Right-of-Way Acquisitions and Relocations Technical Memorandum

Similar documents
Floodplain Technical Memorandum

Southeast Extension to RidgeGate Parkway Scoping Booklet

SOUTHEAST CORRIDOR EXTENSION. PUBLIC SCOPING MEETING/OPEN HOUSE October 15, 2008

1.0 PROJECT PURPOSE AND NEED

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

East Corridor Final Environmental Impact Statement

Section Regulatory Framework/Methodology. Land Use and Development

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Northern Branch Corridor SDEIS March Table of Contents

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Regional Transportation District

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Appendix E Section 4(f) Evaluation

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

7.0 DRAFT SECTION 4(f) EVALUATION

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

Northern Branch Corridor SDEIS March 2017

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

POTOMAC YARD METRORAIL STATION

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

7.5 Impacts on the Section 4(f) Properties

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Mississippi Skyway Preliminary Engineering Report

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

7.0 SECTION 4(F) EVALUATION

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

EAST. city center sub-area plan

COUNCIL COMMUNICATION

Chapter 22. Alternatives to the Proposed Project

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

PROPOSED IMPROVEMENTS

3.5. Visual and Aesthetic Qualities

CHAPTER 7: Transportation, Mobility and Circulation

3.5 VISUAL AND AESTHETIC QUALITIES

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

F-1. C-470 Multimodal Corridor Vision: US-6 to I-25

I. INTRODUCTION. Project Background and Study Area

The transportation system in a community is an

West Broadway Transit Study Initial Screening of Alternatives Memo

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Staff Report and Recommendation

master plan of highways bus rapid transit amendment

Lesson 6. Corridor Planning

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Project Overview. Get Involved. Public Information Meeting. Contact Information

WELCOME TO OPEN HOUSE TWO November 28, 2018

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Section 1. Executive Summary

7.0 FINAL SECTION 4(f) AND 6(f) EVALUATION

6. Consistency with Local Plans

Visual and Aesthetics

3.2 LAND USE, ZONING, AND ECONOMIC CONSIDERATIONS

California Environmental Quality Act (CEQA) Environmental Review Process

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Transportation Improvements

Description of Preferred Alternative

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM

Town of Castle Rock DRCOG 2013 Annual Growth and Development Report. Introduction. Section 1 Metro Vision 2035

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

15. Wetlands Chapter Overview Introduction

City Of Sparks Planning Commission Item

Central Corridor Light Rail Transit. Environmental Assessment Three Infill Stations. Western, Victoria, and Hamline

Transportation Committee

City of Golden. Annexation Study Area Report

Local Growth Planning in North Central Green Line Communities

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Shift Rapid Transit Public Participation Meeting May 3, 2017

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

SECTION 1 Introduction...1. SECTION 2 Regional Context Criteria for Planning Districts Description of Planning District...

Transportation. Strategies for Action

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Chesterfield County Project Update

Environmental Assessment

NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation

LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013

EAST. city center sub-area plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

AMENDMENT NUMBER 2 TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN URS CORPORATION GREAT LAKES AND THE CITY OF ANN ARBOR

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Written Statement for Keizer Station Area B Amendment. Master Plan Amendment for Keizer Station Area B GENERAL INFORMATION

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/ Environmental Impact Report APPENDIX N

Eglinton West LRT Update

Cotton Belt Regional Rail Corridor Project

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

Transcription:

Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014

Table of Contents Page No. Chapter 1.0 Introduction... 1-1 1.1 Background... 1-1 1.2 Regulatory Environment... 1-1 Chapter 2.0 Alternatives Evaluated... 2-1 2.1 No Action Alternative... 2-1 2.2 Preferred Alternative... 2-2 Chapter 3.0 Affected Environment... 3-1 Chapter 4.0 Impact Evaluation... 4-1 4.1 Methodology... 4-1 4.2 No Action Alternative... 4-1 4.2.1 Direct Impacts... 4-1 4.2.2 Indirect Impacts... 4-1 4.2.3 Cumulative Impacts... 4-1 4.3 Preferred Alternative... 4-1 4.3.1 Direct Impacts... 4-1 4.3.2 Indirect Impacts... 4-3 4.3.3 Construction Impacts... 4-3 4.3.4 Cumulative Impacts... 4-3 Chapter 5.0 Mitigation... 5-1 5.1 Avoidance and Minimization Measures... 5-1 5.2 Direct Impacts... 5-1 5.3 Indirect Impacts... 5-1 5.4 Temporary Construction Impacts... 5-1 Chapter 6.0 References... 6-1 TOC-1

