1 Hot Tapping

2 Pretect Pipeline Intervention. Hot Tapping

3 What is Hot Tapping Definition What is it used for? What advantages are there? Hot Tapping is a method of making a connection into an existing pipe or vessel which is still under pressure or live. Additional branches allowing supply to and from other areas of plant etc. Monitoring points for temperature probes etc. Entry points for isolation equipment (Stopples) Can be performed with out the need to shut down the plant. No need for loss of production or supply to other areas

4 Where can it be Used? Petrochemical Industry v Hydrocarbons crude & heavy oils v Light oils, diesel, kerosene, petroleum, motor oils v Various chemicals Power Generating Industry v Steam & Water Pharmaceutical & Food Industry: v Compressed air v Food products Water Industry: v Potable Water & Sewerage

5 Step 1 Mount the hot tapping machine to the tapping valve.

6 Step 2 Advance cutter/pilot assembly until it touches the parent pipe, then start the hot tap.

7

8

9

10

11

12

13

14

15

16

17 Step 3 When pilot breaks through product fills the void, air is expelled through the tapping machine purge valve and valve is then closed to retain the pressure.

18

19 Step 4 When pilot is completely through stop rotation & advance to allow u-wires to drop.

20

21

22

23 Step 5 When cutter touches top of pipe restart machine to complete the cut.

24

25

26

27

28 Step 6 When the cut is complete the machine should be stopped and cutter advanced to confirm tap complete.

29

30

31 Step 7 Coupon and cutter are withdrawn with the coupon or cut out retained by the u-wires.

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51 Step 8 The tapping valve is then closed and the machine can be removed.

52 Typical Hot Tapping Assembly.

53 How do we retain the Coupon? Standard Option - U-wires Pilot drill has u-wires which prevent the coupon from falling into the line. This method is suitable for the vast majority of hot taps. Ø Limits are:- Ø gas velocities of up to 10 m/s (20 mph) Ø liquid velocities of up to 5 m/s (10 mph)

54 Coupon Catcher in Operation

55 Coupon Catcher in Operation

56 Coupon Catcher in Operation

57 Coupon Catcher in Operation

58 Coupon Catcher in Operation

59 Coupon Catcher in Operation

60 Coupon Catcher in Operation

61 Coupon Catcher in Operation

62 Coupon Catcher in Operation

63 Coupon Catcher in Operation

64 Coupon Catcher in Operation

65 Coupon Catcher in Operation

66 Coupon Catcher in Operation

67 Coupon Catcher in Operation

68 Coupon Catcher in Operation

69 Coupon Catcher in Operation

70 Coupon Catcher in Operation

71 Coupon Catcher in Operation

72 Coupon Catcher in Operation

73 Standard cutter with pilot drill and coupon.

74 Standard vertical tap - no unusual problems Angled vertical tap - no problems for angles less than 45 degrees As the angle of tap rotates around there becomes more chance of the swarf from the tap coming back towards the valve and the tapping machine adapter resulting in problems closing the valve and with drawing the cutter fully. The measuring rod will tend to fall out. It is also considerably harder to install the drilling machine into position.

75 Non- standard Hot Taps Tank Tops

76 Non- standard Hot Taps Lateral or Angled Taps

77 Non- standard Hot Taps Hillside Taps

78 Elbow Taps Non- standard Hot Taps

79 Limita<ons Maximum Pressure v Equipment is rated to 1440 PSI ( F (38 C) v Pressures above this can be hot tapped, specialist procedures & equipment required (Refer to Kendal Office) Maximum Temperature v Equipment is rated to 700 F ( PSI (48 Bar)

80 What informa<on is required? Line Details v Nominal size v Wall thickness v Design parameters contents, pressure & temperature v Operating conditions - if different Branch Details v Nominal size v Wall thickness v Length v Flange/interface specification v Clearance space for hot tapping machine Valve Details v Valve type - e.g. ball, gate. v Valve bore v Overall length

81 What informa<on is Required?

82 Equipment Prepara<on Machine Selection v Size of branch to be hot tapped & cutter to be used v Size of parent pipe (type of cutter) v Wall thickness of parent pipe (power required) v Material of parent pipe (cutting material & form) v Total combined length of valve & branch (travel) v Contents, pressure & temperature (seal suitability) v Clearance space for machine Machine Preparation v Valve Adapter v Cutter type v Pilot drill v Cutter Holder

83 Clearance Required for Hot Tap Machines X Y NOTE: Not just X and Y but how to get the machine into position

84 The End

HORNE 15 and 20 thermostatic mixing valve specification manual 2009

HORNE 15 and 20 thermostatic mixing valve specification manual 2009 HORNE 15 and 20 thermostatic mixing valve specification manual 2009 contents HORNE introduction 1-4 history 1 why TMVs? 3 why HORNE? 4 HORNE HORNE 15 TMV 5 4th connection 6 HORNE HORNE 20 TMV 7 HORNE appendix

More information

Eclipse Self-Check UV Scanner

Eclipse Self-Check UV Scanner 856 Instruction Manual 10/18/2010 Eclipse Self-Check UV Model 5602-91 Version 1 Introduction The self-check UV is used for continuous gas or oil flames. A mechanical shutter in the scanner closes briefly

