VC-1, VC-1-SL, VC-2-L, VC-2-SL

Similar documents
Electronic Temperature Controller 70304,

Regulated Ex-Heater HEX with internal controller, HEX with external controller II 3 G II 3 D

Ultra Low Gas Cooler Series EC EC30 and EC-30/FD

Waste water ejection unit

EC Ultra Low Gas Cooler EC-30C Instruction Manual Version Software Version 1.00

Gas cooler series TC-Standard+

Gas cooler series TC-Standard+ X2

Gas cooler series RC 1.1

Electrically Heated Sample Lines Type 3/4/5-N/M/H (Ex), PSP 4M(-W), Type 3/4/5-5/30/50/80/100/120 (Ex)

User Manual GV25 GV35 GV702. Company information: Original instructions GV12066 (1)

Instruction Manual. Alarm Unit For Low Gas Level # Read manual before use! Observe all safety information! Keep manual for future use!

SCC-E Sample Gas Feed Unit. Operator s Manual 42/23-58 EN Rev. 1

Product Manual Glue Applicators MS 80 and MS 200

EN - english. Instructions for installation and operation. Mobile humidity meter DP 207

Magnetic-Inductive Flow Velocity Sensor PIT. Installation and Operating Instructions

Flow switch. Operating Manual. English manual page Page 1 of 15 Fax:

Short Path Distillation Unit. KDL 1 BASIC Version 2015

Installation and operating instructions. DK energy storage and DK energy buffer

Operating manual GTL 369 GTL 369M GTL 389 GTL 389M. Temperature probe. Please keep the manual for future use.

TTV 1500 / TTV 3000 OPERATING MANUAL CONVEYING FAN TRT-BA-TTV TC EN

KK70 Silent. Installation and Operating Instructions L V001

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil eco. Item no: Z-3278

Portable sample gas conditioning PCS.smart+

FSW300 Series Flow Switch

Laboport Chemically-resistant Laboratory Pumps and Systems

USER S MANUAL ATH WH220

Installation, operating and servicing instructions

Operational Instructions. Glue Applicator MS Translation from German to English

Operating instructions

Vacuum Controller with Control Unit VC 900

ENGLISH USER S MANUAL PRE SOAKER 3600

Gas cooler series RC 1.1

JASOPELS ROTATING FLESHING MACHINE 1-BEAM

Inspection Light LED 6149/2. Operating instructions EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN

Installation and operation manual DPC200 - DIFFERENTIAL PRESSURE CONTROLLER. Low pressure with PI-control-mode

SIHI LPH-X - Liquid Ring Vacuum Pump One Stage

GESTRA Steam Systems BK 15. Installation Instructions Steam Trap BK 15, DN 40-50

TFV 900 OPERATING MANUAL RADIAL FAN TRT-BA-TFV900-TC-001-EN

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil 60. Item no: Z-3285

INSTRUCTIONS CertoClav EL

Operating instructions Safety-monitoring module SRB 302X3. 1. About this document. Content

Operating Instructions

TTV 4500 / TTV 4500 HP / TTV 7000

Sensor module. Operating instructions. Sensor module, Type 17-51P2-... Document No P2-7D0001 Version: 17 May 2011/Rev. 0

Operating instructions

ORIGA-SENSOFLEX Displacement Measuring System for Cylinder Series OSP-P

EHA Hoffmann International GmbH

Grain crusher Universal. Purpose: This machine is designed for the crushing of grain in agricultural operation.

SIHI LPH-X - Liquid Ring Vacuum Pump One Stage

NHS VERTICAL AGITATOR

Chemical resistant Vacuum Pumps

User Manual WMF Cup&Cool WMF Cup

Compression Sprayers TECH DATA SHEET /03/17. Ersatzteile Spare Parts Pièces de Rechange

Operating Instructions for Limit switch Model: NBK-R NBK-RM NBK-RT NBK-RA

Rotary Evaporators designed

Operating Instructions for Reka Hot-Melt Glue Applicators

Installation and operation instructions Solar stations SolarBloC midi Premium DN 20 SolarBloC maxi Premium DN 25

HSGM Heißschneide-Geräte

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

Installation and Operation Instructions K36E Modular Heating Circuit - DN 25 Boiler charging set

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

-Zumpe GmbH. Operating Instructions Flexible Impeller Pumps UNISTAR COMBISTAR NIROSTAR ACOSTAR. Pumps and Sprayers

