PACDA Application Forms. 5/15/2018 Aman Fire Protection Consultants 1

Similar documents
FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

Narrative Reports As Regulated by 780 CMR, Section 903.0

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

APPENDIX H (DESIGN SUBMISSION CRITERIA)

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Western Michigan University Facilities Management Engineering Division

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

INSPECTOR I SKILLS ADMINISTRATION

Fire Department Of New York

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

September 30, Dear Fire Suppression System Contractor/Designer:

APPLICATION FOR FIRE CERTIFICATE / FIRE CLEARANCE UNDER THE MAURITIUS FIRE AND RESCUE SERVICE ACT 2013 OFFICE USE ONLY

May 1, Dear Fire Suppression System Contractor/Designer:

Active & Passive Fire Protection System. Page 1 Kalidasan S BT IN SSP-OP

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

Building Fire Safety in New York City s Existing Office Buildings

FIRE IMPAIRMENT NOTICE

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

I. INTRODUCTION Codes, Rules, Laws, & Requirements

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

Commercial Remodel/ Add On Rules and Regulations

Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose

Fire Permit Application

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

PRIVATE FIRE SERVICE INSTALLATION PACKET

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D40 FIRE PROTECTION 02/18

FIRE SERVICE FEATURES

PLAN REVIEW SUBMITTAL GUIDE

Fire System Impairment Policy

FIRE & LIFE SAFTEY STANDARD

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

Commercial Application/Plan Review Submittal Checklist

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

Rocky Mountain Fire Protection District 4390 Eldorado Springs Drive Boulder, CO

Brighton Area Fire Authority

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

You are required to READ ALL PAGES. of this application

Commercial Rules and Regulations

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

Liberty Township Fire Department Fire Prevention Bureau. Clean Agent Fire Protection Plan Submittal Checklist

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

Interim Life Safety Measures (ILSM)

THE MAURITIUS FIRE AND RESCUE SERVICE ACT. Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act

INITIAL FIRE SAFETY ASSESSMENT

Steven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION

Date Issued: December 14, 2017 Revision: 2.1

WEST VIRGINIA UNIVERSITY

FIRE AND SAFETY PROJECT REVIEW REPORT

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

Florida Building Code 2010

INITIAL FIRE SAFETY ASSESSMENT

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

Fire Sprinkler Plan Submittal Form

Fire Sprinkler Submittal Requirements and Acceptance Testing

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

SEMINOLE FIRE DEPARTMENT TENT PERMIT CONDITIONS

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS

Fire Prevention Coffee Break Training. February 2016

Agency for Health Care Administration

Category V. NOTE: Fire Investigations are covered in Criterion 5D.

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

Risk Management Services

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

SECTION WET-PIPE SPRINKLER SYSTEMS

Outline of Measures for Fire Prevention and Safety under the Laws and Regulations of Fire Fighting

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

SPECIAL AMUSEMENT OCCUPANCIES HAUNTED HOUSE, SCARE HOUSE OR MAZE

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

FIRE PROTECTION PROGRAM

30 DAY TEMPORARY TENT APPLICATION ON EXISTING COMMERCIAL PROPERTY

DIVISION 21 FIRE SUPPRESSION

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

Case Study of Underground Car Park. Team Japan

Center for Life Safety Education

VIOLET TOWNSHIP ZONING & BUILDING DEPARTMENT Rustic Drive Pickerington, Ohio (614) Fax (614)

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector

MULTI-LEVEL & COVERED BOOTH CONDITIONS

What are the Contents of an Effective Fire Safety Plan? Name: Date: Address of Project: Building Permit Number:

El Reno Fire Department Fire Alarm Plan Review Worksheet

Design & Construction Standards, Revised January

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

Cedar Hammock Fire Rescue Standard Operational Guidelines FIRE WATCH. General. Requirements for a Fire Watch

GEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures

DEALING WITH FIRE SAFETY

Fire Prevention Coffee Break Training. February 2017

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

New Construction Fire Inspection Process

FIRE CODE. Coal City Fire District International Fire Code Update. 35 S. DeWitt Place Coal City, IL

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Impairments to Fire Protection Equipment

Transcription:

PACDA Application Forms 5/15/2018 Aman Fire Protection Consultants 1

PACDA Submission Forms Preliminary Approval Form Final Approval Form Hazards Material Approval Form 5/15/2018 Aman Fire Protection Consultants 2

PACDA Submission Forms Material Approval Form Approved Contarctor Approval Form Hazards Material Approval Form 5/15/2018 Aman Fire Protection Consultants 3

