Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Similar documents
Chapter 4 - Preparation of Stormwater Site Plans

Draft Rhode Island Stormwater Design and Installation Standards Manual

New Development Stormwater Guidelines

Kearney Post-Construction Stormwater Program

West Virginia Stormwater Management Manual: Methods.

Appendix D - Technical Design Criteria for BMPs

Erosion & Sediment Control Plan Application Form & Checklist

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Huntington Stormwater Utility

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

VA DCR STORMWATER DESIGN SPECIFICATION NO. 11 WET SWALE. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION

4. CONCEPT PLAN DEVELOPMENT

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

Drainage Control Plans

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

ROOFTOP (IMPERVIOUS SURFACE) DISCONNECTION

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

ENGINEERING & CONSTRUCTION MANAGEMENT

Gloucester County PLAN SUBMITTER'S CHECKLIST

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

4. Contractor (and subcontractors if applicable) certification statement(s)

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Non-Residential&Multi-Family PropertyCreditManual

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Article 20 Stormwater Management

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Phase II Storm Water Permit Program MS4 Permit

Appendix I. Checklists

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Post Construction BMPs

Session 1E Non-Structural BMPs. Chesapeake Bay Stormwater Training Partnership 1

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Bioretention cell schematic key

C-12. Dry Pond. Design Objective

SITE PLAN REVIEW APPLICATION AND CHECKLIST

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

How to Update a Storm Water Management Program (SWMP) to Incorporate Total Maximum Daily Load (TMDL) BMPs

A P P E N D I X D. Project Stormwater Plan Worksheets

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

Pollutant Removal Benefits

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

PLAN SUBMITTER'S CHECKLIST

New Tools/Resources for

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Selecting Appropriate Stormwater Control Measures for Your Development Project

VA DCR STORMWATER DESIGN SPECIFICATION NO. 9 BIORETENTION. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Three threshold measures will be applied together to capture project scale and scope and impacts:

Rhode Island Stormwater Design and Installation Standards Manual

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Chapter 2 Roof Downspout Controls

CHECKLIST FOR PHASE II DRAINAGE REPORT

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

NAPA COUNTY PUBLIC WORKS Standards & Specifications

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

City of Fort Worth. December 1, 2004

Pennsylvania Stormwater Best Management Practices Manual

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

City of Columbia BMP Manual. Volume Calculation Tool and Examples

3 12/07/2015 FINAL SUBMISSION 2 11/02/ SUBMISSION #3 1 08/31/ SUBMISSION #2 NO. DATE DESCRIPTION COUNTY REVISIONS SUBMITTED

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Appendix E: Illustrative Green Infrastructure Examples


Low Impact Development Guidance Manual

Stormwater Technical Guide

Vegetated Filter Strips and Buffers

Development of LID Design Guide in Edmonton

Chapter 3 Site Planning and Low Impact Development

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

DEALING WITH STORM WATER MANAGEMENT

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management

Table of Contents. Preface... xv

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Vegetated Filter Strips and Buffers

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

6.2 Flow-Through Planter

Importance of Master Planning Marcy Colclough

Going Green with the NYS Stormwater Design Standards

Costs Design Construction Operation Maintenance

SHEET FLOW TO A VEGETATED FILTER STRIP OR CONSERVED OPEN SPACE

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

Bioretention and Permeable Pavement Maintenance

What does LEED characterize?

Appendix 3-D LOCAL CODE AND ORDINANCE REVIEW AND EVALUATION

Low Density Projects. Design Objective

Transcription:

Planning the BMP Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

PLANNING THE BMP AGENDA BMP Selection BMP Design SWM Plan Preparation 2

BMP SELECTION Types of BMPs Structural BMPs Non-structural BMPs BMP Performance Runoff Reduction (RR) BMPs Pollutant Removal (PR) BMPs Total Load Reduction (TR = RR + PR) 3

& PART 2 & PART 3 DEQ 4

BMP SELECTION Relevant guidance in the VA SWM handbook: CHAPTER 6: Environmental Site Design Appendix 6-B: SW Design in Karst; Appendix 6-C: Sustainable Sites Initiative (SSI) Chapter 8: BMP Overview and Selection 5