More information

LIST OF OISD STANDARDS (April 2016)

LIST OF OISD STANDARDS (April 2016) LIST OF OISD STANDARDS (April 2016) 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 Recommended Practices on Oil Storage and Handling 4. OISD-STD-109

More information

PIPE FREEZING SERVICES MECHANICAL LINE STOP SERVICES PIPE TAPPING SERVICES PIPE FREEZE KITS & PRODUCTS

PIPE FREEZING SERVICES MECHANICAL LINE STOP SERVICES PIPE TAPPING SERVICES PIPE FREEZE KITS & PRODUCTS Specialty Piping Service Solutions A Division of M.T. Ingram & Co. TOLL FREE : 1-866-452-0448 PIPE FREEZING SERVICES MECHANICAL LINE STOP SERVICES PIPE TAPPING SERVICES PIPE FREEZE KITS & PRODUCTS 24 HOURS

More information

Zip Econoboil. On wall boiling water. Installation instructions & user manual. Model number: ,

Zip Econoboil. On wall boiling water. Installation instructions & user manual. Model number: , Zip Econoboil On wall boiling water. Model number: 305542, 303542 1 Table of contents Intended Use... 2 Warnings and precautions... 3 Before installation... 5 Technical specification... 6 Installation

More information

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109 LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

More information

CR1 Series Triton Corrosion Resistant Washdown Heaters

CR1 Series Triton Corrosion Resistant Washdown Heaters CR1 Series Triton Corrosion Resistant Washdown Heaters Ruffneck CR1 Triton Series is a new generation of NEMA 4X corrosion-resistant washdown heaters. The first UL listed Type 4X heater with models ranging

More information

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Niles Steel Tank Hot Water Generator Installation and Operation Manual Niles Steel Tank Hot Water Generator Installation and Operation Manual Contents: Contents 1 Hazard definitions 1 1. General Information.... 2 Availability... 3 Optional Control Packages... 5 2. Installation....

More information

Bosch Product Reference Guide. bosch-climate.co.nz

Bosch Product Reference Guide. bosch-climate.co.nz Bosch Product Reference Guide bosch-climate.co.nz 2 Bosch Product Reference Guide Contents OptiFlow 3 Bosch Water & ProWater Apps 4 4000S External 12L 5 Highflow Condensing 6 4000S Internal 7 Accessories

More information

Zip Hydroboil. Installation and Operating Instructions. Filtered instant boiling water

Zip Hydroboil. Installation and Operating Instructions. Filtered instant boiling water Installation and Operating Instructions Zip Hydroboil Filtered instant boiling water 01552 Zip Hydroboil 1.5 Litre White 01551 Zip Hydroboil 1.5 Litre Stainless Steel 03552 Zip Hydroboil 3 Litre White

More information

Arch Feeder: Installation Manual

Arch Feeder: Installation Manual Arch Feeder: Installation Manual Model #A300N Arch Chemicals, Inc. 1200 Lower River Road, P.O. Box 800 Charleston, TN 37310-0800 Product Stewardship MAKING THE WORLD A BETTER PLACE Arch is committed to

More information

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT Technical Data SD 4511A SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY 12586-2035 TYPE T14 & T14D TEMPERATURE PILOT PRINTED IN U.S.A. SD 4511A/9811 5 13 /16 D 4 7 /8 1 13 /16 T14 PILOT

More information

Zip Econoboil. Installation and Operating Instructions. Budget priced instant boiling water for canteens and kitchens.

Zip Econoboil. Installation and Operating Instructions. Budget priced instant boiling water for canteens and kitchens. Installation and Operating Instructions Zip Econoboil Budget priced instant boiling water for canteens and kitchens. 103592 Zip Econoboil 3.0 litre White HS503 105592 Zip Econoboil 5.0 litre White HS505

More information

INSTALLATION, OPERATION AND MAINTENANCE

INSTALLATION, OPERATION AND MAINTENANCE INLINE HEATER INSTALLATION, OPERATION AND MAINTENANCE MODELS: ILS SERIES 1.5kW 120V SINGLE PHASE BEFORE YOU BEGIN CHECK ALL ELECTRICAL CONNECTIONS TO ALL COMPONENTS WITHIN THE HEATER FOR TIGHTNESS. CONNECTIONS

More information

PRESSURE MOTIVE PUMP (PMP) APPLICATIONS

PRESSURE MOTIVE PUMP (PMP) APPLICATIONS DRAINAGE of a SINGLE SOURCE of for a CLOSED LOOP SYSTEM PURPOSE: For removing condensate from below steam heat transfer equipment when a modulating valve is used for control and stall conditions will exist.

More information

There are two devices used together for heating crude oil in petroleum refinery as in figure (1), and these devices are:

There are two devices used together for heating crude oil in petroleum refinery as in figure (1), and these devices are: Heating of Crude Oil 1.Introduction: There are two devices used together for heating crude oil in petroleum refinery as in figure (1), and these devices are: Heat Exchangers. Tube Still Heaters (Furnaces).

More information

Installation and Operating Instructions. Budget priced instant boiling water heater for beverages.