Preliminary Approval Stage STEP 1 Review and provide basic requirements for firefighting and fire alarm systems Review and provide all necessary requirements for life safety system Provide Fire Safety Strategy Report (FSSR) Obtain PACDA certificate for preliminary design 5/15/2018 Aman Fire Protection Consultants 4

Preliminary Approval Documentation FSSR Life Safety Drawings Fire Fighting Drawings Fire Alarm Drawings Hazards Material Analysis Koroki & Mulkia 3 Copies of Drawing Supervision Letter Payment Card See Aman's Checklist 5/15/2018 Aman Fire Protection Consultants 5

Preliminary Re-approval Step 2; If changes to initial design are made which affect fire protection systems then preliminary approved design must be re-submitted for new approval Updating FSSR- what is its purpose and why is it important- UPDATING FSSR Fire consultant will update FSSR to present changes. 5/15/2018 Aman Fire Protection Consultants 6

Detailed Design Review Step 3; Detailed Design review including review of detail design drawings and calculations Not formally required to be approved by PACDA. It is recommended to avoid changes or extra requirement by PACDA at the end of the project. 5/15/2018 Aman Fire Protection Consultants 7

Detailed Design Review 5/15/2018 Aman Fire Protection Consultants 8

Material Review and Approval Step 4; Material review and approval (For any material which has to be Listed as per NFPA) BEFORE PROCURING ANY MATERIALS Submit test certificates, PACDA certificates and local supplier approval details to fire consultant for review and acceptance DO NOT SOURCE PRODUCTS FROM OUTSIDE OMAN- MUST BE FROM AN OMAN PACDA APPROVED SUPPLIER or Agree with PACDA if you wish to order material from outside prior to do so. Each material/product must have a test certificate from a recognised body which is accepted by PACDA and must have a PACDA approval certificate 5/15/2018 Aman Fire Protection Consultants 9

Material Review and Approval 5/15/2018 Aman Fire Protection Consultants 10

Product Certificate from Testing Lab PACDA Product Approval Certificate 5/15/2018 Aman Fire Protection Consultants 11

Site Visits Step 5; Site visits inspect installation vs. drawings and NFPA codes & standards No need to Involve PACDA at this stage Upon Completion of the project; The fire consultant to issue letter to PACDA confirming compliance of the installation. 5/15/2018 Aman Fire Protection Consultants 12

5/15/2018 Aman Fire Protection Consultants 13 Site Visits

5/15/2018 Aman Fire Protection Consultants 14 Site Visits

5/15/2018 Aman Fire Protection Consultants 15 Site Visits

5/15/2018 Aman Fire Protection Consultants 16 Site Visits

Witness the Testing and Commission Step 6; Witnessing of testing and commission by Fire Consultant- contractor must test 100% of the systems and submit all test reports etc. in correct format to Fire Consultant for them to review Fire Consultant will then visit site and witness testing of approx. 10-20% of the systems to verify the testing done by the contractor 5/15/2018 Aman Fire Protection Consultants 17

Inviting PACDA for Final approval Step 7; Fire Consultant will prepare for and invite PACDA for final inspection in order to gain final approval from them Other important points; Fire Protection Contractor must be registered and approved as a specialist- cannot be a general contractor It is possible to get partial or temporary approvals in order to not delay the project- this is at the discretion of PACDA 5/15/2018 Aman Fire Protection Consultants 18

5/15/2018 Aman Fire Protection Consultants 19

PACDA Application form Fire Consultant Invitation Letter Preliminary Approval Certificate Sample for the final submission 5/15/2018 Aman Fire Protection Consultants 20

Owner of the project letter Main Consultant invitation letter Main Contarctor invitation letter Sample for the final submission 5/15/2018 Aman Fire Protection Consultants 21

PACDA product Certificate Sample for the final submission Fire contractor letter Fire contractor Installer Certificate Product Certificate from Testing Lab 5/15/2018 Aman Fire Protection Consultants 22

Occupancy Certificate Final Approval Certificates Sample 5/15/2018 Aman Fire Protection Consultants 23

Fire Hydrants & Standpipe Final Approval Certificates Sample 5/15/2018 Aman Fire Protection Consultants 24

5/15/2018 Aman Fire Protection Consultants 25 Final Approval Certificates Sample

Clarifications! 5/15/2018 Aman Fire Protection Consultants 26

Clarifications 1. Fire Training Area; - Is there any requirement of safety spacing/location, facilities? - PACDA review document/drawing related to fire training area. 5/15/2018 Aman Fire Protection Consultants 27

