Executive Operations Manager. Policy First Issued 2014

Similar documents
EVACUATION POLICY 1. General

Health and Safety Services. Safety Guide 5. Fire drills

Sir Christopher Hatton Academy A Member of Hatton Academies Trust

Hampton Junior School Lockdown Policy

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

Fire Safety Policy. Investing in success. Dukes Centre Dukes Avenue Kingston KT2 5QY 1. Policy

Invacuation, Lockdown and Evacuation Policy

EMERGENCY EVACUATION PROCEDURE Temporary Instructions w.e.f 5 th September 2018

GREAT DENHAM PRIMARY SCHOOL FIRE SAFETY POLICY September 2017

FIRE SAFETY POLICY. This policy refers to both Wellington Senior School and Wellington Prep School

Youth Challenge Emergency Evacuation and Invacuation Policy

109 Bushfire Plan - Public BUSHFIRE PLAN

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Management Standard: Fire Safety

Arbour House. Fire Policy and Procedures

Local Rules: Fire Safety

Simon Woodfield Facilities Manager Governor Committee Policy Status Developed September 2009 Updated February 2017 Governor Approved June 2016

STATEMENT OF THE HEALTH AND SAFETY STRATEGY FOR THE SYDNEY RUSSELL SCHOOL

Stationers Crown Woods Academy. Evacuation Chair. Policy

NEWTOWN LINFORD PRIMARY SCHOOL. Emergency Procedures Policy

EMLC Academy Trust. Fire Safety Policy 2017/19. Every child deserves to be the best they can be

C3 Fire Safety, including Emergency Preparedness and Response

Fire Safety Policy. Signed Date September on behalf of the Management Committee. on behalf of The Woodlands

East Barnet School I want to learn BOMB EVACUATION PROCEDURES

Fire and Bomb. Evacuation Policy

HEALTH AND SAFETY FIRE SAFETY POLICY Putnoe Primary School

FACILITY OF EMERGENCY PLAN. (Template)

Coodanup College Bushfire Plan

WARWICK PREPARATORY SCHOOL

Fire Evacuation Procedure WISE Campus

LONE WORKING RISK ASSESSMENT AND PROCEDURES POLICY

Kings Fire Safety Policy

Fire Evacuation Procedure Stroud Campus

ROSALIE PRIMARY SCHOOL BUSHFIRE PLAN Introduction 2. Overview 2 Bushfire Preparation checklist (refer to Appendix A) 3 Communication 4

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

Invacuation, Lockdown and Evacuation Policy

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London

KELSO HIGH SCHOOL EMERGENCY EVACUATION PROCEDURE

EMERGENCY ACTION PLAN (General Evacuation)

RYDES HILL PREPARATORY SCHOOL & NURSERY P28 (ISI 12B) FIRE SAFETY POLICY (INCLUDES EYFS)

Fire Emergency Procedures

Annemount School Fire Safety Policy This Policy is for the whole school including the EYFS

(Fire) Emergency Evacuation Plan

Fire Prevention and Procedures Policy

Policy for Safe Evacuation of Persons with Disabilities

FIRE SAFETY POLICY Revised March 2013

FIRE PROCEDURES 1. APPOINTMENTS

Fire Safety Policy 2018/19

Fire and Emergency Evacuation Procedures

Fire Safety, Procedures and Risk Assessment Policy

Emergency Notification Plan. Developed By: Cleveland State University Police Department Office of Emergency Management

Fire risk management plan. MH/05/Revised/06/17

EMERGENCY EVACUATION PLAN for FIRE

Project: Location: Date Prepared: Last Reviewed:

Health and Safety Policy

EMERGENCY MANAGEMENT PLAN For Lambton High School. Date of last review: April, Review date: April, 2018

Whitley Abbey Primary School

Fire Safety Policy. Document Author: Director of Estates, Fleet & Facilities Management

EVACUATION PROCEDURES IN EDUCATION PREMISES

AL NOORI MUSLIM SCHOOL. Emergency Evacuation and Lockdown Policy Policies & Documents

Fire Evacuation Procedure Berkeley Green, John Huggett Engineering Hall

Fire Evacuation Procedure Stroud Campus

Fire Safety and Emergency Evacuation. Herne Bay Junior School. Compassion Courage Hope Integrity Justice Respect Responsibility - Wisdom

Fire Policy and Procedures St Helen s School

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

Peponi House Preparatory School Nairobi, Kenya. Peponi House Fire Risk Prevention Policy

Fire Safety Management

GHS 8-4 Fire Policy and Procedures

GENERAL - Regulatory. Fire Policy, Risk Assessment and Prevention (ISI 12a) Fire Procedures (ISI 12b)

Property Name & Address [ Property Name ] - [ Property Address ]

EMERGENCY OPERATIONS PLAN Revision 4.0

Event Safety Check List

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University ARTS COTTAGE ( )

Fire and Emergency Plan: Evacuation & Invacuation. Fire and Emergency Plan: Evacuation & Invacuation

To seek Cabinet approval of the Council s Fire Safety Policy. It is proposed that Cabinet approves the Fire Safety Policy.

