following: Form IPD-DS1. Data Submittal Form. One test report for each BMG Published installation instructions in printed or electronic format. Electronic forms shall be obtained from AHRI. 1

STEP 2.1.2 Processing Application Package. STEP 2.1.2.1 Performance Certification Agreement for Original Equipment Manufacturer (OEM Agreement). No further action required beyond that listed in Section 4, STEP 4.2 of the AHRI General Operations Manual. STEP 2.1.2.2 Participation and Licensing Fee Invoice. Payment of the Participation and Licensing Fee is due within 30 calendar days of the invoice issue date. Testing shall not be conducted until the invoice is paid in full. No further action required beyond that listed in Section 4, STEP 4.2 of the AHRI General Operations Manual. STEP 2.1.3 Selection and Acquisition of Test Samples. STEP 2.1.3.1 Number of Qualification Tests. 30% of the Applicant s BMGs shall be tested. Fractional models should be mathematically rounded to the nearest whole number using traditional rounding methods. A minimum of two (2) models shall be tested. Each Participant shall have in stock three (3) of each of the following major components for AHRI or the Laboratory personnel (as required) to select from: Fan; Evaporator coil; Refrigerant air reheat coil; Compressor; Liquid condenser (if rating with this option); and/ or Pool Water condenser (if rating with this option). STEP 2.1.3.2 Acquisition of Qualification Test Samples/Selection Criteria. Within 30 calendar days of a request by AHRI, the Applicant shall have units available for selection. Samples shall be acquired in accordance with Section 3 of this manual. STEP 2.1.4 Qualification Testing. AHRI shall supply the Laboratory with the published ratings. The Laboratory shall test the units, in accordance with the latest edition of the Standard, against the Published Ratings. STEP 2.1.4.1 Operating Tests. In addition to the Performance Rating tests, all qualification tests shall include all of the following Operating Tests to be conducted: Moisture Removal Capacity Test; and/or Moisture Removal Efficiency Test If the sample fails the Operating Tests, a second sample, to be selected by AHRI, shall pass in order to qualify into the program. If the second sample does not pass, then that model and BMG shall not be entered into the AHRI Directory of Certified Product Performance (Directory) and the Applicant shall cease production and sale of the failed model and BMG in order to qualify into the certification program. A new sample shall be selected and tested to continue the qualification process. STEP 2.1.4.2 Successful Completion of All Qualification Tests. If all qualification tests pass, proceed to STEP 2.1.5. STEP 2.1.4.3 First Sample Qualification Test Failure. Refer to Section 4, STEP 4.4.2 of the AHRI General Operations Manual for details regarding the first sample qualification failure options: 2

STEP 2.1.4.4 Second Sample Qualification Test Failure. Refer to Section 4, STEP 4.4.3 of the AHRI General Operations Manual for details regarding the second sample qualification failure options. STEP 2.1.5 Welcome to the Program. No further action required beyond that listed in Section 4, STEP 4.5 of the AHRI General Operations Manual. 2.2 Private Brand Marketer (PBM) Applicants. With the additions noted below, the PBM qualification process shall proceed according to the AHRI General Operations Manual, Section 5. PBM Applicants are not required to undergo initial qualification testing. PBM product certification is contingent upon the certification of the associated OEM product. STEP 2.2.1 Certification Application Package. In addition to the Application for AHRI Certification Form noted in the AHRI General Operations Manual, Section 5, STEP 1, Applicants shall submit the following documentation to AHRI: Form IPD-DS2. This form shows the correlation between PBM Applicant s units and OEM Applicant s units. Electronic forms shall be obtained from AHRI. STEP 2.2.2 Processing Application Package. STEP 2.2.2.1 Performance Certification Agreement for Private Brand Marketer (PBM Agreement). No further action required beyond that listed in Section 5, STEP 5.2.1 of the AHRI General Operations Manual. STEP 2.2.2.2 OEM Agreement on Behalf of the PBM Applicant. No further action required beyond that listed in Section 5, STEP 5.2.2 of the AHRI General Operations Manual. STEP 2.2.2.3 Licensing Fee Invoice. Payment of the Licensing Fee is due within 30 calendar days of the invoice issue date. STEP 2.2.3 Welcome to the Program. No further action required beyond that listed in Section 5, STEP 5.3 of the AHRI General Operations Manual. 3. Equipment Selection and Testing 3.1 Annual Testing Requirement. 30% of the Participant s BMGs shall be tested, with a minimum of two (2) models. Fractional models should be mathematically rounded to the nearest whole number using traditional rounding methods. 3.2 Location of Test. Testing shall be performed at the Laboratory and units shall be installed in the test facility in accordance with the Participant s published installation instructions in printed or electronic format. 3.3 Selection of Test Samples. Selections shall be made based on data contained in the Directory. AHRI shall inform the Participant, in writing, of the sample(s) selected for test. 3.4 Methods for Acquiring Test Samples. AHRI, or its representative, shall make a Random Component Selection from the Participant s stock inventory within 90 calendar days of model selection by AHRI. Selected samples shall be shipped to the Laboratory accompanied by the Participant s published installation instructions in printed or electronic format. Refer to Section 9 of the AHRI General Operations Manual. 3

