DUNHAM-BUSH. Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units.

Similar documents
A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

.2 Section Waste Management and Disposal.

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

Liebert CSU3000 Chiller

SECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller:

CxA to Answer this Section

SECTION ROTARY-SCREW WATER CHILLERS

YCIV Hz & Hz

PDF Created with deskpdf PDF Writer - Trial ::

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SYSTEM DESIGN REQUIREMENTS

Air Conditioning Operation and Troubleshooting Matt Dunham

BuildingName The Description of the Project P DOCUMENTS

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

AIR COOLED CHILLERS WITH SCROLL COMPRESSORS AND CENTRIFUGAL FANS

Series 6, Vertical Floor-Mount Units

SECTION DOMESTIC WATER PUMPS

BasicTroubleshooting Information and Guidelines

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

AIR COOLED CHILLERS WITH SCROLL COMPRESSORS AND CENTRIFUGAL FANS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION AIR COOLED WATER CHILLERS

INSTALLER'S GUIDE. ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES

Construction Standards Page

RV Products Division INSTALLATION INSTRUCTIONS FOR SERIES PACKAGE AIR CONDITIONER

1.2 REFERENCES - comply with the following codes and standards:

2. CURRICULUM. Sl. No.

Contour TM Screw Compressors

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

DESIGN STANDARDS SECTION 15600

GPE Kc UNITS FOR 4-PIPE SYSTEMS WITH SCROLL COMPRESSORS. COOLING CAPACITY FROM 77 TO 426 kw - 2 COOLING CIRCUITS. GPE 802 Kc + CF + GP + MV + P1

AIR COOLED PACKAGED CHILLER

Series 6, Vertical Floor-Mount Units

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

CLASSIFIED PERSONNEL POSITION AVAILABLE POSTED: NOVEMBER 28, 2017 OPEN: UNTIL FILLED HVAC TECHNICIAN

Submittal Data Performance Data Electrical Data

Guide Specifications

COLMAC COIL. Installation, Operation, and Maintenance ENG Rev A. Air Cooled Fluid Coolers. Contents. When you want Quality, specify COLMAC!

UNDERCOUNTER LABORATORY REFRIGERATORS and FREEZERS Installation, Operation and Maintenance Instructions

12 In Row. Installation Manual. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

INSTALLATION INSTRUCTIONS FMB/FMC SERIES MULTI-POSITION AIR HANDLER

Refrigeration Technology in Building Services Engineering

SERVICING AND BREAKDOWN...

MAC-120HE-03 Air-Cooled Chiller

PACKAGE AIR CONDITIONER

CONTENTS. B. System Design and Performance Requirements

Water-Cooled Dual Compressor Screw Chiller

MACH N-407 Heat Pump Air-Cooled Chiller

Trouble Shooting Guide PWA, 3-phase (D10571)

Service Step by Step Trouble-Shooting Check-List

INSTALLATION INSTRUCTIONS FMB/FMC SERIES MULTI-POSITION AIR HANDLER

UNIFIED FACILITIES GUIDE SPECIFICATIONS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION REFRIGERATION

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

INSTALLATION, COMMISSIONING AND OPERATING MANUAL

KR Series Air Defrost Unit Coolers Operating and Installation Manual

IOM Installation, Operation, and Maintenance Manual. Magnitude Magnetic Bearing Centrifugal Chillers

User s Information and Installation Instructions

FEATURES AND BENEFITS

Direct Fired Heater Model AD Specification

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

MAXIMUM SERIES. Maximum Series portable chillers can be used on a variety of process applications that require 20 F to 70 F chilled water.

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA

Installation Operation Maintenance

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

1025, BOUL. MARCEL-LAURIN INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER. Prepared par Claude Gadoury, P. Eng MTL TECHNOLOGIES INC.

MAC N-407 Air-Cooled Chiller

SECTION REFRIGERATION. 1. Reciprocating Compressors (Hermetic). 2. Reciprocating Compressors (Open Drive). 3. Water Cooled Condensing Units.

IOM Installation, Operation, and Maintenance Manual. Magnitude Magnetic Bearing Centrifugal Chillers

Condensing Unit Installation and Operating Instructions

WCOX B Water-Cooled Packaged Chillers with Helical Rotary Compressors

Rev B, 9/2/2009. Kodiak Chiller Overview

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Installation Operation Maintenance

SWIMMING POOL HEAT PUMP UNIT ECO - series. Installation & Instruction manual

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

SECTION Fire Pumps

SECTION CHILLERS

- 1 - Updated on 18 March, 2010

60Hz. R134a HXWC SERIES. 205 to 560 Tons. Products That Perform...By People Who Care WATER-COOLED SEMI-HERMETIC SCREW COMPRESSOR WATER CHILLERS

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.