Portable sample gas conditioning PCS.smart

Original Operating Instructions V-VTE

Flameproof Manual Call Points

1592P01. for liquids in piping DN

Operation Manual. Diaphragm pumps 2-headed. Types MP 101 Zp, MP 201 Ep MPC 101 Zp, MPC 201 Ep

UFM-T100H US ES CA Power Alarm Test TM

operation manual SAUNA-VII (07/05) page 1 of 14 SAUNA- Plus VII

Installation and assembly instructions. for standard configuration radial blowers

Operating and Maintenance Instructions

Manual Power relay SR853

Model: 1100 Float-Controlled Condensate Trap, PN 25

Operation Manual. Diaphragm pumps. MP 054 Zp, MPC 054 Zp MP 104 Ep, MPC 104 Ep

Cleaning unit for coolant. :_decftez`_>r_fr] Book No.: V2

Users Manual Pury 250e Gas Purification System

Aquamax KF Oil Evaporator. User Manual

Copyright LIQUIDYN GmbH 08/2013 Version

Model: 1413 Model: 1418 Float-Controlled Condensate Trap, PN 100

The sealless FLUX F 424

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-d.

Vacuum Switch, Differential Pressure Adapter, Switching Amplifier

OPERATING MANUAL. BAK Thermoplastic Welding Technology AG 1

OPERATION AND MONTAGE MANUAL ROOF FANS

Operating Manual. Model: Float-Controlled Condensate Trap, PN Safety instructions. 2 General description and usage

Diaphragm pumps. Operation Manual. Models: 2019C-02 (230V / 50Hz) 2019B-01 (115V / 60Hz) 2019C-50 (230V / 50Hz)

Compact Gas Conditioning MAK10

ULTRAFLOW 54 DN

Karlsruher Glastechnisches Werk KGW-ISOTHERM

AIRGOCLEAN 10 E OPERATING MANUAL AIR CLEANER TRT-BA-AIRGOCLEAN10E-TC-001-EN

Model: 1200 Model: 1200-G Model: 1200-N Float-Controlled Condensate Trap, PN 40

Operating instructions

Operating Manual. VIENNA Hot Display

KESSEL Grease separator EasyClean free Standard, Direct - oval in NS 2, 4, 7, 10, 15, 20, 25, 30 for set-up in frost-free rooms

K Operating Instructions. Before first use of the unit read these operating instructions and act in accordance with them.

Original Operating Instructions V-VC

User Guide Topax Hygiene System. S Booster MP44/MP66/MP88

CREMALDI Cream machines Operating instructions

Silvento concealed variant clamped-ventilator - Replaces Skalar-; Skalar-V...; Skalar-2V... - Installation directions - Please pass on to the user -

System Components and Accessories for Sample Gas Conditioning. Data Sheet 10/ EN June 2004

Transcription:

Pre-Cooling Unit Series VC VC-1, VC-1-SL, VC-2-L, VC-2-SL Instruction Manual Version 1.00.02

Dear customer, we have made up this operating manual in such a way that all necessary information about the product can be found and understood quickly and easily. Should you still have any question, please do not hesitate to contact M&C directly or go through your appointed dealer. Respective contact addresses are to be found in the annexe to this operating manual. Please also contact our homepage www.mc-techgroup.com for further information about our products. There, you can read or download the data sheets and operating manuals of all M&C products as well as further information in German, English and French. This Operating Manual does not claim completeness and may be subject to technical modifications. 04/2016 M&C TechGroup Germany GmbH. Reproduction of this document or its content is not allowed without permission from M&C. Version: 1.00.02 2 VC 1.00.02 www.mc-techgroup.com

Content 1 General information... 4 2 Declaration of conformity... 4 3 Safety instructions... 5 4 Warranty... 5 5 Used terms and signal indications... 6 6 Introduction... 7 7 Application... 7 8 Technical Data... 7 9 Description... 8 10 Function... 10 11 Reception and storage... 11 12 Installation instructions... 12 13 Supply connections... 12 13.1 Hose connections... 12 13.2 Electrical connections... 13 14 Start-up... 14 15 Closing down... 14 16 Maintenance... 14 16.1 Cleaning the cooling fins... 14 16.2 Maintenance of the peristaltic pump(s), type SR25.1 and SR25.2... 15 16.2.1 Change of the pump tube... 15 16.2.2 Change of contact pulleys and springs... 16 16.2.3 Cleaning the pump head... 16 17 Spare parts list... 17 18 Appendix... 18 List of illustrations Figure 1 Dimensions VC-1... 8 Figure 2 Dimensions VC-1-SL... 9 Figure 3 Dimensions VC-2-L... 9 Figure 4 Dimensions VC-2-SL... 10 Figure 5 Schematic diagram of the heat exchanger function... 11 Figure 6 Electrical connection VC-1-SL... 13 Figure 7 Electrical connection VC-2-SL... 13 Figure 8 Change of the pump tube... 15 www.mc-techgroup.com VC 1.00.02 3

