Sentinel House. Full Planning Application Planning Statement. August 2014 Applicant: SJW Estates Ltd Prepared by: DP9 Ltd

Size: px
Start display at page:

Download "Sentinel House. Full Planning Application Planning Statement. August 2014 Applicant: SJW Estates Ltd Prepared by: DP9 Ltd"

Transcription

1 Sentinel House Full Planning Application Planning Statement August 2014 Applicant: SJW Estates Ltd Prepared by: DP9 Ltd

2 CONTENTS 1. INTRODUCTION SITE DESCRIPTION THE PROPOSED DEVELOPMENT CONSULTATION PLANNING POLICY PLANNING OBLIGATIONS AND COMMUNITY INFRASTRUCTURE LEVY SCHEME BENEFITS & CONCLUSION...26

3 1. INTRODUCTION 1.1 This Planning Statement has been prepared by DP9 Ltd (hereafter referred to as DP9 ) on behalf of SJW Estates Ltd ( the Applicant ), in support of an application for planning permission for the redevelopment of Sentinel House, Old Marylebone Road, referred to for the purposes of this report as the Additional Affordable Housing Site (the AAH Site ). 1.2 The description of development for the proposal (herein known as the Proposed Development) is as follows: Demolition of existing office building and construction of a 9 storey residential building comprising 41 residential units, landscaping along Old Marylebone Road and associated works. 1.3 The Proposed Development is linked to a separate planning application being submitted concurrently by St. John's Wood Square Ltd for the redevelopment of the Former St John s Wood Royal Horse Artillery Barracks. Sentinel House forms the additional off-site affordable housing provision in relation to the Barracks site (herein referred to as the Main Site ). 1.4 This Statement provides a general description and an evaluation of the Proposed Development against relevant national, strategic and local planning policy guidance. 1.5 This Statement should be read in conjunction with the following documents submitted as supporting material to the application: Document Title Prepared By Planning Application drawings Squire and Partners Design and Access Statement Squire and Partners Sustainability and Energy Statement Atelier Ten Construction Management Plan EC Harris Basement Impact Assessment Robert Bird Group Statement of Community Involvement Soundings Overview Affordable Housing Report (covering both Sentinel House and the St. John s Wood Square site) DS2 Affordable Housing Viability Report (submitted confidentially) DS2 3

4 (covering both Sentinel House and the St. John s Wood Square site) 1.6 The application for the Main Site is supported by a comprehensive Environmental Statement (ES). The Sentinel House planning application is known as the Additional Affordable Housing Site for the purposes of this ES and as such the following chapters/reports are relevant to the Sentinel House application: Document Title Prepared By Transport Statement (including outline Travel Plan) (ES Volume 4b Technical Appendices) WYG Noise Assessment (part of ES Volume 2) Environ Air Quality Assessment (Part of ES Volume 2) Environ Archaeology Report (part of ES Volume 2) Environ Arboricultural Report (part of ES Volume 4c Technical Appendices) Environ Daylight sunlight assessment (part of ES Volume 4c Technical Appendices) Environ 1.7 The remainder of this Planning Statement comprises the following sections: Section 2 Site Description; Section 3 The Proposed Development; Section 4 Consultation; Section 5 Planning Policy; Section 6 Planning Obligations; and Section 7 Scheme Benefits & Conclusions. 4

5 2. SITE DESCRIPTION The Site 2.1. Sentinel House, Old Marylebone Road, is a seven storey (ground plus six storey) office building with single level basement, constructed in the 1990s. The building has a gross internal floor area of approximately 3,300m², however currently only two of the office floors are occupied. The office reception is located on the corner of Harcourt Street and Old Marylebone Road Sentinel House is adjoined by two residential buildings, Varsity Court and Charter Court to the east. The three buildings share a single basement, which is accessed via Varsity Court along Homer Street to the south-east. The two adjoining residential buildings and Sentinel House fall under the freehold ownership of the Applicant, however this planning application relates only to Sentinel House As shown on the Site Location Plan, the Site area is approximately 0.07 hectares (ha). Surrounding Area 2.4. The AAH Site falls just outside the Portman Estate Conservation Area and is in the vicinity of a Grade II listed terrace on Harcourt Street The area is characterised by many varieties of brick buildings from the 18th and 19th Century. The primary surrounding land use is residential located to the east, south and west of the Site. To the north, due to proximity to Marylebone Road, office typologies become more prevalent and the scale of buildings increase. Accessibility 2.6. The AAH Site benefits from excellent public transport accessibility and consequently has a Public Transport Accessibility Level (PTAL) score of 6b, which is categorised as Excellent The AAH Site is situated in close proximity to Edgware Road Underground Station. The station is in Zone 1 of the London Underground Network and served by the Circle, District and Hammersmith and City lines which provide frequent services. London Marylebone Station is located approximately 500m north east of the Site, providing mainline rail services to the Midlands. In addition to the above, the Site is extremely well served by a number of high frequency bus routes, including routes 6, 23, 27 and 36 which operate 24 hours a day With regard to road accessibility, the AAH Site is accessible to a comprehensive highway network comprising the A40 Westway, A501 Marylebone Road and A5 Edgware Road. The A40 Westway provides a 5

