Feedback from potential users of UV in HVAC

Similar documents
Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

UVC EMITTERS. For microbial control, enhanced IAQ and energy savings. General Products Catalog

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

Critical Process Rooftop Series CPRT

Closing the Loop What s best for your system?

The Role of Air Handling Units in Combating the Spread of Infectious Disease

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

or

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

AMERICAN AIR & WATER, INC.

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

IAQ: Re-tuning Commercial Buildings

Trim Pump Impellers. Fredrick/Weinman Engineered Products 2-1/2 KH, 2-1/2 x 3 x 12

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY

ASHRAE JOURNAL ON REHEAT

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

Technical Assignment 3 11/15/04. Executive Summary

Comfort and health-indoor air quality

RoofPak Applied Rooftop Systems

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Climate control precision in Hi-tech environments Jupiter and Mercury Close Control Units

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Technical Report Three

ENGINEERING. Edition No. 13 October 2002

Fan Selection. and Energy Savings

How to Take Basic Readings to Show Energy Efficiency

AIR PURIFICATION SYSTEM

The Centurion Rooftop GAS/ELECTRIC, TONS ELECTRIC/ELECTRIC, TONS

Trane Performance Climate Changer Air Handlers. An air handler for every need.

Appendix A. Glossary of Common Terms

IAQ VENTILATORS. FRESH AIR REQUIREMENTS. Applications ASHRAE 62.1, 90.1 & School / university / day care.

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

Element D Services Heating, Ventilating, and Air Conditioning

Performance Climate Changer Next generation air handler from Trane

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

HVAC Efficiency In Healthcare. Presenter Mr. Nate Lincoln

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

FAN TERMINAL UNITS Constant Volume (Series Flow), Standard Design

Energy Management and Controls

UVC GERMICIDAL TECHNOLOGY APPLICATIONS IN HOSPITALS

Civil Engineering Building

Steril Air mobil. Owner s Manual. GENTRA Rıhtım cd. Yuva sk. No: ¾ Beyoğlu İstanbul Turkey Tel : Fax:

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

Chilled Water DOAS Fan Powered Terminal Units

Trane Performance Climate Changer Air Handlers. An air handler for every need.

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

Mechanical Systems Thesis Proposal: Calvert Memorial Hospital Prince Frederick, MD Holly Mawritz

FAN WALL Technology. Product

Cleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY

NEW GREEN SERIES INSTALLATION AND OPERATION SP-150GS SP-200GS. Manufactured by ULTRA-SUN TECHNOLOGIES, INC Stellar Court Corona, CA 92883

Architectural Engineering Senior Thesis Mechanical System Redesign

City of Duluth Festival Center 04/25

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

WHITE PAPER. ANSI/AHRI Standard for Fan and Coil Evaporators - Benefits and Costs

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Computing Services Center

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

HVAC Controls Upgrades: Requirement Details ( )

FCC Fan-Coil Units High-Performance, Vertical

High Efficiency Air Cleaners

VariCool VAV. (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water. Unique Solutions for All-Indoor HVAC Projects

Solution: Problem: How can the air, and surfaces, be cleaned to lower the risk from the usual suspects? OR PACKAGE

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

Ultraviolet Lights on Daikin Applied Rooftop Systems and Rooftop Air Handlers

Distribution Restriction Statement

VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN

ULTRAMAX GOLD UMX REMOTE LAMP AIR DISINFECTION SYSTEMS w/ ODOR REDUCING TECHNOLOGY (PCO) OWNERS GUIDE

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

GARCIA GALUSKA DESOUSA Consulting Engineers

An HVAC Audit of the Canberra Institute of Technology

Comfort, Energy & Health Solutions

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

FF1DNA, FF1DNE FAN COIL UNITS. Sizes 018, 024, 030. Form No. PDS FF1D.18.3 FEATURES FF1D

Document No B Revised June Atlantic Ultraviolet Corporation

T-Series Climate Changer Air Handler. It s Hard To Stop A Trane.

HVAC Controls Upgrades: Requirement Details ( )

Technical Assignment 3

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

Worried aboutthe air quality in your schools?

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS

Daikin Blueprint: Delivering Hot Water with a Chiller

HEALTHY HOME AIR PURIFICATION SYSTEM

Dehumidifying with Dedicated Outdoor Air

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance

C.E.P., C.E.M, C.I.P.E.