Head Office M&C TechGroup Germany GmbH Rehhecke 79 40885 Ratingen Germany Telephone: 02102 / 935-0 Fax: 02102 / 935-111 E - mail: info@mc-techgroup.com www.mc-techgroup.com 1 GENERAL INFORMATION The product described in this operating manual has been examined before delivery and left our works in perfect condition related to safety regulations. In order to keep this condition and to guarantee a safe operation, it is important to heed the notes and prescriptions made in this operating manual. Furthermore, attention must be paid to appropriate transportation, correct storage, as well as professional installation and maintenance work. All necessary information a skilled staff will need for appropriate use of this product are given in this operating manual. 2 DECLARATION OF CONFORMITY CE - Certification The product described in this operating manual complies with the following EU directives: EMV-Instruction The requirements of the EU directive 2014/30/EU Electromagnetic compatibility are met. Low Voltage Directive The requirement of the EU directive 2014/35/EU Low Voltage Directive are met. The compliance with this EU directive has been examined according to DIN EN 61010. Declaration of conformity The EU Declaration of conformity can be downloaded from the M&C homepage or directly requested from M&C. 4 VC 1.00.02 www.mc-techgroup.com

3 SAFETY INSTRUCTIONS Please take care of the following basic safety procedures when mounting, starting up or operating this equipment: Read this operating manual before starting up and use of the equipment. The information and warnings given in this operating manual must be heeded. Any work on electrical equipment is only to be carried out by trained specialists as per the regulations currently in force. Attention must be paid to the requirements of VDE 0100 (IEC 364) when setting high-power electrical units with nominal voltages of up to 1000 V, together with the associated standards and stipulations. Check the details on the type plate to ensure that the equipment is connected to the correct mains voltage. Protection against touching dangerously high electrical voltages: Before opening the equipment, it must be switched off and hold no voltages. This also applies to any external control circuits that are connected. The device is only to be used within the permitted range of temperatures and pressures. Check that the location is weather-protected. It should not be subject to either direct rain or moisture. The devices must not be used in hazardous areas. Installation, maintenance, monitoring and any repairs may only be done by authorized personnel with respect to the relevant stipulations. 4 WARRANTY If the equipment fails, please contact M&C directly or else go through your M&C authorised dealer. We offer a one year warranty as of the day of delivery as per our normal terms and conditions of sale, and assuming technically correct operation of the unit. Consumables are hereby excluded. The terms of the warranty cover repair at the factory at no cost or the replacement at no cost of the equipment free ex user location. Reshipments must be send in a sufficient and proper protective packaging. www.mc-techgroup.com VC 1.00.02 5

5 USED TERMS AND SIGNAL INDICATIONS D ANGER! W A R N I N G! C ARE! This means that death, severe physical injuries and/or important material damages will occur in case the respective safety measures are not fulfilled. This means that death, severe physical injuries and/or important material damages may occur in case the respective safety measures are not fulfilled. This means that minor physical injuries may occur in case the respective safety measures are not fulfilled. C A R E! A T T E N T I O N! Without the warning triangle means that a material damage may occur in case the respective safety measures are not met. This means that an unintentional situation or an unintentional status may occur in case the respective note is not respected. NOTE! These are important information about the product or parts of the operating manual which require user s attention. SKILLED STAFF These are persons with necessary qualification who are familiar with installation, use and maintenance of the product. 6 VC 1.00.02 www.mc-techgroup.com

