1 MONTANA HOUSE 2 TECHNICAL SPECIFICATIONS June 28, 2011 Table of Contents CHAPTER 1. DESIGN QUALIFICATION AND CERTIFICATION Design Qualification Additional Utility Requirements Utility Quality Control Requirements Existing Codes and Regulations... 3 Table 1: Montana House 2 New Construction - Prescriptive Component Requirements... 4 CHAPTER 2. THERMAL EFFICIENCY General Ceiling Above Grade Walls Slab Floors Sealed Crawlspaces Doors and Glazing Air Leakage Control Combustion Appliances... 7 CHAPTER 3. HEATING AND COOLING SYSTEMS General Sizing for Heat Pumps and Central AC Heat Pump Controls Zonal Electric Controls Forced Air Electric Controls... 9 CHAPTER 4. DUCT WORK Design Requirements Duct Installation System Air Filter CHAPTER 5. VENTILATION AND AIR QUALITY Moisture Vapor Transfer: Attic and Crawlspace Ventilation Mechanical Ventilation Formaldehyde Reduction Measures CHAPTER 6. LIGHTING AND APPLIANCES Lighting Appliances APPENDIX SECTION 1: BLOWER DOOR AIR LEAKAGE TESTING SECTION 2: COMBUSTION APPLIANCE ZONE Page 1 of 22

2 CHAPTER 1. DESIGN QUALIFICATION AND CERTIFICATION 1.1. Design Qualification Single family homes built to meet Montana House 2 Specifications must meet the thermal envelope, heating system, and lighting and appliance efficiency requirements listed these Specifications, included in Table 1. The Montana House 2 Specification is designed to be the prescriptive standard for the minimum performance criteria for the components of Montana House 2. The Montana House 2 is applicable for homes with heat pump, zonal electric (unducted), or forced air electric heating systems. Single family homes extend to duplexes, triplexes and attached units separated fully from ground-to-roof (i.e., townhouses and condominiums) Additional Utility Requirements Utilities may add requirements more stringent than those in this specification Utility Quality Control Requirements Building design and construction must be reviewed and verified by the utility to meet the Montana House 2 Technical Specifications. If the house fails an inspection or test, the contractor and utility will identify the problem area and work to repair it and may retest each home thereafter. The utility will work with the contractor and will be encouraged to improve his construction practices in future houses. If contractor continues to fail inspections or tests, incentive and energy savings levels could be reduced or the builder could be dropped from the program Building Plan Review A building plan review shall be completed by the utility prior to construction. The plan review will be used as basis for qualifying each Montana House 2. Plans should include all required features for the Montana House 2 (i.e. Slabs, Floors, Walls, Ceilings & Attics). Substantial deviation from the specifications shall be approved by phone followed by written approval from BPA Checklist Agreement Once the building plans have met the specifications, the participating utility will provide plan review checklist agreement, detailing the required features. The homeowner and the builder must sign the checklist agreement, which states that they agree to build the home to the minimum specifications Slab Inspection The utility shall make an in-progress inspection to verify the under-slab insulation levels prior to the pouring of the slab. The contractor is required to notify the utility at least 48 hours prior to the slab being poured. If the utility cannot be present to inspect under-slab insulation, the contactor shall take pictures that verify insulation levels and submit the pictures to the utility Wall Inspection The utility shall make an in-progress inspection to verify proper air-sealing and exterior wall insulation levels prior to installation of the drywall. Contractor is required to notify the utility at least 48 hours prior to installation of the drywall. If the utility cannot be present to inspect the wall assembly, the contractor shall take pictures to verify insulation levels and air-sealing and submit the pictures to the utility Final Inspection The utility shall make a final inspection to verify the house was built to the specifications and properly commissioned. The contractor is required to notify the utility when the house is completed Blower Door Test Page 2 of 22

3 If the house is the first one built by the contractor to Montana House 2 specifications the final inspection shall include a blower door test to verify compliance with air tightness specifications. The utility shall perform a random blower door test upon completion of every tenth house thereafter Existing Codes and Regulations These specifications are intended to meet or exceed applicable existing building codes and Federal regulations. In any case where a Federal, State or local code or regulation exceeds these requirements, that code or regulation applies. Page 3 of 22

4 Table 1: Montana House 2 New Construction - Prescriptive Component Requirements Insulation Ceiling R- 60 Adv. Flat or Minimum R-49 vaulted. Wall (above grade) Floors over Unconditioned Space Slab Floors Unheated Heated Radiant R-21 Int. + R-5 foam R-38 Insulation in floor joist cavity. R-10 Full Slab + R-5 Thermal Break R-15 Perimeter, 4 R-10 Remaining Slab + R-5 Thermal Break Applies to all concrete slab floors above or below grade. Minimum R-5 thermal break required between slab edge and all walls and footings. Applies to all concrete slab floors above or below grade. Perimeter insulation shall be installed for a distance of 4 feet vertical, horizontal, or combined distance. Minimum R-5 thermal break required between slab edge and all walls and footings. Basement Wall R-21 Below grade walls can extend up to 24 inches above grade. Sealed Crawlspace Wall R-21 The crawlspace wall shall be sealed and mechanical ventilation shall be provided. Sealed crawlspaces shall be considered conditioned space. Windows & Doors Windows U NFRC rated: Up to 1% of heated floor area exempt. Glazing Skylights U-0.50 Skylight area shall not exceed 5% of heated floor area. Max. Glazing 15% of Heated Floor Area Area Combined window and skylight area. Exterior Doors U-0.16 One door up to 28 ft 2 exempt. Ducts in Unconditioned Space Insulation Rigid R-11 Flexible R-8 Sealing Mastic Cloth duct tapes not allowed. Max. Leakage Not tested Ventilation & Air Sealing Ventilation System Whole-House Mechanical ventilation system required. Envelope Tightness Pa Utility to test 10% of homes Heating & Cooling Equipment Heat Pump 8.5 HSPF/SEER 13 Installed according to Montana House 2 New Construction Air Conditioner SEER 13 specifications for sizing and controls. Zonal Electric Electronic thermostat required. Forced Air Electric Energy Star programmable thermostat required. Water Heating 39 gallons Energy Factor 0.96 Electric Water Heaters 40 to 49 gallons Energy Factor to 64 gallons Energy Factor gallons Energy Factor 0.91 Appliances & Lighting Appliances ENERGY STAR qualified Applies to built-in appliances and any new purchases.. Lighting ENERGY STAR qualified A minimum of 90% of sockets to be either ENERGY STAR bulbs, fixtures, or both. Page 4 of 22

5 CHAPTER 2. THERMAL EFFICIENCY 2.1. General All insulation materials shall be installed according to the manufacturer's instructions to achieve proper densities, avoid compression and voids, and maintain uniform R-values. To the maximum extent possible, insulation shall extend over the full component area to the intended R-value. All R-values specified are nominal. Recessed fixtures (e.g., medicine cabinets, electrical panels, recessed lights, heating equipment, etc.) shall be covered by the full depth of insulation required by the component assembly. EXCEPTION: One percent of the component area (e.g., vaulted ceiling, wall) may have a minimum of R-10 insulation between the fixture and the building exterior if required ventilation clearances are maintained. Hatches connecting conditioned spaces to attics and crawlspaces shall be insulated to at least the requirement for the appropriate component, except R-38 is allowed for ceiling hatches Ceiling An advanced-frame attic is any combination of heel height, insulation material and baffles that provides the required ventilation space and a minimum of R-49 at the exterior edge of exterior walls. The insulation shall increase to the full R-value at the highest rate allowed by the roof pitch and taper down to reach the outside edge of the exterior wall or to blocking between rafters. Ventilation baffles in attics shall be permanent, weather-resistant retainers and allow insulation to be installed to the outer edge of the exterior wall to the fullest depth possible. All vents for attic/roofs and crawlspaces shall be clear of insulation. Attic and roof vents shall not be used as exhaust vents for mechanical ventilation systems Above Grade Walls Insulation shall uniformly fill the entire cavity and to be installed as per manufacturer's directions. When present, insulated sheathing (either interior or exterior) is assumed to cover the entire opaque wall surface. All rim joists in heated basements or crawlspaces, or between floors, shall be insulated to the above-grade wall R-value Framing Description: Framing systems shall use 2x6 wood framing. Intermediate framing is defined as follows: Intermediate: Studs framed on 16 or 24-inch centers with single or double top plate(s) and single bottom plate. Corners use 2 studs or other means of fully insulating corners, and 1 stud with trim piece is used to support each header. Headers consist of double 2X material with R-10 insulation between the header and exterior sheathing. Interior partition wall/exterior wall intersections are fully insulated in the exterior wall, typically framed with 2 studs (corners) or drywall backers or ladder blocking (partitions) Slab Floors Slab floor insulation shall be installed under the entire slab in heated spaces. Slabs in heated spaces shall have an R- 5 thermal break between footings, walls, and slabs in adjacent unconditioned spaces. Slab floors used as part of a radiant heating system shall have R-15 4 perimeter and R-10 under the rest of the slab. Page 5 of 22