Installation and Operating Instructions. Budget priced instant boiling water heater for beverages. Installation and Operating Instructions Zip Econoboil Budget priced instant boiling water heater for beverages. Model No. Description Reg.No. Part No. HS503 Zip Econoboil 3.0 litre White EB003 103592 HS505

More information

Kinetics Controls & Innovation Ltd RIGLESS WELL INTEGRITY & INTERVENTION ISOLATIONS. kciltd.co.uk

Kinetics Controls & Innovation Ltd RIGLESS WELL INTEGRITY & INTERVENTION ISOLATIONS. kciltd.co.uk Kinetics Controls & Innovation Ltd RIGLESS WELL INTEGRITY & INTERVENTION ISOLATIONS kciltd.co.uk KCI IS A GLOBAL PROVIDER OF BESPOKE ENGINEERED LEAK SEALING SOLUTIONS FOR MATURE OR AGING OIL & GAS FACILITIES.

More information

INSTALLATION INSTRUCTIONS WARRANTY

INSTALLATION INSTRUCTIONS WARRANTY QT FLOW CENTER INSTALLATION INSTRUCTIONS Fig. 1. Low Head Pump Center Flow Chart Fig. 2. High Head Pump Center Flow Chart NOTE: Read the entire instruction manual before starting the installation. WARRANTY

More information

SERIES 24. Series 24 Features. Commercial, Forced Draft, Hot Water or Steam Boiler. The right fit for any commercial job

SERIES 24. Series 24 Features. Commercial, Forced Draft, Hot Water or Steam Boiler. The right fit for any commercial job SERIES Commercial, Forced Draft, Hot Water or Steam Boiler Sizes from to,8 MBH output The right fit for any commercial job The Series is built to handle any installation - businesses, institutions, apartments,

More information

Air Driven Sewer Pipe Tapping Machine Instruction and Maintenance Manual

Air Driven Sewer Pipe Tapping Machine Instruction and Maintenance Manual Air Driven Sewer Pipe Tapping Machine Instruction and Maintenance Manual Thank you for your purchase of the Sewer Pipe Tapping Machine. Please read and understand this short operation manual. This machine

More information

CONSTRUCTION STANDARDS FOR COMMERCIAL FISHING VESSEL

CONSTRUCTION STANDARDS FOR COMMERCIAL FISHING VESSEL Transports Canada Région du Québec Sécurité maritime Transport Canada Quebec Region Marine Safety CONSTRUCTION STANDARDS FOR COMMERCIAL FISHING VESSEL Ventilation systems, cooking, heating and other domestic

More information

Installation & Service Guide

Installation & Service Guide Reverse Osmosis Ontario Soft Water.ca Kitchener, Canada 519-579-0500 Installation & Service Guide Pentair 75 gpd Encapsulated Membrane System Standard System 75gpd Membrane Your New Reverse Osmosis System

More information

WALLACE MAXIPUMP 3000, 5000, 6000 and HYDROJET 30P, 30C, 140 AND HJ400 INSTALLATION AND MAINTENANCE INSTRUCTIONS

WALLACE MAXIPUMP 3000, 5000, 6000 and HYDROJET 30P, 30C, 140 AND HJ400 INSTALLATION AND MAINTENANCE INSTRUCTIONS 6 th June 2006 Page 1 WALLACE MAXIPUMP 3000, 5000, 6000 and HYDROJET 30P, 30C, 140 AND HJ400 INSTALLATION AND MAINTENANCE INSTRUCTIONS Please read and follow all these instructions carefully before proceeding

More information

Industrial Processing Solutions

Industrial Processing Solutions Industrial Processing Solutions Fluid power, filtration, and roll cleaning products. Innovative products and technologies. Rotating Unions & Accessories Rotary unions for water and air service ( 3 8 to

More information

Partner. Peerless. Indirect-Fired. Water Heater. Installation, Operation & Maintenance Manual

Partner. Peerless. Indirect-Fired. Water Heater. Installation, Operation & Maintenance Manual Peerless Indirect-Fired Partner Water Heater Installation, Operation & Maintenance Manual Product Selection 1. The following guidelines apply to residential systems only. For commercial or institutional

More information

Zip Econoboil 1.5 litre White Zip Econoboil 3.0 litre White Zip Econoboil 5.0 litre White Zip Econoboil 7.

Zip Econoboil 1.5 litre White Zip Econoboil 3.0 litre White Zip Econoboil 5.0 litre White Zip Econoboil 7. Zip Econoboil Installation and Operating Instructions 301042 Zip Econoboil 1.5 litre White 303042 Zip Econoboil 3.0 litre White 305042 Zip Econoboil 5.0 litre White 307042 Zip Econoboil 7.5 litre White

More information

AQUAS POOL PACKAGE INSTALLATION INSTRUCTIONS FOR MODELS: XPN AQUAS Pool Package

AQUAS POOL PACKAGE INSTALLATION INSTRUCTIONS FOR MODELS: XPN AQUAS Pool Package AQUAS POOL PACKAGE INSTALLATION INSTRUCTIONS FOR MODELS: XPN 400 801 AQUAS Pool Package The AQUAS pool package system is a high efficiency commercial condensing boiler, pre-piped package system from the