Health and Safety Draft Performance Standard HSPS 012. Provision of Personal Emergency Evacuation Plans (PEEPs) (Fire Safety)

Emergency Evacuation Plan. Kettering Labs. School of Engineering

Fire safety procedure

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University BLUE BAND BUILDING ( )

FIRE SAFETY POLICY and FIRE SAFETY ARRANGMENTS

Wellsprings Primary School. Fire Emergency Evacuation Plan

Joint Responsibility for Health and Safety Internal Guidance for Members and other occupiers of the Scottish Parliament Campus.

OMBC People, Communities & Society RISK ASSESSMENT

Visitor information pack

EMERGENCY EVACUATION PLAN

Environmental emergency preparedness and response

NEWBATTLE ABBEY COLLEGE. Fire Safety and Emergency Evacuation Policy and Procedure

FIRE AND EMERGENCY EVACUATION POLICY AND PROCEDURES

Emergency Procedures Policy

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

Change Made by (Signature)

Tuition, Medical and Behaviour Support Service

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

Fire Safety and Fire Risk Management Procedures, Fire Safety Systems Testing Instructions and Log Sheets

Glenmere Primary School Fire Safety Policy FIRE SAFETY POLICY. Revised on April Sam Conlon. Created by S.Conlon 1

FIRE AND EMERGENCY EVACUATION PROCEDURES STARCROSS PRIMARY SCHOOL

Visitor & Intruder Security Policy

KING S HOUSE SCHOOL FIRE RISK MANAGEMENT POLICY & PROCEDURES

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Fire Evacuation Procedure Filton Campus

Transcription:

Policy No: 49. Flood Evacuation Plan Coordinator Review Frequency Executive Operations Manager Annually Policy First Issued 2014 Last Reviewed Autumn Term 2017 Date policy considered by External HR Consultant Date policy considered by External Solicitor N/A N/A Agreed by Governors and adopted on 17 th November 2017 Does this policy need to be agreed by Governors? If yes, which committee Yes, Board of Governors Due for Review Autumn Term 2018 This policy is communicated by the following means: Governors Staff Governor consultation by email when policy reviewed and agreement Policy folders on staff shared drive and inhouse training Parents Students Academy website, Parent Evenings Academy website, assemblies, in lessons

UTC@harbourside Flood Evacuation Plan Introduction This is a plan to ensure the effective evacuation of UTC@harbourside in the event of a Flood. It is imperative that as soon as the UTC grounds start to flood the site is evacuated quickly and effectively for the safety of staff and students. In most instances early warning will be received via the Environment Agency, so Evacuation won t be required, however organised closure of the building we be put in place. UTC@harbourside sits on the banks of the river Ouse and as such is subject to potential flooding from high tides and/or a combination of high tides and heavy rainfall. With the increased risk of flooding all staff must be aware of the procedures in place to prevent flooding by the use of the built in flood defence systems and understand their roles and responsibilities within the plan. Scope The plan will clearly identify the persons and their roles within the plan to ensure the UTC is adequately protected and in turn the student s and staff s H&S is prioritised. By implementing the plan the risk of flooding will be monitored and as a result the flood protection measures can be implemented prior to any potential flooding and the H&S of the Staff and Students can be prioritised by informing them that access isn t possible during the times of flooding / potential flooding. Objectives To ensure that the UTC has taken all practicable measures to lower the risk from flooding by monitoring the times of high tides and/or heavy rainfall, so flood defences can be implemented to limit / prevent any damage to the property and learning environments. By ensuring this is completed the H&S of the occupants by removing them from site can be guaranteed. The plan must therefore clearly identify roles and responsibilities to ensure those with particular responsibilities within the plan are competent to carry out their role. If unforeseen flooding occurs during occupation the plan must clearly identify a safe evacuation procedure. Situation Description of the Site The school is a University Technical College (UTC) for up to 600 students aged 14-19. The main buildings have a small footprint, however the main building is based over x4 floors. All external ground floor access doors have been provided with flood defence barriers, which can manually be installed, whilst the walls also have been constructed at act as flood defences to protect the building. As The UTC is a new College, the student numbers will increase over the next few years, however the initial numbers will be approx. x80 students and x10 staff from September 2015 September 2016. Map(s) - Site Map showing key infrastructure & utilities Appendix 1

