SA Series Startup Form

START UP FORM PACKET

Liebert Challenger 3000/Liebert Challenger ITR with Liebert icom Control. Operation & Maintenance Manual - 50 & 60Hz

Condensing Unit Installation and Operating Instructions

M2 Series Startup Form

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

Liebert CSU3000 Chiller

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

M2 Series Startup Form

START UP FORM PACKET

/ No. (\01. la-ejl~ Withthe MainDisconnectOFFcheckthe following: Owner Address I~O ~.Cc:t\". ~\\A. Contact Name, Contact Telephone # Installation Date

Service Step by Step Trouble-Shooting Check-List

YCIV Hz & Hz

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

Rev B, 9/2/2009. Kodiak Chiller Overview

BasicTroubleshooting Information and Guidelines

DANFOSS OPTYMA PLUS INVERTER UNITS

Liebert DCP. with Liebert icom Control, Hz, 200kW Nominal Capacity. User Manual

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

Horizon Elite Ice Machine Installation Instructions for Remote Condensing Unit

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

Operation and Maintenance Manual

RecoverX Oil-Filled Hermetic Refrigerant Recovery System. Operation and Maintenance Manual

Container Refrigeration

Air-Cooled Split-System Condensing Units for Rooftop Systems and Air Handlers Models RCS 10E to 20E 10, 12.5, 15 & 20 Tons

Installation, Operation & Maintenance: Field-Installed Electric Heater for RXT Series Units

MODEL SCM INSTALLATION, OPERATION & MAINTENANCE MANUAL

SA Series Start up Report

Liebert Prop Fan Condensing Unit

INSTALLATION AND OPERATING INSTRUCTIONS (2 Through 10-ton Air Cooled Single Stage Chillers)

MAC N-407 Air-Cooled Chiller

Circulating Oil Temperature Control System

INSTRUCTIONS FOR TAL SERIES VACUUM HOPPER LOADER

INSTALLATION & OPERATION MANUAL

Horizon Elite Ice Machine Installation Instructions for Remote Condensing Unit

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

C13-Series Engineering Guide

Condensing Unit Installation and Operating Instructions

DISPOSER CONTROL CENTER

AquaSaver DISPOSER CONTROL CENTER Installation Manual. Model AS-101K

HP50HA ABG Heat Pump

Refrigerant Recovery Unit, Model RRU134

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

Installation Operation Maintenance

CHILLER. Operator s & Installation Manual

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

Liebert DSE Thermal Management System

Installation Instructions

Verde GSE PCA Bridge and Ground Mount Units 30/45/60/90/120 Tons. Installation and Maintenance Manual

Table of Contents. Installation, Operation, and Maintenance Manual ELBPxx

NON-CYCLING REFRIGERATED AIR/GAS DRYERS QPNC 75 to QPNC 250 OPERATOR S MANUAL

PRO Installation. Touch Wi-Fi Thermostat

PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE 11/03/2015 Rev 00

P-Series, Vertical Floor-Mount Units

CROWN. Boiler Co. Santa-Fe Series. Hydronic Air Handlers INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Dunham Bush Air Cooled Screw Chiller AFVX B 6SR Series

Owners Manual Refrigerated Air Dryer MHT SERIES

Emerson Inspire 1HDEZ Installation Instructions. Thermostat/Interface Equipment Control TROUBLESHOOTING

MACH N-407 Heat Pump Air-Cooled Chiller

30GN FLOTRONIC II AIR-COOLED CHILLERS

ECO1ZN3P, ECO2ZN4P ECO

Bulletin (Jan 2011) And User s Guide

VertiCool Aurora Engineering Guide

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

AE R1 October to 5 Ton ZPS*K6 Copeland Scroll Two-Stage Compressors

Emerson Blue Easy Set 1H/1C

INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE

DOLE REFRIGERATING COMPANY 1420 Higgs Road Lewisburg, Tennessee Phone (931)

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

LXG-300 Series. Models with LXG-300 Series Instruments

30GT FLOTRONIC AIR-COOLED CHILLERS

PRO Installation. Thermostat Wi-Fi

SPA BLOWER OWNER'S MANUAL XXXX, XXXX, XXXX, XXXX, XXXX, XXXX fax

AIR-COOLED CONDENSING UNIT UNITS PRODUCED AFTER JANUARY, 1996 INDEX SCHEMATIC DIAGRAM FIG. NO.

Air-Cooled Split System Condensing Unit for Rooftop Systems and Air Handlers

Contour TM Screw Compressors

INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE

PS SERIES PARALLEL RACK SYSTEM START UP GUIDE

OACS Outdoor Air-Cooled Central Chillers

Thomas J Kelly. Fundamentals of Refrigeration. Sr. Engineering Instructor Carrier Corporation. August 20, Page number: 1.