Spec No. 1 2 3 4 5 6 7 8 9 9A 10 11 12 13 14 15 6

BMP SELECTION DEQ Stormwater Design Specifications (Version 2.0; 2013) 1. Description Table 1 Summary of Stormwater Functions 2. Performance: Table 2 Potential LEED Credits 7

BMP SELECTION (CONTINUED) DEQ Stormwater Design Specifications (Version 2.0; 2013) 3. Design Tables: Level 1 and Level 2 Table 3 or 4 Design Criteria 8

BMP SELECTION (CONTINUED) General Rules: Sizing; Max DA Surface Area; Ponding Depth; Filter Media; Soil Testing; Geometry; Pre-Treatment; Conveyance Planting Plan Table 3 or 4 Design Criteria 9

BMP SELECTION (CONTINUED) DEQ Stormwater Design Specifications (Version 2.0; 2013) Section 4: Typical Details 10

BMP SELECTION (CONTINUED) DEQ Stormwater Design Specifications (Version 2.0; 2013) 5. Physical Feasibility: Available Space Site Topography Contributing Drainage Area Available Hydraulic Head Depth to Water Table / Bedrock Utilities Soil Hotspots Setbacks 11

BMP DESIGN DEQ Stormwater Design Specifications (Version 2.0; 2013) Section 6: Design Additional Guidance: SWM Handbook Chapter 8 - BMP Overview and Selection Appendix 8-A: BMP Design Checklists 12

BMP DESIGN CONTRIBUTING DRAINAGE AREA The little infiltration trench that could.... 13

BMP DESIGN CONTRIBUTING DRAINAGE AREA The big Bio-detention basin that could nt.... 14

General flow path Relation of inlets to outlets Length/width ratio Shortest flow path BMP DESIGN BMP GEOMETRY 15

BMP DESIGN LENGTH-TO-WIDTH RATIO Inlet Structure W L Outlet Structure Length/Width Ratio = L/W, where: L = Length from inlet to outlet W = Average width 16

BMP DESIGN SHORTEST FLOW PATH L Outlet Structure SFP Curb Inlets Shortest Flow Path Ratio = SFP/L SFP = Length of shortest flow path from an inlet to outlet L = Overall length of facility 17

L/W = 3.4:1 Outlet Inlet 18

L/W = 8.9:1 Outlet Inlet 19

Multiple Cells 20

SFP = 25 /315 Inlets Outlet 21

SFP = almost none 22

Outlet Last Curb Cut 23

24

BMP DESIGN BMP GEOMETRY RECOMMENDATIONS BMP Type L/W Ratio Shortest Flow Path Ratio Wet Pond Level 1 = 2.0 Level 2 = 3.0 or multicell Dry Pond Level 1 = 2.0 Level 2 = 3.0 or multicell SW Wetland Level 1 = 2.0 Level 2 = 3.0 or multicell Bioretention Level 1 = 3.0 Level 2 = 3.5 Level 1 = 0.5 Level 2 = 0.8 Level 1 = 0.4 Level 2 = 0.7 Level 1 = 0.5 Level 2 = 0.8 Level 1 = 0.3 Level 2 = 0.8 OR flow distribution 25

BMP DESIGN PRETREATMENT MEASURES Rip-rap aprons / channels 26

BAE Stormwater Engineering Group 27

Works as a BMP; BMP DESIGN FILTER STRIPS Should work for pre-treatment 28

BMP DESIGN PRETREATMENT MEASURES Feasibility: Grass filter strips 29

BMP DESIGN PRETREATMENT MEASURES Feasibility: Sediment forebays 30

BMP DESIGN PRETREATMENT MEASURES Feasibility: Sediment forebays 31

BMP DESIGN PRETREATMENT BY DESIGN BAE Stormwater Engineering 32

PERMEABLE PAVEMENT DESIGN Limit Run-on to: Impervious cover; and a ratio of 2.5:1 (allows for the opposite parking space and the drive aisle to drain into one parking space of permeable pavement). Run-on Ratio (R) = A c /A p where A c = contributing area; and A p = permeable pavement area 33