Site Map showing max predicted extent of flood water (See EA Flood Maps) Appendix 2 Site Map showing evacuation routes and assembly points Appendix 3 Site Map for Emergency Services Not included as Fire Brigade aware of access routes and attended site for familiarisation. A copy of the map is available in the Premises Information Box (PIB). Site Map showing Flood Protection where proposed Appendix 4 Flood Risk The environment of the site is clearly of a brownfield and post-industrial nature, with traces of this history clearly visible both in the existing buildings on site, but also in the nature of the hardstanding and in segments of railway track still visible. The site is also extremely exposed due to the adjacency of the River Ouse and the site s proximity to the south coast. The site is positioned in a Flood Risk Zone 3A and subject to tidal flooding. The likelihood of major flooding is approximately once every 50 Yrs. and the severity is considered as moderate, as the building has flood defences and if installed correctly this ill limit damage to the property. The risk to building users is minimal, as tides are monitored as well as flood warnings being received. This allows for preparation, safe controlled evacuation and for the defences to be installed. The school is located next to the river Ouse which is a rapid reaction water course and has cause significant flooding in the past. Considerations No additional considerations are noted at present, however note should be made that additional measures for the evacuation of Disabled may need to considered, however will be picked up within the Fire Evacuation PEEPS. These can be utilised noting that the safe evacuation routes will be to the rear of the building only to Assembly Point B. Prevent, Protect, Prepare. Tides are monitored and flood warning received via the Environment Agency. The UTC is therefore well prepared and has maximum time to react and implement the Defence Procedure. (See separate document). In addition processes are in place to monitor and keep staff and parents/students aware. These are detailed in the Action on Alert section. Flood Warnings The Environment agency flood risk early warning system contacts: Kathryn Reynolds kathrynreynolds@utc-harbourside.org 07710882594, Adanma Umunna adanmaumunna@utc-harbourside.org 07973705585 Paul Bevan - paul.bevan@outlook.com 07776134593 Bernie Flint bernieflint@utc-harbourside.org 07771756687, as designated number either at the UTC or on a designated number for an out of hours/term event. Should the above people be unavailable Matthew Dawson 07754103173 is contacted.

The UTC has signed up the Environment Agency Flood Warning Scheme (https://fwd.environment-agency.gov.uk/app/olr/home) 0845 988 1188. The following action will be taken for each flood warning. Warning Message Timing Action Flooding is 2 hours to 2 days in Be prepared for possible. Be prepared. advance of flooding. flooding. Prepare a flood defenses. Monitor and implement defense plan Inform Parents and Students and evacuate if required. Flooding is expected. Immediate action required. Half an hour to 1 day in advance of flooding. Act now to protect your property. Move any critical equipment and information to a safe location Implement defense plan Inform Parents and Students and evacuate. Severe flooding. Danger to life. When flooding poses a significant threat to life and different actions are required. Be ready should you need to evacuate from the property. Co-operate with the emergency services and call 999 if you are in immediate danger. Implement defense plan Inform Parents and Students and evacuate if required. Warning Removed No further flooding is currently expected for your area. Issued when a flood warning is no longer in force. Flood water may still be around and could be contaminated. If you've been flooded, ring your buildings and

contents insurance company as soon as possible. Action On Alert Follow instructions as detailed under Flood Warnings section. Action to be taken in the event of Alarm being Raised or Flood Warning Received: 1. If flood warning received whilst the school is occupied (during working hours)in hours: Raise the alarm and evacuate school following established Fire Drill procedures. Main assembly point B (see Appendix 3) Contact Emergency Fire Services (999) if necessary and/or Environment Agency Flood line: (0845 988 1188) if event was not expected. If safe to do so, locate and turn off key services e.g. water, gas & electricity. Following enquiries/assessment the school should either be invacuated, evacuated or stood down. Evacuation 2. If site starts to flood whilst the school is occupied (during working hours), immediate action is to evacuate. a) Evacuate school following emergency site evacuation, see Appendix 3. Invacuation 3. If warning has been received but site has not yet started flooding and the school is occupied (during working hours), immediate action is to invacuate to building outside flood zone if one can be arranged. Stand-down 4. Following confirmation from the Environment Agency, the decision can be taken to stand down the UTC. In this eventuality, the school should return to normal lessons following the agreed re-occupation. Out of Hours Warning/Flood 5. If flooding occurs out of hours: a) Notify the Health & Safety Team Leader (Adanma Umunna both in and out of hours to discuss UTC closure if necessary. b) Inform Emergency Management Team see section flood warnings P3. Go to scene and activate Emergency Plan.

