West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

Similar documents
Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019

CITY OF MELBOURNE SUBMISSION WEST GATE TUNNEL PROJECT

Authority. any changes required as a result of the approved CHMP.

INQUIRY AND ADVISORY COMMITTEE WEST GATE TUNNEL PROJECT ENVIRONMENT EFFECTS STATEMENT. HEARING SUBMISSION 12 September 2017

... on the draft Arden Vision & Framework

West Gate Tunnel panel hearing

West Gate Tunnel Project

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

STRATEGIC PLANNING ASSESSMENT WEST GATE TUNNEL PROJECT

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

Planning and Environment Regulations 2005 Form 9. Draft for exhibition only - v1. Permit no.: WYP6217/12

West Gate Tunnel Project. Report of Kate Gray

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

West Gate Tunnel. Melbourne. Urban Design Statement Chris Procter. Submitted to Ashurst On behalf of City of Melbourne

Kaufland supermarket and complementary uses, part 1158 Nepean Highway, Mornington Incorporated Document (Insert date) 2019

Others Submitters OPENING SUBMISSIONS ON BEHALF OF HOBSONS BAY CITY COUNCIL

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

LIVING INFRASTRUCTURE PLAN

Rapid Transit Implementation Working Group September 14, 2017

Melbourne Water. oria University. Sneydes Ro. ydes Road POINT COOK WEST DEVELOPMENT CONTRIBUTIONS PLAN. October 2012 (Amended July 2017)

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

M4-M5 Link Rozelle Interchange factsheet 2017

Outcomes. Cross Section (Exhibition) Appendix (Exhibition) Requirement (Exhibition) Guideline (Exhibition) Table (Exhibition) Objective (Exhibition)

Rannoch 132 / 33 kv Substation Extension

participate.melbourne.vic.gov.au/westmelbourne

Summary of strategic directions

Sandy Creek Road and 1720 Bacchus Marsh Road, Little River

Section 12C Subdivision in the Rural Residential Zone

PLANNING AND ENVIRONMENT LIST. FORM B STATEMENT OF GROUNDS To be completed by Referral Authorities and objectors

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

NON-TECHNICAL SUMMARY

ACU DEVELOPMENT PLAN OBJECTION RESPONSE

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

The importance of Partnerships Showcasing Arden. Emily Mottram, Director Urban Renewal 31 March 2017

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Welcome to the Public Consultation Exhibition

Land at Rampton Road. Cottenham

Beveridge Central PSP

Re: Amendment C234 Cardinia Planning Scheme Pakenham East Precinct Submission by Earldean Pty Ltd and Auscare Commercial Pty Ltd

Response by the Wiltshire Archaeological and Natural History Society

West Gate Tunnel Project. Report of Dr Pallavi Mandke

EVALUATION OF MASTER PLAN ALTERNATIVES

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

6Natural. Environment Development Permit Guidelines

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016

LIST OF LIVE AND DETERMINED PLANNING APPLICATIONS RELATING TO THE WIDER BRENT CROSS CRICKLEWOOD REGENERATION SCHEME

DRAFT TARNEIT WEST Outline Development Plan MAY 2007

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

Proposed View - Summer. Existing View - Summer. Proposed View - Winter. Existing View - Winter

MORDIALLOC BYPASS EXPERT WITNESS STATEMENT

GO WHERE THE ACTION IS. New Retail Tenancies Millers Rd, Altona North. millersjunction.com.au

PLANNING AND BUILDING STANDARDS COMMITTEE 3 JUNE 2013 APPLICATION FOR PLANNING PERMISSION

Derry City and Strabane District Council Planning Committee Report. Environmental Improvement Scheme. Derry City & Strabane District Council

Manor Lakes - Development Contributions Plan

Urban and Landscape Design Frameworks Highways and Network Operations Guideline

Child Minding Centres and Family Day Care

BANDON FLOOD RELIEF SCHEME

DESIGN OF FOOTBRIDGES

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions:

Wingecarribee Shire Council

HS2 Environment. Protecting the environment

East Corridor Final Environmental Impact Statement

Welcome to our exhibition

AMENDMENTS. Date Effective. Amendment No. Council. DCP 14 Davidson St, Greenacre Page 2

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B5 Construction Heritage Management Plan

Chapter 1: General Program Information

May Request for Secretary s Environmental Assessment Requirements

Melbourne Metro Rail Project Environmental Effects Statement Draft Council Submission June 2016

C176. Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria. Version th November 2013

I209 Quay Park Precinct

DAREBIN PLANNING SCHEME AMENDMENT C137

See the West Melbourne Transport and Access Study (Phillip Boyle and Associates) for more information on the proposed Spencer Street tram.