List of Tables Page No. Table 4-1 Summary of Right-of-Way Impacts Preferred Alternative... 4-3 List of Figures Figure 1-1 FasTracks Plan... 1-2 Figure 1-2 Study Area... 1-3 Figure 2-1 No Action Alternative... 2-1 Figure 2-2 Preferred Alternative... 2-3 Figure 2-3 RidgeGate Station Option 1 Opening Day (2019)... 2-4 Figure 2-4 RidgeGate Park-n-Ride Site Plan: Option 2 Opening Day (2019)... 2-5 Figure 2-5 RidgeGate Station Option 1 and 2 in 2035... 2-6 Figure 4-1 Right-of-Way Impacts Project Corridor... 4-4 Figure 4-2 RidgeGate Station Right-of-Way Acquisitions Parking Option 1 in 2019... 4-5 Figure 4-3 RidgeGate Station Right-of-Way Acquisitions Parking Option 2 (2019)... 4-6 Figure 4-4 RidgeGate Station Right-of-Way Acquisitions Parking Option 1 and Option 2 (2035)... 4-7 TOC-2

Chapter 1.0 Introduction This Technical Memorandum was prepared in support of the Southeast Extension Environmental Assessment initiated by RTD in 2012. This Technical Memorandum focuses on information regarding the land acquisitions (partial or full) and relocations that would occur as a result of the Southeast Corridor Light Rail Extension project. Federal and state laws require that property owners be paid fair market value for their land and improvements, and that they be assisted in finding replacement business sites or dwellings. Relocations result from right-of-way acquisitions that require the use of a property occupied by a residence or business. Partial acquisitions occur when only a portion of an existing land use is required and as such may not result in relocations. Full acquisitions occur when a complete parcel is required and may result in either a residential or business relocation. 1.1 Background In November 2004, Regional Transportation District (RTD) voters approved the FasTracks initiative to expand and improve public transit service within the Denver Metropolitan Region (Metro Region). The comprehensive FasTracks Plan, which formed the basis of the FasTracks ballot initiative, includes the construction and operation of new fixed-guideway transit lines, improved bus service, and park-n-rides throughout the Metro Region. The Southeast Extension was included in the RTD FasTracks program and is in the currently adopted Regional Transportation Plan (RTP). The fixed-guideway transit elements (rail and bus rapid transit) of the FasTracks Plan are shown in Figure 1-1. The proposed action is to extend transit service south into the City of Lone Tree to serve the increased population and employment generated by planned development in the City of Lone Tree. The Southeast Extension study area is located in northern Douglas County, and includes the City of Lone Tree and portions of Highlands Ranch and the Town of Parker. It begins at the existing end-of-line Lincoln Avenue LRT station and extends south along I-25 to the I- 25/RidgeGate Parkway interchange. It includes areas of planned development south of Lincoln Avenue on the east and west side of I-25 (see Figure 1-2). 1.2 Regulatory Environment Under the Uniform Relocation Assistance and Real Property Acquisition Policy Act of 1970, as amended, all federal agencies are required to meet certain standards for the fair and equitable treatment of persons displaced by federally-supported actions. Relocation assistance will follow the guidelines set forth in Title 49, Part 24 of the Code of Federal Regulations (49 CFR Part 24). RTD intends to follow the intent of the Uniform Act regardless of project funding sources. 1-1