6 2.5. Sealed Crawlspaces Where sealed crawlspaces are used, the following requirements apply Sealing Crawlspaces shall be sealed at both the rim joist and the mud sill with caulk or gasketing. All penetrations through the building envelope of the foundation wall, including the following, shall be sealed (e.g., caulking, expanding foam, tape, backer rod, gasket material, etc.) to limit air-leakage: Over all framing joints where floors intersect exterior walls (e.g., at rim and band joists and at top and bottom wall plates), and At the top and bottom of the mudsill on homes with basements or conditioned crawlspaces Insulation Perimeter insulation shall extend from the bottom of the subfloor to crawlspace floor covering any exposed foundation. Minimum of R-21 insulation shall be provided at the entire perimeter of the crawlspace. Insulation shall be permanently attached to framing materials in a manner capable of structurally supporting the insulation. Insulation may be either fiberglass batt, blowin batt, foam inplace or rigid insulation board or any combination of above Vapor Barrier The floor of the crawlspace shall be covered with a vapor (moisture) barrier in accordance with the provisions of the International Building Code. Vapor (moisture) barrier shall be lapped at each seam by a minimum of one foot. Seams may be taped as an alternative to lap seams. If a rat slab (2 minimum) is poured over the vapor barrier lapped or taped seams may be avoided Ventilation Mechanical ventilation shall be provided by the introduction of forced air from the furnace or heat pump directly into the crawlspace, or by use of a dedicated exhaust ventilation system. When using forced air from the furnace or heat pump, a minimum of one supply register and a return grill shall be used in the crawl space. A minimum flow of 50 cfm shall be provided by either the supply register. When using a dedicated exhaust ventilation system, overall ventilation capacity shall be a minimum of 50 CFM or 0.15 ACH calculated based on whole house volume whichever is greater. The exhaust fan shall be rated for continuous duty and use no more than 35 watts or 0.3 amps Doors and Glazing All windows, skylights and sliding glass doors shall be NFRC certified and labeled. Exterior doors that have not been tested shall use the default U-factors found in the following table: 2.7. Air Leakage Control Performance testing, performed as described in Appendix A, is required on at least 10% of houses labeled Montana House 2 in each utility service territory. Building envelope leakage shall not exceed 4.0 ACH at 50 Pa. The utility shall keep test results records on file and make them available to BPA and/or the RTF on request. Page 6 of 22

7 2.8. Combustion Appliances Sealed combustion appliances inside the heated space shall meet the requirements of Local codes or the International Mechanical Code as applicable. Neither unvented nor atmospheric combustion appliances are permitted. Whenever a combustion appliance used for secondary space heating is present within a building, a Combustion Appliance Zone (CAZ) pressure test is required as outlined in Appendix A; a UL listed carbon monoxide detector should also be installed within the heated space. Exception: A UL-listed carbon monoxide detector may be installed within the heated space in lieu of the CAZ pressure test requirement. Page 7 of 22

8 CHAPTER 3. HEATING AND COOLING SYSTEMS 3.1. General The primary heating system shall be electric. The heating contractor is responsible for designing and installing the heating system to meet all International Mechanical Code, National Electric Code, applicable local codes and equipment manufacturer's requirements. All equipment shall be located and installed according to manufacturer specifications and guidelines, all applicable codes and standards, and accepted industry practices Sizing for Heat Pumps and Central AC Heat Pump System Sizing The recommended method and form for heating and cooling load calculations is available in the Air Conditioning Contractors of America (ACCA) Manual J. This or an equivalent method shall be performed using Component U-values and F-values in the heat loss and heat gain coefficients that reflect the actual construction of the building. Heating loss and cooling gain calculations shall be made using 70 F indoor design temperature for heating and 75 F for cooling. The recommended ASHRAE winter design temperature and cooling design temperature for the nearest weather station representative of the installation shall be used. The heat pump system shall be sized using either of the following methods, rounding up to the nearest 6000 Btu/hr capacity at ARI rating conditions: Heat pumps shall be sized using no higher than a 30 F Balance Point Heat pumps shall be sized in accordance with the sizing method specified by the utility. However, in no case shall the Balance Point used for sizing be higher than 35 F. A Balance Point Worksheet shall be kept on file with the utility. Duct leakage shall be assumed to be CFM50=0.06 x floor area in sq. feet, corresponding to an approximate duct system loss of 10%. Exception: If the air handler and all ductwork are within the thermal envelope of the house, 0% shall be used as the duct system loss in sizing calculations. Partial tons calculated shall be rounded up to the next half-ton nominal size increment. Installed auxiliary heating shall not exceed 125% of the heating design load. All supplemental heaters greater than 5 kw shall be staged. Sizing documentation shall be kept on file at the utility Central Air Conditioner System Sizing When sized separately from a heat pump, central air conditioners shall not be sized greater than 140% of design cooling load calculated consistent with methods discussed in Section Heat Pump Controls The utility shall verify heat pump controls meet the following requirements. Results from the installation and functional check-out of system controls shall be held on file at the utility and made available to BPA and/or the RTF on request Indoor Thermostat An electronic thermostat shall be installed to control the heating and cooling system. Thermostats used for both heating and cooling shall have a manual changeover feature or heating/cooling lockout to prevent cross-cycling between heating and cooling. All indoor thermostats shall include a manual selector switch to permit all supplemental heaters to be energized under control of the indoor thermostat (with the compressor and outdoor thermostats bypassed) when the compressor is inoperative. Page 8 of 22

9 3.3.2 Control of Auxiliary Heat Heat pump systems shall employ control strategies that minimize the unnecessary use of auxiliary heat. In all systems, auxiliary heat shall not operate during a first stage heating call (unless system is switched to emergency heat). Auxiliary heat shall be controlled in the following manner depending on system type: For systems with a single stage of compression and for systems with multiple stages of compression but without supply air temperature sensor control: Auxiliary heat shall be controlled in such a manner that it does not engage when the outdoor air temperature is above 35 F, except when supplemental heating is required during a defrost cycle or when emergency heating is required during a refrigeration cycle failure. Exception: If the minimum setting available for auxiliary cutout on the indoor thermostat is 40 F, 40 F may be used For systems with a single stage of compression and the option of supply air temperature sensor control, supply air temperature sensor shall not be allowed to bring on auxiliary heat when the outdoor air temperature is above 35 F, except for those special conditions and operating modes specified in the first paragraph of Section For systems with multiple stages of compression and supply air temperature sensor control: Auxiliary heat shall be controlled in such a manner that it engages only after all stages of compression have been engaged and the supply air temperature falls below 85 F. OR If the staging temperature is set higher than 85 F, the system shall be equipped with an outdoor thermostat or equivalent control that prevents auxiliary heat from operating when outdoor temperatures are above those specified earlier in the first paragraph of Section Zonal Electric Controls Zonal systems shall have one electronic thermostat per zone Forced Air Electric Controls For central furnace or similar type systems, a programmable ENERGY STAR thermostat shall be installed. Page 9 of 22

10 CHAPTER 4. DUCT WORK 4.1. Design Requirements It is recommended that all ductwork for all system types be designed and installed in accordance with recommended industry practice as outlined in Air Conditioning Contractors of America (ACCA) publications or American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) handbooks. The air distribution system design and installation shall be such that air flow across the indoor coil is as specified in the manufacturer's literature, or for heat pumps is between 350 and 425 cubic feet per minute (CFM) per BTU/hr output at ARI rating conditions if the manufacturer s literature is not specific. Care should be taken in system design so that the external static pressure acting on the system air handler does not become excessive and affect performance, longevity, and/or energy usage. The system shall be designed and installed such that external static pressure does not exceed 0.8 w.c. Duct design shall meet the following minimum requirements: Building Cavities and Ducts Unlined building cavities shall not be used as ducts to convey return or supply air Branch Ducts Branch out runs shall be a minimum of 6 inches in diameter except to bathrooms Zonal Pressure Relief Return pathways shall be provided between axial zones (e.g. bedrooms) and the main body of the dwelling. Return pathways may include pass-through grilles, pressure-relief ducts, return ducts, door undercuts or similar devices. Return pathways should be sufficiently sized to limit pressurization of axial zones to 3 Pa or less when the system is operating at maximum system airflow Duct Installation Duct Connections and Support All new duct joints, plenum drives, metal joints to include all slips and drives shall be mechanically fastened with screws. Flexible ducts shall be attached using nylon/plastic straps tightened with a manufacturer approved tool (hand tightening is not acceptable) or stainless steel worm drive clamps (Panduit or equal). Mastic and/or tape of any kind shall not be used as mechanical fasteners. Ducts shall be cut to proper length supported in such a manner to prevent air flow constriction Insulation All rigid metal ducts and plenums outside the heated space shall be insulated to an installed value of at least R-11. A vapor barrier meeting a flame spread rating of 25 or less and smoke developed rating of 50 or less (in accordance with ASTM E-84-88) shall be installed on the outside surface of the insulation All ducts and plenums that are internally lined with insulation outside the heated space shall be installed in accordance with SMACNA's Duct Liner Application Standard, Second Edition. The total R-value of this duct work shall be no less than R All flexible HVAC ducts outside the heated space shall have an Air Diffusion Council (ADC) certified minimum R-value of R All HVAC ducts routed within exterior wall cavities shall be insulated to a minimum of R-8 between the duct and the exterior wall sheathing All duct insulation shall be installed and supported using mechanical fasteners such as permanent plastic straps or nylon twine. Tape is not a mechanical fastener and shall not be used as such. Approved tape may be used at insulation seams to provide a continuous vapor barrier. Page 10 of 22