On-line; Off-line; Design storm; Inlet Channel By-pass Overflow BMP DESIGN CONVEYANCE 34

ED Pond (L2) wet features: Forebay Outlet Micro-pool Shallow marsh/wetland BMP DESIGN CONVEYANCE 35

BMP DESIGN (CONTINUED) DEQ Stormwater Design Specifications (Version 2.0; 2013) 7. Design Adaptations Coastal Plain; Karst; Steep terrain; Cold Climate; Linear Design 36

SWM PLAN PREPARATION Chapter 8: BMP Overview and Selection Appendix 8-A: BMP Design Checklists 37

STORMWATER MANAGEMENT PLANS STORMWATER MANAGEMENT PLANS 38

SWM PLAN PREPARATION 9VAC25-870-55: Stormwater Management Plans B. A complete SW Plan includes the following elements: General Info: 1. Information on the type and location of discharges, with Preand post-developed drainage areas; 2. Owner contact information; 3. A narrative (or documentation) of the pre- and postdeveloped site conditions; 4. A general description of the proposed BMPs and long term maintenance provisions; 5. BMP Data: i) type; ii) location (coordinates); iii) acres treated; and iv) surface waters into which they discharge. 39

SWM PLAN PREPARATION 9VAC25-870-55: Stormwater Management Plans B. A complete SW Plan includes the following elements (contd.): BMP Design Info: 6. Hydrologic & Hydraulic Computations; 7. Documentation and calculations verifying compliance with quality and quantity requirements; 8. Map(s) showing topography and the following: a. Drainage areas; b. Streams, ponds, wetlands, culverts, floodplains, etc.; c. Soil types, geologic formations, trees and/or vegetative cover; d. Current land use (and any improvements on the land); 40

SWM PLAN PREPARATION 9VAC25-870-55: Stormwater Management Plans B. A complete SW Plan includes the following elements (contd.): BMP Design Info (continued): 8. Map(s) showing topography and the following (contd.): e. Sufficient information on adjacent parcels to assess any stormwater impacts; f. Limits of clearing and grading (ESC plan - ELGs), and proposed drainage patters; g. Proposed improvements: buildings, roads, parking, utilities, drainage, and SWM facilities; h. Tabulation of the percentage of proposed land uses: 9. Offsite compliance information (if applicable) 10. Plan review fee form 41

9VAC25-870-55. STORMWATER MANAGEMENT PLANS 1. A stormwater management plan shall apply the stormwater management technical criteria to the entire common plan of development or sale where applicable. Individual lots or parcels in a residential, commercial, or industrial common plan of development or sale shall not be considered to be separate land-disturbing activities. Instead, the common plan, as a whole, shall be considered to be a single landdisturbing activity. 42

COMMON PLAN OF DEVELOPMENT OR SALE Means a contiguous area where separate and distinct construction activities may be taking place at different times on different schedules. 43

COMMON PLAN OF DEVELOPMENT Individual LDA s within a larger common plan of development require permit coverage, e.g.: Building on four ½-acre lots in a 20 acre development, or Building a fast-food restaurant on a ¾ acre pad that is part of a 20 acre retail center 44

9VAC25-880-50. STATE PERMIT APPLICATION (REGISTRATION STATEMENT). C. Construction of a single-family residence separately built, disturbing less than one acre and part of a larger common plan of development or sale is authorized to discharge under this general permit and is not required to submit a registration statement or the department portion of the permit fee, provided that the stormwater management plan for the larger common plan of development or sale provides permanent control measures (i.e., Stormwater management facilities) encompassing the single-family residence. 45

PROJECT EXAMPLE 20 acre residential subdivision development 45 1/4 to 1/3 acre lots (zoned R3)