6 connection from Paddington to North Kensington, whilst the A5 Edgware road links Marble Arch to Edgware. The Site falls within the designated London Congestion Charging Zone, although Old Marylebone Road, along the western boundary of the Site falls outside of the Zone. Planning History 2.9. Planning permission (ref: 88/06634/FULL) for the redevelopment of Old Marylebone Road and the erection of a seven storey building to provide office space and 28 flats with basement car parking was granted in May Elevational alterations were approved during construction (ref: 90/05344/FULL) in November This development included land outside the current AAH Site, and was a mixed use development arranged in a ushape with three street frontages. Sentinel House was the commercial section of the development, with two wings known as Charter Court and Varsity Court the residential elements of the scheme A Certificate of Lawful Use (ref: 07/09566/CLEUD) was issued in December 2007 to confirm that the lawful use of the sixth floor was for Class B1 office use Since the completion of Sentinel House, there have also been a number of minor applications for the Site, such as applications relating to signage, tree pruning and changes to plant. 6

7 3. THE PROPOSED DEVELOPMENT 3.1. The description of development is as follows (the Proposed Development ): Demolition of existing office building and construction of 9 storey residential building comprising 41 residential units, landscaping along Old Marylebone Road and associated works A full description of the Proposed Development is provided in the accompanying Design and Access Statement prepared by Squire and Partners. A summary of the Proposed Development is provided below. Design 3.3. The Proposed Development will comprise eight storeys plus ground, with a single level basement. The two main pedestrian entrances to the AAH Site will be at ground level accessed from Old Marylebone Road. Private amenity spaces will be provided in the form of balconies and a private terrace at roof level Although an increase in the number of storeys is proposed, residential floor heights are lower than that of offices and, as such, the building s height matches that of the existing building. The uppermost level is set back on all sides, which takes into account the reduced massing of the pitched roof of the existing building The building line will be increased by approximately 2m, bringing the building in line with the existing office building adjacent to the Site. The pavement remains the same width along the front of the building. The extended footprint allows for recessed balconies to the units and matches the building on Old Marylebone Road. Affordable Housing 3.6. The Proposed Development will deliver 41 housing units in the form of apartments. All apartments are designed to meet the London Housing Design Guide standards and Lifetime Homes, with 10% (four) wheelchair accessible units. All units will be designed and built to achieve Code for Sustainable Homes (CSH) Level It is proposed that all of the 41 residential units will be affordable rental housing units. 7

8 3.8. The unit mix for Sentinel House has been developed in consultation with WCC, and is set out below: Bedrooms Number Mix 1 Bed (2 person) 9 22% 2 Bed (3 person) 4 10% Wheelchair Accessible 2 Bed (4 person) 15 36% 3 Bed (5 person) 7 17% 3 Bed (6 person) 6 15% Total As previously described, the Proposed Development represents additional offsite affordable housing provision in support of the proposed development at the Former St John s Wood Royal Horse Artillery Barracks. As such, the 41 proposed units complement the delivery of 59 intermediate units on the Barracks site, therefore providing 100 units in total. For reference, the proposed mix of these units is as follows: Bedrooms Number Mix 1 bed (1 person) 20 34% 1 bed (2 person) 23 39% 2 Bed (3 person) 14 24% 2 bed (4 person) 2 3% Total 59 Landscaping & Public Realm There is an existing large London Plane tree at the front of the AAH Site, which rises 22m and would otherwise impact on daylight/sunlight and views up to 5th floor of the Proposed Development. As detailed in the accompanying Arboricultural Assessment (contained within Volume 4C of the ES), this tree is significantly unbalanced and unable to grow to a natural form due to previous pollarding It is proposed that this tree is therefore removed and replaced by the planting of three new trees, of more appropriate size and of a similar form and size to existing adjacent trees on Old Marylebone Road. Additionally, the landscaping on the Old Marylebone Road frontage will be extended and improved to create a more attractive view along the street and provide valuable defensible space to the lower residential units The constrained nature of the AAH Site restricts the level of playspace that can viably be accommodated on the Site. As set out in the accompanying draft Heads of Terms for the S106 Agreement, the Applicant has considered options for external hard landscaped playspace to be introduced on the 8th floor level. As set out in the accompanying Design & Access Statement, an area of playspace of approximately 50 m² offering the potential for children to experience climbing, balancing and sliding in a safe environment, has been 8