Commercial Water Source Heat Pump Water Heater Operations and Installation Manual

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

PRO Installation. Touch Wi-Fi Thermostat

TITAN SERIES Complete Central Chiller & Pump Tank Package 20 to 70 Tons 20 F to 70 F

ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER OPERATIONS AND MAINTENANCE MANUAL

CoolSpot Engineering Guide

Commercial High-Efficiency Condensing Units

FOR SERVICE TECHNICIAN S USE ONLY

INSTALLATION AND OPERATING INSTRUCTIONS (2 Through 10-ton Air Cooled Single Stage Chillers)

HYDROGEN SULFIDE REMOVAL SYSTEMS

Trouble Shooting Guide FAA, 3-phase (D3631)

UP TO 17.5 SEER / 13.5 EER / 9.5 HSPF HEAT PUMP ENVIRONMENTALLY BALANCED R- 410A REFRIGERANT 2 THRU 5 TONS SPLIT SYSTEM

High Profile Evaporator

MODEL URS-1: FACTORY RETROFIT PROGRAM

Transcription:

The following information must be completed and forwarded to your local Liebert sales office to establish your equipment warranty. Installer Address Owner Address Owner e-mail address Date of Installation: Was the unit received in good condition? Yes No If no, was the freight carrier notified? Yes No Have the manuals been kept in the units? Yes No PRE-START-UP XDC Serial Number: XDC Model Number: Air Cooled or Drycooler Serial Number(s): Air Cooled or Drycooler Model Number(s): Air Cooled or Drycooler Serial Number(s): Air Cooled or Drycooler Model Number(s): 2014 Emerson Electric Co. All rights reserved Page 1 of 10 Rev.11 10/2015

This XDC is providing cooling fluid for: XDO Qty XDV Qty XDH Qty XDR Qty XDS Qty Is XDIO Communications being deployed? Yes No PUMP #1 H.P. Serial No. PUMP #2 H.P. Serial No. Tandem Compressor 1 Tandem Compressor 1 Model Number Serial Number Tandem Compressor 2 Tandem Compressor 2 Model Number Serial Number WARNING Arc flash and electric shock hazard. Open all local and remote electric power disconnect switches, verify with a voltmeter that power is off and wear personal protective equipment per NFPA 70E before working within the electric control enclosure or any hazardous voltage electric connection enclosure. Failure to comply can cause serious injury or death. Page 2 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

With the electric power to the unit OFF check the following items as noted: Remove the electrical cover from each pump. Verify the pumps are set-up for low speed operation. Internal piping clamps tight and secure. R134A field piping properly supported and secure. R134A field piping properly sized according to the User Manual. Hot Gas line pitched according to User Manual. R407C field piping trapped according to User Manual. R407C field piping properly sized according to the User Manual. ALL electrical connections are tight and properly terminated. Heat Rejection Interlock wiring has been correctly installed between XDC and Condenser(s)/Drycooler (70 and 71). Lee Temp Heater Pads are connected to a separate power source. XDC is charged with at least 80% of calculated charge on R407C side of the system. XDC is charged with at least 80% of calculated charge on R134A side of the system. CAN Communication cable has been correctly installed between XDP and XD Modules. Remote Sensors A & B are installed according to User Manual. Equipment is installed level. Page 3 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

Remove all debris from unit area. ALL isolation ball valves in the XDC are open. ALL isolation ball valves are open to the XD Modules. Filter drier by-pass ball valves are closed so that the refrigerant flow is through the filter drier. By-pass Flow Controllers are installed and positioned correctly per the following table. In the table below is the recommended number of by-pass flow controllers that need to be opened based on the Cooling Modules Total Nominal kw. Cooling Modules Cumulative Model Size kw Liebert XDC Required Number of Open Bypass Flow Controllers 32 to 63 N/A 64 to 95 2 96 to 127 1 128 to 160 0 Unit Inspection Note: Heat load is required for a proper start-up of this system. WARNING Risk of electric shock, contact with high speed moving parts and hot surfaces, Can cause serious injury or death. Use extreme caution when working inside the unit cabinet of an energized unit near bare live hazardous voltage terminals and hot surfaces such as motors. 1. Check voltage at disconnect and record. L1-L2 L2-L3 L1-L3 2. Close all local and remote electric power disconnect switches. Verify with a voltmeter that power is on and the supply voltage matches the marked unit voltage rating. Page 4 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