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

MISSION CRITICAL Air Conditioning Systems. Maintenance Guide. ClimateWorx International Inc. 14 Chelsea Lane, Brampton, Ontario, Canada L6T 3Y4

GERMICIDAL ULTRAVIOLET FIXTURES

UV100E Ultraviolet Air Treatment System

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

Transcription:

w w w. e s m a g a z i n e. c o m

Looking for lifecycle guidance or more extensive info for your stationary applications? An industry IAQ veteran weighs in about the design, installation, commissioning, retrofit, and O&M of ultraviolet systems for commercial HVAC equipment. By Forrest Fencl Feedback from potential users of UV in HVAC equipment suggests that many are confused about its use. Despite UV s relative simplicity compared to equipment such as chillers and boilers, not all HVAC professionals are proficient on how to size and specify UV-C systems, how to design their installation, how to install UV-C systems, or how to plan for lamp replacements. All of this is to be expected. While UV-C systems are not new, the UV-C industry has undergone formalization in recent years, beginning primarily with ASHRAE adding a UV-C section to the Systems and Equipment Handbook. Also, manufacturers have simplified their offerings to make selection, installation, and service much easier. This article takes advantage of these advancements to provide guidance about the complete lifecycle of UV-C systems sizing, selection, installation, commissioning, operations, service, and disposal/recycling. UV-C systems today are primarily focused on stationary or surface applications, e.g., coil irradiation with airstreams as a secondary benefit. Because coil applications are dominant, this article will focus on these types of installations. This article breaks the lifecycle into four parts: 1. System sizing and installation design 2. Commissioning guidance 3. Retrofitting UV-C systems 4. Maintenance PART 1: SYSTEM SIZING AND INSTALLATION DESIGN Designing a UV-C system can be simple once the basics are known, such as the rationale for a UV-C system, how to estimate the lifecycle cost (first cost and operating cost), sizing, and installation design. The most authoritative resource for design guidance is the 2011 ASHRAE Handbook: Applications. Section 60.8 summarizes decades of research papers, technical articles, and application experience. The problem. The handbook describes how HVAC systems can promote the growth of bacteria and mold-containing biofilms on damp or wet surfaces such as cooling coils, drain pans, plenum walls, humidifiers, fans, energy recovery wheels, and filters, and links these conditions to reduced airflow and heat exchange efficiency. Exposing HVAC surfaces to UV-C light prevents the buildup of contaminants and, in retrofits, eradicates contaminants that have built up over time. Alternatives. The handbook describes how chemically and mechanically removing deposits and growth from the surfaces of HVAC equipment can be costly, difficult to perform, and dangerous to maintenance staff and building occupants. Engineers and

Illuminating Info: UV-C For HVAC FIGURE 1. Overlapping lamps enables installation of uniform lengths, which makes re-lamping easier. (Image courtesy of UV Resources.) building owners should read this section carefully. Design guidance. Perhaps the most important guidance in the handbook is the specification for UV-C irradiance levels that should strike coil surfaces: 50-100 µw/cm2. A more understandable and convenient way to provide the recommended amount of UV is to use lamp watts, which can be found printed on all major suppliers lamps. ASHRAE s recommendation of 100 µw/cm2 works out to be slightly under 7.5 lamp watts per sq ft of coil surface area. UV lamps are available in multiple lengths ranging from 24 in to 60 in (60-145W). Lamps are typically overlapped in the plenum to reduce the number of sizes used (Figure 1). Doing this, the designer can often use one lamp length, which will minimize both first and replacement costs. A 27,000-cfm system could have a coil size of about 6 ft high by 9 ft wide that might use four 60-in, 145W lamps, or 10.7 lamp watts per sq ft. Lifecycle cost. Many users report that their cost for an installed system featuring high output lamps was less than $0.15 per cfm. As discussed in the section above, this might cost ($0.15 x 27,000 cfm) less than $4,000. The operating cost for a system that is on 24/7 is then easy to estimate: Annual energy cost = Installed Wattage (kw) x Utility Rate ($/kwh) x 8,760 hours. This system at $0.10/kWh rate comes out to (0.580 x 0.10 x 8,760) about $508/year or less than 1% of the power to operate the air conditioning system. Field reports indicate that the first cost of a UV-C system is approximately the same as one properly performed coil-cleaning procedure, especially if system shutdowns, off-hours work, associated overtime, and/or contractor labor costs are considered. The cost is usually more than offset by system sustainability or energy use and little or no maintenance, as ASHRAE points out. UV-C lamps are typically replaced all at once as part of a routine annual fluorescent lamp change-out schedule. They can also be recycled with fluorescent lamps. Location. UV-C systems are most often installed downstream of the cooling coil in the direction of airflow. This is favored because the air there approaches saturation, meaning that within this plenum, there could be raw water, damp insulation, and other conditions that are known to lead to the growth of mold and some forms of bacteria. Also, coil drain pans are often extended in this location to catch raw water carry-over from the cooling coil. Lamp installation details. Lamps are mounted horizontally, usually 12 in from coil surfaces. A connection to 120/240/277Vac power fed through a toggle switch outside of the plenum and door interlock cut-off switches are the basic installation criteria. Check manufacturer s Installation/Operation/Maintenance (IOM) details for how to hold the lamps in place for easy lamp installation and replacement. Controls and safety. UV-C systems should be designed with door interlocks such that when air handlers are opened, the UV-C lights are turned off automatically (See Figure 2). Warning labels should be placed on air-handler doors. Additional equipment that can be installed is lamp/ballast monitors, alarms, and radiometers. Lamp/ballast monitors are typical today, and alarms and radiometers are used in infectious disease applications where the highest output must be maintained on a continuous basis. PART 2: COMMISSIONING TIPS (CHECKING DESIGN SPECIFICATIONS AND INSTALLATION QUALITY) The following tips should be followed for any UV-C install in new and retrofit applications. This section covers pre-functional checks and tests, functional checks and tests, and training/documentation. PRE-FUNCTIONAL Installation. Obtain a list of materials specified, ordered and received, and verify that they are correct. Verify that the installation FIGURE 2. HVAC equipment with installed UV-C lamps should have an interlock switch that turns off the UV-C lamps when the door is opened. (Image courtesy of UV Resources.)

