Document Code: 1 (5) Issuing date: Status:

Similar documents
Document Code: 1 (13) Issuing date: Status:

Document Code: 1 (15) Issuing date: Status:

Document code: 1 (10) Issuing date: Status:

CHAPTER 3 BASIC STEAM CYCLE

SULPHUR RECOVERY UNIT

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Steam and Power Conversion System

Cold Weather Preparedness Plant Winterization Lessons Learned & Best Practices

Foster Wheeler Condensers and Feedwater Heaters. High Quality Steam Components

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

Existing Mechanical System Operation

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

Efficiency Maximiser for Solid Fuel Central Heating

Document Code: 1 (6) Issuing date: Status:

CONTENTS. B. System Design and Performance Requirements

Silhouette. Feedwater Heater. Boiler Feedwater

Steam Generator (Boiler) & Steam Turbine. Steam Generator (Boiler) ME 268. Model Lab

BuildingName The Description of the Project P DOCUMENTS

City of Duluth Festival Center 04/25

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

Raising the Efficiency of Gas-Fired Power Plants and CCPP. GEA Heat Exchangers

On-Load Boiler Cleaning with Steam

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return

MILL IN SERVICE FIRST COAL FIRES AT MEDUPI

/ / Take the technological step into MODERN Condensate Handling Equipment for steam systems MANUFACTURED IN AMERICA with craftsmanship and quality.

Boiler Condensate Return Basics. Presented by Steve Connor February 24, 2016

Renovation, Modernization and Life Time Extension Measures on Steam Turbines Sustainable Growth - Strategies for efficiency Increase

CONSIDERATIONS IN CONVERTING A DUAL SHELL OR A DUAL PRESSURE COAL FIRED PLANT CONDENSER INTO A COMBINED CYCLE PLANT CONDENSER

COMcheck Software Version Mechanical Compliance Certificate

HEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods

Improved safety system in a nitric acid plant

Element D Services Heating, Ventilating, and Air Conditioning

Laboratory exercise 3: Condensing water heater

NEW CHILLER SCHEDULE

TECHNICAL SPECIFICATIONS FOR PLUSHER WDS 12 SERIES INSTRUMENT WASHER DISINFECTORS

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview

Cast Line Heaters The Benefits of This Space Saving Electric Heater

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

FINISHING EQUIPMENT NOVA-S-PLUS. Vacuum/blowing ironing table

Portable honeycomb matrix compact dryer, with loading, combines dehumidifying plastic resin and conveying into a single unit.

NFPA 85 COMPLIANCES OF BMS: A CASE STUDY OF BOILER CONTROL AT SBM OFFSHORE MALAYSIA COMPANY 1. AHMED ABOUELRISH 2 Universiti Teknologi Petronas

Yarway Narvik Steam Desuperheater Series 4300 TempLow

Deaerator. Specifications

Precision air handling cabinets Ciatronic MICRO/EXPAIR

Temptek Auxiliary Equipment

PHRT HEAT PUMP WITH HYDRAULIC EQUIPMENT AIR / WATER 9 to 18 KW

INTRODUCTION TO SOLAR THERMAL POWER STATIONS We shall look at some of the different methods of supplying solar energy to the power stations.

TECHNICAL INFORMATION L / A 1

Boiler. Fire tube Boiler:

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4.

Dynamic Simulation of a CFB Boiler System

Union County Vocational - Technical Schools Scotch Plains, New Jersey

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

Improved Dryer Control

GPPS-2017-Put 4 digit paper number here

Appendix B3 System/Component Cause Codes

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CONTENTS. B. System Design and Performance Requirements

Speransa 2008: Round table: Nuclear and sustainable development Universitad Politecnica de Valencia \UPV - Passive safety systems -

David Cronin-Ohio Valley Area Manager. Heat Transfer, Controls & Instrumentation, Metering.