11 Air Tightness All HVAC supply and return ducts, air handlers, and plenums inside and outside the heated space shall be sealed at all joints and corners, including prefabricated joints, with approved mastic. UL181A-M or UL181B-M mastic shall be used on rigid metal ducts. UL 181B-M mastic shall be used on flex ducts. It is unnecessary to seal longitudinal seams unless they are damaged. Tape of any kind is not allowed except for use on operable doors in the system such as on the air handler System Air Filter Air filters shall be installed in the return air system in a location that will be easily accessible to the user for filter servicing and in a position where all return air and outside air will pass through the filters before crossing the indoor coil or heat exchanger. Filters should not be installed in crawl spaces or attics without ready access via a door to conditioned space or a pull-down ladder. Page 11 of 22

12 CHAPTER 5. VENTILATION AND AIR QUALITY 5.1. Moisture Vapor Transfer: The following shall be installed to limit moisture transfer: General A vapor retarder of not more than 1.0 perm shall be installed in, or applied to, exterior walls, ceilings, and floors. It shall be installed according to the manufacturer's specifications, on the warm side (in winter) of all insulation. The retarder shall be considered to be on the warm side if the R-value of the materials between it and the heated space is not more than 33 percent of the total R-value of the component section at the insulated cavity Slab Floors Slab floors shall have a minimum of 4 inches of sub-slab gravel meeting ONE of the following requirements: 1. ASTM Standard C33, "Standard Specifications for Concrete Aggregates," or any successor standards, and shall be size Number 67 or larger size aggregate as listed in Table 2, Grading Requirements for Coarse Aggregates; or, 2. the 1988 Washington State Department of Transportation specifications (3), "Coarse Aggregate for Portland Cement Concrete," or any successor standards, and aggregate size shall be of Grade 5 or larger size aggregate as listed in (c), "Grading;" or, 3. is screened, washed, free of deleterious substances in a manner consistent with ASTM C33, with 100 percent of the gravel passing a 1-inch sieve and less than 2 percent passing a #4 sieve. Sieve characteristics shall conform to those acceptable under ASTM C Crawlspace Ground Cover In crawlspaces, a ground moisture barrier of 6-mil black polyethylene, or equal approved by the utility, shall be installed covering the entire ground surface of the crawlspace Attic and Crawlspace Ventilation Outdoor air ventilation shall be provided in the following places, at the following rates: Attics/Ceilings Adequate cross ventilation shall be maintained above all ceiling insulation by providing both low and high vents. At least 1 ft 2 of net-free vent area shall be provided for every 300 ft 2 of ceiling area with 50-to-60 percent of the vent area located near the roof ridge and 40-to-50 percent located near the eaves. One-level venting may be used if at least 1 ft 2 of net-free vent area is provided for every 150 ft 2 of ceiling area and adequate cross ventilation can be maintained Unconditioned Crawlspaces Unconditioned crawlspaces shall be ventilated by openings in at least two opposing exterior foundation walls with a net-free vent area of not less than 1 ft 2 for each 150 ft 2 of underfloor area. Where local code allows, this ventilating area may be reduced to 1 ft 2 for every 300 ft 2 of underfloor area if the crawlspace soil is dry, well drained and a ground cover meeting the provisions of has been installed. Where allowed by code, mechanical ventilation of 2 ACH or higher is acceptable. Page 12 of 22

13 5.3. Mechanical Ventilation Whole-house ventilation systems, which include exhaust-air fans and outside-air intakes, are required and shall be designed and controlled to provide adequate ventilation for the occupants while minimizing energy penalties. Whole-house ventilation systems shall use remotely-mounted exhaust fans (i.e. more than 4-feet from the pick-up grille) or surface-mounted fans (i.e. exhaust fan motors within 4-feet of the pick-up grille). Surface-mounted fans shall have a sone rating of 1.5 or less for intermittently-operating systems and 1.0 or less for continuously-operating systems. Both remotely and surface-mounted fans shall be installed to limit the transmission of fan vibrations to the building structure. Intermittently-operating whole-house ventilation fans shall be controlled by 24-hour timers, with a minimum of 2 on-periods per day, and shall be set to operate for a minimum of 8 hours per day. The four general system designs are: 1. Integrated Spot and Whole-House Design: This system uses one or more exhaust fans to provide spot and whole-house ventilation. The fan(s) is controlled by both a manual switch, crank timer, or dehumidistat in the bathroom for spot ventilation AND a 24-hour timer to provide whole-house ventilation. 2. Continuous Ventilation: This system uses a continuously-operating fan to exhaust air at a minimum rate of 25 cfm for the kitchen and 20 cfm per bathroom, with a maximum rate of 0.5 ACH. A fan exhausting air from the kitchen and from each bathroom also provides spot ventilation. An integrated spot and whole-house fan is acceptable if spot ventilation is also provided for the kitchen and for all bathrooms. 3. Discrete Spot and Whole-House Design: This system uses separate exhaust fans and control systems to provide spot and whole-house ventilation. Spot Ventilation is provided by standard bath fans controlled by a manual switch, crank timer or dehumidistat, and a kitchen range hood. Whole-house ventilation is provided by a fan, controlled by a 24-hour timer that exhausts air from a central hallway near the bedrooms. 4. Forced-Air Heating/Cooling System Integrated Design: In this system, the forced-air heating/cooling system is used to bring outside air into the return-air plenum and distribute it through the supply ducts. Spot ventilation is provided by bathroom and kitchen exhaust fans A 24-hour timer, controls the heating/cooling system air handler, a motorized damper in the outside-air supply duct, and an exhaust fan to provide ventilation and to reduce building pressurization. An outside-air supply duct meeting the diameter and length requirements in section , is connected to the return-air plenum within 36 inches of the air handler. The outside-airflow is controlled by a balancing damper or constant airflow regulator in the outside-air supply duct to meet the airflow specified in section Exhaust Air Flow Rates Exhaust air flow rates shall meet either the following Performance or Prescriptive requirements. Performance Path: The minimum combined measured airflow capacity for whole-house exhaust systems shall be 0.35 ACH, but not less than 15 cfm per bedroom and 15 cfm for the main living area. The maximum ventilation rate for non-heat recovery ventilation systems shall not exceed 0.5 ACH for houses of 1400 ft 2 or larger or 0.65 ACH for houses smaller than 1400 ft 2. Prescriptive Path: Whole-house ventilation systems that do not meet the performance path shall meet the HVI certified fan flow requirements, minimum duct diameters, and maximum duct lengths listed in this section. Page 13 of 22

14 TABLE D: Single Family Intermittent Ventilation Minimum Certified Number of Bedrooms Fan Flow at 0.25 in W.G. 2 or less 50 cfm 75 cfm 3 80 cfm 120 cfm cfm 150 cfm cfm 180 cfm Maximum Certified Fan Flow at 0.25 in W.G. Fans shall be certified by HVI at 0.25 inches water gauge as determined by HVI 916. The following table gives the minimum duct diameter, maximum duct length and maximum number of elbows for smooth ducts or 90 degree bends in flexible ducts based upon fan size. TABLE E: Exhaust-Fan Duct Length vs. Diameter FLEX DUCT FAN TEST Flex Maximum Max CFM Duct W.G. Diameter Feet SMOOTH DUCT Smooth Maximum Duct Length Diameter Feet 50 4" 25 4" " 90 5" " No limit 6" No limit " Not allowed 4" " 15 5" " 90 6" No limit " Not allowed 5" " 45 6" No limit " 15 6" No limit " 70 7" No limit 3 *Subtract 10-feet from the maximum duct length for each additional elbow Exhaust-Duct Insulation All exhaust ducts in unheated spaces shall be insulated to at least R Exhaust Duct Termination Exhaust ducts shall terminate outside the residence in a fitting with an area not less than the area of the duct. MAXIMUM # 90 Elbows* Spot Ventilation Spot ventilation fans, ducted to the outside of the envelope and meet the minimum capacities listed in the following table. The fan shall be certified at 0.25 inches of water gauge as determined by HVI 916 (July 1993). Kitchen range hoods or down-draft range exhaust fans may be rated at 0.1 inches of water gauge. TABLE F: Spot-Ventilation Fan Capacity Location Certified Fan Capacity Each bathroom Kitchen 50 cfm 100 cfm Exception: Separate spot ventilation is not required for a continuously-operating system which exhausts 25 cfm from the kitchen and 20 cfm from each bathroom. Page 14 of 22