6 INTRODUCTION The VC-... pre-cooling units produced by M&C incorporates the Jet-Stream design of heat exchanger. This design induces condensate formation and guarantees optimum dew point reduction to ambient temperature. 7 APPLICATION The M&C pre-cooling units VC-... are used in gas analysis to lower the dew point of humid gas, for example: to relieve downstream main cooling system if process-bound water or steam irruption can become forward, if non-heated sample lines without adequate slope are mounted, for gas analysis system with electrochemical sensors. 8 TECHNICAL DATA Pre-cooling unit version VC-1 VC-1-SL VC-2-L VC-2-SL VC-.. Part No. 230V 50-60Hz 03K1000 03K3000 03K4000 03K5000 Part No. 115V 50-60Hz 03K1000 03K3000a 03K4000a 03K5000a Jet-Stream heat exchanger 1x 1x 2x 2x out of Duran glass EC-G Forced ventilation no yes yes yes Autom. condensate 1x 2x removal with SR25.. Sample gas connection 2x GL18-6 2x GL18-6 4x GL18-6 4x GL18-6 Condensate connection 1x GL25-12 1x DN4/6 2x GL25-12 2x DN4/6 Power consumption 25VA 20VA 30VA Gas flow rate 1x 250 Nl/h 1x 250 Nl/h 2x 250 Nl/h 2x 250 Nl/h recommended, (other flow rates possible) Weight approximately ca. 3,5 kg ca. 7,5 kg ca. 9 kg ca. 11 kg Sample gas pressure max. 3 bar g ΔP per heat exchanger 4 mbar at 300 Nl/hr Stagnant space per heat 70 ml exchanger Sample inlet temperature max. 180 C Ambient temperature +2 C to +45 C Storage temperature 0 C to +55 C Electrical connection Terminals max. 2,5 mm 2, PG11 cable gland Electrical standard / Case EN 61010 / IP22-EN60529 protection Method of mounting / mounting / immediately Ready for working Material of sample contacting parts Duran glass, PTFE Duran glass, PTFE Duran glass, PTFE, PVDF, Novoprene Duran glass, PTFE, PVDF, Novoprene www.mc-techgroup.com VC 1.00.02 7

9 DESCRIPTION The condensate formed should be removed with a small peristaltic pump, sample trap or collection vessel. The VC-..-SL pre-cooling unit has as a standard peristaltic pumps SR25.1 for automatic condensate removal. The VC-..-..L pre-cooling unit has got a fan to force the ventilation of the cooling fins for performance rise. In this case, a deflector is integrated for an optimal air conduction. The VC-1-.. pre-cooling unit is equipped with one EC-Jet-Stream heat exchanger. The VC-2-.. pre-cooling unit is equipped with two EC-Jet-Stream heat exchangers to connect two independent sample streams or parallel or series function to connect one sample stream with a corresponding high flow rate. The compact lightweight design of this device makes it ideal for use in portable and continuous sample conditioning systems. The pre-cooling units are self-controlling with low maintenance. Figure 1 Dimensions VC-1 8 VC 1.00.02 www.mc-techgroup.com

Figure 2 Dimensions VC-1-SL Figure 3 Dimensions VC-2-L www.mc-techgroup.com VC 1.00.02 9

Figure 4 Dimensions VC-2-SL 10 FUNCTION The especially for gas analysis designed M&C gas pre-cooler type VC-.. cools sample gas down to ambient temperature. The novel construction of the jet-stream heat exchangers guarantees a very good pre-separation of condensate and for that reason an optimal drying of sample gas with a minimum of washing out effects. Figure 3 shows the functional diagram of the heat exchanger. 10 VC 1.00.02 www.mc-techgroup.com

Sample OUT Sample IN Cooling block +5 C Condensate OUT Figure 5 Schematic diagram of the heat exchanger function 11 RECEPTION AND STORAGE The gas cooler VC-.. are complete pre-installed units. Carefully inspect the cooler and any special accessories included with it immediately on arrival by removing them from the packing and checking for missing articles against the packing list! Check the items for any damage in transit and, if required, inform the shipping insurance company immediately of the damage found! The cooler must be stored in a weather protected frost-free area! NO TE! www.mc-techgroup.com VC 1.00.02 11

12 INSTALLATION INSTRUCTIONS The cooler VC-.. is suitable for wall mounting. Mounting dimensions see figure 1-4. NO TE! Unheated gas sample lines must be provided with slope up to the cooler. Connect the heated sample line with sufficient thermal decoupling of min. 20cm to the cooler! 13 SUPPLY CONNECTIONS 13.1 HOSE CONNECTIONS The connection for sample gas inlet and outlet happens at the GL-connectors on the upper part of the heat exchangers. In standard a hose with 6mm outer diameter is connected. M&C tube resp. hose connectors are available as option (see data sheet 3-5.1.1) NO TE! Do not mix up the hose connections; the inlet and outlet connections of the heat exchangers are marked with arrows; Ensure that the connections are sealed adequately; To ensure free removal of the condensate, ensure that the listed diameters for the condensate removal lines are not reduced! Ensure that the connections are sealed adequately by noting the following: Before assembly, check the GL coupling rings to see if the PTFE/silicon locking rings have been damaged. The sealing rings should be installed with the PTFE side facing the medium. The condensate connection for the VC-1-SL and VC-2-SL is done at the hose connectors DN4/6 of the peristaltic pumps. For VC-1 and VC-2L the connection is done at the bottom of the heat exchanger with the following possibilities of condensate removal: peristaltic pump(s) type SR25.1 or SR25.2-G (required connection adapter part no. 09F9520 for VC-1 resp. 05V6035 for VC-2L), external mounted condensate vessel(s) with manually emptying (required connection adapter part no. 09F9525 DN6/8 or 09F9530 DN10/12), automatic float-type condensate traps type AD-... (only for excess pressure operation). (required connection adapter part no. 09F9525 DN6/8 or 09F9530 DN10/12). 12 VC 1.00.02 www.mc-techgroup.com