AIR COOLED FREE-COOLING CHILLERS WITH SCROLL COMPRESSORS AND AXIAL FANS

TABLE OF CONTENTS FOR YOUR SAFETY

WFC-M Series Installation. WFC- M Series. Hot Water Fired single Effect Absorption Chiller. Installation WFC-M100 Version 1.0 (Original/Document)

INTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies

TITAN SERIES Complete Central Chiller & Pump Tank Package 20 to 70 Tons 20 F to 70 F

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

CONTENTS AUTOMATIC TRANSFER SWITCHES

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

CPX MEDICAL AIR PLANT INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

IOM Installation, Operation, and Maintenance Manual. Magnitude Magnetic Bearing Centrifugal Chillers

Technical Standards for the Air Conditioning and Heat Pump Professional BPI STANDARDS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

Transcription:

DUNHAM-BUSH Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units. Job Name Unit Model Address & Location Unit Serial Number of Units Kindly complete, chop and sign this form and return to DBSS should you require Dunham-Bush to dispatch technicians or supervision to jobsite. Failure to complete and check all the below items may result in additional charges to your company. Additional charges will result if the start-up and commissioning exercise is delayed, or additional days are required due to site delays/problems, or if there is in-complete preparations on your scope of work. A. Dunham-Bush Unit 1. Erected on foundation.. 2. Spring isolators or ISO pads installed and adjusted to level unit. 3. Cooler/ Chiller vessel insulated.. 4. Chiller leveled within 1/16 per foot.. 5. Visually check for leaks ( oil dripping etc.).. 6. Standing Pressure of each refrigerant circuit refrigerant pressure chart attached ) 7. Inspect chillers or condensing units for damage.. 8. Check for enough clearance for proper airflow and servicing of unit. B. Air Handling Unit/ Fan Coil / Process System 1. All units tested, commissioned and operating without problem

2. All process system ready and completed for Operation C. Piping 1. Cleaned, flushed and pressure tested for leaks 2. Properly supported vibration eliminators installed.. 3. Air vents, thermometers and pressure gauges installed. 4. All water balancing and isolating valves installed and tested 5. All chilled and condenser water flow switches installed, tested and calibrated 6. All modulating valves and flow controls checked and calibrated 7. All modulating valves and flows set at design flow requirement 8. Water piping system properly purged of air and no air lock in system.. D. Units with Cooling Tower 1. Cleaned, tested and operational. 2. Tower fan tested and balanced.. 3. Tower water flow balanced 4. Water treatment services performed, auto chemical Feed has flow interlock

E. Water Pump 1. All condenser and chill water pump tested operational and balanced. 2. All pumps properly primed and no air lock in pumping system 3. Adequate and constant water supply available. 4. Required flow ratio must be maintained prior to start-up the chillers ( follow water flow curve on I.O.M.) F. Electrical Wiring 1. Adequate and constant power supply available.. 2. All power wiring and control completed to all of the system component and checked for terminal security tightness... 3. All circuit breakers and overload relays properly sized and installed 5. All wiring and grounding conforms to National Electrical Codes. 6. All automatic control devices checked, tested And operational 7. All field supplied main electrical boards, switch boards, starter boards and controls checked, tested and operational.. 8. Customer interlocks only as indicated on wiring diagram ( shielded cable as required ).. 9. Energize crank case heater for 24 hours prior to start-up of the compressors.. G. Units With Remote Refrigerant Condenser Piping 1. Required amount of refrigerant for system

Charging at job site 2. Entire system properly dehydrated must hold vacuum at 800-1,000 microns for a minimum of eight (8) hours with vacuum pump secured. 3. All fan cycling, damper control systems checked and operational.. 4. All control wiring installed.. H. Remote Evaporator Systems 1. Liquid line solenoid interlocked with Dunham-Bush Unit control panel.. 2. Entire system properly dehydrated must hold vacuum at 800-1,000 microns for a minimum of eight (8) hours with vacuum pump secured. 3. All thermal expansion valves properly sized and Properly installed. 4. All refrigerant piping installed in accordance With standard good practice and design criteria.. 5. All terminal equipment properly sized and properly installed.. 6. All automatic control devices checked and operational.. I. Conditions 1. Essential electrical power is available.. 2. Essential water supply for city usage and conditions is available.. 3. Full load available for proper test and balance of Dunham-Bush equipment

Services To Be Rendered Dunham-Bush engineers, supervisors, technicians and service representative will check, test, start-up and commission the chiller and condensing units in accordance to standard Dunham-Bush procedures and re-commendation and standard commercial good practices. Dunham-Bush Rendered Services Above Do Not Include Any Responsibility For The Following:- 1. Installation and operating of the temperature control system external to the chillers or condensing units Other wise agreed upon by both parties prior to performance of works. a. Balancing of the air distributor side of this system. b. Balancing of the water side of the system other than the chillers or condensing units. c. Balancing of refrigerant systems. 2. Electrical wiring performed by others. We (the dealer/contractor) request The present of Dunham-Bush personnel at the job site on or about (date) to check, test start-up and commission the equipment/system as required. On receipt of this form, Dunham-Bush will schedule their service personnel to this job within seven to fourteen days (7-14 days) of the requested date. It is understood that Dunham-Bush personnel will be at site to perform startup and commissioning exercise for a period not exceeding normal working days. We the undersigned agree that we will pay a free for such time that is spent on this over the specific normal working days agreed upon, due to delays and in-complete preparations on our part and scope of works/responsibilities. To cover this contingency, our contingency Purchase Order No. be issued with the assurance that if no addition time is required, this purchase order will be cancelled.

An overtime charge will be rendered for work executed on Saturday, Sunday and Public Holidays. Dealer / Contractor Address Signed by Company Stamp Full Name Position in Company