15 Page 15 of Backdraft Dampers A tight-fitting backdraft damper, capable of closing when intermittently-operating fans are not in use, shall be provided in each exhaust duct Controls Intermittently-operating, whole-house exhaust fans shall have both automatic and manual controls. Automatic controls shall include a time clock or cycle timers with a minimum of two on-periods per day and be set to provide at least 8 hours of mechanical ventilation per day. A manual override switch accessible to, and controllable by, occupants allows occupants to run the fan continuously or disable it if desired. The spot and whole-house ventilation controls may be wired in parallel, allowing the same fan to perform both functions. A whole-house exhaust fan, for example, may be wired to both the manual spotventilation switch in the bathroom and to a time clock Outside-Air Supply The outside-air may be supplied by either of the following the requirements: 1. Fresh-Air Inlets: Individual outside-air inlets shall: be located to avoid drafts, have a controllable and secure opening, be sleeved or otherwise designed to prevent compromising the thermal integrity of the wall or window into which it is placed, and provide a total opening area of at least 4 in 2 of net-free area or be HVI certified to provide 10 cfm at 10 Pascals for each bedroom and for each 300 ft 2 of combined living area. 2. Central Outside-Air Duct: A central duct providing outside-air directly to the return plenum of a forced-air heating/cooling system which circulates fresh air to the required rooms (used with Forced Air Heating/Cooling System Integrated Design). This duct shall have a motorized damper and a flow-control device to provide a supply airflow equal to the exhaust airflow rates specified in section Duct diameter and length shall meet the following requirements: TABLE G: Option 4 Air-Inlet Duct Length vs. Diameter Minimum Number Of Bedrooms Smooth Duct Diameter Minimum Flex Duct Diameter Maximum Duct Length 1/ 2 or less 6" 7" 20 ft 3 3 7" 8" 20 ft 3 4 or more 8" 9" 20 ft 3 1/ For lengths over 20-feet, increase the duct diameter by 1-inch. 2/ For more than 3 elbows, increase the duct diameter by 1-inch. Maximum Number of Elbows 2/ Outside-Air Source The outside-air shall come from outside the building envelope and shall not be taken from the following locations: within 10-feet of an exhaust vent or combustion appliance flue outlet unless the vent/outlet is at least 3-feet above the air inlet where it will pick up objectionable odors, fumes, or flammable vapors a hazardous or unsanitary location a room or space containing any fuel-burning appliance within 10-feet of a plumbing vent unless the vent is at least 3-feet above the air inlet attics, crawlspaces, or garages

16 The outside-air source shall have adequate protection from entry by rain, insects, leaves, and other objects. The outside-air source shall limit excessive airflows under normal operation Outside-Air Distribution Adequate outside-air distribution shall be provided by individual room inlets, separate duct systems, or a forced-air system. Where outside-air supplies are separated from the exhaust points, undercut doors, door or wall grilles, transoms grilles, or other approved means shall be provided to allow air circulation between spaces Formaldehyde Reduction Measures All structural panel components of the house such as softwood plywood, particle board, wafer board, and oriented strand board shall be identified as "EXPOSURE 1," "EXTERIOR," or "HUD-Approved." Page 16 of 22

17 CHAPTER 6. LIGHTING AND APPLIANCES 6.1. Lighting All qualified homes shall have a minimum of 90% of all internal and external lighting sockets employing ENERGY STAR compact fluorescent lamps, or ENERGY STAR fixtures, or some combination of ENERGY STAR lamps and ENERGY STAR fixtures Qualified Products All energy efficient lighting products installed for the purpose of meeting the requirements of 7.1 shall be listed as ENERGY STAR qualified and labeled. Visit the ENERGY STAR Web site at to determine qualified bulbs, lamps, fixtures and ceiling fans Appliances All built-in appliances in qualified homes must be listed as ENERGY STAR qualified and labeled. Dishwashers are the only typical built-in appliance within an ENERGY STAR product category. It is recommended that ENERGY STAR labeled products also be considered for any non-built-in appliances provided as part of the new construction process Qualified Products All energy efficient appliance products installed for the purpose of meeting the requirements of 7.2 shall be listed as ENERGY STAR qualified and labeled. Visit the ENERGY STAR Web site at to determine qualified and labeled appliances. Page 17 of 22

18 APPENDIX PERFORMANCE TESTING PROTOCOLS Page 18 of 22

19 SECTION 1. BLOWER DOOR AIR LEAKAGE TESTING Scope: This Appendix describes the blower door test protocol for testing the air-leakage of a single family house. When to Test: Testing in new construction shall occur after everything is roughed-in/ installed that will penetrate the building envelope (e.g., plumbing, electrical, HVAC, ventilation, combustion appliances, etc.) and the air barrier has been installed. House/Residence Preparation: Homes shall be checked before testing to assure that following preparation measures have been completed: All windows and doors shall be properly closed, including pass-through wood-box doors and pet doors. All interior doors shall be left open. Water plumbing drains with p-traps that may be empty shall be sealed or filled. All exhaust fan openings, vent openings, and intake-air vents with backdraft dampers (e.g., dryer vents and kitchen, bathroom, utility room, whole-house, range vents, etc.) shall NOT be sealed. Open dryer exhaust ducts with no dryer installed shall be left un-sealed. Exterior vent openings without backdraft dampers that are part of a continuous ventilation system shall be temporarily sealed for the test. Heat recovery ventilator supply openings shall be sealed. Heat recovery ventilator exhaust openings without backdraft dampers shall not be sealed. Supply and return registers shall NOT be sealed and the heating system shall be turned off. HVAC ducts shall be tested with the envelope. Dampers in the outside-air supply duct into the return plenum shall be left as-is. All flue dampers, fireplace doors, and wood burning stove doors shall be closed, but NOT sealed. Leave any combustion air ducts or louvers to the exterior open. (If a homeowner or builder has sealed them off, open them for the test.). Operable crawl-space vents, where present, are to be left in the open position. Equipment Set-up: Blower door equipment shall be set-up using the procedure described by the instrument manufacturer. It is assumed that most tests will be performed with a digital pressure gauge. If magnahelic gauges are used, special attention must be paid to ensuring gauges are at room temperature and that gauge hysterisis has been reduced or eliminated through proper procedures (described in product literature). When setting up the reference (outside) pressure measurement location and input (inside) location, make sure the end of each hose is not in the air stream of the blower door. Use of a static pressure tap is recommended. Performing the Test: Measure the pressure in the house with respect to outside before testing is begun to get the baseline offset. If using the newest digital pressure gauges, this correction may be done automatically. If not using the newest gauge, record the baseline offset before proceeding. Run the test in depressurization mode. (Make sure the house is at a lower pressure WRT outside when running the test.) Perform the test using the following procedures: 1. Depressurize the house to about 50 Pascals WRT outside. 2. Look at the blower door fan pressure. If fan pressure is less than 30 Pa, switch to a more restrictive ring. 3. Record fan pressure and flow. 4. Repeat test at 25 Pa. NOTE: If wind is a problem, use 5 or 10 second gauge averages or even long term averages. Error Checking: It is highly recommended that the technician check the validity of the test. The quick method to do this, assuming that the higher test pressure (around 50 Pa) is very close to twice the lower test pressure (around 25 Pa), is to Page 19 of 22

20 confirm that the lower test flow is about 0.6 x the higher test flow. That is, if the CFM50 is about 2000 CFM, the CFM25 is about 1200 CFM. If this relationship does not hold to within 10%, the test should be repeated. Page 20 of 22