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

2x58 MW Coal Fired Power Plant at Mauritius

CL44eR DISHWASHER STANDARD FEATURES MODEL OPTIONS AT EXTRA COST ACCESSORIES DIRECTION OF OPERATION VOLTAGE. Item # Quantity C.S.I.

Boiler Technical Specifications (2013)

Medupi Unit 6 ACC hot cleaning: Method and results

Refrigerated Air Dryers VF Series. DHT Series. Non-Cycling 10-2,000 scfm scfm

THERMODYNAMICS STEAM P7690 AND STEAM BENCHES CUSSONS TECHNOLOGY LABORATORY RECOMMENDATION

Appendix B9 Geothermal Unit Cause Codes

WHISPA III 5000 WM & 9000 WM. heatingthroughinnovation. Installation, Operating, Maintenance and After Sales Manual. Part Number: Issue 1

POWERENERGY

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

ENGINE GENERATORS AND ACCESSORIES

Design and analysis of the piping systems

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

COMcheck Software Version Mechanical Compliance Certificate

TECHNICAL SPECIFICATIONS FOR PLUSHER WDS 18 SERIES INSTRUMENT WASHER DISINFECTORS

Refrigerated Compressed Air Dryer

CPF PRODUCT DESCRIPTION

"A Case Study of Three Drum Parameter Control in Boiler Using Discrete PID Controller Based on Simulation"

PLYWOOD INDUSTRY JOB EVALUATION PROGRAM JOB DESCRIPTION. Points: 242 Grade: 18

Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC. Installation and Operating Service Manual BOILER FEED SYSTEM

DESIGN CLASS FUNCTION

POWER GENySYS P ROJECT E XPERIENCE I NFORMATION - D ISTRIBUTED G ENERATION

Vertical Laboratory Autoclave A series:

EXPAIR. Use. Precision air handling cabinets. Reducted footprint Dual-wall construction

Laddomat. Mixing valves for solid fuel boilers. Version 1.01

Homework Chapter2. Homework Chapter3

Understand and apply domestic central heating system installation and maintenance techniques

An Instrumentation and Control for Loop Test

THE NEXT GENERATION IN CONDENSING BOILERS M-SERIES

OPERATIONS AND MAINTENANCE MANUAL FOR THE 8-TON TURF CART ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER

SECTION AIR COILS

MEP 599 Diploma Design Project- Fall Term 2016

Pellet Stove Test Manual

Facilities Services Utilities Shutdown Request Form

What to Expect from Your EtaPRO Investment

STEAMPAK Series BurnerPAK BMS Burner Management Systems

ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER OPERATIONS AND MAINTENANCE MANUAL

Transcription:

Document Code: 1 (5) Project : MULTI FUEL CFB BOILER SIMULATOR Author: Approved: Language: JJA Document title: SYSTEM DESCRIPTION MAIN CONDENSATE PUMPING Submitted for: Customer reference: Other information:

Document Code: 2 (5) TABLE OF CONTENTS 1 GENERAL... 3 2 DESIGN DATA... 4 3 EQUIPMENT DATA... 4 4 AUTOMATION AND INSTRUMENTATION... 4 4.1 Condenser level control... 4 5 OPERATION... 5 5.1 Start-up... 5 5.2 Normal operation... 5 5.3 Operating disturbances... 5 6 CONNECTED SYSTEMS... 5