9 provided. Furthermore, each apartment has its own private amenity area with larger terraces provided at the rooftop apartments In addition to the above, it should be noted that the AAH Site is very well located with regard to existing play and open space in the area. This includes the significant amenity spaces at Regent s Park and Hyde Park. Car & Cycle Parking Volume 4b of the Environmental Statement comprises the Transport Statement for the AAH Site and explains fully the parking and servicing strategy As previously stated, Sentinel House adjoins two residential buildings to the east. Charter Court fronts Harcourt Street and Varsity Court fronts Homer Street, with a shared undercroft basement providing parking for all three buildings, which is accessed by a ramp from Homer Street The existing residential units at Charter Court and Varsity Court are subject to an existing planning condition, which requires one parking space per unit to be permanently provided; these will be retained and will be unaffected by the Proposed Development It is proposed to extend the existing building footprint by extending the building line out towards Old Marylebone Road. The basement will also be extended and reconfigured to maximise the number of parking spaces that can be provided. This includes incorporating the part of the existing basement of Sentinel House currently occupied and used as office space, into the car park layout The proposed layout shows that one space per unit can be retained for the 26 units in Charter Court and Varsity Court and an additional 12 spaces (4 of which will be Blue Badge /wheelchair accessible parking spaces) can be created for use by the new residential development in Sentinel House. This equates to an overall parking provision of 0.56 spaces per unit across the wider site and shared basement and 0.3 spaces per unit when considering Sentinel House in isolation Communal cycle storage will be situated within the car park for the affordable units, with a total of 70 cycle places provided on the ground level and 3 in the basement Additionally, the Applicant is prepared to consider free car club membership for all residents of the Proposed Development for an agreed period of time. This will enable occasional car users to have access to a car without needing to own one and increase parking demand. Access & Servicing Vehicular access via the existing ramp to the shared undercroft basement will be retained and will remain located off Homer Street. Pedestrian access into the new building will be relocated from the corner of Old Marylebone Road 9

10 and Harcourt Street, to the front side of the building, off Old Marylebone Road. Two main entrances will be located at ground level, set back behind a landscaped buffer zone which runs between the façade and the public right of way along Old Marylebone Road Servicing will continue as existing. It is proposed that on-street waiting and loading restrictions will allow for a service vehicle to park along Harcourt Street Refuse collection will occur from two dedicated refuse stores located at ground level on the north and south elevations (Harcourt Street and Homer Street). These will be secured by access codes / keys, which will be provided to the WCC s staff responsible for waste collection in order to access the refuse store and collect the waste. This prevents waste being placed on the public highway and causing obstruction. Construction Management The Applicant is committed to ensuring that disturbance to neighbouring residents during the demolition and construction phases of the Proposed Development is kept to a minimum. The application is accompanied by a Construction Management Plan, prepared by EC Harris which outlines in detail the proposed strategy for managing construction activity. This includes: The appointment of a Community Liaison Officer to communicate information on the upcoming works to local residents directly; Construction taking place within Council approved working hours, with no noisy works to take place until 9.30am, and no working on Sundays/Public Holidays; Utilising off-site manufacturing and prefabrication to minimise wet trades ; and Contractors will be required to comply with the Considerate Constructors Scheme as well as WCC s Code of Construction Practice. 10

11 4. CONSULTATION Context 4.1 As set out previously, the Proposed Development forms additional off-site affordable housing connected to the redevelopment of the Former St John s Wood Royal Horse Artillery Barracks (the Main Site ), circa 1.1km north of Sentinel House. 4.2 The Main Site in St. John s Wood benefits from an extant planning permission granted in May The Planning Permission (08/10114/FULL) has granted consent for the provision of 133 residential units, of which 59 units were to be affordable housing units. 4.3 St. John s Wood Square Ltd acquired the Main Site in April Following a review of the above Consented Scheme, it was decided that a revised scheme for the Main Site would be progressed, reflecting the Applicant s vision for a family orientated environment that enhances the unique characteristics of the locality. Site Search 4.4 The Applicant has engaged in detailed pre-application discussions with WCC in connection with the delivery of affordable housing. In discussions with WCC concerning the provision of off-site affordable housing, a number of potential sites have been considered. The starting point for the search has been the provision of affordable housing within the vicinity of the Main Site, in the St John s Wood area. In addition, certain parts of the borough were excluded from the search for a site due to the existing over-concentrations of social housing within them. The discussions with WCC did focus on a site within St John s Wood. However, this site was not able to be secured by the Applicant, and alternative sites were considered in discussion with WCC. Those discussions led to the currently proposed AAH Site which has been accepted by WCC as being capable of providing off-site affordable housing in connection with the Main Site. 4.5 The Applicant has undertaken significant consultation in respective of the affordable housing proposed for the AAH Site. This consultation includes several meetings with WCC s Housing team as well as meetings with the following Registered Providers (RPs), all of whom are active within the Borough: Genesis Housing; Network Housing; Notting Hill; Octavia Housing; and 11

12 Peabody 4.6 These discussions considered the design, tenure, mix and affordability of the affordable housing proposed on the AAH Site. The main conclusions drawn were as follows; The location of the AAH Site is deemed very accessible with excellent access to transport and amenities; The proposed affordable housing is well designed and considered; The two cores proposed allow for better management of the block; and The mix of units proposed finds a suitable balance between meeting WCC s housing need and best management practise in relation to the proportion of family homes. Community and Stakeholder Engagement 4.7 An extensive programme of consultation has been carried out as part of the design evolution of the Proposed Development and the Design and Access Statement details how it has evolved as a response. 4.8 Consultation has been undertaken with: WCC, including Planning and Design Officers and meetings with local Ward Councillors; Greater London Authority; Transport for London; Marylebone Association; Secured by Design Officer; and Residents and other Local Groups. 4.9 Three pre-application meetings with WCC were held over the period of a year. These have led to significant revisions, particularly in terms of massing for the building and the unit mix. The main concerns of Councillors and Officers during the negotiations were: The projecting balconies were considered a contentious addition to the street scene; Extensive glazing was considered inappropriate due to overheating and ventilation; and The top storey would be considered too prominent and bulky if not set back. 12