More information

MODELS LFP4218/LFP6018 TOP VENT GAS FIREPLACE

MODELS LFP4218/LFP6018 TOP VENT GAS FIREPLACE MODELS LFP4218/LFP6018 TOP VENT GAS FIREPLACE PFS APPROVED FOR NATURAL GAS OR PROPANE GAS Z21.50-2014 If your plans do not allow for the venting system as outlined previously in the installing chimney/vent

More information

CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER

CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER CARVER - CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER 1:0 SPECIFICATIONS Water capacity Water connections Water supply 9 litres (2 gallons)

More information

THERMOSTATIC SINGLE-PIPE AND DOUBLE-PIPE VALVES

THERMOSTATIC SINGLE-PIPE AND DOUBLE-PIPE VALVES ST.07.05.00 THERMOSTIC SINGLE-PIPE AND DOUBLE-PIPE VALVES 1. Art.1420 THERMOSTIC SINGLE-PIPE VALVE Single-pipe valves allow manual, thermostatic or thermo-electric regulation. Separation of the lockshield

More information

Designing Batch Process Utility Piping

Designing Batch Process Utility Piping Originally published in the September 2016 issue of ASPE Journal. (C) 2016, American Society of Plumbing Engineers. All rights reserved. Designing Batch Process Utility Piping by Anthony J. Curiale, CPD,

More information

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners 1 1. General Installation Information (to be completed by technician) Date installed: Location (city & state): Cleaner s name: National Board number (boiler): Installed by (company): Installed by (technician):

More information

IntaKlean Installation & Servicing Instructions IKMF22 and IKMF28

IntaKlean Installation & Servicing Instructions IKMF22 and IKMF28 IntaKlean Installation & Servicing Instructions IKMF22 and IKMF28 In this procedure document we have endeavoured to make the information as accurate as possible. We cannot accept any responsibility should

More information

Electronic Flow Switches

Electronic Flow Switches Industries Electronic Flow Switches Petrochemical Refining Oil Production Water Treatment Pharmaceutical Food and Beverage Pulp and Paper Power Production Gas Processing Mining Biotechnology Semiconductor

More information

2-Stage Under Counter Filtration System Model: WP-2 LCV

2-Stage Under Counter Filtration System Model: WP-2 LCV INSTALLATION, OPERATION AND MAINTENANCE MANUAL Save manual for future reference 2-Stage Under Counter Filtration System Model: WP-2 LCV IMPORTANT If you are unsure about installing your WATTS water filter,

More information

INSTANT-FLOW C-MICRO WATER HEATER

INSTANT-FLOW C-MICRO WATER HEATER WATER HEATER INSTALLATION AND OPERATION INSTRUCTIONS (LOW ACTIVATION MODELS) TABLE OF CONTENTS Technical Information..................................... 2 Dimensional Data........................................

More information

EPU - WM30 EPU - WM 50 EPU - WM100

EPU - WM30 EPU - WM 50 EPU - WM100 INSTALLATION INSTRUCTIONS WALL HUNG WATER HEATERS EPU - WM30 EPU - WM 50 EPU - WM100 MARCH 2018 PART NO. 025217 01 EVERFLO IMPORTANT NOTE TO THE INSTALLER Read these instructions before commencing installation.

More information

APEX Water Filters MODEL RO 5. Treat your body to pure goodness with Apex filtered water INSTRUCTION MANUAL. pure water in every drop

APEX Water Filters MODEL RO 5. Treat your body to pure goodness with Apex filtered water INSTRUCTION MANUAL. pure water in every drop APEX Water Filters pure water in every drop MODEL RO 5 INSTRUCTION MANUAL Treat your body to pure goodness with Apex filtered water A Water supply adapter valve B Cold water shut-off valve C Hot water

More information

Installation Instructions

Installation Instructions Installation Instructions For NoFrost Combined Refrigerator-Freezers with IceMaker CS 2060, CS 2061 7084 339-00 Important Please Read and Follow these Instructions These instructions contain Danger, Warning

More information

Electro Controls. Flow WattsIndustries.co.uk

Electro Controls. Flow WattsIndustries.co.uk Electro Controls Flow - 07 WattsIndustries.co.uk FLOW AIR FLOW SWITCHES EAA.. EAA.. detects air flow in ducts to monitor fan operation and switches in the event of flow failure. It is suitable for non-aggressive

More information

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013 Fuel Gas Systems Knowledge Objectives (1 of 2) Explain the impact of fuel gases on fire and explosion investigations. Discuss the characteristics of fuel gases. Identify common fuel gas system components.