Each Participant shall have in stock three (3) of each of the following major components for AHRI or the Laboratory personnel (as required) to select from: Fan; Evaporator coil; Refrigerant air reheat coil; Compressor; Liquid condenser (if rating with this option); and/or Pool Water condenser (if rating with this option). 3.5 Sample Acquisition Timeframe. The Participant shall assemble the sample within 45 calendar days of Random Component Selection and then deliver the selected sample(s) to the Laboratory within 14 calendar days after being assembled. 3.6 Operating Tests. In addition to the Performance Tests, AHRI shall conduct the following Operating Tests on each model: Moisture Removal Capacity; and Moisture Removal Efficiency. 3.7 Certified Data. In accordance with the Standard the following certified ratings are verified by test: Moisture Removal Capacity, kg of moisture/h; Moisture Removal Efficiency, kg of moisture/kwh; Total Cooling Capacity, kw; Net Sensible Cooling Capacity (if applicable), kw; Total Heat of Rejection to Indoor Air, kw; Total Heat of Rejection to Outdoor Air (if applicable), kw; Total Heat of Rejection to Liquid (if applicable), kw; and Total Input Power, kw. 3.8 Test Failures. 3.8.1 Operating Test Failure. If the initial failure is an Operating Test, the Participant shall select one of the following options: Obsolete all models within the BMG; or Test second sample of the model. If the second sample fails the Operating Tests, the BMG shall be obsolete. 3.8.2 Options Following First Sample Failure. When the Participants are notified of a first sample certified rating failure, they have seven (7) calendar days to select one of the following options: Re-rate all models within the failed sample s BMG, proportionate to the failed test s results. The model shall be re-rated to the nearest round-off capacity, but no higher than the actual final test results. Test second sample of the same model (sample shall be available within the timeframe allotted in Section 3.5 following notification of failure). Obsolete the model. 4

3.8.3 Options Following 2 nd Sample Failure. When the Participant is notified of a secondsample certified rating failure, the Participant has seven (7) calendar days to select one of the following options: Re-rate all models within the failed sample s BMG proportionate to the failed test s results; or Obsolete the model, which also obsoletes all models within the corresponding BMG. 4. Challenge Tests Refer to Section 10 of the AHRI General Operations Manual. 5. AHRI Directory of Certified Product Ratings 5.1 Publication of Ratings in Certified Directory. For each certified model, the Directory shows: AHRI Certified Reference Number Model Status Name of Manufacturer Brand Name of Model Model Number(s) or Designation(s) Remote Rejection Unit Model Number (if applicable) Moisture Removal Capacity, kg of moisture/h Moisture Removal Efficiency, kg of moisture/kwh Total Cooling Capacity, kw Net Sensible Cooling Capacity (if applicable), kw Total Heat Of Rejection To Indoor Air, kw Total Heat Of Rejection To Outdoor Air (if applicable), kw Total Heat Of Rejection To Liquid I (if applicable), kw Total Input Power, kw 5.2 Data Forms. Each Participant shall list its products by BMG. If available, in lieu of submitting hard copy forms, the Participant may upload data via the Directory. Contact AHRI to see if this feature is available. 6. Assessment and Payment of Certification Fees 6.1. Equipment Disposal Fees. The Participant is responsible for the delivery and expenses associated with shipping test samples to and from the Laboratory. Following the completion of the test, the Participant shall provide instructions to the Laboratory regarding the disposal/shipment of the sample(s). The Laboratory shall invoice the Participant for expenses associated with the disposal/shipment of the sample from the Laboratory s facility to a location designated by the Participant. 7. Issuance of Violations and/or Termination Refer to Section 14 of the AHRI General Operations Manual. 8. Program Hierarchy, Complaints, and the Appeals Process Refer to Section 15 of the AHRI General Operations Manual. 5