13 4.10 In addition to the above pre-application discussions, the proposals have also been subject to community engagement, with a public exhibition being held at Sentinel House between 11 and 14 June 2014, and a follow-up public exhibition held on 16 and 19 July A separate meeting was also held with C&V Management Ltd who represent the owners and residents of the adjacent Charter & Varsity Courts. A more detailed explanation of the consultation approach is provided in the Statement of Community Involvement The main concerns raised can be summarised as follows: Concerns regarding construction impact, dust and noise; Impact on car parking arrangement with increased usage within the same entrance; and The lack of private rented units within the Proposed Development The comments received have helped the Proposed Development to evolve into that which is now submitted. The design responses to the pre-application feedback are discussed in more detail in the accompanying Design & Access Statement, whilst the Construction Management Plan outlines the key measures that will be employed to ensure that construction disturbance is kept to a minimum. 13

14 5. PLANNING POLICY 5.1. This section provides an evaluation of the Proposed Development against planning policy relevant to the AAH Site. The planning policy context comprises three levels of adopted and emerging policy national, regional and local. Within each level there is both planning policy and guidance which combine to provide the framework for the consideration of the Proposed Development. The key planning policy documents taken into account at this stage and referred to in this Planning Statement include those listed below Specialist guidance has also been taken into account in assessing the impacts of the Proposed Development through supporting documents. National Planning Policy 5.3. National planning policy is set out in the form of the National Planning Policy Framework (NPPF) which was adopted on 27 March The NPPF establishes overarching principles of the planning system, including the requirement of the system to drive and support development and supports approving development proposals that accord with the development plan without delay. There is also a presumption in favour of sustainable development [which] should be seen as a golden thread running through both plan-making and decision-taking The Proposed Development will use previously developed land within an area of excellent public transport accessibility. The design has been informed by the principles of sustainability and is therefore compliant with the underlying principles of the NPPF. The Development Plan 5.5. The relevant statutory development plans for the AAH Site comprises the: London Plan (2011), incorporating Revised Early Minor Alterations to the London Plan (2013) - This is the overall strategic plan for London, setting out a fully integrated economic, environmental, transport and social framework for the development of the capital to In 2013, the Mayor adopted the Revised Early Minor Alterations to the London Plan, which sought to ensure consistency between the London Plan and the NPPF. Draft Further Alterations to the London Plan, to address key housing and employment issues emerging from the latest census data are currently being progressed. An Examination in Public regarding the alterations is due to commence on 1 September WCC Adopted Westminster City Plan (2013) This document sets out the vision for the City of Westminster up to and beyond 2026 and includes the strategic policies for the borough. Further revisions to include detailed City Management Policies are proposed. As these are yet to be subject to Regulation 19 consultation, submission or examination, WCC do not 14

15 consider that these policies are advanced enough to be used for determining planning applications. WCC Replacement Unitary Development Plan saved policies (UDP) (2007) Parts of the UDP were saved by the Secretary of State in January 2010 and remain in force until the adoption of replacement City Management Policies The Mayor has also published Supplementary Planning Guidance (SPG) documents which expand upon policy within the London Plan and are material considerations. In addition, there is a range of local planning guidance that would be used alongside the aforementioned documents to help determine the Application. These include Westminster Supplementary Planning Guidance documents such as the City of Westminster Inclusive Design and Access (2007) and WCC Air Quality Strategy and Action Plan (2001). Relevant guidance documents have been referred to in this Section of the Statement and in the relevant supporting documents which accompany the application. Assessment of Conformity with Planning Policy 5.7. The following sections below assess the conformity of the Proposed Development against relevant National and Development Plan policies. For ease of reference, these policies have been grouped by topic. More detailed reviews of planning policies can be found in the relevant Environmental Statement chapters and supporting documents that accompany the application. Land Use 5.8. The NPPF is underpinned by 12 core principles as outlined in paragraph 17 of that document. These include encouraging the effective use of land by reusing land that has been previously developed (provided it is not of high environmental value) Chapter 6 of the NPPF concerns delivering a wide choice of high quality homes, with paragraph 39 stating that housing applications should be considered in the context of the presumption in favour of sustainable development The London Plan requires London Boroughs to achieve and exceed minimum average annual housing targets. Proposals should also seek to optimise housing potential, in line with Policy 3.4 and ensure that new housing is designed to be of the highest quality internally, externally and in relation to their context and to the wider environment, in line with Policy The London Plan requires Boroughs to seek affordable housing from suitable development proposals, as dictated by Policies 3.11 and Proposals are generally considered suitable when they have the capacity to provide for 10 or more homes. The amount of affordable housing sought, according to Policy 3.12, should be the maximum reasonable amount taking into consideration, amongst other requirements, the need to encourage rather than restrain residential development and the specific circumstances of individual sites. 15