Illuminating Info: UV-C For HVAC shutdown of integrated systems at the BMS, if applicable. Verify that system sequence operation is correct. Alarms and safeties. Verify that systems alarms are active if applicable. Verify sequence of operation under alarm condition. Verify equipment safeties are active. TRAINING AND DOCUMENTATION Training. Verify that adequate safety training is provided to building maintenance personnel for entering an active UV-C installation (See Figure 3). Witness portions of the training, and identify any additional resources for use after training ends, such as lamp replacement and disposal. Also ensure that staff has been trained on safety measures, including UV-C exposure, lamp breakage, function of the alarms and safety interlocks, and how to tell if they are not functioning properly. Also, ensure that protective eyewear and clothing is discussed and available to staff. Report of commissioning. Document commissioning activities. Document issues resolved during the commissioning process. Identify a plan to resolve any issues remaining after installation and commissioning. Systems manual. Document operations and maintenance manuals for equipment included in the commissioning process. Create a useable sequence of operations of systems. Document the design intent for use during renovation or retrocommissioning. Document safety features and requirements, along with the availability and location of protective clothing and eyewear. FIGURE 3. Note the person checking the installation is wearing protective eyewear, and that the safety interlock for turning off the lights when the access door is open has been overridden. (Image courtesy of UV Resources.) meets construction details and the manufacturer s IOM manual for the equipment. Document the condition of equipment as installed. Start up. Using the manufacturers IOM, note any pre-operation requirements. Verify that manufacturer s startup procedures are performed and document the performance. Verify the calibration of devices, including the operation of the toggle switch, door interlock safety cut-off switch(s), and that all lamps can be turned on, and that they are functioning. Controls. Review installation of sensors such as radiometers, current switches, and output signals to the building management system (BMS). Document calibration of sensors and devices and document proper operation of remote monitoring of equipment at the BMS, if applicable. FUNCTIONAL Automatic equipment operation. Witness automatic startup and shutdown from the plenum wall switch as well as the door switches. Verify that equipment sequence of operations is correct. Automatic system operation. Witness automatic startup and PART 3: RETROFIT GUIDANCE UV-C has been more prevalent in new-construction specifications and projects; however, UV-C installs have gained popularity in retrofit projects, especially in hospitals. Three reasons seem to be driving the increase: 1) Better indoor air quality; 2) increased airflow, and 3) energy savings. UV-C systems will clean dirty coils, even deeply inside the coil. And once clean, UV-C keeps the coil clean continuously. Typically, retrofits adding UV are comprised of fixtures, lamps, and door interlock switches, plus an electrical connection. Options can include a radiometer, or more popular today, a lamp-monitoring kit that provides local and remote monitoring. As to framing to hold the fixtures inside coil plenums, most users build their own, using preformed materials available at hardware stores. As with new construction, UV-C system design is similar in process and costs ($0.15/cfm). While economic benefits from improved indoor air quality exist, they can be difficult or subjective to quantify. Therefore, energy savings drive most retrofit payback analyses. The more accurate and therefore favored way to determine payback, or ROI, is by measuring the before and after capacity of an air conditioning system and putting the measurements into the following equation: BTU s = cfm x 4.5 x (h1 h2), where: h1 h2 = enthalpy difference (British thermal units per degree wet-bulb). The following parameters are necessary to determine capacity: Coil traverse note: if fan is VAV, set at 60Hz for each test Coil entering and leaving wet bulb temperatures (h1 h2) For fan horsepower savings: Coil pressure drop (expressly across the cooling coil)