More information

SPECIALIZED EQUIPMENT

SPECIALIZED EQUIPMENT MIXING & BLENDING SPECIALIZED EQUIPMENT For Challenging Applications Bepex International s mixing and blending equipment has been serving industries around the world for decades. Bepex combines the extensive

More information

Installation Instructions

Installation Instructions Installation Instructions For NoFrost Combined Refrigerator-Freezers with IceMaker CS/CBS 20 7084 337-00 Important Please Read and Follow these Instructions These instructions contain Danger, Warning and

More information

INSTALLATION, COMMISSIONING AND OPERATING MANUAL

INSTALLATION, COMMISSIONING AND OPERATING MANUAL INSTALLATION, COMMISSIONING AND OPERATING MANUAL 1 YTBV-D-CE42_0109 CONTENT Available models and capacities Supplier information Warranty Safety Emergency stops/ shutdowns About this manual Models Physical

More information

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20 Piping Layout Design Introduction The performance requirements of the equipment are developed by design teams which normally include members from the different departments such as process, engineering,

More information

WATERSHIELIJrM REVERSE OSMOSIS INSTALLA TION MANUAL ~ ~ ~ ~ ~ l ~ TO INSURE THIS PRODUCT AND THE INSTALLATION THEREOF. ~ ~ ~ ~ ~

WATERSHIELIJrM REVERSE OSMOSIS INSTALLA TION MANUAL ~ ~ ~ ~ ~ l ~ TO INSURE THIS PRODUCT AND THE INSTALLATION THEREOF. ~ ~ ~ ~ ~ WATERSHIELIJrM REVERSE OSMOSIS SYSTEM INSTALLA TION MANUAL p 1 ~ -~ I IMPORTANT I ITHIS REVERSE OSMOSIS SYSTEM WAS SOLD IN KIT FORM. IT HAS ~ INOT BEEN PRESSURE TESTED IN ANY WAY. UPON INSTALLATION IT

More information

LUCCI AIRFUSION RESORT DC CEILING FAN

LUCCI AIRFUSION RESORT DC CEILING FAN LUCCI AIRFUSION RESORT DC CEILING FAN INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION CAUTION READ INSTRUCTIONS CAREFULLY FOR SAFE INSTALLATION AND FAN OPERATION. V 2. 0 p u b l i c a t i o n o

More information

INSTANT-FLOW C-MICRO WATER HEATER

INSTANT-FLOW C-MICRO WATER HEATER WATER HEATER INSTALLATION AND OPERATION INSTRUCTIONS (LOW ACTIVATION MODELS) TABLE OF CONTENTS Technical Information..................................... 2 Dimensional Data........................................

More information

Jet ejectors for the oil industries. Vacuum solutions for refineries and the petrochemical industries

Jet ejectors for the oil industries. Vacuum solutions for refineries and the petrochemical industries Jet ejectors for the oil industries Vacuum solutions for refineries and the petrochemical industries Vacuum distillation From plant planning to commissioning Vacuum distillation is used in oil refineries

More information

Silhouette. Feedwater Heater. Boiler Feedwater

Silhouette. Feedwater Heater. Boiler Feedwater Roth Roth Low Low Silhouette Silhouette TRAY DEAERATORS Boiler Boiler Feedwater Feedwater Heater Heater Capacities Capacities to to 50,000 50,000 lb/hr lb/hr Model RDTV-150-5-1-2 vertical tray type deaerator

More information

Installation, Operation and Maintenance Instructions

Installation, Operation and Maintenance Instructions Installation, Operation and Maintenance Instructions Speakman Company Safe-T-Zone Heat Traced Emergency Stations You have selected the designated item: SE-7001 OTHER: SERIAL NO: 3/08 Rev-3 92-2904 INSTALLATION

More information

UV Scanner. Model Specification. Introduction. 854 Instruction Manual

UV Scanner. Model Specification. Introduction. 854 Instruction Manual 854 Instruction Manual 10/11/010 UV Model 5600-91 C US Introduction This sensor features a high temperature and high sensitivity ultraviolet (UV) tube for monitoring gas or oil flames in applications that

More information

Eclipse 90 UV Scanner Model A Version 1

Eclipse 90 UV Scanner Model A Version 1 85 Instruction Manual 10/14/010 Eclipse 90 UV Model 5600-90A Version 1 C US Introduction This sensor features a high sensitivity ultraviolet (UV) tube for monitoring gas or oil flames that cycle on and

More information

Installation. 15 W. Undercounter/Freestanding Ice Machine FGIM515 / CFGIM515 FPIM515 / CFPIM515

Installation. 15 W. Undercounter/Freestanding Ice Machine FGIM515 / CFGIM515 FPIM515 / CFPIM515 Installation 15 W. Undercounter/Freestanding Ice Machine FGIM515 / CFGIM515 FPIM515 / CFPIM515 TABLE OF CONTENTS Warnings & Important Safety Instructions 3 Dimensions (Professional) 5 Dimensions (Custom

More information

Air. Pressure. Motion. nnnnnnnn

Air. Pressure. Motion. nnnnnnnn Air. Pressure. Motion. nnnnnnnn AIRTEC classic ejectors Page 10.001 AIRTEC column ejectors Vacuum generators with 1, 4, 6 and 8 independent vacuum circuits. Series HV and HF Page 10.010 MI and MIF Page

More information

SuperStor Contender Indirect Fired Water Heater

SuperStor Contender Indirect Fired Water Heater SuperStor Contender Indirect Fired Water Heater INSTALLATION START-UP MAINTENANCE PARTS SuperStor Contender Water Heater Models SSC-35 / SSC-50 / SSC-80 / SSC-119* *NOTE: A suffix of S denotes Solar Model