21 SECTION 2. COMBUSTION APPLIANCE ZONE PRESSURE TESTING Scope: This test is required whenever a vented combustion appliance used for primary space or water heating is present within a building. (Decorative wood or gas fireplaces or stoves are not subject to this test.) A Combustion Appliance Zone (CAZ) is any zone in the house that contains a combustion appliance. CAZs need not be heated. The test measures the magnitude of any air handler- induced pressure effects within the combustion appliance zone. A zone with a sealed combustion appliance that has an isolated combustion path preventing mixing of room air and combustion air is not considered a CAZ. Depressurization of a combustion appliance zone by more than 3 Pascals with reference to outside is considered a potential hazard and mitigation should be performed (by adding pressure relief paths or other means). Depressurization of a CAZ by more than 15 Pa is the hazard threshold for induced-draft (power vented) appliances. A micro manometer is required to perform this test. Set Up: Set up the house for normal heating season operation with all exterior doors and windows closed. Turn off all exhaust devices including clothes dryer, bathroom fans, kitchen fan, central vacuum, and whole house ventilation systems. Open all return and supply registers. Turn off combustion devices so that they will not operate during the test (except furnace if air handler will not operate at high speed without the furnace firing). Remove furnace filters. Shut off any outside ventilation air to the duct system if it can normally be shut off during air handler operation. Close manual flue dampers Step 1: Identify zone(s) with the combustion appliance(s). These are referred to as combustion appliance zones (CAZs). If furnace and/or water heater are in the garage, the garage is the CAZ. You may need to do a separate test on each zone if you suspect problems. Note CAZ tested (usually main body of house or garage). There may be more than one: Step 2: Measure the baseline pressure. Place one end of the measuring tube outside the house, and attach the other end to the reference tap on the pressure gauge. An extra long hose is very handy for this test. Leave the input port open to read pressure inside the CAZ. Record the gauge pressure Pa. If there is wind, switch to longer-term average reading. Step 3: Turn on the air handler at the highest speed setting (either with fan switch or by turning on the heat). Step 4: Door set-up. Moving through the home, check the door position for each interior door. Close the door, and measure the pressure of the room with reference to the main body of the house. If the pressure is positive or zero, leave the door closed. If the pressure is negative, leave the door open. Note that this allows observation of the effectiveness of zonal pressure relief (section of the Standard). When all doors have been set up properly, record the gauge pressure in the CAZ: Pa. This is the air-handler induced pressure. If the CAZ is in the garage, go on to step 9. Page 21 of 22

22 If the reading is equal to or more negative than 3 Pa, there is a potential problem with atmospherically-vented appliances in the CAZ. If appliances are induced draft, a reading of -15 Pa or more negative indicates a potential problem. Next, do the worst case test (this is optional). This assumes that the CAZ is inside the house. Leave the air handler on. If CAZ is the garage, go to step 10. Step 5: Turn on exhaust fans that are in the CAZ. Step 6: Turn on fans located behind interior doors that were shut for step # 4. Step 7: Record the gauge pressure in the CAZ: Pa. This is the WORST CASE DEPRESSURIZATION number. Step 8: If worst case reading is equal to or more negative than 5 Pa, there is a potential problem if atmospherically-vented appliances are in the CAZ. If appliances are induced draft, a reading of -15 Pa or more negative indicates a potential problem. Step 9: If the CAZ is the garage, make sure air handler is off before beginning tests. Take pressure gauge to the garage. Measure garage pressure with respect to outside and record the pressure Pa. Use long-term averaging if needed (windy). Step 10: Turn on the air handler and record the gauge pressure Pa. Step 11: Any amount of depressurization (more negative number in Step 10 than in Step 9) indicates the potential for drawing garage air into the heating system. Look for return leaks. Step 12: Record any mitigation measures considered and/or undertaken. Page 22 of 22

EARTH ADVANTAGE HVAC REQUIREMENTS

EARTH ADVANTAGE HVAC REQUIREMENTS EARTH ADVANTAGE HVAC REQUIREMENTS Homes are performance tested by approved performance testing (PTCS) technicians to ensure systems and equipment work as designed. Technicians must follow the ENERGY STAR

More information

Ducted Heat Pump Program Equipment and Installation Specifications Site-Built and Manufactured Homes Exhibit A

Ducted Heat Pump Program Equipment and Installation Specifications Site-Built and Manufactured Homes Exhibit A Ducted Heat Pump Program Equipment and Installation Specifications Site-Built and Manufactured Homes Exhibit A 1.0 GENERAL REQUIREMENTS... 3 1.1 INTERPRETATION OF SHALL AND SHOULD... 3 1.2 INSTALLATION

More information

Snohomish County PUD #1 HEAT PUMP SYSTEM INSTALLATION STANDARDS

Snohomish County PUD #1 HEAT PUMP SYSTEM INSTALLATION STANDARDS Snohomish County PUD #1 HEAT PUMP SYSTEM INSTALLATION STANDARDS April 2018 Topic TABLE OF CONTENTS Pages A. INTRODUCTION 5 B. DEFINITIONS 5 1. Shall 5 2. Should 5 C. CUSTOMER ELIGIBILITY 5 1. Single Family

More information

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717)

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717) City of York Qdot Engineering 101 S. George St 116 E Gas Ave York, PA 17405 York, PA 17405 (717) 849-2329 (717) 744-8315 INSPECTION CHECKLIST Residential Mechanical 2009 Codes This checklist is intended

More information

Inspection Checklist Mechanical Rough in

Inspection Checklist Mechanical Rough in Property Owner Name: Property Address: Permit Number: Inspectors Name: Review Date: Permits and Plans 1. Job address is posted in a visible location. (R319.1) 2. Permit and approved plans are on site and

More information

Supplement A- Improving Forced Air Heating Systems

Supplement A- Improving Forced Air Heating Systems Supplement A Improving Forced Air Heating Systems The Challenge Recent research and testing of new homes in the Pacific Northwest and across the United States shows the importance of a properly installed

More information

ENERGY STAR Qualified Homes

ENERGY STAR Qualified Homes ENERGY STAR Qualified Homes HVAC SYSTEM QUALITY INSTALLATION RATER CHECKLIST 1 For Version 3 Part 2 of HVAC Quality Installation PRESENTED BY: Rocky Mountain Power wattsmart New Homes Program & Questar

More information

NAHB Green Home Building Guidelines. 3.1 Prerequisites. ResCheck. Energy Efficiency

NAHB Green Home Building Guidelines. 3.1 Prerequisites. ResCheck. Energy Efficiency NAHB Green Home Building Guidelines Energy Efficiency 3.1 Prerequisites 3.1.1 Home is equivalent to the IESS 2003 or local energy code. Conformance shall be based on plan analysis using software. 3.1.2

More information

Inspection Checklist Residential Mechanical Rough In July 2016

Inspection Checklist Residential Mechanical Rough In July 2016 Inspection Checklist Residential Mechanical Rough In July 2016 This Inspection Checklist reflects code requirements of the 2015 International Residential Code (IRC), the 2015 Uniform Plumbing Code (UPC),

More information

2015 MECHANICAL CODE REQUIREMENTS

2015 MECHANICAL CODE REQUIREMENTS 2015 MECHANICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Mechanical requirements for residential buildings per

More information

MBPA Home Performance FIELD DATA COLLECTION FORM

MBPA Home Performance FIELD DATA COLLECTION FORM MBPA Home Performance FIELD DATA COLLECTION FORM Customer Information Test Date: Name Address City State Zip Phone: ( ) Email: Electric Provider Heating Fuel Provider Account Number Account Number Customer

More information

Ventilation for New Low-Rise Residential Buildings July 20, 2015

Ventilation for New Low-Rise Residential Buildings July 20, 2015 Ventilation for New Low-Rise Residential Buildings July 20, 2015 BSC Standard 01 2015 Building Science Corporation 3 Lan Drive, Suite 102 Westford, MA 01886 www.buildingscience.com Contents 1. PURPOSE...3

More information

Equipment Specifications and Required Information Quantity Rebate

Equipment Specifications and Required Information Quantity Rebate Rebate not to exceed 50% of the cost of equipment. Recycling rebates qualify for the entire rebate, regardless of the recycling cost. Equipment must be purchased or recycled in 2016. Installed equipment

More information

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances Rebate not to exceed cost of high efficiency equipment. Equipment must be purchased or recycled in 2015. Installed equipment must be on cooperative's lines. Submit the documentation listed below no later

More information

SAFETY AND INSTALLATION MANUAL MODEL 8100

SAFETY AND INSTALLATION MANUAL MODEL 8100 SAFETY AND INSTALLATION MANUAL ENERGY RECOVERY VENTILATORS MODEL 8100 Provides year-round fresh air Recovers 77% of the apparent heating or cooling energy from the exhausted air See Warnings Page 3 Table

More information

HVAC Equipment Access Equipment Location

HVAC Equipment Access Equipment Location City of Lancaster- Building Department 121 East Chestnut Street, Suite 102, Lancaster, Ohio 43130-3825 (740) 687-6649, Fax (740) 681-5030 Web site: www.ci.lancaster.oh.us/dept/building HVAC Heating, Ventilating,

More information

Chapter 7: Heating and Cooling Systems

Chapter 7: Heating and Cooling Systems [302.2.1] [302.1] Chapter 7: Heating and Cooling Systems Design Conditions The Washington State Energy Code sets the following conditions for heating system design and equipment sizing: Indoor Design Temperature:

More information

NEW HOME CERTIFICATION PROGRAM 2018 PROGRAM GUIDE

NEW HOME CERTIFICATION PROGRAM 2018 PROGRAM GUIDE NEW HOME CERTIFICATION PROGRAM 2018 PROGRAM GUIDE Focus on Energy, Wisconsin utilities statewide program for energy efficiency and renewable energy, helps eligible residents and businesses save energy