Document Code: 3 (5) 1 GENERAL Function of the main condensate pumping system is to pump condensate from the condenser through the LP preheaters to feed water tank. It also supplies spray water to the LP bypass station (S1 LBB20 AA201) to be adjusted with control valve (S1 LCE10 AA201) and cooling/seal water for Turbine Island users. System is shown on P&I diagram S1LC -MFB1001. Condenser itself (also the gland steam condenser) is in Turbine Island scope of supply. The system is equipped with 2x100 % main condensate pumps (S1 LCB10/20 AP101). During normal operation one pump is running with constant rotation speed and the level in the condenser is regulated with control valve S1 LCA30 AA201. From the condenser water is pumped through LP preheaters (3 pcs.) to feed water tank. Flows entering the condenser are: Turbine exhaust Cold reheat Feed water HP- & LP preheaters and turbine drainages LP 1 preheater condensate Demineralised make-up water (according to feed water tank level) Steam from LP preheater by-pass station (start-up, turbine trip, shut-down) After the pumps there is a flow measurement and during the start-up / other boiler part load situation adequate flow for the pumps is secured with minimum flow valve. From the hot reheat piping there is a LP bypass station to condenser. Bypass station is used during start-up / shutdown and in case of steam turbine trip. Spray water for the LP bypass is taken from the main condensate pumps. In steam turbine trip bypass station in controlling hot reheat steam pressure and large amount of condensate is taken quickly to spray water purposes (hydraulic valves). In order to keep the main condensate pumps in right operation range, in turbine trip second main condensate pump is started automatically. Both main condensate pumps are running always when LP-bypass is at maximum. From the main condensate line water is taken also to steam turbine cooling during start-up- / shutdown and sealing waters to valve / water seals. During normal operation these connections are closed.

Document Code: 4 (5) 2 DESIGN DATA System design is based on situation where boiler load is at 100 % (ambient air +9 C, cooling water +12 C) and make-up up water flow is calculated based on 3 % blow down. When LPbypass is at maximum flow (turbine trip), both main condensate pumps are running. 3 EQUIPMENT DATA Main condensate pumps S1 LCB10/20 AP101 Function of the main condensate pumps is to pump condensate arising to condenser through the LP preheaters to feed water tank. Pumps are located in the pump pit underneath condenser. Number of units 2x 100 % Type KSB / MTC-A 150/04 12.1 Flow rate 80,1 kg/s Head 159 m Pumping temperature 23 C Motor power 200 kw 4 AUTOMATION AND INSTRUMENTATION 4.1 Condenser level control Main condensate pumps are running with constant speed and the level is controlled with valve S1LCA30 AA201. Low-level protection for the main condensate pumps is done by level measurement interlock and low-level switch. To main condensate pumping is also related the minimum flow control. During start-up and other low load situations minimum flow for the pumps and for the gland steam condenser is ensured with control loop FIC S1 LCA30 CF201.

Document Code: 5 (5) 5 OPERATION 5.1 Start-up Turbine and condenser start-up (vacuum pumps etc.) in detail is in Turbine Manufacturers scope of supply. Before the main condensate pumping system can be started, condenser and suction lines to pumps are filled with water. One main condensate pump is started against closed discharge valve (motorised), control valve S1 LCA30 AA201 is closed. Motorised valve S1 LCA10 AA101 (or S1 LCA20 AA101) is opened partly. When pressure S1 LCA30 CP201 after the pump starts to increase, also the minimum flow valve is opened partly. Finally motorised valve is opened fully and minimum flow control S1 LCA30 AA201/-CF201 is set to Auto mode. Piping system from the control valve S1 LCA30 AA201 to feed water tank is filled by opening control valve partly. In initial start-up lines are vented manually. When the system is filled with water, condenser level control LICSA S1MAG10 CL201 is set to Auto mode. In hot/ warm start-up (lines / heat exchangers full of water) start-up procedure can be handled from the control room. Main condensate pump is started against closed MOV (S1 LCA10/20 AA101) and the valve is opened. Both minimum flow control and condenser level control are set to Auto mode. 5.2 Normal operation One main condensate pump is running while the other is stand-by. All the condensates from the condenser are pumped to feed water tank and connections to LP bypass spray and to turbine cooling are closed. 5.3 Operating disturbances. Failure of the running main condensate pump Second pump will automatically start. Turbine trip Second main condensate pump starts and LP bypass station is opened automatically. 6 CONNECTED SYSTEMS LP preheating system HP steam system Condenser Feed water system HP preheaters Make up water system S1 LCC -MFB1001 S1 LB -MFB1001 S1 LB -BFB2506 S1 LA -MFB1001 S1 LAD -MFB1001 S1 GHC -MFB1001