WARNING Arc flash and electric shock hazard. Wear personal protective equipment per NFPA 70E before working within the electric control enclosure or any hazardous voltage electric connection enclosure. Use extreme caution when checking the status of live hazardous voltage circuits. Failure to comply can cause serious injury or death. Check unit electrical phasing with a phase meter. If phasing is incorrect, change wiring at input source to unit. Do not change any unit or component phasing. Check the compressors for proper rotation by bumping the contactors and watching the gauge pressures. If the pressures are equalized and the compressor sounds noisy, then compressor is running backwards. Check the pumps for proper rotation by bumping the contactors. For 460V units Use the Grundfos rotation device provided. This device must be held against the pump housing at the inspection screw located on the end bell of the pump motor prior to energizing the pumps. For 208V units View the LED on the pump. Green only indication notates proper rotation Green & Red indication notates incorrect rotation. Pump # 1 Rotation Pump # 2 Rotation 3. Check and record control voltage transformers for proper output. (Secondary voltage should not be under 23 VAC or exceed 27 VAC under load, change tap if necessary). T1 Volt 4. Record icom Software Version: Note: The software version is located in the Network Menu that is located in Service Menus. 5. Record XDIO Software Version: Note: The software version is located in the XDIO Menu that is located in Service Menus. Page 5 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

6. Turn on fans at XD Cooling Modules. Note: If XDIO Communications is being used, the Cooling Module fans will automatically come on when the XDP is turned ON at the I/O switch. 7. Turn unit ON at I/O switch on display. Note: If the pumps of the XDC cannot maintain flow and continue to switch over due to starting difficulties, turn the unit off and allow the receiver to refill with refrigerant. Once the receiver has a refrigerant level in the second sight glass, try to restart the XDC. Compressor Side of XDC Air Cooled Systems Check refrigerant level after the compressors have been operating for at least 15 minutes. Add additional refrigerant to achieve refrigerant level based on the ambient condition. Note: On the receivers with two refrigerant-level sight glasses follow the recommended Sight Glass Levels below. Note: On receivers with three refrigerant-level sight glasses do not use the middle sight glass, use the upper and lower glasses only and follow the recommended Sight Glass Levels below. Ambient Temperature Sight Glass Levels (Check appropriate box) 40 F (4.5 C) and lower bottom sight glass is 3/4 full 40 to 60 F (4.5 to 15.5 C) bottom sight glass is full 60 F (15.5 C) and higher top sight glass is 3/4 full a. Record Voltage to Heater Pads Volts Page 6 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

Water/Glycol System Operation If the head pressures recorded below equal 105 F condensing temperature, no adjustment of the glycol/water regulating valves are required. If the condensing temperatures are above 110 F, adjust the glycol/water regulating valves to lower the head pressure. If the system has balancing valves in it, these valves should be adjusted to the required GPM for this piece of equipment. After the condensing temperature has been set up properly, the system should be allowed to run for 10 to 15 minutes to obtain stable conditions. Entering condenser water/glycol temperature Leaving condenser water/glycol temperature 8. Record compressor operating pressures and superheat after circuits are properly charged. Compressor #1 Tandem Suction Pressure: Discharge Pressure: Superheat: Compressor #2 Tandem Suction Pressure: Discharge Pressure: Superheat: Page 7 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

9. Record amperages of the compressors. Compressor #1 Tandem Compressor 1A L1 L2 L3 Fuse Size Compressor 1B L1 L2 L3 Fuse Size Compressor #2 Tandem Compressor 2A L1 L2 L3 Fuse Size Compressor 2B L1 L2 L3 Fuse Size 10. Record the amperages of each compressor crankcase heater. Compressor 1A Compressor 1B Compressor 2A Compressor 2B IMPORTANT NOTE: Refrigerant oil must be added to each compressor circuit at the time of start-up. Confirm the amount of oil required for each circuit in the XDC User Manual. Fill out the tag with the additional oil amount added at each service valve for future use. Page 8 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

Pump Side of XDC Once constant flow is established, verify that the level in the receiver sight glass is between the 2nd and 3 rd level after 10-15 minutes of operation. See diagram below. 11. Test the differential pressure switch by intentionally closing the ball valve on the discharge line of the operating pump to prevent further flow. An alarm should annunciate following this for "Loss of Flow on P1". Confirm that the switch has opened on low pressure (below 6 psi). 12. Record pump amperages after the charge in the R134A system is topped off. Pump #1 L1 L2 L3 Fuse Size Pump #2 L1 L2 L3 Fuse Size 13. Record pumps operating pressures. Pump #1 Suction Pressure Discharge Pressure Pump #2 Suction Pressure Discharge Pressure Page 9 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015

Your start-up is now complete. Your input is important to us. Did you encounter any factory or field issues? If YES, please check the YES box and supply detailed description below. If NO, please check the NO box; however please feel free to provide any additional comments or suggestions. YES NO Comments: START-UP PERFORMED BY: (Please print name) COMPANY: START-UP DATE: PHONE #: IMPORTANT: This form must be properly completed and returned to your local Liebert Sales Office. If you do not know who your local Liebert sales office is, call 1-800- LIEBERT or check our website at: http://www.emersonnetworkpower.com/en-us/brands/liebert/pages/default.aspx Page 10 of 10 2014 Emerson Electric Co. All rights reserved Rev. 11 10/2015