13.2 ELECTRICAL CONNECTIONS C ARE! NO TE! When connecting the equipment, please ensure that the supply voltage is identical with the information provided on the model type plate! Attention must be paid to the requirements of IEC 364 (DIN VDE 0100) when setting high-power electrical units with nominal voltages of up to 1000V, together with the associated standards and stipulations. An external main switch must be provided. The main circuit must be equipped with a fuse (over current protection); for electrical details see technical data (chapter 8). The electrical connection of the VC-1-SL is done in the housing of the peristaltic pump SR25.2-G: Figure 6 Electrical connection VC-1-SL The electrical connection of the VC-2-L is done in the connection box at terminals: L = 3, N = 2 and PE = 1 The electrical connection of the VC-2-SL is done in the housing of the 2 peristaltic pumps SR25.1: Figure 7 Electrical connection VC-2-SL www.mc-techgroup.com VC 1.00.02 13

14 START-UP The following steps should be carried out before initial start-up: Connect the cooler unit to the mains power supply (except VC-1); Check that the equipment is connected to the correct mains voltage, 115V or 230V, as shown on the type plate. 15 CLOSING DOWN NO TE! The location for the cooler must remain frost-free, even when the unit has been switched off! If the cooler unit is putting out of action for a short time no particular measures need to be taken. We recommend sweeping the cooler with inert gas or ambient air while the unit is putting out of action for a longer time. C ARE! Aggressive condensate is possible. Wear protective glasses and proper protective clothing! 16 MAINTENANCE The safety instructions specific to the plant and process are to be consulted prior to any maintenance work! D ANGER! Dangerous voltage! It is necessary to take the gas cooler off the mains before any assembly, maintenance and repair work is carried out! The cooler VC-.. does not require any special maintenance intervals. 16.1 CLEANING THE COOLING FINS Dust on the cooling fins reduces the cooling capacity. Therefore it is necessary to clean the fins from time to time. The following steps are recommended: Disconnect the cooler from the mains (except VC-1); Unscrew the cooler hood and remove it carefully (except VC-1); Clean the fins carefully with compressed air; Re-install the cooler hood; 14 VC 1.00.02 www.mc-techgroup.com

16.2 MAINTENANCE OF THE PERISTALTIC PUMP(S), TYPE SR25.1 AND SR25.2 Before the maintenance work is carried out, it is necessary that the specific safety procedures pertaining to the system and operational process are observed! D ANGER Dangerous voltage! It is necessary to take the pump off the mains before any assembly, maintenance and repair work is carried out! Flexible tube, conveying belt, contact pulleys and contact springs are the only parts of the pump subject to wear. They are simple to change. 16.2.1 CHANGE OF THE PUMP TUBE C ARE! Aggressive condensate is possible! Wear protective glasses and proper protective clothing! NO TE! If you send back the peristaltic pump to the M&C service for repair, please let us know what kind of condensate has been pumped. Before sending the pump back clean all parts from dangerous or highly aggressive contaminants. 2 4 3 1 Figure 8 Change of the pump tube Take off the cooler of the mains; Open hose connectors at the pump; Press conveying belt at the recessed grips and turn S-bolt clockwise up to limit stop; www.mc-techgroup.com VC 1.00.02 15