COMMON PLAN OF DEVELOPMENT 20 acre Common Plan of Development 13 acres of lots 35% impervious (~4.5 ac) 50% (avg) managed turf (~6.5 ac) 15% open space (undisturbed buffers) (~2 ac) 3 acres right of way 18 ft pavement width; 6 ft shoulder (~ 2.4 ac) 30 ft right of way; (~0.6 ac turf/grass channel) 4 acres open space (buffers, park, floodplain) Total: 6.0 acres forest/open space 7.1 acres managed turf 6.9 acres impervious 47

TP Reduction Requirement = 10.86 lb/yr 48

INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION ~ 3.75 acres of land disturbance 3 ac right-of-way Impervious; pavement & shoulders ~ 2.4 ac; Grass drainage ditch ~0.6 ac turf; or BMP?? 0.75 ac BMP footprint ~ 0.75 ac open space. 49

INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION Initial Land Disturbing Activity = 3.0 acres of right of way; and 0.75 acres for BMPs

INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION BMP Design: 2 x (Bioretention Level 2 & ED L2) Entire acreage of right of way ( ½ to each); 12 lots (~3.2 ac); 6 to each practice: Impervious ~ 1.1 ac; Managed Turf ~ 1.6 ac; Forest/Open Space ~0.5 ac. Total acreage to Combined BMP: 12 lots plus right of way 2.4 + 1.1 = 3.5 ac impervious 0.6 + 1.6 = 2.2 ac managed turf; 0.75 + 0.5 = 1.25 ac Forest/Open Space Total DA A = 6.95 acres 51

INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION Proposed DA A = 3.2 acres of lots (12 lots); 3.0 acres of right of way; and 0.75 acres for BMPs BMP Treatment trains Bioretention L2 & ED L2 BMP 1: Bioretention Level 2 BMP 2: ED L2

DA B: INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION 15 lots draining to ED L2 (~4.4 ac: 2.2 ac to each ED) Impervious ~ 1.5 ac; Managed Turf ~ 2.2 ac; Forest/Open Space ~0.7 ac. Treatment Train Performance Goal (each lot): Each lot consists of approx 0.1 ac impervious Treat minimum 50% of impervious cover with Rain Garden Level 1; or Equivalent = TP reduction of 0.06 lb/yr and RR = 69 ft 3 Remaining Imp and Turf drains to ED L2 53

INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION Proposed DA B = 4.4 acres of lots (15 lots); BMP Treatment trains BMP 1: Each lot 50% Imp to (min) Rain Garden L1 (TP 0.06 lb/yr; RR 69 ft 3 /yr) BMP 2: ED L2

DA C: INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION 18 Remaining Lots (~5.4 ac) Impervious ~ 1.9 ac; Managed Turf ~ 2.7 ac; Forest/Open Space ~0.8 ac. Performance Goal (each lot): Each lot consists of approx 0.1 ac impervious Treat minimum 50% of impervious cover with Rain Garden Level 1; or Equivalent = TP reduction of 0.06 lb/yr and RR = 69 ft 3 55

INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION Proposed DA C = 5.4 acres of lots (18 lots); BMP (No Treatment trains) Each lot 50% Imp to (min) Rain Garden L1 (TP 0.06 lb/yr; RR 69 ft 3 /yr)

57

58

59

CURVE NUMBER ADJUSTMENT (ENERGY BALANCE) 60

INITIAL PLAN SUBMITTAL & PERMIT REGISTRATION VSMP land disturbing activity ( 1 ac): STORMWATER POLLUTION PREVENTION PLAN: GENERAL REQMTS EROSION & SEDIMENT CONTROL PLAN STORMWATER MANAGEMENT PLAN Including performance goals/general details for on-lot bmps POLLUTION PREVENTION PLAN ADDITIONAL MEASURES TO ADDRESS TMDL 61

COMMON PLAN OF DEVELOPMENT Plan Submittal Requirements for single family lots in CPD? 62

INDIVIDUAL SF LOT WITHIN LARGER CPD Local ESC Permit Application; Agreement in Lieu of ESC Plan; SWPPP Template; General Information on BMPs; BMP Implementation Plan (found in larger CPD SWPPP; or new SWPPP); PP BMP Maintenance Agreement; 63

QUESTIONS? 64