CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

Similar documents
RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

NOTICE TO ALL FIRMS. Bid RFI Questions and Answers

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Memphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc.

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

SANTA FE COUNTY IFB# PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2

9 E. Scarborough Park Concession Stand and Restroom And / Or Lake Kirby Park Softball Fields Restroom Addition

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT ELECTRICAL POWER AND TRANSMISSION INSTALLERS. Test Code: 5922 Version: 01

FIRE AND SAFETY PROJECT REVIEW REPORT

ARCHITECT S PRE-BID ADDENDUM

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

DIVISION 21 - FIRE SUPPRESSION

PLATTEVILLE MIDDLE SCHOOL

Procurement Department ADDENDUM # 1

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

DIVISION 21 - FIRE SUPPRESSION

Commercial Application/Plan Review Submittal Checklist

DESIGN & CONSTRUCTION GUIDELINES

ADDENDUM NO. 2 COOK LIBRARY BATHROOM RENOVATIONS PROJECT NUMBER TU-1874-SBR

FIRE ALARM: BY OTHERS, IF REQUIRED.

Yes, any other system must be clean agent, and the Fire Alarm Control Panel must be a single addressable Fire Alarm Control Panel.

PLAN REVIEW SUBMITTAL GUIDE

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE SAFETY REQUIREMENTS FOR PRE RESIDENTIAL BUILDINGS OF THREE OR MORE STORIES (DOROTHY MAE ORDINANCE - NO. 158,963)

Maintence/Renewal Report

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

ADDENDUM NO. 1. PREPARED BY: Justin Scott DATE PREPARED: 05/25/2018. PROJECT: Centerville-Washington Park District Park Operations Facility

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

This addendum responds to initial questions submitted by vendors. A1. Batteries are to be invoiced separately under the cost plus.

Community Development Department Commercial Permit Application

6. ENGINEERING SYSTEMS REQUIREMENTS H50 WATERFRONT UTILITIES

An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010

Electrical Design Guidelines Table of Contents

Florida Department of Transportation 1000 NW 111 th Avenue, Room 6203 Miami, Florida

Florida Department of Transportation

New Construction Fire Inspection Process

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

Welcome to Voice Permits

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651)

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

Asurity 1. Property Inspection Report S Gurd Rd., Hastings, MI Inspection prepared for: Beretta Lenos Real Estate Agent: Stan Labinski -

Photovoltaic (Solar) Array Installation Guide

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

Product Guide Specification

Fire Permit Application

CITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT

OPERATIONS AND STORAGE BUILDING

Tualatin Valley Fire & Rescue Finance Department SW 70 th Ave., Tigard, OR Phone: , Fax:

FAQ. (Frequently Asked Questions) What is required to convert my unfinished basement to finished space?

Element D Services Electrical

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

I. INTRODUCTION Codes, Rules, Laws, & Requirements

This Report Was Prepared For: Property Address Inspected:

Ph: (907) Quality Homes

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

CHAPTER SIX Automatic Gates

Electric Floor Warming Systems Installation and Operation Instructions. Mat Heating Systems and Cable Heating Systems. UL Listed for USA and Canada

Arlington Public Schools Purchasing Office

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Fire & Life Safety Supplemental Rules & Regulations for New Construction & Significant Remodels

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

Product Specifications Dialog Room Controller* (*patent pending)

FOUNTAINS UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS APRIL 30,

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

LED Bollard Collection

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

Appendix B. Facilities Assessment Report

Canadian Property Inspections

Page 1 of General

Home Inspection Report

Hearth and Homes Inspections, llc

1921 River Birch Dr., Shawnee, OK Inspection prepared for: Vicki Jager Date of Inspection: 7/27/2015 Time: 8am Weather: Sunny

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:

National Property Inspections

Brighton Area Fire Authority

Commercial Rules and Regulations

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

SECTION (16140) - WIRING DEVICES

Transcription:

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505) 599-1377 http://www.fmtn.org IMMEDIATE ATTENTION Construction Services for Municipal Operations Center Expansion BID #16-114679 ADDENDUM TWO April 15, 2016 Notice to Bidders: The above referenced bid is hereby amended as follows: The following are the questions received with the answers immediately following: 1. Site Grading Plan sheet C1.2, note 3 calls out 4 minimum new asphalt millings, while Site Improvements Plan sheet C1, note 8 calls out new 3 asphalt paving. It s not clear where new asphalt ends and asphalt millings starts. A1: For asphalt and millings location Sheet C1.2 is correct. 2. Demolition Keyed Note E on sheet C3.1 calls out saw cut and removal of existing asphalt, but the note points to the existing irrigation line. A2: Delete Note E. 3. Acoustical Ceiling tile Specification section 095113, paragraph 2, part 2.3 A is calling for a 2X4 washable white vinyl tile Armstrong A769. However, the Armstrong Cortega A769 is a generic tile, not vinyl. Please clarify. A3: Delete reference to washable white vinyl. 4. Guard Rail at Interior Stairs: Please provide detail for guard rail at interior stairs. A4: Install 1½ ɸ pipe rail each side of stair. Extend past top and bottom tread 1-0. 5. Sheet S2.1, Wind Beam The roof framing plan for Building #2 shows wind beam WB-1 and WB-2. WB-1 is a W8x18 wide flange beam. Please provide size beam for WB-2. A5: Wind beam WB-2 W8x18. 6. Are we to include a wall mounted steel ladder for access to the roof hatch in building #1? A6: No.