More information

RESNET HERS Rater Sample Test Questions 2

RESNET HERS Rater Sample Test Questions 2 RESNET HERS Rater Sample Test Questions 2 1. Which of the following is the best device for removing standing water from a crawl space? A. Dehumidifier B. Sump pump C. Air-to-air heat exchanger D. Crawl-space

More information

SnuggPro DATA COLLECTION FORM

SnuggPro DATA COLLECTION FORM SnuggPro DATA COLLECTION FORM Section 1: General Information Trade Ally: Trade Ally Telephone: Trade Ally Email: Auditor Name: Auditor Telephone: Auditor Email: Home Owner Name: Home Owner Telephone: Home

More information

State of ALASKA, Weatherization Assistance Program. Technical Support Document. Combustion Safety

State of ALASKA, Weatherization Assistance Program. Technical Support Document. Combustion Safety 5.3.1A(2) Page 1 of 2 State of ALASKA, Weatherization Assistance Program Technical Support Document Combustion Safety This document is intended to support in detail the Combustion Safety Test Report. The

More information

Illinois Home Weatherization Assistance Program - Field Standards Manual

Illinois Home Weatherization Assistance Program - Field Standards Manual Illinois Home Weatherization Assistance Program - Field Standards Manual Contents 100 Diagnostic Standards 111 Blower Door 1111 House Set-Up 11111 Basements 1112 Blower Door Test 11121 Building Tightness

More information

Inspection Checklist Mechanical Final

Inspection Checklist Mechanical Final Property Owner Name: Property Address: Property Parcel Number: Inspectors Name: Review Date: Permits and Plans 1. Job address is posted in a visible location. (R319.1) 2. Permit and approved plans, and

More information

Energy Effcient Home Construction

Energy Effcient Home Construction Energy Effcient Home Construction TABLE OF CONTENTS ENERGY SAVINGS - TWO PLANS... 1 REQUIRED FEATURES CHART... 2 THE ELECTRIC HEAT PUMP... 4 ELECTRIC HEATING COST CHART... 5 AIR SEALING... 6 INSULATION...

More information

Objectives. Home Performance Diagnostics with the House of Pressure (Part 1) How can Pressure effect Building Performance?

Objectives. Home Performance Diagnostics with the House of Pressure (Part 1) How can Pressure effect Building Performance? Home Performance Diagnostics with the House of Pressure (Part 1) Objectives Learn the basic rules of air flow and differences Begin to be able to recognize building problems related to airflow and differences

More information

Installation Instructions

Installation Instructions FAVXXR6C2100-A01 Vent Damper and Control Installation Instructions FAMILIARIZE YOURSELF WITH THE INSTALLATION INSTRUCTIONS BEFORE STARTING ATTENTION INSTALLER: This product must be installed by a qualified

More information

2009 Washington State Energy Code Residential Sections

2009 Washington State Energy Code Residential Sections 2009 Washington State Energy Code Residential Sections Gary Nordeen, Luke Howard, Emily Salzberg (360) 956-2042 energycode@energy.wsu.edu Produced with funding from: 1 WSEC text Washington State University

More information

Pro Eco-Energy. Home Assessment

Pro Eco-Energy. Home Assessment Pro Eco-Energy Home Assessment Prepared for: Prepared by: Pro Eco Energy Andrew Aliferis PO Box 445 Scotland, PA 17254 717-446-0575 ABOUT THIS REPORT Your in-home evaluation was conducted on 2/12/2013.

More information

BALTIMORE GAS AND ELECTRIC COMPANY (BGE) Home Performance with ENERGY STAR Program. Rebate and Incentive Instructions

BALTIMORE GAS AND ELECTRIC COMPANY (BGE) Home Performance with ENERGY STAR Program. Rebate and Incentive Instructions Rebate and Incentive Instructions Contents Application Instructions... 1 Rebate Requirements Summary... 2 Comprehensive Home Energy Audit (CHEA) Rebate... 4 Air Sealing and Insulation Rebate... 4 Air sealing...

More information

Home Energy Savings Program. Wyoming HVAC Trade Ally Manual

Home Energy Savings Program. Wyoming HVAC Trade Ally Manual Home Energy Savings Program Wyoming HVAC Trade Ally Manual Version 2.0 February 16, 2015 Table of Contents Glossary... 2 Version History... 3 Existing Single Family Homes Incentives... 5 Central Air Conditioner

More information

Home Energy Savings Program. Utah HVAC Trade Ally Manual

Home Energy Savings Program. Utah HVAC Trade Ally Manual Home Energy Savings Program Utah HVAC Trade Ally Manual Version 2.0 October 24, 2014 Table of Contents Glossary... 2 Version History... 3 Existing Single Family Homes Incentives... 6 Central Air Conditioner

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION CHAPTER 23.20 LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION SECTIONS 23.20.100 Local Amendments To The International Mechanical Code, 2000 Edition 23.20.202 Definitions 23.20.301.14

More information

Indoor Environmental Quality

Indoor Environmental Quality The average person spends about 90% of their time indoor, a significant amount of time. Therefore, it is essential that houses provide a healthy and comfortable interior living environment. Conditions

More information

BUILDING PERFORMANCE INSTITUTE TECHNICAL STANDARDS

BUILDING PERFORMANCE INSTITUTE TECHNICAL STANDARDS BUILDING PERFORMANCE INSTITUTE TECHNICAL STANDARDS FOR THE BUILDING ANALYST PROFESSIONAL Health and Safety All technicians performing diagnostic tests, inspections, or installations, must have access to

More information

LEED for Homes V4 Provisional Alternative Compliance Paths for the Canadian market March, 2017

LEED for Homes V4 Provisional Alternative Compliance Paths for the Canadian market March, 2017 LEED for Homes V4 Provisional Alternative Compliance Paths for the Canadian market March, 2017 Note: These provisional ACPs may be used by registered LEED v4 Homes and Midrise projects until official ACPs

More information

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM # ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM DETAIL Labor Material FURNACE COMPONENTS 1 Furnish & Install Sight-Impaired Thermostat For Heating and Cooling

More information

Put the V back in HVAC

Put the V back in HVAC Put the V back in HVAC V is for Ventilation A system or means of providing fresh air. Webster New Collegiate Dictionary Benjamin Franklin so unwholesome as air in a closed room that has been often breathed

More information

ENERGY STAR Homes Northwest Performance Testing Field Guide

ENERGY STAR Homes Northwest Performance Testing Field Guide ENERGY STR Homes Northwest Performance Testing Field Guide Cover photos Left, center: Conservation Services Group, Inc.; Right: The Energy Conservatory. Used with permission. cknowledgements cknowledgments

More information

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used by

More information

BPI ANALYST ENVELOPE AUDIT FIELD EXAM CHECKLIST

BPI ANALYST ENVELOPE AUDIT FIELD EXAM CHECKLIST BPI ANALYST ENVELOPE AUDIT FIELD EXAM CHECKLIST 1. Pre-Inspection Homeowner Interview (3 minutes) A. Turn on & zero CO Meters. Determine ambient CO : B. Record Outside Temperature: C. Homeowner interview:

More information

Home Performance Science

Home Performance Science Home Performance Science Symptoms of a Sick House Too hot/too cold rooms Respiratory problems Headaches/nausea Smoky fireplace Foggy windows Stuffy air and lingering odors Peeling paint Constant dust problems

More information

SH, VH & SE Models. SH, VH & SE Series Heat & Energy Recovery Ventilators IMPORTANT - PLEASE READ THIS MANUAL BEFORE INSTALLING UNIT

SH, VH & SE Models. SH, VH & SE Series Heat & Energy Recovery Ventilators IMPORTANT - PLEASE READ THIS MANUAL BEFORE INSTALLING UNIT SH, VH & SE Series Heat & Energy Recovery Ventilators IMPORTANT - PLEASE READ THIS MANUAL BEFORE INSTALLING UNIT CAUTION - Before installation, careful consideration must be given to how this system will

More information

Ventilation BCBC 9.32 & Richard Kadulski Architect

Ventilation BCBC 9.32 & Richard Kadulski Architect Ventilation BCBC 9.32 & 9.36.3.9 2014 1 9.32 Ventilation - Changes Exhaust only ventilation no longer acceptable New Principal Fan Sizing Table Ventilation air must be distributed to each bedroom and a

More information

SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017

SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017 SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017 The Residential Energy Code Worksheet is a tool to help you plan your energy code needs for new or remodeled homes,

More information

DUCT SYSTEMS CHAPTER 6

DUCT SYSTEMS CHAPTER 6 SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter except as otherwise

More information

Chapter Eight RESNET Standards

Chapter Eight RESNET Standards Chapter Eight RESNET Standards Effective Date This chapter goes into effect on January 3, 2012 800 RESNET Standard for Performance Testing and Work Scope: Enclosure and Air Distribution Leakage Testing