16 Negotiations on sites should take account of their individual circumstances including development viability The Westminster City Plan, at Policy S14 notes that residential use is the priority use across the Borough unless specified otherwise. Proposals should also seek to meet housing need, in accordance with Policy S15 and provide an appropriate mix of units The City Plan states that an additional 5,600 social rented homes would be required annually to meet demand. There is typically a waiting list of about 5,500 households in priority need for social housing, and a further 20,000 households who do not qualify for social housing and cannot afford market housing Policy S16 of the City Plan states that off site affordable housing will be acceptable where the affordable housing provision is greater and of higher quality than would be possible on- or off site, in the vicinity, and where it would not add to an existing localised concentration of social housing This approach is in line with the main objectives of Saved UDP Policy H4, although it should be noted that the Council has prepared a specific document on how to apply affordable housing policy in the period between the adoption of the Core Strategy and the adoption of the City Management Plan. This document reiterates the hierarchical policy approach to on-site provision, off site provision and via a commuted sum The redevelopment of Sentinel House for affordable residential housing conforms with Policy S14 of the City Plan which identifies residential use as the priority use within the City of Westminster. There is no local planning policy protection for the existing office floorspace, which as previously mentioned, suffers from a high vacancy rate It is proposed that the entirety of the Proposed Development is to be for affordable rent housing units. Each unit complies with or exceeds the relevant housing design policies The accompanying Overview Affordable Housing Statement produced by DS2 provides full details of the affordable housing offer. An Affordable Housing Viability Report, which is submitted confidentially for assessment by WCC also accompanies the application. When combined with the Main Site, the Proposed Development will deliver 100 affordable housing units, of which 41 will be Affordable Rent at Sentinel House and 59 Intermediate units at the Main Site. This represents a 70% increase on the number of affordable housing units proposed through the Consented Scheme and an increase in the number of social/affordable rented units The Viability Assessment has demonstrated that the current affordable housing offer of 100 affordable housing units is the maximum reasonable amount of affordable housing that the Proposed Development at the Main Site and AAH Site can provide. 16

17 5.20. Overall, in the context of the analysis provided above, the mix and type of land uses proposed are considered to be acceptable. Design The NPPF considers that good design is a key aspect of sustainable development, is indivisible from good planning, and should contribute positively to making places better for people It goes on to say that it is important to plan positively for the achievement of high quality and inclusive design for all development, including individual buildings, public and private spaces and wider area development schemes The NPPF further states that in determining applications, great weight should be given to outstanding or innovative designs which help raise the standard of design more generally in the area The London Plan requires all large scale proposals to be of the highest quality design especially in terms of impact on views, the wider and local townscape context and local environmental impact. The achievement of high quality urban design is also highlighted as a key factor in achieving a more attractive and green city The London Plan requires all proposals to be of the highest quality design especially in terms of any impact on views, the wider and local townscape context and local environmental impact. The achievement of high quality urban design is also highlighted as a key factor in achieving a more attractive and green city Policy 7.6 sets out design principles, which include maximising the potential of sites, promoting high quality inclusive design and enhancement of the public realm. Proposals should also achieve an inclusive environment (Policy 7.2), design out crime (Policy 7.3) and have regard to local character (Policy 7.4) The Council, within the City Plan Policy S28, requires the design of proposals to incorporate exemplary standards of sustainable and inclusive urban design and architecture. The Saved Policies of the UDP also champion the highest standards of design The existing building is of little architectural merit and it is not considered that its demolition would have a detrimental impact on the character of the area or the streetscape. The evolution of the Proposed Development with regard to the local character is detailed in the accompanying Design & Access Statement. The result is a development of the highest quality architectural quality which conforms to all relevant design criteria and policy. 17

18 Transport, Servicing & Refuse Paragraph 34 of the NPPF states that Plans and decisions should ensure developments that generate significant movement are located where the need to travel will be minimised and the use of sustainable transport modes can be maximised Paragraph 32 requires developments that generate significant amounts of movement to be supported by a Transport Statement or Transport Assessment, and states that plans and decisions should take account of whether: the opportunities for sustainable transport modes have been taken up depending on the nature and location of the site, to reduce the need for major transport infrastructure; safe and suitable access to the site can be achieved for all people; and improvements can be undertaken within the transport network that cost effectively limit the significant impacts of the development. Development should only be prevented or refused on transport grounds where the residual cumulative impacts of development are severe Policy 6.3 of the London Plan states that development proposals should ensure that impacts on transport capacity and the transport network, at both a corridor and local level, are fully assessed. Development should not adversely affect safety on the transport network The relevant Development Plan policies relating to transport, refuse and servicing are provided in full within Volume 4B of the Environmental Statement, which should be referred to for further information and read in conjunction with the following evaluation This assessment concludes that the Proposed Development will result in no material impact on the operation of the surrounding highway network and will result in a negligible impact on the surrounding public transport network Sentinel House adjoins two existing residential buildings; Charter Court fronts Harcourt Street and Varsity Court fronts Homer Street. A shared undercroft basement provides parking for all three buildings, accessed by a ramp from Homer Street The WCC UDP states that a maximum of 1 space per residential unit may be provided for 1 and 2 bedroom units, and a maximum of 1.5 spaces per residential unit may be provided for units with 3 or more bedrooms. However, the London Plan has supported parking maximums with a presumption for approval where lower than maximum parking provision has been applied for. As the AAH Site is located within an area with a high PTAL rating, the London Plan policies suggest such residential development should aim for significantly less than 1 space per unit. 18