Take away conveying belt and remove the old hose set from the guides by the hose connectors; Press the two contact pulleys and check whether the spring pressure is still sufficient, if not, the contact springs have to be changed (see 16.2.2); Put the new hose set with the hose connectors into the guides of the conveying belt ; NO TE! Only the usage of the original hose set guarantees a perfect function. Never lubricate the hose. Before mounting the pump check all parts for impurity and clean if necessary. Put the conveying belt with the new hose into the dovetail guide of the pump body; Press conveying belt at the recessed grips and simultaneously turn the S-bolt anticlockwise until it snaps; Switch on pump. 16.2.2 CHANGE OF CONTACT PULLEYS AND SPRINGS Take off the cooler of the mains; Unscrew the nut of the pump head (span of the jaw 5,5); Draw the pump head out of the motor shaft; Now the driver can picked out of the pump head and is ready for maintenance. The removal of the springs (4 pcs.) away from the driver is possible without the aid of any tools. Therefore press together the spring and take it out of the groove in the driver respectively out of the boring in the axle. Now the roller bearing axle can be dismounted and the contact pullets are ready for change. Remounting happens in the opposite way. NOTE! While mounting pay attention to the fit of rotational axis driver. Use genuine M&C spare parts only! 16.2.3 CLEANING THE PUMP HEAD When changing flexible tube or other parts, inspect all parts for dirt before assembling the pump head and clean them if necessary. As far as possible clean the parts with a dry cloth. Solvents should not be used as they can attack the plastics and synthetic rubber parts. If a compressed air line is available, blow the parts out with it. C ARE! Aggressive sample is possible! Wear protective glasses and proper protective clothing during disassembly, repair or cleaning! 16 VC 1.00.02 www.mc-techgroup.com

17 SPARE PARTS LIST Wear, tear and replacement part requirements depend on specific operating conditions. The recommended quantities are based on experience and they are not binding. Electric gas cooler VC-.. (C) Consumable parts (R) Recommended spare parts (S) Spare parts Recommended quantity being in operation [years] Part No. Indication C/R/S 1 2 3 02 K 9100 Jet-stream heat exchanger type EC-G. Material: Duran-glass. Connections: Sample gas: 2x GL18-6mm, Condensate: 1x GL25-12mm R 1 1 1 90 K 0115 Thermal conductivity paste, -20 to +140 C, silicon free, 50gr. R 1 1 2 90 K 0035 ECP, EC-FD fan 230V 50Hz. C - - 1 91 F 1010 Sealing ring GL18-6mm, material: PTFE. R 2 4 6 91 F 1015 Sealing ring GL18-8mm, material: PTFE. R 2 4 6 90 F 0025 Sealing ring GL25-12mm, material: PTFE. R 2 4 6 91 F 1005 Spare union nut GL18 R 1 1 1 91 F 1007 Spare union nut GL18/14 R 1 1 1 90 F 0020 Spare union nut GL 25 R 1 1 1 90 F 0022 Spare union nut GL 25/18 R 1 1 1 09 F 9500 Connector/adaptor GL18 DN4/6 PV S - - - 09 F 9520 Connector/adaptor GL25 DN4/6 PV. S - - - 09 F 9525 Connector/adaptor GL 25 DN6/8 PV S - - - 09 F 9530 Connector/adaptor GL 25 DN10/12 PV S - - - Peristaltic pump SR25.1 and SR25.2 (C) Consumable parts (R) Recommended spare parts (S) Spare parts Recommended quantity being in operation [years] Part No. Indication C/R/S 1 2 3 90 P 1007 Hose set SR25.1 C 1 2 4 with PVDF-tube connectors 4/6mm, standard 90 P 1020 Driver SR25, complete S - 1 1 90 P 1010 1 set (4 pcs) contact springs SR25 for driver R 1 2 2 90 P 1045 Contact pulleys SR25 PVDF for driver S 2 4 4 90 P 1050 Conveying belt SR25.1 S - 1 2 90 P 1025 S-bolt SR25.1 S - - 1 01 P 1000 Peristaltic pump SR25.1, complete 230V/115V, 50/60Hz R - - 1 01 P 1300 Peristaltic pump SR25.2, complete 230V/115V, 50/60Hz R - - 1 90 P 1030 Heat peristaltic pump SR25, complete without motor and gears S - - 1 www.mc-techgroup.com VC 1.00.02 17

18 APPENDIX Further product documentation can be seen and downloaded from our home page: www.mc-techgroup.com Threaded couplings for GL glass connections Document: 3-5.1.1 Instruction manual peristaltic pump SR25.1 Document: 3-7.1ME Automatic liquid drain AD-SS Document: 3-6.2.3 Automatic liquid drain AD-P Document: 3-6.2.1 Condensate vessel TG, TK Document: 3-6.3.1 18 VC 1.00.02 www.mc-techgroup.com