Figure 1-1 FasTracks Plan 1-2

Figure 1-2 Study Area 1-3

Chapter 2.0 Alternatives Evaluated This technical memorandum evaluates the effects of two alternatives a No Action Alternative and the Preferred Alternative. These alternatives are described below. 2.1 No Action Alternative The No Action Alternative assumes no new improvements would be constructed other than currently committed projects identified in the 2035 RTP. This alternative includes the existing bus routes in the area and a new bus route (Route 411) connecting Parker and the Lincoln Station along RidgeGate Parkway. The Colorado Department of Transportation (CDOT) project that includes I-25 widening from RidgeGate Parkway to C-470 is also included as part of this alternative. Figure 2-1 shows the No Action Alternative. Figure 2-1 No Action Alternative 2-1

2.2 Preferred Alternative The Preferred Alternative includes a 2.3-mile, double-track light rail extension that runs south from the existing Lincoln Station along the west side of I-25, crosses to the east side of I-25 just north of the Sky Ridge Medical Center, and continues south to the RidgeGate Parkway interchange. This alternative provides three new stations. The Sky Ridge Avenue Station across from the Sky Ridge Medical Center and the Lone Tree City Center Station situated in the core of the RidgeGate planned development are both planned as kiss-n-ride stations without parking. A new end-of-line station at RidgeGate Parkway would provide a park-n-ride. Access to the RidgeGate Station would be provided from Havana Street via two access roads. All three stations would accommodate feeder bus service. The light rail tracks would be grade separated via an overpass where they cross Lincoln Avenue, I-25, and RidgeGate Parkway. One at-grade crossing is proposed on a minor roadway near the Sky Ridge Station. The Preferred Alternative is shown on Figure 2-2. Two parking design options are being considered at the RidgeGate Station, as described below: Option 1: This option would provide a 1,300-space surface parking lot on opening day (2019). In 2035, the surface parking lot would be replaced with two parking structures that would accommodate a total of 2,100 parking spaces. The southern parking structure would consist of four levels and the northern parking structure would consist of three levels. Option 2: This option would provide one 4-level, 1,300-space parking structure on opening day (2019). In 2035, an additional 3-level parking structure would be built north of the first structure that would provide 800 parking spaces, for a total of 2,100 spaces. The two parking structures in 2035 would be the same design and configuration under both parking options. 2-2

Figure 2-2 Preferred Alternative 2-3

Figure 2-3 RidgeGate Station Option 1 Opening Day (2019) 2-4

Southeast Extension Figure 2-4 RidgeGate Park-n-Ride Site Plan: Option 2 Opening Day (2019) 2-5

Southeast Extension Figure 2-5 RidgeGate Station Option 1 and 2 in 2035 2-6

Chapter 3.0 Affected Environment The study area for land acquisition and relocations is the estimated limits of construction for the alignment and the proposed stations and facilities. Figure 2-2 in Chapter 2.0 provides a project location map. The Southeast Extension project would extend transit service in the Southeast Corridor along I- 25 by 2.3 miles (Figure 2-2). The project parallels I-25, ending just south of the I-25/RidgeGate Parkway interchange. From the current end-of-line Lincoln Station, the alignment extends south across Lincoln Avenue to a new station immediately north of Sky Ridge Medical Center. At this point, the alignment turns east and crosses I-25, then turns south and continues on to the planned Lone Tree City Center Station and the new end-of-line station just south of RidgeGate Parkway. Between Lincoln Station and Lincoln Avenue, the Southeast Extension project is located within existing right-of-way adjacent to the I-25 southbound off-ramp to Lincoln Avenue. This right-ofway is 25 feet wide and was specifically reserved for this project by the City of Lone Tree. It is currently owned by CDOT and the City of Lone Tree. The light rail alignment will include a grade-separated crossing over Lincoln Avenue. South of Lincoln Avenue the alignment resides in the RidgeGate Planned Development owned by Coventry Development Corporation. Per agreements with the City of Lone Tree, Coventry will convey right-of-way to RTD for the purposes of the Southeast Corridor Light Rail Extension, from Lincoln Avenue south to the proposed end-of-line station at RidgeGate Parkway. Generally, this right-of-way will be 45 feet wide between stations and wider within station areas. Within the RidgeGate Planned Development, the light rail alignment turns east and crosses CDOT s I-25 right-of-way immediately north of the Sky Ridge Medical Center. On the east side of I-25, the alignment returns to a southerly orientation and intercepts CDOT s right-of-way again at RidgeGate Parkway. The alignment would be grade-separated at both roadway crossing locations, going over I-25 and over RidgeGate Parkway. 3-1