19 5.36. The Proposed Development shows that one space per unit could be retained for the 26 residential units at Charter Court and Varsity Court and an additional 12 spaces (of which 4 will be Blue Badge/wheelchair accessible spaces) can be created for use by the new residential development at Sentinel House. This equates to an overall parking provision of 0.56 spaces per unit across the wider site and shared basement and approximately 0.30 spaces per unit when considering Sentinel House in isolation, which is in accordance with WCC maximum car parking standards Furthermore, 20% of the new parking spaces to be associated with Sentinel House will provide active electric vehicle charging points (EVCPs) and a further 20% will provide passive EVCPs, to accommodate potential future demand; this is also policy compliant. Cycle parking will be provided in two secure parking/storage facilities on-site, offering up to 73 cycle spaces which exceeds the minimum standards The Proposed Development is therefore considered to be acceptable in transport terms. Energy & Sustainability The relevant national, regional and local planning policies relating to sustainability and energy are assessed in full within the supporting Sustainability and Energy Statement (produced by Atelier Ten), which should be referred to for further information. However, we provide a summary of the key policies and evaluation of the Proposed Development against these below The NPPF notes that planning plays a key role in helping shape places to secure radical reductions in greenhouse gas emissions, minimising vulnerability and providing resilience to the impacts of climate change, and supporting the delivery of renewable and low carbon energy and associated infrastructure. As such it includes a number of sustainability related objectives, most notably the presumption in favour of sustainable development, and the effective use of land by reusing land that has been previously developed The London Plan at Policy 5.2 advises that development proposals should make the fullest contribution to minimising carbon dioxide emissions in accordance with the following energy hierarchy: Be lean: use less energy; Be clean: supply energy efficiently; and Be green: use renewable energy The Policy requires all new residential buildings to achieve a 25% improvement on 2010 Part L of the Building regulations by 2010, 40% improvement by 2013, and be carbon zero by

20 5.43. Policy 5.7 states that within the framework of the energy hierarchy, major development proposals should provide a reduction in expected carbon dioxide emissions through the use of on-site renewable energy generation, where feasible Policy CS40 of the Westminster City Plan concerns renewable energy and requires all major developments to maximise on-site renewable energy generation to achieve at least 20% reduction of CO2 emissions and, where feasible, towards zero carbon emissions, except where WCC considers that it is not appropriate or practicable due to the local historic environment, air quality and/or site constraints The accompanying Sustainability and Energy Statement provides full details of the sustainable credentials of the Proposed Development in accordance with policy requirements These supporting documents outline the following key credentials in relation to sustainability and energy. By way of summary however key compliant sustainability measures include: The AAH Site benefits from excellent public transport links, which is considered to accord with the presumption of sustainable development contained in the NPPF; The Proposed Development can achieve an estimated 20% carbon dioxide emission reduction of the whole development (excluding unregulated loads); Provision of roof mounted PV panels; The residential units will achieve Code for Sustainable Homes (CfSH) Level 4. A CfSH pre-assessment is contained within the Appendices of the supporting Sustainability and Energy Strategy to demonstrate that this target can be met; A Construction Management Plan will be implemented during construction to control potential environmental impacts and contractors will be required to sign up to the Considerate Constructors Scheme; and A total of 73 cycle parking spaces will be provided to encourage the use of cycling as a sustainable transport measure. Additionally, 20% of new parking spaces for Sentinel House will provide active electric vehicle charging points (EVCPs) and a further 20% will provide passive EVCPs, to accommodate potential future demand Due to the measures outlined above, the scheme is considered to addresses the sustainability requirements set out in the national, regional and local policies. 20

21 Daylight, Sunlight and Overshadowing National guidelines for daylight and sunlight are contained with the BRE publication Site Layout Planning for Daylight and Sunlight A Guide to Good Practice (2011) London Plan Policy 7.6 states that buildings and structures should not cause unacceptable harm to the amenity of surrounding land and buildings, particularly residential buildings, in relation to privacy, overshadowing, wind and microclimate Saved UDP Policy ENV13 part D notes that the Council will ensure that both new and replacement accommodation, particularly residential, receives adequate daylight and sunlight. In addition, it specifies at part E that WCC will normally resist proposals which result in a material loss of daylight/sunlight, particularly to existing dwellings With regards to overlooking, the same Saved Policy at part F requires proposed development to take into consideration enclosure and overlooking and not increase the sense of either being increased The design of the Proposed Development has been informed with full consideration of potential issues regarding daylight, sunlight and overlooking, as set out in the accompanying Environmental Statement technical appendices. The Proposed Development would replicate the existing development in terms of scale and massing and therefore none of the surrounding properties experience alterations in light beyond the BRE recommended Guidelines. In light of this and given the urban setting, the Proposed Development is considered to be acceptable in terms of daylight, sunlight and overlooking. Noise, Vibration & Air Quality In relation to noise, the NPPF states that planning policies and decisions should aim to: avoid noise giving rise to significant adverse impacts on health and quality of life as a result of new development; and mitigate and reduce to a minimum other adverse impacts on health and quality of life arising from noise from new development, including through the use of conditions London Plan Policy 7.15 states that development proposals should seek to reduce noise by minimising the existing and potential adverse impacts of noise on, from, within or in the vicinity of proposals Westminster Saved Policies ENV6 and ENV7 seek to ensure that development proposals do not have an adverse impact on the noise environment, including any noise generated from plant, machinery and internal activity. 21