Clarifications 2. PACDA Approved Vendor List 5/15/2018 Aman Fire Protection Consultants 28

Clarifications 3. PACDA Approved Manufacturer / Model List; - For example, Claval Model-123 is PACDA Approved, but Viking Model-456 cannot be used in Oman. 5/15/2018 Aman Fire Protection Consultants 29

Clarifications 4. Equipment/Component which shall be used PACDA Approved item; It is not only for fire fighting equipment. Inst., Arch., Elec., Piping items shall be clarified. Preliminary equipment list will be provided to Consultant/Vendor at the meeting. 5/15/2018 Aman Fire Protection Consultants 30

Clarifications 5. Drawings/Documents which shall be approved by PACDA; It is not only for fire fighting deliverables. dhse, Inst., Arch., Elec., Piping items shall be clarified. Preliminary deliverable list will be provided to Consultant/Vendor at the meeting. Is it stamp only? or should we use certified design company for engineering? 5/15/2018 Aman Fire Protection Consultants 31

Clarifications 6. Necessity of PACDA Approval or UL/FM Certificate for Firewater System / Gas Suppression System Piping Component bulk items, such as block valve, strainer, drain valve, pipe, fitting, flange, etc. 5/15/2018 Aman Fire Protection Consultants 32

Clarifications 7. Necessity of PACDA Approval for Fire Proofing Material A) Leightweight Cementitious Material (1) Fendolite (2) Avikote (ex. AV800) B) Intumescent Epoxy Material (1) Jotachar (ex. JF750) 5/15/2018 Aman Fire Protection Consultants 33

Clarifications 8. PACDA Approved Vendor List for Fire Proofing Material including manufacturer, Brand name. (If available) 9. Necessity of PACDA Approval for FACP(Fire Alarm Control Panel), Fire Alarm Devices (Fire Detectors and Alarm devices..), VESDA and related devices. 5/15/2018 Aman Fire Protection Consultants 34

Clarifications 10. PACDA certified construction company Should we use PACDA certified construction company for Fire Alarm system construction? 11. PACDA certified inspector Should we use PACDA certified inspector? 12. SIL (Safety Integrity Level) Local Regulation If there is SIL requirement in local regulation, please inform us SIL level in Oman Local 5/15/2018 Aman Fire Protection Consultants 35

Life Safety 5/15/2018 Aman Fire Protection Consultants 36

Fire Life Safety Evaluating compliance with the most recent editions of the National Fire Protection Association (NFPA) codes and standards. Review include requirements for: Applicable codes, Means of egress, Fire department access Construction type, Building height and area, Fire-rating requirements, Occupancy and use, Occupant load, Egress capacity, and special requirements applicable to the project. The analysis will be summarized in a Fire Safety Strategy Report (FSSR) 5/15/2018 Aman Fire Protection Consultants 37

Fire Life Safety 5/15/2018 Aman Fire Protection Consultants 38

Fire Life Safety 5/15/2018 Aman Fire Protection Consultants 39

Fire Life Safety 5/15/2018 Aman Fire Protection Consultants 40

Fire Safety Strategy Report 5/15/2018 Aman Fire Protection Consultants 41

Fire Safety Strategy Report General 1.1. Design Basis 1.2. Code Basis 1.3. Related Documents Executive Summary Fire Strategy 3.1. Firefighting Operations 3.1.1. Firefighter Notification 3.1.2. Building Access 3.1.3. Planning For Disasters 3.2. Buildings 3.3.1. Goals and Objectives 3.3.2. General Strategy 3.3.3. Standards 5/15/2018 Aman Fire Protection Consultants 42

Fire Safety Strategy Report Building Descriptions 4.1.1 Main Building 4.1.2 Workshop/ Warehouse 4.1.3 Electrical Substation 4.1.4 Civil Defense building 4.1.5 Security Cabin Buildings Analysis 5.1. Classification and Occupancy 5.1.1 Classification of Occupancy 5.1.2 Classification of Hazard of Contents 5.1.3 Occupant Load 5.1.4 Classification of Construction 5.2. Means of Egress 5.2.1 General 5.2.2 Egress Routes 5.2.3 Capacity of Means of Egress 5.2.4 Exit Access 5.2.5 Exit Discharge 5.2.6 Illumination of Means of Egress 5.2.7 Emergency Lighting 5.2.8 Marking of Means of Egress 5.2.9 Doors 5/15/2018 Aman Fire Protection Consultants 43