Chapter 4.0 Impact Evaluation 4.1 Methodology To identify potential acquisitions and displacements that would occur from implementing the Preferred Alternative, mapping of the limits of disturbance for the Southeast Corridor Light Rail Extension project were overlaid onto corridor parcel maps. Each of the parcels was then analyzed to determine if an acquisition was necessary and if relocations would occur. 4.2 No Action Alternative 4.2.1 Direct Impacts The No Action Alternative would not result in direct impacts as a result of the Southeast Extension project. Other transportation projects included in the No Action transportation network, such as the I-25 widening project and Sky Ridge Avenue/Bismark Drive construction across I-25, may require property acquisitions. The impacts of these other projects have been or would be considered in the NEPA process or other environmental clearances for each of these projects, and avoidance, minimization, and/or mitigation specified as appropriate in the specific NEPA decision document for each project. 4.2.2 Indirect Impacts No indirect impacts would occur. 4.2.3 Cumulative Impacts Historically, about 20 percent of developed lands are used for local infrastructure projects, such as streets, parking facilities, schools, utility right-of-way, and parks. This trend is expected to continue as a result of the RidgeGate planned development in the Study Area. 4.3 Preferred Alternative The direct, indirect, construction-related, and cumulative impacts of the Preferred Alternative are described below. 4.3.1 Direct Impacts Efforts were taken in the development and design of the Preferred Alternative to avoid or minimize property acquisitions. Right-of-way acquisitions required for the Preferred Alternative are described below. No residential acquisitions would be required, and no business or residential locations would be required. North of Lincoln Avenue, right-of-way required between Lincoln Station and Lincoln Avenue for the LRT alignment is located within existing right-of-way. This right-of-way is 25 feet wide and was specifically reserved for this project by the City of Lone Tree. It is currently owned by CDOT and the City of Lone Tree. Partial acquisitions of three commercial properties (less than approximately 1.15 acre total) adjoining the reserved 25-foot right-of-way would be required, 4-1

and approximately 22 parking spaces would be permanently removed from one commercial property. South of Lincoln Avenue, the LRT alignment is located in the RidgeGate Planned Development by Coventry Development Corporation. Per agreements with the City of Lone Tree, Coventry would convey right-of-way to RTD for purposes of the Preferred Alternative, from Lincoln Avenue south to the proposed end-of-line station at RidgeGate Parkway. Generally, the Preferred Alternative right-of-way would be 45 feet wide between stations and wider within the station areas. At the proposed RidgeGate station south of RidgeGate Parkway, Parking Option 1 in 2019 would require approximately 35 acres from 33 parcels, including approximately 12 acres for the LRT alignment and approximately 21 acres for the RidgeGate station park-n-ride. For Parking Option 1 in 2035, the surface parking lot would be removed and the same parking structures proposed under Option 2 would be constructed. Parking Option 2 would require approximately 29 acres from 33 parcels, including approximately 12 acres for the LRT alignment and approximately 15 acres for the RidgeGate station park-nride. The land required for both proposed parking structures (one in 2019 and the second in 2035) would be acquired at the same time. It should be noted that the acquisitions described above do not include the land required to build the two access roads to the RidgeGate station site. They also do not include improvements to the Havana Street/RidgeGate Parkway intersection that are recommended in 2035 to mitigate traffic impacts. Although RTD would construct those improvements as part of the construction of the Preferred Alternative, RTD would not acquire the property for those improvements. Right-of-way required for the Preferred Alternative is summarized in Table 4-1 and shown on Figure 4-1, Figure 4-2, and Figure 4-4. 4-2