22 5.56. WCC is designated as an Air Quality Management Area due to existing high levels of pollutants. Policy ENV5 of the UDP states that WCC will encourage new development that does not lead to an increase in local air pollution A full evaluation of the Proposed Development is provided within the supporting Environmental Statement. This demonstrates that the use of appropriate mitigation measures, to be set out within the Construction Environmental Management Plans (CEMP) and Construction Method Statements to be agreed with WCC, will mitigate noise and vibration and air quality impacts on sensitive receptors that could arise during construction In the context of the above, the Proposed Development is therefore considered to be acceptable in terms of noise, vibration and air quality. Ecology, Aboriculture and Biodiversity The NPPF notes that the planning system should contribute to and enhance the natural and local environment. This should be achieved by (amongst other actions) recognising the wider benefits of ecosystem services and minimising impacts on biodiversity and providing net gains in biodiversity where possible The NPPF also stipulates that LPAs, when determining planning applications, should seek to conserve and enhance biodiversity, and encourage the incorporation of biodiversity in and around developments. Planning permission should be refused for development resulting in the loss or deterioration of irreplaceable habitats, unless the need for, and benefits of, the development in that location clearly outweigh the loss Policy 7.19 of the London Plan concerns biodiversity and sets out the Mayor s policy in relation to biodiversity and access to nature Policy 5.3 concerns Sustainable Design and Construction and advocates that the highest standards of sustainable design and construction should be achieved in London to improve the environmental performance of new developments and to adapt to the effects of climate change over their lifetime. Policy 5.10 promotes urban greening, such as new planting in the public realm, including tree planting, green roofs and walls and soft landscaping Policy CS37 of the City Plan states that biodiversity and green infrastructure will be protected and enhanced throughout the City of Westminster and opportunities to extend and create new wildlife habitat as part of development will be maximised Volume 4C of the ES includes an Extended Phase I Habitat Survey and an Arboricultural Assessment of the Proposed Development The Proposed Development will require the removal of the London Plane tree and existing scrub. The Ecology Report confirms that habitats present within the AAH Site are common and widespread, and that landscape planting would compensate for any habitat loss in the long term. As detailed in the Arboricultural Report, the tree is a regrown pollard which due to its naturally 22

23 spread crown form and close proximity to Sentinel House, has become significantly unbalanced. It is proposed that the loss of the existing tree will be mitigated with the planting of three new semi-mature Gingko trees and the relandscaping of the frontage. This will maintain tree cover and enhance the character and appearance of the local area in this regard In the context of the above, the Proposed Development is therefore considered to be acceptable in terms of ecology and biodiversity. Archaeology Paragraph 128 of the NPPF outlines that Local Planning Authorities should require developers to submit an appropriate desk-based assessment and, where necessary, a field evaluation, where a site on which development is proposed includes or has the potential to include heritage assets with archaeological interest London Plan Policy 7.8 requires development proposals to make provision for the protection of archaeological resources The UDP notes, as supporting paragraph , that WCC will implement Saved Policy DES 11 under relevant legislation and statutory guidance and by means of legal agreements and planning conditions The AAH Site lies within the Paddington and Lillestone Villages Area of Special Archaeological Priority. A Historic Environment Assessment of the Proposed Development is provided within the supporting Environmental Statement Technical Appendices This concludes that in light of the low potential of the AAH Site to contain significant archaeological remains, along with the relatively small area of proposed impact, further investigation is not considered necessary to determine an application for planning consent. It is proposed that an archaeological watching brief be carried out during preliminary ground preparation and subsequent new foundation construction, which would ensure that any previously unrecorded archaeological assets, if present, were not removed without record Any archaeological work would be undertaken in accordance with an approved Written Scheme of Investigation (WSI) and could be carried out under the terms of a standard archaeological planning condition set out under the granting of planning permission In the context of the above, the Proposed Development is therefore considered to be acceptable in terms of archaeology. 23