More information

Hanson LED C e i l i n g F a n

Hanson LED C e i l i n g F a n Hanson LED C e i l i n g F a n model no. 052-8398-2 Toll-free 1-866-827-4985 IMPORTANT: For your safety please read and understand this manual before installing or operating this product. OWNER S MANUAL

More information

FX5 Series Explosion-Proof Electric Air Heaters

FX5 Series Explosion-Proof Electric Air Heaters FX5 Series Explosion-Proof Electric Air Heaters Ruffneck FX5 heaters are C UL US certified for use in hazardous locations. They are designed for the harshest environments such as: dry indoor industrial

More information

Installation and User Instructions Aquarius Undersink Vented Water Heaters Models: AU7/3, AU7/1, AU10/3, AU10/1.

Installation and User Instructions Aquarius Undersink Vented Water Heaters Models: AU7/3, AU7/1, AU10/3, AU10/1. Installation and User Instructions Aquarius Undersink Vented Water Heaters Models: AU7/3, AU7/1, AU10/3, AU10/1. Please read and understand these instructions before starting work. Please leave this leaflet

More information

M2 Series Startup Form

M2 Series Startup Form M Series Startup Form Job Name: Date: Address: Model Number: Serial Number: Tag: Startup Contractor: Address: Phone: Pre Startup Checklist Installing contractor should verify the following items.. Is there

More information

Boiling water heater KA

Boiling water heater KA Application areas Boiling water supply: > Offices > Canteens / Bistros > Restaurants / Hotels > Hospitals > Catering services Product information 1 / 7 Product information boiling > 15 25 40 Part number

More information

Notices for installation

Notices for installation Notices for installation Important Notices Before installing, please contact with local authorized maintenance center, if unit is not installed by the authorized maintenance center, the malfunction may

More information

POWER VENTER SYSTEM. Model: PVO-300, PVO-600

POWER VENTER SYSTEM. Model: PVO-300, PVO-600 POWER VENTER SYSTEM Model: PVO-300, PVO-600 Included is one ETL and cetl listed Power Venter to be used primarily with a single 120VAC controlled oil fired furnace, boiler, or water heater. The PVO may

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Stour Thermostatic Exposed Shower Valve Single Outlet, Rigid Riser, Fixed Shower Arm & Soap Basket - BF2S Options: Burlington has a shower head of 3 different sizes for your selection.

More information

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw SEMI-INSTANTANEOUS ENERGY: STEAM TO WATER U-TUBE SINGLE-WALL & DOUBLE-WALL HEAT EXCHANGERS FLOOR DRAIN Typical Construction Figure 34-1 FLOOR DRAIN 1. U-tube

More information

Installation Instructions

Installation Instructions Installation Instructions For Fully Integrated NoFrost Combined Refrigerator-Freezers HC 2062 HCB 2062 HC/HCB 2062 7084 341-00 Important Please Read and Follow these Instructions These instructions contain

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

esfr dry pendent sprinkler Vk502 (k14.0)

esfr dry pendent sprinkler Vk502 (k14.0) Page 1 of 11 1. DESCRIPTION Viking Early Suppression Fast Response (ESFR) Dry Pendent Sprinkler VK502 is a fast response fusible element type sprinkler designed for use in storage areas subject to freezing

More information

Salt Spray Cabinet. Manual. Model Ref.: VF7705 (500 liter) VF7710 (1000 liter)

Salt Spray Cabinet. Manual. Model Ref.: VF7705 (500 liter) VF7710 (1000 liter) Salt Spray Cabinet Manual Model Ref.: VF7705 (500 liter) VF7710 (1000 liter) Health & Safety The Manufacturer is required to ensure, for reasons of Health and Safety at Work that, as far as is reasonably

More information

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Design and Construction Standards SECTION PLUMBING EQUIPMENT SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES

More information

MX Series Indoor Modular Blowers Electric Heat, Hot Water Heat, or No Heat

MX Series Indoor Modular Blowers Electric Heat, Hot Water Heat, or No Heat SG-MAH-08 April 2016 MX Series Indoor Modular Blowers Electric Heat, Hot Heat, or No Heat Specification Guide Contents...Pa Page Standard Features... 2 Physical Data... 2 Blower Performance... 3 Nomenclature...

More information

ENERGY CONTROL LOCKOUT/TAGOUT PROGRAM PLAN

ENERGY CONTROL LOCKOUT/TAGOUT PROGRAM PLAN ENERGY CONTROL LOCKOUT/TAGOUT PROGRAM PLAN Published by Environmental Health and Safety Last updated: 1/25/2017 Page 1 of 16 1. INTRODUCTION John Jay College Environmental Health and Safety (EHS) office

More information

Preventing Fires And Explosions In Pilot Plants And Laboratory Units

Preventing Fires And Explosions In Pilot Plants And Laboratory Units Preventing Fires And Explosions In Pilot Plants And Laboratory Units Richard Palluzi ExxonMobil Research and Engineering Co 1545 Route 22 East Annandale, NJ 08801 October, 1998 1 Introduction Pilot plants