Fire Safety Strategy Report Building Descriptions 4.1.1 Main Building 4.1.2 Workshop/ Warehouse 4.1.3 Electrical Substation 4.1.4 Civil Defense building 4.1.5 Security Cabin Buildings Analysis 5.3 Passive Fire Safety Measures 5.3.1 Structural Elements 5.3.2 Compartmentation 5.3.3 Interior Finish, Contents, and Furnishing 5.3.4 Firestop Systems and Devices Required. 5.4 Active Fire Safety Measures 5.4.1 Automatic Extinguishing Systems 5.4.2 Fire Detection, Alarm, and Communication Systems 5.4.3 Manual Fire Extinguishing Systems 5.4.4 Other Active Systems 5.4.5 Lighting and Electrical Systems 5.4.6 Cause and Effect Matrix 5/15/2018 Aman Fire Protection Consultants 44

Fire Safety Strategy Report Fire Safety Management 6.1 Active and Passive Fire System Testing 6.2 Active and Passive Fire System Maintenance 6.3 General Maintenance 6.4 Fire Watch 6.5 Management of Change 6.6 Impairments Conclusion 5/15/2018 Aman Fire Protection Consultants 45

Fire Alarm System 5/15/2018 Aman Fire Protection Consultants 46

Fire Alarm system Prepare a conceptual fire alarm detection and notification system layout for the proposed facility. Drawings shall identify required Control panels Sequence of operation Notification appliances Fire alarm initiating devices Locations of smoke detectors Connections to fire protection and building systems, and necessary connections to off-site monitoring facilities. Applicable codes Provide Fire Alarm System Note 5/15/2018 Aman Fire Protection Consultants 47

Fire Alarm system Provide Fire Alarm System Note 5/15/2018 Aman Fire Protection Consultants 48

Fire Alarm system System Design Symbols 5/15/2018 Aman Fire Protection Consultants 49

Fire Alarm system Sequence of Operation 5/15/2018 Aman Fire Protection Consultants 50

Fire Alarm system Layout 5/15/2018 Aman Fire Protection Consultants 51

Automatic Sprinkler system 5/15/2018 Aman Fire Protection Consultants 52

Automatic Sprinkler system Provide a conceptual sprinkler system layout for the proposed facility. Drawings shall identify points of connection to the available water supply, system zoning, valve room locations, hazard classifications, design criteria, conceptual sprinkler locations, sprinkler type, conceptual location of piping, etc., Automatic Sprinkler System Note 5/15/2018 Aman Fire Protection Consultants 53

Automatic Sprinkler system Provide Automatic Sprinkler System Note 5/15/2018 Aman Fire Protection Consultants 54

Automatic Sprinkler system System Design Symbols 5/15/2018 Aman Fire Protection Consultants 55

Automatic Sprinkler system System Design Layout 5/15/2018 Aman Fire Protection Consultants 56

Automatic Sprinkler system System Design Layout Note 5/15/2018 Aman Fire Protection Consultants 57

Automatic Sprinkler system Typical Concept 5/15/2018 Aman Fire Protection Consultants 58

Automatic Sprinkler system Typical Concept 5/15/2018 Aman Fire Protection Consultants 59

Standpipe system Prepare standpipe drawings for the proposed facility. Drawings shall identify points of connection to the fire protection infrastructure piping locations for standpipes hose outlets valve locations design criteria, etc. Standpipe System Note 5/15/2018 Aman Fire Protection Consultants 60

Standpipe system System Design Layout 5/15/2018 Aman Fire Protection Consultants 61

Fire Pumps Determine the capacity of the fire pump and stored fire protection water source for the facility. Drawings shall identify The locations of the fire pump Capacity Size stored fire protection water source Protection Standpipe System Note 5/15/2018 Aman Fire Protection Consultants 62

Check list 5/15/2018 Aman Fire Protection Consultants 63

Plan Review Check List 5/15/2018 Aman Fire Protection Consultants 64

Fire Pump 5/15/2018 Aman Fire Protection Consultants 65

Fire Pump 5/15/2018 Aman Fire Protection Consultants 66

Inspection and Testing Check List 5/15/2018 Aman Fire Protection Consultants 67

Fire Pump 5/15/2018 Aman Fire Protection Consultants 68

Fire Pump 5/15/2018 Aman Fire Protection Consultants 69

Fire Pump 5/15/2018 Aman Fire Protection Consultants 70

Testing Equipment 5/15/2018 Aman Fire Protection Consultants 71

Testing Equipment 5/15/2018 Aman Fire Protection Consultants 72

Testing Equipment 5/15/2018 Aman Fire Protection Consultants 73

Testing Equipment 5/15/2018 Aman Fire Protection Consultants 74