c) If safe to do so, locate and turn off key services e.g. water, gas & electricity. 6. In case of injury, contact Ambulance & Police (999). 7. Site Reoccupation If the site is the re-occupied following a flood warning, the plan is to do so in class number order with all classes going through reception. 8. Who to inform and how: The Principal to primarily contact to organise roles and responsibilities: Kathryn Reynolds 07710882594 Paul Bevan 07776134593 Bernie Flint 07771756687 In the absence of the Principal this position will be passed down in order of seniority. Kathryn Reynolds to contact all staff via email and all parent, cleaning contractor and catering contractor prior to attending site to support with flood defence procedure. 9. Procedure for contacting parents Contact with staff will be via mobile telephone All parents will be contact by group email and by text using Group Call. This is accessible off site to all 10. Out of Hours Contact: As above. If limited staff are available we can call upon assured security to assist on 01903 277345 11. Instructions for Staff: Those within the Flood Team to erect and dissemble the Flood Defences should follow the Flood Defence Procedure. Kathryn Reynolds will be responsible for co-ordinating further communications with Staff and Parents. 12. Control Centre: School Office 01273 916170 or out of hours as per section 8 13. Communication with parents/carers: If the UTC is under flood conditions or the resulting damage or unforeseen issues prevent the

UTC from re-occupation for a prolonged period, a meeting should be co-ordinated with BACA and use of their hall arranged to speak to parents/carers. Draft letter to parents Page: 9. 14. Media: Communication and Marketing Holly Wilson hollywilson@aldridgeeducation.org 15. Resources: See Staff Register for list of First Aiders / or detailed on H&S Notice Board. 16. Finance: Funds available via UTC Credit Card which is held onsite or can be claimed back via expenses 17. Returning to Normal: Please consider the following Contact details for key services and insurance How will the UTC continue to function following the flood if the damage is severe and the building is put out of bounds for some time? 15. Mutual Aid Arrangements: Arrangements may be possible with BACA or PACA 16. Who hold copies of this plan? All Staff. Date Dear Parents, Re: on at

We regret to inform you that following the ******** affecting pupils from this UTC, the UTC will remain closed for a number of days. The earliest date on which it will reopen will be. Information on the position at UTC and details of when it will reopen will be broadcast on Newhaven Radio and, so please tune in after the news at 1.00pm, 5.00pm or 6,00pm (TBC) if you can. The Council s Education Service has an information line number you can phone if you are unable to hear/see the broadcasts, or if it is important for you to receive more information. The number is ******** Please do not telephone or drive to the UTC, as telephone lines and access roads need to be kept clear for essential personnel. We recommend that pupils stay close to home during this difficult time. We will endeavour to start teaching again as soon as possible. With our very best wishes to you and your children. Yours, (Insert Names)Principal Monitoring The Principal or in their absence a nominated member of SLT must arrange monitoring of the flood waters (from a safe distance) and co-ordinate the staff to arrange re-opening of the site. It is vital that as flooding is tidal and though flood waters may drop that several high tides potentially combined with other factors may mean that the flood waters may rise again. With this in mind close communications must be kept with the environment agency prior to removing flood defences and re-occupation. Evacuation Evacuation will follow the Fire Evacuation Procedure in all respects, with the exception that the Assembly Point B will be used only. Please note however that this is only required in an Emergency and under normal conditions and with prior knowledge of a potential flood, evacuation should be co-ordinated in a controlled manner within the timespan provided by the Environment Agency. This may allow plenty of time for Parents to be informed and students to finish at a set time later that day. Site Reoccupation Though there are flood defences, it is likely that following a flood the external areas will need to be cleaned, as well as internal areas. This will be managed by the Facilities Manager /

Principal. For Health & Safety, caution must be taken prior to turning power and gas back on in the building, especially if there has been water ingress internally. Briefing/Training/Exercising All Permanent key Staff have been trained in Manual Handling and the safe deployment of the defence systems. Annual refresher training must be undertaken. Any new staff assisting with the Flood Defence Procedure, should have undertaken Manual Handling Training as a minimum and directed by a trained member of the staff at all times. Distribution List Version Control - 001 Issued on 27/05/2016 Valid Until 26/05/2016 Review Annual (May 2017)

Appendix 1 - Site Map showing key infrastructure & utilities

Appendix 2 Environmental Agency Plan

Appendix 3 Evacuation Map Normal Evacuation will carried out, as per the Fire Evacuation Plan, however the riverside area (Assembly Point A) won t be used. Those evacuating will meet at Assembly Point B and as required move away down the access road as required.

Appendix 4 Flood Defence Map (included in Defence Procedure) Flood Evacuation Plan