More information

Multitube- Heatexchanger 0,5-8,0M² INSTALLATION AND OPERATION SPECIFICATION

Multitube- Heatexchanger 0,5-8,0M² INSTALLATION AND OPERATION SPECIFICATION Multitube- Heatexchanger 0,5-8,0M² INSTALLATION AND OPERATION SPECIFICATION 19-09-2014 Installation Installation & Safety parameters Before installing the Heat-exchanger, follow these requirement: 1. Make

More information

Appliance Bottom Model :97100 DE 4002 Steam Cleaner (Chemical-Free)

Appliance Bottom Model :97100 DE 4002 Steam Cleaner (Chemical-Free) Appliance Bottom Model :9700 DE 00 Steam Cleaner (Chemical-Free) Page- 6 7 8 9 0 6 7 8 9 Number Description Qty Req. K66070 TRANSFORMER K667790 CABLE K689860 HOSE K689990 HOSE BAND CLIP 7 K689880 HOSE

More information

Installation Guide. 15 W. Undercounter/Freestanding Nugget Ice Machine U L. Viking Range, LLC. 111 Front Street

Installation Guide. 15 W. Undercounter/Freestanding Nugget Ice Machine U L. Viking Range, LLC. 111 Front Street Installation Guide Viking Range, LLC 111 Front Street Greenwood, Mississippi 38930 USA (662) 455-1200 For product information, call 1-888-(845-4641) or visit our web site at vikingrange.com in the US or

More information

SONAC 110 INSTALLATION & OPERATION MANUAL

SONAC 110 INSTALLATION & OPERATION MANUAL SONAC 110 INSTALLATION & OPERATION MANUAL An L&J Technologies Co. 5911 Butterfield Road Hillside, IL 60162 Phone: 708-236-6000 Fax: 708-236-6006 1 was started in 1976 to offer new and innovative electronic

More information

Phantom-X 399C/500C. Residential High Efficiency Gas Boilers PHNTM399C, PHNTM500C Submittal Sheet. Wholesaler Job Name Mechanical Contractor

Phantom-X 399C/500C. Residential High Efficiency Gas Boilers PHNTM399C, PHNTM500C Submittal Sheet. Wholesaler Job Name Mechanical Contractor PHNTM Floor Standing Heating s Phantom-X 399C/500C Residential High Efficiency Gas s PHNTM399C, PHNTM500C Submittal Sheet Wholesaler Job Name Mechanical Contractor Number Gas Type BTU/hr INPUT BTU/hr OUTPUT

More information

InterSeptor Centrifugal Separators Operating & Maintenance Manual

InterSeptor Centrifugal Separators Operating & Maintenance Manual General Information: This manual was prepared to assist in the installation, operation, and maintenance of PEP ICS centrifugal separator systems. For immediate response to questions not covered in this

More information

Machine and Power Tool Safety Checklist. Version 1.1 March Chestnut Street, Suite 400, Philadelphia, PA

Machine and Power Tool Safety Checklist. Version 1.1 March Chestnut Street, Suite 400, Philadelphia, PA Machine and Power Tool Safety Checklist Version 1.1 March 2017 3160 Chestnut Street, Suite 400, Philadelphia, PA 19104 215-898-4453 Machine and Power Tool Safety Checklist Overview The purpose of this

More information

Copy Right By: Thomas T.S. Wan

Copy Right By: Thomas T.S. Wan Chapter 23 Motor and Starter Copy Right By: Thomas T.S. Wan 温到祥著 Sept. 3, 2008 All rights reserved Electric Motors All the motors are to be designed and constructed in accordance with NEMA code. Electric

More information

propanel Series Installation Manual

propanel Series Installation Manual propanel Series Installation Manual propanel Series Installation Manual is published by Uponor Wirsbo 5925 148th Street West Apple Valley, MN 55124 (952) 891-2000 2003 Uponor Wirsbo All rights reserved

More information

STEAM VALVE SUPPLY & SYSTEM DESIGN

STEAM VALVE SUPPLY & SYSTEM DESIGN TRAP SURVEYS SYSTEM AUDITS TECHNICAL SUPPORT AND MUCH MORE... STEAM VALVE SUPPLY & SYSTEM DESIGN ISIS Steam; bringing you the expertise and technical knowledge to represent, promote and service the extensive

More information

Operation & Installation Manual

Operation & Installation Manual Operation & Installation Manual Rinnai Instantaneous Water Heater Model - IHF10 This appliance shall be installed in accordance with: Manufacturer s Installation Instructions Current AS/NZS 3500 & AS/NZS

More information

Hygro and Hygrothermal Transducers (Capacitive) for Air Conditioning Applications

Hygro and Hygrothermal Transducers (Capacitive) for Air Conditioning Applications Data Sheet 907020 Page 1/9 Hygro and Hygrothermal Transducers (Capacitive) for Air Conditioning Applications For measuring relative humidity and temperature For versatile climatic applications and ventilation

More information

Here is your conveying solution: Product group D.