9. Proper Use of the AHRI Certification Mark and Claims to Certification Except as noted below, refer to Section 8.1 of the AHRI General OM and the AHRI Brand Usage Guide. 9.1 Publication of Non-Certified Ratings (Application Ratings). Manufacturer s publications may contain Application Ratings. However, certification can only be implied for products operating at Standard Rating Condition. Where ratings are included that are outside of the scope of the Certification Program, they shall be accompanied by the following statement: Ratings outside of the scope of the AHRI Indoor Pool Dehumidifiers Certification Program. 6

APPENDIX A: FORM: IPD-DS1 AIR-CONDITIONING, HEATING & REFRIGERATION INSTITUTE SHEET OF IPD CERTIFICATION DATA (See instructions below) DATE: REVISED: * NOTE: Rated Condition B is only for Units previously tested at Condition A or Condition C. Company (OEM) Location Trade/Brand Name Unit Model Number Remote Rejection Unit Model Number (if applicable) Unit Configuration AHRI Type from Table 1 of AHRI Standard 910 Voltage - Hertz - Phase Air Flow [m 3 /s] Pool Water Flow [L/s] (if applicable) Another Rejection Liquid Flow [L/s] (if applicable) Dehumidification Ratings @ Rated Condition A from Table 2 of AHRI Standard 910 If Applicable Total Heat Rejection Capacity [W] Dehumidification Ratings for Sensible Cooling @ Rated Condition B from Table 2 of AHRI Standard 910 If Applicable* Net Sensible Cooling Capacity [W] Total Heat Rejection Capacity [W] Dehumidification Ratings for Sensible Cooling with Pool Heating @ Rated Condition B from Table 2 of AHRI Standard 910 If Applicable* Net Sensible Cooling Capacity [W] Total Heat Rejection Capacity [W] Dehumidification Ratings @ Rated Condition C from Table 2 of AHRI Standard 910 If Applicable Heat Rejection to Air Capacity [W] Heat Rejection to Liquid Capacity [W] I certify that the model listed above meets all of the requirements of the Standard. Signed: Title: 7

INSTRUCTIONS This certification form applies to Original Equipment Manufacturers (OEM) only. A completed form shall be submitted for certification of all eligible models. 8

APPENDIX B: FORM IPD-DS2 AHRI INDOOR POOL DEHUMIDIFIERS CERTIFICATION PROGRAM DATA SHEET (PRIVATE BRAND MARKETER) PRIVATE BRAND MARKETER TRADE OR Brand Name ORIGINAL EQUIPMENT MANUFACTURER Date PBM Model Designation OEM Model s AHRI Certified Reference Number Company (OEM) Location Trade/Brand Name Unit Model Number Remote Rejection Unit Model Number (if applicable) Unit Configuration AHRI Type from Table 1 of AHRI Standard 910 Voltage - Hertz - Phase Air Flow [m 3 /s] Pool Water Flow [L/s] (if applicable) Another Rejection Liquid Flow [L/s] (if applicable) Dehumidification Ratings @ Rated Condition A from Table 2 of AHRI Standard 910 If Applicable Total Heat Rejection Capacity [W] Dehumidification Ratings for Sensible Cooling @ Rated Condition B from Table 2 of AHRI Standard 910 If Applicable Net Sensible Cooling Capacity [W] Total Heat Rejection Capacity [W] Dehumidification Ratings for Sensible Cooling with Pool Heating @ Rated Condition B from Table 2 of AHRI Standard 910 If Applicable Net Sensible Cooling Capacity [W] Total Heat Rejection Capacity [W] Dehumidification Ratings @ Rated Condition C from Table 2 of AHRI Standard 910 If Applicable Heat Rejection to Air Capacity [W] Heat Rejection to Liquid Capacity [W] * NOTE: Rated Condition B is only for Units previously tested at Condition A or Condition C. I certify that the model listed below meets all of the requirements of the Standard. 9

Signed: Title : Form IPD-DS2 applies to PBMs only. These are Participants who purchase a complete indoor pool dehumidifier from another Participant, designated as the Original Equipment Manufacturer (OEM). It is intended to eliminate unnecessary, repetitive filing of the same certification data. A complete form shall be submitted for certification of all eligible models not certified through the EDP (Electronic Data Procedures) allowed under the provisions of the AHRI certification programs. For PBM certification, this form applies only when the OEM has previously certified the model(s) under his own model number designation. AHRI Standard Ratings" are the capacities, MRC, MRE, and kilowatts published, or to be published, by the PBM. PLEASE NOTIFY AHRI IMMEDIATELY OF ANY CHANGE OF OEM SOURCE. 10