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Appendix H: Easement cross sections

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

PANEL HEARING MELBOURNE PLANNING SCHEME AMENDMENT C258 HERITAGE POLICIES REVIEW AND WEST MELBOURNE HERITAGE REVIEW

Board Order 29S.PA0049

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

17A. Wind Microclimate

25 AVALON ROAD, AVALON

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Draft Eastern District Plan

Ashe Morgan Docklands to North Melbourne Strategic Connection West Gate Tunnel Project Impact & Opportunity

Implementing sustainable water strategy through development industry engagement

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES

Chapter 1. Introduction

Draft Ada Street Cardiff Area Plan

Appendix 18F: Tauriko Business Estate Services Strategy Statement and Sequencing Schedule

Chapter Master Planned Communities (MPC) District

Local Government Charter. I Local Government Charter

EASTERN GOLF COURSE DEVELOPMENT PLAN OCTOBER 2013

Transcription:

West Gate Tunnel Project Incorporated Document May 2017 Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987. Drafting Note: The planning control contained in this Incorporated Document has been prepared by Western Distributor Authority to govern the further design, development and operation of the West Gate Tunnel Project and has been prepared subject to the outcomes of the EES assessment process.

1.0 INTRODUCTION This document is an incorporated document in the Melbourne, Port of Melbourne, Hobson Bay, Maribyrnong, Wyndham and Brimbank Planning Schemes (Planning Schemes) and is made pursuant to section 6(2)(j) of the Planning and Environment Act 1987. This document gives effect to specific controls for the West Gate Tunnel Project (Project) pursuant to clause 52.03 of the Planning Schemes. The controls in this Incorporated Document prevail over any contrary or inconsistent provision in the Planning Schemes. 2.0 PURPOSE The purpose of this Incorporated Document is to permit the use and development of land described in clause 3.0 for the purposes of the Project. 3.0 LAND This Incorporated Document applies to the land described as 'Land for the West Gate Tunnel Project' in Figure 1 of this document (Project Land). 4.0 CONTROL Despite any provision to the contrary, or any inconsistent provision, in the Planning Schemes, no planning permit is required for, and no planning provision in the Planning Schemes operates to prohibit, restrict or regulate the use or development of the Project Land for the purposes of, or related to, constructing, maintaining or operating the Project. The Project includes, but is not limited to: A freeway standard road connecting the West Gate Freeway to City Link, the Port of Melbourne and the western edge of the central area of Melbourne. Widening of the West Gate Freeway from the M80 interchange to the West Gate Bridge to provide for additional lanes in each direction, and widening of Princes Freeway between M80 interchange and Kororoit Creek Road. Elevated roads and road infrastructure, including over the Maribyrnong River, Footscray Road, Moonee Ponds Creek and connections to CityLink. Interchanges and grade separations associated with road connections. Road connections at Princes Freeway, M80/ Western Ring Road, Old Geelong Road, Grieve Parade, Millers Road, Williamstown Road, Hyde Street, Douglas Parade, Simcock Avenue, West Gate Bridge, City Link, Mackenzie Road, Dynon Road, Appleton Dock Road and Footscray Road, and the extension of Wurundjeri Way to Dynon Road with widening of Wurundjeri Way to Flinders Street. Twin road tunnels and associated infrastructure, including ventilation structures. A control centre and freeway maintenance facility. Utility installation and relocation and associated services, including relocation of the North Yarra Main Sewer, electricity transmission towers, lines, cables and associated sub-stations.

Construction and relocation of rail infrastructure and associated services. Earthworks and related structures, kerbs, channels, water and soil transfer and treatment structures, facilities and works, water quality facilities, retaining walls, noise and screening barriers, cuttings, batters and fill associated with the Project. Any buildings or works or associated infrastructure or activities for the Project. Ancillary activities to the use and development of the Project Land for the purposes of, or related to, the Project, including, but not limited to: Developing and using lay down areas for construction purposes. Constructing and using temporary site workshops and storage, administration and amenities buildings. Removing, destroying and lopping trees and vegetation, including native vegetation. Demolishing and removing buildings, fixtures, structures and infrastructure. Restoration and reinstatement works. Developing and using land for a shared use path and pedestrian overpasses. Constructing or carrying out works for bridges, ramps, excavation, fences, temporary barriers, noise attenuation walls, stabilisation, creating bunds, mounds, landscaping, the salvage of artefacts, water treatment, water storage, flood mitigation and to alter drainage. Creating or altering access to a road in a Road Zone Category 1 or land in a Public Acquisition Overlay if the purpose of acquisition is for a Category 1 road. Storage and assembly of materials required for the Project. Constructing and carrying out works to install, alter or relocate, drainage infrastructure, utility installations and services. Roadworks and constructing and using temporary access roads, diversion roads and vehicle parking areas. Displaying construction, directional and business identification signs. Stockpiling of excavation material. Subdividing and consolidating land in accordance with plan/s approved by the Minister for Planning. This control is subject to the conditions in clause 5 of this Incorporated Document. 5.0 CONDITIONS Development and Urban Design Plans 5.1 Development of the Project must be carried out generally in accordance with the West Gate Tunnel Project Development and Urban Design Plans dated May 2017 which includesand in accordance with the Environmental Performance Requirements included in Appendix A of those plans (West Gate Tunnel Project Development and Urban Design Plans and EPRs). Environmental Management Strategy 5.2 Prior to the commencement of any buildings or works associated with the Project, an Environmental Management Strategy (EMS) for the Project must be approved by the Minister for Planning. The EMS must be prepared in consultation with Melbourne City Council, Hobsons