Here is your conveying solution: Product group D. Here is your conveying solution: Product group D. D Dosing pumps The 6 ranges of dosing pumps can be used in virtually all industries for the metering and dosing of precise quantities. They are particularly

More information

OWNER S MANUAL AND INSTALLATION GUIDE PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION

OWNER S MANUAL AND INSTALLATION GUIDE PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION ClearChoice Economy Under Sink Drinking Water System OWNER S MANUAL AND INSTALLATION GUIDE PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION Congratulations on the purchase of your ClearChoice

More information

DBF 4XL Dryer Booster Fans

DBF 4XL Dryer Booster Fans Installation and Operation Manual Item #: 401315 Rev Date: 050814 DBF 4XL Dryer Booster Fans DBF4XL Kit Includes: Dryer Booster Fan, 1 pc Fan Mounting Bracket and Hardware, 1 pc Wall Label (Mount on wasll

More information

VALVES SECTION 15100

VALVES SECTION 15100 VALVES SECTION 15100 PART 1 GENERAL 1.1 DESCRIPTION A. The requirements of this SECTION apply to all Work of this DIVISION where applicable. The valves, materials, and methods herein are generally common

More information

ALH SYSTEMS LTD ALH SYSTEM 1 SERVICE VALVE AND DRILLING MACHINE OPERATING MANUAL

ALH SYSTEMS LTD ALH SYSTEM 1 SERVICE VALVE AND DRILLING MACHINE OPERATING MANUAL ALH SYSTEMS LTD ALH SYSTEM 1 SERVICE VALVE AND DRILLING MACHINE OPERATING MANUAL CONTENTS ALH SYSTEM 1 PRODUCT RANGE OPERATING AND SERVICE NOTES ALH SYSTEM 1 SERVICE VALVE EXPLODED DIAGRAM ALH SYSTEM 1

More information

THEORY OR OPERATION 2 SENSOR UNIT - MECHANICAL 6 SENSOR UNIT - ELECTRICAL 8 CONTROL UNIT - MECHANICAL 9 CONTROL UNIT - ELECTRICAL 9 OPTIONS 11

THEORY OR OPERATION 2 SENSOR UNIT - MECHANICAL 6 SENSOR UNIT - ELECTRICAL 8 CONTROL UNIT - MECHANICAL 9 CONTROL UNIT - ELECTRICAL 9 OPTIONS 11 Table of Contents INTRODUCTION 1 THEORY OR OPERATION 2 DESCRIPTION 5 SENSOR UNIT - MECHANICAL 6 SENSOR UNIT - ELECTRICAL 8 CONTROL UNIT - MECHANICAL 9 CONTROL UNIT - ELECTRICAL 9 SPECIFICATIONS 10 OPTIONS

More information

Installation and Testing of Inverted Bucket Steam Traps Manual

Installation and Testing of Inverted Bucket Steam Traps Manual Installation and Testing of Inverted Bucket Steam Traps Manual 307-EN Please read and save these instructions Armstrong IB Traps Installation Before Installing Run pipe to trap. Before installing the trap,

More information

ECONOBOOST EB II & EB III Compact Water Booster

ECONOBOOST EB II & EB III Compact Water Booster ECONOBOOST EB II & EB III Compact Water Booster The Stokvis EB II twin pump & EB III triple pump cold water booster units meet today s need for compact, reliable, high performance equipment with modest

More information

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,

More information

Lockout Tagout Specific Procedure

Lockout Tagout Specific Procedure Machine: Boiler : Control panel on front of unit 3. Turn off the (Electric/natural gas) energy sources by placing energy isolating Control panel on front of unit Panel, breaker #5. 7. 9 Ball valve on natural

More information

Bliss Box Former Troubleshooting. 6.1 Troubleshooting Chart. Troubleshooting INTRODUCTION SAFETY PROCEDURES

Bliss Box Former Troubleshooting. 6.1 Troubleshooting Chart. Troubleshooting INTRODUCTION SAFETY PROCEDURES 6.0 Bliss Box Former 1.0 INTRODUCTION Table 6-1 provides a logical sequence of tests that are designed to isolate problems with the Bliss Box Former machines. This table includes a list of probable causes

More information

ON-LOAD CLEANING FOR HEAT EXCHANGER FOULING. Optimising heat transfer on petrochemical plants and oil refineries

ON-LOAD CLEANING FOR HEAT EXCHANGER FOULING. Optimising heat transfer on petrochemical plants and oil refineries ON-LOAD CLEANING FOR HEAT EXCHANGER FOULING Optimising heat transfer on petrochemical plants and oil refineries Experience across the globe Maximising fired heater energy efficiency is a key consideration

More information

Quartz. Thermo. Concealed shower valve with adjustable head. Quartz Thermo installation guide page 1

Quartz. Thermo. Concealed shower valve with adjustable head. Quartz Thermo installation guide page 1 Quartz Thermo Concealed shower valve with adjustable head Quartz Thermo installation guide page 1 Shower systems Components Quartz Thermo built-in shower valve with adjustable head QZ3111 Quartz Thermo

More information

HDLV 55-Gallon Powder Drum Unloader

HDLV 55-Gallon Powder Drum Unloader Instruction Sheet P/N 07333 0 HDLV -Gallon Powder Drum Unloader Description See Figure. The HDLV -gallon powder drum unloader uses a Prodigy HDLV High Capacity pump to supply virgin powder to a powder

More information