More information

EnergyMeasure HOME DATA COLLECTION FORM

EnergyMeasure HOME DATA COLLECTION FORM EnergyMeasure HOME DATA COLLECTION FORM Section 1: General Information Customer Name: Site ID: Assessment Date: Street Address: City: State: Zip Code: Alternate Address: City: State: Zip Code: Telephone

More information

Mechanical Appliance and Equipment Inspection Checklist

Mechanical Appliance and Equipment Inspection Checklist 34 2015 IRC Performing Residential Mechanical s Mechanical Appliance and Equipment Checklist Inspect Mechanical Appliance and Equipment Comments / I. Identify possible mechanical appliance and equipment

More information

Installation Guide. Dehumidification. Fresh Air Ventilation. Compact Size. Energy Efficient. RXID-AW90A Whole House Dehumidifier

Installation Guide. Dehumidification. Fresh Air Ventilation. Compact Size. Energy Efficient. RXID-AW90A Whole House Dehumidifier RXID-AW90A Whole House Dehumidifier with fresh air ventilation Installation Guide Dehumidification Fresh Air Ventilation Compact Size Energy Efficient The whole house dehumidifier integrates highcapacity

More information

IMC Significant Changes Summary Tier I

IMC Significant Changes Summary Tier I 2009-2015 IMC Significant Changes Summary Tier I 202 Environmental Air The definition of environmental air has been expanded through the addition of parking garage exhaust. 306.1 Access More than just

More information

The Art of Building Science

The Art of Building Science The Art of Building Science What is Building Science? Building Science seeks to apply the scientific fundamentals of building dynamics to the functional relationships between the house s components and

More information

AUTOMATIC MAKE-UP AIR DAMPER WITH TRANSFORMER READ AND SAVE THESE INSTRUCTIONS

AUTOMATIC MAKE-UP AIR DAMPER WITH TRANSFORMER READ AND SAVE THESE INSTRUCTIONS AUTOMATIC MAKE-UP AIR DAMPER WITH READ AND SAVE THESE INSTRUCTIONS FOR RESIDENTIAL USE ONLY Page 1 WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS, OBSERVE THE FOLLOWING: 1. Installation

More information

Heat or Energy Recovery Ventilation System

Heat or Energy Recovery Ventilation System INSTALLATION MANUAL Heat or Energy Recovery Ventilation System MODELS: FC80 HRV & FC80 ERV This device MUST be installed by a qualified agency in accordance with the manufacturer's installation instructions.

More information

Uniform Dwelling Code 2017 Updates SPS 323

Uniform Dwelling Code 2017 Updates SPS 323 Uniform Dwelling Code 2017 Updates SPS 323 Lenny Kanter UDC Engineering Consultant Department of Safety and Professional Services 608 261 6541 voice 608 267 9723 fax robert.kanter@wi.gov Plan Review and

More information

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA CITY OF DANA POINT COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248 3594 www.danapoint.org INDOOR AIR QUALITY B011 AIR 2013 CALIFORNIA CODES CODE

More information

RESNET National Conference New Orleans, LA. February 16, 2009 Presented by Rich Moore Invisible Energy Denver, CO

RESNET National Conference New Orleans, LA. February 16, 2009 Presented by Rich Moore Invisible Energy Denver, CO RESNET National Conference New Orleans, LA. February 16, 2009 Presented by Rich Moore Invisible Energy Denver, CO rgalenmoore1@msn.com This session will address the basics of combustion and the latest

More information

wattsmart New Homes Contractor-Certified HVAC Quality Assurance (HVAC-QI)

wattsmart New Homes Contractor-Certified HVAC Quality Assurance (HVAC-QI) Contractor-Certified HVAC Quality Assurance (HVAC-QI) HVAC Quality Assurance (HVAC-QI) Checklists The following checklists are required, with all applicable items completed and checked, including final

More information

Residential New Home Construction Checklist

Residential New Home Construction Checklist Residential New Home Construction Checklist A separate permit is required for each address. Address/PID: All materials and the installation of all materials must comply with the Minnesota State Building

More information

NC Mechanical Code. Land Use and Environmental Service Agency (Code Enforcement) Table of Contents

NC Mechanical Code. Land Use and Environmental Service Agency (Code Enforcement) Table of Contents Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Exhaust Systems Chapter 7 Combustion Air Chapter 9 Specific Appliances Chapter 11 Refrigeration Chapter 13 Fuel Oil Piping POLICY Table

More information

Duct Leakage, Sealing & Testing

Duct Leakage, Sealing & Testing Duct Leakage, Sealing & Testing Massachusetts Energy Code Technical Support Program 1 Who Is Mass Save? Mass Save is an initiative sponsored by Massachusetts gas and electric utilities and energy efficiency

More information

SECTION DUCTWORK

SECTION DUCTWORK PART 1 GENERAL 1.1 REFERENCES SECTION 23 31 00 DUCTWORK A. ASHRAE - Handbook, Duct Design B. ASHRAE - Handbook, Duct Construction C. ASTM A90/A90M - Standard Test Method for Weight (Mass) of Coating on

More information

In the past, contractors sized heating and cooling systems GETTING HVAC RIGHT

In the past, contractors sized heating and cooling systems GETTING HVAC RIGHT GETTING HVAC RIGHT Calculating loads is just the first step. For a trouble-free system that s long on comfort, you need to specify the equipment, design the ductwork, and make certain everything is correctly

More information

SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT

SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT CHAPTER 9 SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT SECTION 901 GENERAL 901.1 Scope. This chapter shall govern the approval, design, installation, construction, maintenance, alteration

More information

Building Division WSEC & IRC Ventilation (Effective July 1, 2016) Residential Buildings Prescriptive Compliance Form

Building Division WSEC & IRC Ventilation (Effective July 1, 2016) Residential Buildings Prescriptive Compliance Form Residential Please Energy & Submit IRC Ventilation two (2) Prescriptive copies Compliance Fm Effective 7-1-2016 (F hardcopy submittals: please submit 2 copies) Building Division 801 228 th Ave SE Sammamish,

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

C O D E S & A M M E N D M E N T S

C O D E S & A M M E N D M E N T S SEVIER COUNTY UTILITY DISTRICT SEPTEMBER 2, 2014 Sevier County Utility District has adopted the 2009 International Fuel Gas Code for gas inspections. The following pages contain frequently used codes and

More information

Technical Standards for the Air Conditioning and Heat Pump Professional BPI STANDARDS

Technical Standards for the Air Conditioning and Heat Pump Professional BPI STANDARDS Technical Standards for the Air Conditioning and Heat Pump Professional BPI STANDARDS THE SYMBOL OF EXCELLENCE FOR HOME PERFORMANCE CONTRACTORS VERSION 1.1, FEBRUARY 2003 TABLE OF CONTENTS: TECHNICAL STANDARDS

More information

Installation Instructions for Heat Recovery Ventilators with 2 Speed RNC Electronics. RNC Series. Residential Heat Recovery Ventilators (HRV)

Installation Instructions for Heat Recovery Ventilators with 2 Speed RNC Electronics. RNC Series. Residential Heat Recovery Ventilators (HRV) Installation Instructions for Heat Recovery Ventilators with 2 Speed RNC Electronics RNC Series Models RNC95 RNC155 RNC200 RNC10 RNC20 RNC120D RNC5-TPD Residential Heat Recovery Ventilators (HRV) Manufactured

More information

DUCT SYSTEMS CHAPTER 6

DUCT SYSTEMS CHAPTER 6 CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter

More information

2012 INTERNATIONAL FUEL GAS CODE VENTS

2012 INTERNATIONAL FUEL GAS CODE VENTS 2012 INTERNATIONAL FUEL GAS CODE SECTION 502 (IFGC) VENTS 502.1 General. All vents, except as provided in Section 503.7, shall be listed and labeled. Type B and BW vents shall be tested in accordance with

More information

Installation Instructions

Installation Instructions Installation Instructions PAM3 SERIES PACKAGE AIR CONDITIONERS TABLE OF CONTENTS SAFETY LABELING AND SIGNAL WORDS... 2 UNIT DIMENSIONS... 3 SAFE INSTALLATION REQUIREMENTS... 3 LOCATING THE UNIT... 3 CLEARANCES...