7. The civil drawings and structural drawings show a portion of Building #4 to be included in the base bid. Please advise if any of building #4 is to be included in the base bid or if all of Building #4 is part of Alternate #1. A7: Building #2 - Entire Building is an Alternate. 8. Please confirm the city will provide power up to and including the transformers, and we are only to include power from the transformers to buildings #1 and #3 (base bid) and building #4 (alternate #1). A8: Yes. FEUS will supply power up to and including the transformers. All service work from transformers should be included in proposal. 9. Please confirm the city will provide communications, including raceways and cabling to the buildings. A9: COF will provide an overhead fiber line for communications up to the utility pole located at the NW corner of the property. 10. Please advise if we are to provide the concrete pads for the transformers. A10: No. 11. Please confirm the contractor is to remove and relocate the light pole (note C on C1.1 and note 5 on C1.2) and the city will remove and relocate the overhead power line to the light pole. A11: FEUS will remove existing light pole and associated secondary line. 12. Please confirm CH2M will be providing and installing the site water line, new water meter, new fire hydrant and new 6 fire line as shown on sheet C1. A12: Contractor to install fire line, fire hydrant, domestic water line. CH2M will install water. Contractor to pay for meter. 13. Site Improvements Plan sheet C1, note 12, location for new fire hydrant what size water line to fire hydrant? Is this by CH2M? A13: 6 inches. 14. Please confirm our bid is to include the cost of CH2M s work described above. A14: No. 15. Sheet C1.2 note 3 install 4" min asphalt millings and C2.1 note 4 calls for 21/2 paving over 8" base course sheet C3.1 note 1 calls for same paving as note 4 on C2.1 what note is to be followed? A15: City is installing asphalt and providing millings.

16. In buildings 1 and 4 require a fire riser there is no location or detail provided. A16: Building #1 - Install between OHD and Door 102. Building #4 - Install in Southwest. 17. Who will be providing the millings? A17: City of Farmington. 18. If the irrigation line interferes with construction what is the plan to shut line down during irrigation season? A18: We will coordinate for shutdown to tie in. 19. Sheet A2.1 relay storage shows a 12x12 overhead door and sheet A2.2 shows a 12x14 the eave is not tall enough to accommodate the 12x14 door. A19: Door is 12x12. 20. There is no water entry detail provided. A20: See Sheet P5.1. 21. Is the CMU block to be a standard grey or colored? A21: South wall of Building #1 and East and North wall of Building #4 to be split face to match main Municipal Operations Center building. Rest is regular gray. 22. Who will be taking care of the communications for this project? A22: The City of Farmington will handle this internally. 23. Sheet E3.1 building #3 panel 3 shows 30 amp circuits feeding GFCI receptacles that are only 20 amp rated. A23: Sheet E3.1. Building #3. Panel 3 shows 30amp circuits feeding GFCI receptacles that are only 20amp rated. Response: The direction provided to us by the City of Farmington is that the block heaters require a 30amp, 120VAC branch circuit. The symbol used is for a 20amp, 120VAC duplex outlet. The contractor shall include in his bid for providing a 30amp, 120VAC receptacle, which shall be coordinated with the City of Farmington prior to ordering and installation. 24. Sheet E3.1 building 3 what controls the lighting? A24: Sheet E3.1. Building #3. What controls the lighting? Response: The light fixtures (type SL1 or SL2) in this area are specified with on-board occupancy sensors mounted integral to the fixtures. See light fixture schedule, Sheet E6.1. 25. Sheet E1.2 (RT-2 shows that it's being fed from Panel 2 ckts 9, 11, 13. Also MA:1 shows that it is being fed from panel 2 ckts 8, 10, 12, and appears to be located at building 1. A25: Sheet E1.2. (RT-2 shows that it s being fed from Panel 2 ckts 9, 11, 13. Also MA.1