Illuminating Info: UV-C For HVAC 4. Coil cleaning costs (material & labor), actual or estimated. 5. Drain pan cleaning and treatment costs (material & labor). 6. Electrical cost in dollars per kwh. 7. Demand charge in dollars per hours of system cooling per year (actual or estimated). 8. How is unit operation and operation hours controlled? Make sure it is consistent. FIGURE 4. UV-C lamp (top) and fluorescent lamp (bottom) of the same form factor, which could be made on same lamp machine. The UV-C lamp has a fused quartz envelope that is clear in order to let UV-C light through unfiltered. The fluorescent lamp glass envelope is lined internally with phosphor, which glows when charged. (Image courtesy of UV Resources.) Optional: Chilled water entering and leaving temperature and volume Coolant temperature differentials (at the coil for CW units) Fan rpm Fan motor amp draw By taking these measurements, the user will be able to determine their actual capacity, both before the installation of UV, and after. It is not uncommon to see improvements of 10% to 50% (or more). Help can be had through most UV-C manufacturers in performing these measurements and obtaining ROI spreadsheets for actual payback calculations. For ultimate precision, the following should be considered to maximize before/after consistency: 1. Note all damper positions and unusual damper systems that might affect pressure drop readings (i.e. economizer cycle). Dampers can move for various reasons, but their movement can effect airflow and pressure drop readings. 2. If the AC system is VAV, override the controller so that the unit is at 100% capacity (60Hz) during each test period to provide exact before and after comparisons of cfm. This will assure that fan rpm is the same each time readings are performed. 3. Note whether the system includes a return air fan. A return air fan will affect total airflow and therefore pressure drop across the coil. It must perform the same during the before and after measurements. If it includes a VFD be sure it is also at 60Hz. UV-C RESOURCES Additional articles by the author The Hidden Value of UV-C and Maintaining A/C-System Performance With UV-C have appeared in various publications and will provide background information to engineers, contractors, commissioning providers, and facility staff. Find them all on the UV Resources website at http://tinyurl. com/mjvlxay. PART 4: OPERATING AND MAINTENANCE RECOMMENDATIONS Most all lamp manufacturers list a UV-C lamps useful life as 9,000 hours. At 9,000 hours the lamp output begins to fall to 85% or less of the original output. Because the blue hue produced by the lamp is not indicative of the invisible UV-C energy output, lamp manufacturers are not willing to guarantee useful UV-C output for longer than 9,000 hours. The lamp closest to a UV lamp in construction and function is the fluorescent lamp as both are low pressure UV-C lamps (See Figure 4). Therefore, both can be treated similarly whether purchasing, storing, replacing, or disposing. The minor construction differences are the glass envelope and internal coatings. In the fluorescent lamp, ordinary glass is used and it is internally coated with phosphors, which gives fluorescent lamps their characteristic glow (visible light). Can UV-C lamps be run longer than 9,000 hours? Yes, but field operators report that running lamps longer will produce lamp outages one lamp at a time. This requires maintenance personnel to inspect UV-C installations routinely to know what and how many to replace. This is poor management of staff time. Furthermore, replacing lamps only as they burn out requires a significant amount of lamps be kept as spares should lamps start to fail in larger numbers. Most users report that they have set up an annual replacement schedule or linked it to their fluorescent lamp replacement schedule. An annual lamp schedule has the following benefits: 1. It provides time to get a full replacement competitively quoted and fulfilled. 2. The inventory or replacement lamps are reduced to a recommended quantity of 5% of the installed lamp quantity to hedge against breakage or premature failure. 3. It eliminates the time, labor, and cost of trying to monitor the lights on a more frequent basis, especially toward the 9,000-hr window. 4. It minimizes system downtime and provides maximum UV-C output to keep the kill of airborne microorganisms as high as possible. ES The president of UV Resources, Forrest Fencl, is the holder or co-holder of 15 patents and the author or co-author of numerous papers and articles and several ASHRAE Handbook chapters related to ultraviolet air and surface treatment. He is a Life member of ASHRAE, an ASHRAE Fellow, formerly an ASHRAE Distinguished Lecturer, and a member of the International Ultraviolet Association (IUVA) and the Illuminating Engineering Society (IESNA). Reprinted from Engineered Systems Magazine October 2013 P.O. Box 4270 Troy, MI 48099