More information

Combustion Safety. RESNET Conference San Antonio, TX February 27, Presented by Rich Moore Lightly Treading Energy & Design Denver, CO

Combustion Safety. RESNET Conference San Antonio, TX February 27, Presented by Rich Moore Lightly Treading Energy & Design Denver, CO Combustion Safety RESNET Conference San Antonio, TX February 27, 2006 Presented by Rich Moore Lightly Treading Energy & Design Denver, CO Goals of this session Recognize the need for combustion safety

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:

More information

Ways to Save. Energy efficiency tips to help you lower your monthly power bill. 1 Ways To Save

Ways to Save. Energy efficiency tips to help you lower your monthly power bill. 1 Ways To Save Ways to Save Energy efficiency tips to help you lower your monthly power bill 1 Ways To Save 2 Ways To Save Money Saving Advice Jackson EMC is a good resource to use in your energy planning. We can show

More information

PLAN THE INSTALLATION Planning the installation first requires selecting the most appropriate installation approach. The chart below offers suggestion

PLAN THE INSTALLATION Planning the installation first requires selecting the most appropriate installation approach. The chart below offers suggestion AUTOMATIC MAKE-UP AIR DAMPER WITH To register this product visit: www.broan.com MODELS MD6T MD8T MD10T READ AND SAVE THESE INSTRUCTIONS FOR RESIDENTIAL USE ONLY Page 1 WARNING TO REDUCE THE RISK OF FIRE,

More information

INSTALLATION AND OPERATION MANUAL Model BR70/BR130

INSTALLATION AND OPERATION MANUAL Model BR70/BR130 INSTALLATION AND OPERATION MANUAL Model BR70/BR130 Units should be installed by properly licensed contractor(s) according to local code requirements. WARNING BR Unit (door closed) BR130 (Door Closed) BR

More information

Intermediate framed denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation.

Intermediate framed denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Pt Orchard, WA 98366 (360) 874-5533 permitcenter@cityofptchard.us RESIDENTIAL ENERGY CODE WORKSHEET

More information

New Jersey Home Performance with ENERGY STAR Home Performance Audit/ Software Data Collection-2011

New Jersey Home Performance with ENERGY STAR Home Performance Audit/ Software Data Collection-2011 New Jersey Home Performance with ENERGY STAR Home Performance Audit/ Software Data Collection-2011 Customer: Street: City: Zip: Phone: (Home): ( ) - Phone: (Work): ( ) - Owner: Yes No/ Name: Phone: ( )

More information

Notable Changes in the Mechanical Codes

Notable Changes in the Mechanical Codes Notable Changes in the Mechanical Codes July 2004 The following are some of the changes between the 1997 Uniform Mechanical Code and the 2003 International Mechanical Code(M) and the 2003 International

More information

Vent Supplement Ultra-80, -105, -155, -230 & -310

Vent Supplement Ultra-80, -105, -155, -230 & -310 Gas-fired water boiler Vent Supplement Ultra-80, -105, -155, -230 & -310 Installation of: Vent piping Air piping with This document must only be used by a qualified heating installer/service technician.

More information

Overview. Case Study 2008 Building America Prototype ICI Showcase House. Daytona Beach, Florida. Project Team: ICI Homes, Building Science Corporation

Overview. Case Study 2008 Building America Prototype ICI Showcase House. Daytona Beach, Florida. Project Team: ICI Homes, Building Science Corporation 008 /009Building America Prototype ICI Showcase House Case Study 008 Building America Prototype ICI Showcase House Daytona Beach, Florida Project Profile Overview Building Science Corporation (BSC) collaborated

More information

2017 Home Rebates Guidelines

2017 Home Rebates Guidelines 2017 Home Rebates Guidelines Updated: January 1, 2017 Effective: January 1, 2017 Version 1.1 1 2017 Home Rebates Guidelines To assist the Service Provider community in our area with its transition to a

More information

WAP Pressure Diagnostics Procedure. Page 1

WAP Pressure Diagnostics Procedure. Page 1 WAP Pressure Diagnostics Procedure Page 1 This document is meant to describe an overall procedure that will allow a WAP Energy Assessor to conduct a thorough blower door / manometer guided diagnostic assessment

More information

The 2018 Ventilation Extravaganza. Rick Karg Residential Energy Dynamics 2018

The 2018 Ventilation Extravaganza. Rick Karg Residential Energy Dynamics 2018 The 2018 Ventilation Extravaganza Rick Karg Residential Energy Dynamics 2018 Topics Multifamily Manufactured homes Equipment options Controls Ducting Low-cost strategies Best practices 2 Multifamily 3

More information

An Introduction to Energy Efficient and Effective Whole-House Ventilation

An Introduction to Energy Efficient and Effective Whole-House Ventilation 0 An Introduction to Energy Efficient and Effective Whole-House Ventilation 1 The 1973 energy crisis caused people to look for ways to reduce the cost of heating and cooling their homes. The building industry

More information

Ventilation. ASHRAE 62.2 COMPLIANCE How do we get there? Bruce Hagen ND Dept. of Commerce.

Ventilation. ASHRAE 62.2 COMPLIANCE How do we get there? Bruce Hagen ND Dept. of Commerce. Ventilation ASHRAE 62.2 COMPLIANCE How do we get there? Bruce Hagen ND Dept. of Commerce /NDCommerce /NDCommerce /NDCommerce /NDCommerce WHATS NEW IN ASHRAE 62.2 2016 Controls (Override) Shutoff for maintenance

More information

DUCT SYSTEMS CHAPTER 6

DUCT SYSTEMS CHAPTER 6 CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.3.0 Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: AHSC (Asian Heal Service Center

More information

FAQ. (Frequently Asked Questions) What is required to convert my unfinished basement to finished space?

FAQ. (Frequently Asked Questions) What is required to convert my unfinished basement to finished space? NEW CASTLE COUNTY DEPARTMENT OF LAND USE FAQ (Frequently Asked Questions) What is required to convert my unfinished basement to finished space? 1. To convert an unfinished basement to finished space, at

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2012 EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2012 EDITION CHAPTER 23.20 LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2012 EDITION Sections 23.20.100 Local amendments to the International Mechanical Code, 2012 Edition.... 2 23.20.101.2 Scope.... 2 23.20.103-110

More information

Land Use and Environmental Service Agency (Code Enforcement) NC Mechanical Code. Table of Contents

Land Use and Environmental Service Agency (Code Enforcement) NC Mechanical Code. Table of Contents Table of Contents Chapter 1 Administration Chapter 2 Definitions Chapter 3 General Regulations Chapter 4 Ventilation. Chapter 5 Exhaust Systems Chapter 6 Duct Systems Chapter 7 Combustion Air Chapter 8

More information

101 EASY WAYS TO SAVE ENERGY AND MONEY TOGETHERWESAVE.COM

101 EASY WAYS TO SAVE ENERGY AND MONEY TOGETHERWESAVE.COM 101 EASY WAYS TO SAVE ENERGY AND MONEY TOGETHERWESAVE.COM TOGETHERWESAVE.COM DO A LITTLE. SAVE A LOT. EVERYTHING YOU DO, NO MATTER HOW SMALL, CAN ADD UP TO BIG SAVINGS - FOR YOU AND YOUR NEIGHBORS. FROM

More information

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.0 GENERAL SECTION 15740 SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.01 DESCRIPTION Item A. Scope This section specifies four sizes of fan coil units designed for hydronic heating and air conditioning.

More information

Home Energy Audit. 170 Security Circle Suite 104 Athens, GA

Home Energy Audit. 170 Security Circle Suite 104 Athens, GA 170 Security Circle Suite 104 Athens, GA 30605 706-248-0821 Home Energy Audit Customer: John Customer Auditor: Brian Young BPI# 5015564 Address: 0000 Deer Run Drive Date: 08/17/2010 Type: Single Family

More information

City of Chanhassen. Site address. Ventilation Quantity (Determine quantity by using Table R or Equation R )

City of Chanhassen. Site address. Ventilation Quantity (Determine quantity by using Table R or Equation R ) City of Chanhassen 7700 Market Blvd. - PO box 147 - Chanhassen, MN 55317 Phone 952-227-1180 - Fax 952-227-1190 - Web www.ci.chanhassen.mn.us Ventilation, Makeup and Combustion Air Calculations Instructions

More information

Combustion Appliance Safety Testing Guidelines

Combustion Appliance Safety Testing Guidelines Combustion Appliance Safety Testing Guidelines This guide is intended to assist home performance contractors complete all combustion safety tests adequately and safely according to the Building Performance

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2006 EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2006 EDITION CHAPTER 23.20 LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2006 EDITION Sections 23.20.100 Local amendments to the International Mechanical Code, 2006 Edition... 2 23.20.101.2 Scope... 2 23.20.303.4

More information

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems 233100 AIR DISTRIBUTION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 230700 HVAC Insulation B. Section 237300 Air Handling C. Section 230900 Building Automation and Control System Guidelines D. Section

More information

Energy Saver 101: Home Energy Audits

Energy Saver 101: Home Energy Audits Energy Saver 101: Home Energy Audits Take the first step to improving your home s energy efficiency: get a home energy audit. What is a home energy audit? A home energy audit helps you pinpoint where your

More information

1 Exam Prep Energy Efficient Building Construction in Florida 8th Edition Tabs and Highlights

1 Exam Prep Energy Efficient Building Construction in Florida 8th Edition Tabs and Highlights 1 Exam Prep Energy Efficient Building Construction in Florida 8th Edition Tabs and s These 1 Exam Prep tabs are based on the Energy Efficient Building Construction In Florida, 8th Edition (with references

More information