shows that it is being fed from Panel 2 ckts 8, 10, 12, and appears to be located at Building #1. Response: Panel P2 is located near the Building #1 addition and has more space available in it to serve two rooftop units. Sheet E0.1. Electrical General. 1. Fire alarm system shall be as manufactured by Honeywell, Vista-250FBP (no exception) to match the cities standard. The contractor shall disable the remote dial-in feature. 2. Provide all manual pull stations with covers as per the Farmington Fire Marshall requirements. 3. It is the design intent for all fire alarm cabling to be installed within conduit. Exposed cabling shall not be acceptable. 26. Specification section 076100 is for sheet metal roofing, yet we cannot locate where this material is in the drawings. Can you let me know if there is any sheet metal roofing in this project? If so, I would like to submit a prior approval for the material, and I need to do that in the next day or so. A26: Sheet A3.2. Building #3 has metal roof. Metals specified in Section 07 6100-26 gauge. 27. Can TPO be bid for all roofs instead of putting metal panels on such a low sloped roof? A27: Sheet A3.2. TPO can be substituted for metal panels. 28. Is there to be a ¼ substrate board on TPO assemble? A28: Yes. 29. Do we provide R-20 or R25 for the insulation? A29: R-20 CHANGE: Listed below are revisions to the technical specifications. The changes made are as follows: Specification Section 08 4523. 1. In Section 08 4523-2¾ Insulated Translucent Fiberglass Sandwich Panel Wall System, 2.2 PANEL COMPONENTS, 4. Appearance:, a. Exterior face sheets: Smooth.070 thick and crystal in color.; and b. Interior face sheets: please revise to Interior face sheets: Smooth.045 thick and crystal in color. 2. In Section 08 4523-2¾ Insulated Translucent Fiberglass Sandwich Panel Wall System, 2.3 PANEL CONSTRUCTION, A.2 Light transmission: revise to 30%. 3. In Section 08 4523-2¾ Insulated Translucent Fiberglass Sandwich Panel Wall System, 2.4 BATTENS AND PERIMETER CLOSURE SYSTEM, D. Finish: revise Manufacturer s factory applied finish, which meets the performance requirements of AAMA 2604. Color to be selected from manufacturer s standards.

Specification Section 08 7100. Hardware Group #5: Add Door 500. Specification Section 08 7100. Delete existing hardware schedule. Insert schedule attached to this addendum. Sheet A2.1. Room 300. Relay Storage. Install 2 layers R-19 insulation using the basket system. Delete Detail A/S1.3. Earthwork shall follow Geotechnical Report by Geomat. Sheet M1.2. Building #2. Plumbing Plan should be Sheet P1.2. Sheet E0.1. Electrical General. 1. Fire alarm system shall be as manufactured by Honeywell, Vista-250FBP (no exception) to match the cities standard. The contractor shall disable the remote dial-in feature. 2. Provide all manual pull stations with covers as per the Farmington Fire Marshall requirements. 3. It is the design intent for all fire alarm cabling to be installed within conduit. Exposed cabling shall not be acceptable. Sheet E1.1. Building #1. Power Plans and Details. 1. Breakroom 201. Provide contactors for shutdown or the range outlet (P1-65, 67) and hood fan (P1-30) upon fire suppression system activation. Mount the contactors above the ceiling over the hood where they will be acceptable. Sheet E2.1. Building #2. Electrical Plans. 1. Storage 301 and 302. Remove ceiling mounted occupancy sensors. Revise fixtures to Type SL2. Sheet F1.1. Building #1. Fire Alarm Plans. 1. Work/Storage 102. Provide a second pull station at the exterior door on the west side of the building. 2. Delete duct mounted smoke detectors for RTU-2 and MAU-1. Sheet F5.1. Building #4. Fire Alarm Plan and Details. 1. Work/Storage 102. Provide a second pull station at the exterior door on the west side of the building.

It is the intent of the design for the contractor to coordinate with the City of Farmington for the placement of the transformer, but the transformer will be installed by the City of Farmington. The contractor will extend service to the buildings from the new service transformers. The contractor will be required to provide conduit to Building #1 from the nearby utility pole. Phone service to Building #1 will be via the local phone utility. CHANGE: Attached is a list of approved substitutions. Receipt of this addendum shall be noted on Form AF-1 (a) in Tab I Bidding Requirements for the above referenced bid. If your bid has already been submitted to this office, and this addendum will affect your bid quote, please contact this office and we will return your bid. Any bids that have been received, and are not requested to be returned will remain in this office unopened until April 27 at 2:00 p.m. /s/ Emily Milne Emily Milne Buyer ll Phone: (505) 599-1370 Fax: (505) 599-1377 Email: emilne@fmtn.org

APPROVED SUBSTITUTIONS: Sections 07 5423 Johns Manville and Carlisle 08 1113 Curries 08 4523 Major Industries Quadian 275 08 4113 Old Castle Arcadia Manko DL GL GLE SL SL1 SL2 Liton, Prescolite (2000 Lumen) Daybrite with 0-10 dimming, Columbia WL Daybrite with 4000 K, Columbia (4000 K) WL1 (4000 K) EM OWE P1 P1 Pole Evenlite, Compass LSI, Spaulding LSI, Spaulding LSI, Spaulding Lighting Controls Hubbell Control Solutions, Leviton