Bay City Council, Wyndham City Council, Brimbank City Council and Maribyrnong City Council. The EMS must: 5.2.1 respond to the Environmental Performance Requirements by outlining how they will be implemented; 5.2.2 set out the process and timing for development of the Construction Environmental Management Plan, Work Site Environmental Management Plans and other plans and procedures required by the Environmental Performance Requirements, including the process and timing for consultation with Councils, Roads Corporation, Melbourne Water and the Environment Protection Authority as relevant; and 5.2.3 be prepared consistent with the Environmental Management Framework as contained in the Environment Effects Statement (EES) and the Environmental Performance Requirements. 5.3 The EMS may be amended from time to time to the satisfaction of the Minister for Planning. 5.4 The use and development of the Project Land must be carried out in accordance with the approved EMS. Amendment to the West Gate Tunnel Project Development and Urban Design Plans and EPRs 5.5 The West Gate Tunnel Project Development and Urban Design Plans and EPRs may be amended to the satisfaction of the Minister for Planning. 5.6 An amendment to the West Gate Tunnel Project Development and Urban Design Plans and EPRs must be accompanied by the following information: 5.6.1 amended West Gate Tunnel Project Development and Urban Design Plans and EPRs; and 5.6.2 a statement from Western Distributor Authority explaining and supporting the proposed changes. 5.7 If the Minister for Planning approves an amendment to the West Gate Tunnel Project Development and Urban Design Plans and EPRs, the development must be carried out generally in accordance with the West Gate Tunnel Project Development and Urban Design Plans and EPRs, as amended. Native vegetation 5.8 Details of the proposed removal, destruction or lopping of native vegetation necessary for the construction of the Project must be prepared in accordance with the Permitted clearing of native vegetation - Biodiversity assessment guidelines (Department of Environment and Primary Industries, September 2013), to the satisfaction of the Secretary to the Department of Environment, Land, Water & Planning (DELWP), except as otherwise agreed by the Secretary to DELWP.

5.9 Native vegetation offsets must be provided in accordance with the Permitted clearing of native vegetation - Biodiversity assessment guidelines (Department of Environment and Primary Industries, September 2013) except as otherwise agreed by the Secretary to DELWP. Preparatory and Other Works 5.10 The following buildings and works may commence before the EMS is approved: Preparatory works for the Project including, but not limited to: Works, including vegetation removal, where, but for this incorporated document, a planning permit would not be required under the provisions of the Planning Schemes. Investigating, testing and preparatory works to determine the suitability of land, and property condition surveys. Creation of construction access points and working platforms. Site establishment works, including temporary site fencing and hoarding, site offices, hardstands and laydown areas. Establishing temporary car parking sites. Construction, protection, modification, removal or relocation of existing utility services. Establishment of environment and traffic controls. Demolition to the minimum extent necessary to enable preparatory works. Salvaging and relocating of artefacts and other preparatory works required to be undertaken in accordance with the approved cultural heritage management plan prepared for the Project under the Aboriginal Heritage Act 2006. The removal, destruction or lopping of native vegetation to the minimum extent necessary to enable preparatory works, to the satisfaction of the Minister for Planning. Any native vegetation removal to enable preparatory works forms part of the total extent of native vegetation removal necessary for the construction of the Project and native vegetation offsets must be provided in accordance with the Permitted clearing of native vegetation - Biodiversity assessment guidelines (Department of Environment and Primary Industries, September 2013) except as otherwise agreed by the Secretary to DELWP. Availability of EMS and Other Documents 5.11 The current version of the following documents must be available on a clearly identifiable project website until commencement of operation of all components of the Project: the West Gate Tunnel Project Development and Urban Design Plans and EPRs; and the EMS approved under clause 5.2. 6.0 EXPIRY The controls in this document expire if any of the following circumstances apply: The development allowed by the controls is not started by 1 December 2020. The development allowed by the controls is not completed by 1 December 2026. The use allowed by the controls is not started by 1 December 2026.

The Minister for Planning may extend these periods if a request is made in writing before the expiry date or within three months afterwards.