Table 4-1 Summary of Right-of-Way Impacts Preferred Alternative Approximate Acreage (RidgeGate Parking Option 1 in 2019) Approximate Acreage (RidgeGate Parking Option 2 in 2019/2035 and Option 1 in 2035) Number of Right-of-Way Parcels Full Private Acquisitions 0 0 0 Partial Private Acquisitions 7 3.4 3.4 Private Permanent Easements 2 3.5 3.5 CDOT Permanent Easements 6 3.0 3.0 City of Lone Tree Partial 2 0.6 0.6 Acquisitions City of Lone Tree Permanent 8 0.4 0.4 Easements Douglas County Permanent 2 0.02 0.02 Easements Rampart Range Metro District Full 2 3.2 3.2 Acquisitions Rampart Range Metro District 2 0.2 0.2 Permanent Easements RidgeGate Station Park-n-Ride 2 20.6 14.6 Acquisitions Total 33 34.9 28.9 Source: RTD and Jacobs, 2014 4.3.2 Indirect Impacts Indirect effects are not anticipated. 4.3.3 Construction Impacts An estimated eight acres of temporary construction easements are anticipated. Temporary construction easements may be needed on adjacent property to gain access to the dedicated rightof-way during construction activities. These easements will be refined during the final design and right-of-way process. Temporary impacts may be associated with staging, materials storage, and parking as necessary to construct the Preferred Alternative. In addition, property access may be temporarily impacted. Construction of the Preferred Alternative could affect surrounding roadways through temporary lane closures and/or detours. This may include temporary closure of a parking lot circulator road on the east edge of a commercial parking lot north of Lincoln Avenue. 4.3.4 Cumulative Impacts Partial property acquisitions required for the Preferred Alternative may compound property needs associated with other local actions in the area. The acquired properties are small portions adjacent to the dedicated right-of-way boundary. As a result, no cumulative acquisition impacts are expected from the Preferred Alternative. 4-3

Figure 4-1 Right-of-Way Impacts Project Corridor 4-4

Figure 4-2 RidgeGate Station Right-of-Way Acquisitions Parking Option 1 in 2019 4-5

Southeast Extension Figure 4-3 RidgeGate Station Right-of-Way Acquisitions Parking Option 2 (2019) 4-6

Southeast Extension Figure 4-4 RidgeGate Station Right-of-Way Acquisitions Parking Option 1 and Option 2 (2035) 4-7

Chapter 5.0 Mitigation Minimization efforts were identified during project development to avoid or minimize property acquisitions. Mitigation measures for property impacts that could not be avoided are described below. 5.1 Avoidance and Minimization Measures Input provided during the public involvement process was a key factor in development of alternatives to avoid and minimize impacts to private property. Outreach included public meetings and newsletters. Efforts were made to reduce the extent of permanent impacts only to include land necessary for the LRT alignment, station, park-n-ride facility, and associated roadway improvements. This commitment to minimize permanent impacts reduces the amount of public right-of-way and private and public parcels (including parking) that would be necessary for implementation of the Preferred Alternative. 5.2 Direct Impacts The acquisition of real property interests will fully comply with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (Uniform Act) and the Fifth Amendment of the United States Constitution. The Uniform Act applies to all acquisitions of real property or displacements of people resulting from federal or federally assisted programs or projects. All affected owners will be provided notification of the acquiring agency s intent to acquire an interest in their property, including a written offer letter of just compensation specifically describing those property interests. RTD will coordinate with property owners during the final design process to seek ways to minimize parking impacts and identify opportunities to replace parking removed as a result of the project. 5.3 Indirect Impacts No mitigation is required because no indirect impacts are anticipated. 5.4 Temporary Construction Impacts RTD will coordinate use with specific property owners where a temporary construction easement is required. Temporary access will be provided during normal business hours. Adequate detours, including advanced notice and signing will be provided before beginning construction. Adjacent property used during construction activities will be returned to original conditions, once construction is complete. Also, special use permits to access CDOT right-ofway during construction will be obtained. 5-1

Chapter 6.0 References U.S. Department of Housing and Urban Development. Uniform Relocation Assistance and Real Property Acquisition Policies for Federal and Federally Assisted Programs Act of 1970, as amended. 42 U.S.C. Chapter 61. 6-1