24 6. PLANNING OBLIGATIONS AND COMMUNITY INFRASTRUCTURE LEVY 6.1. Section 106 of the Town and Country Planning Act 1990 allows the entering into of an obligation, by agreement or otherwise, between the local planning authority and any person interested in the land for the purposes of: restricting the development or use of the land in any specified way; requiring specified operations or activities to be carried out in, on, under or over the land; requiring the land to be used in any specified way; or requiring a sum or sums to be paid to the authority (or, in a case where section 2E applies, to the Greater London Authority) on a specified date or dates or periodically Regulation 122 of the Community Infrastructure Levy Regulations (2010) states that planning obligations may only constitute a reason for granting planning permission for the development if the obligation is: necessary to make the development acceptable in planning terms; directly related to the development; and fairly and reasonably related in scale and kind to the development The NPPF states that sustainable development must be deliverable. It states at paragraph 173 that: To ensure viability, the costs of any requirements likely to be applied to development, such as requirements for affordable housing, standards, infrastructure contributions or other requirements should, when taking account of the normal cost of development and mitigation, provide competitive returns to a willing land owner and willing developer to enable the development to be deliverable Paragraph 203 of the NPPF states that: Local planning authorities should consider whether otherwise unacceptable development could be made acceptable through the use of conditions or planning obligations Paragraph 204 reinforces the requirement that planning obligations meet the tests set out at regulation 122 of the CIL Regulations. 24

25 The Development Plan 6.6. The setting of a London-wide Community Infrastructure Levy ( CIL ) was a power given to the Mayor under the Planning Act 2008 designed to raise money for the infrastructure needed to develop an area. The Mayor formally adopted the CIL charging schedule on 1 April For development schemes in the City of Westminster, the Mayoral CIL is levied at 50 per m² of uplift from existing to consented floorspace in lawful use. The money raised will go towards London's share of the Crossrail funding package agreed with the Government At the local level, Policy S32 of the City Plan requires planning obligations to mitigate the directly related impacts of development; ensure the development complies with policy requirements within the Development Plan; and, if appropriate, seek contributions for supporting infrastructure WCC has also adopted a Supplementary Planning Guidance (SPG) document on planning obligations (January 2008). This seeks to secure obligations towards a whole range of items, depending on the type and size of development proposed. Planning Obligations for the Development Draft Heads of Terms for a legal agreement pursuant to Section 106 of the Town and Country Planning Act 1990 are provided in the bullet points below. These provide a package of planning obligations designed to mitigate the impact of the Proposed Development, based on the key Policy requirements in relation to planning obligations, as detailed in the previous paragraphs Proposed obligations can be summarised as follows: Transfer of Sentinel House to a Registered Provider; Provision of a Residents Car Parking Scheme (12 spaces) and payment of costs of a standard car club membership for one occupier of each affordable unit; Compliance with the Code of Construction Practice, the requirements of which shall commence on demolition of the existing buildings; Environmental Inspectorate Contribution; and Landscaping and public realm improvements along Old Marylebone Road, including the replacement of the existing tree with three new specimens The Draft Heads of Terms are provided without prejudice. 25

DELEGATED DECISION on 1st September 2015

DELEGATED DECISION on 1st September 2015 Application N o : 14/04810/OUT LONDON BOROUGH OF BROMLEY TOWN PLANNING RENEWAL AND RECREATION DEPARTMENT DELEGATED DECISION on 1st September 2015 14/04810/OUT Claire Harris 4 Oaklands Road Bromley BR1

More information

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Location 374B Long Lane London N2 8JX Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Applicant: Ms Katrin Hirsig Proposal: Single storey

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012. LOCATION: 15A Pyecombe Corner, London, N12 7AJ REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:

More information

Garages To Rear Of The Willows 1025 High Road London N20 0QE

Garages To Rear Of The Willows 1025 High Road London N20 0QE Location Garages To Rear Of The Willows 1025 High Road London N20 0QE Reference: 15/03944/FUL Received: 25th June 2015 Accepted: 2nd July 2015 Ward: Totteridge Expiry 27th August 2015 Applicant: Mr Alex

More information

Reference: 15/06961/RCU Received: 13th November 2015 Accepted: 17th November 2015 Ward: Coppetts Expiry 12th January 2016

Reference: 15/06961/RCU Received: 13th November 2015 Accepted: 17th November 2015 Ward: Coppetts Expiry 12th January 2016 Location 91 Manor Drive London N20 0XD Reference: 15/06961/RCU Received: 13th November 2015 Accepted: 17th November 2015 Ward: Coppetts Expiry 12th January 2016 Applicant: Mr Christos Papadopoulos Proposal:

More information

6B Bertram Road London NW4 3PN

6B Bertram Road London NW4 3PN Location 6B Bertram Road London NW4 3PN Reference: 16/6621/RCU Received: 14th October 2016 Accepted: 19th October 2016 Ward: West Hendon Expiry 14th December 2016 Applicant: Proposal: Ms Kavita Singh Erection

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

REFERENCE: B/00601/12 Received: 11 February 2012 Accepted: 21 February 2012 WARD(S): High Barnet Expiry: 17 April 2012

REFERENCE: B/00601/12 Received: 11 February 2012 Accepted: 21 February 2012 WARD(S): High Barnet Expiry: 17 April 2012 LOCATION: 37 Kings Road, Barnet, Herts, EN5 4EG REFERENCE: B/00601/12 Received: 11 February 2012 Accepted: 21 February 2012 WARD(S): High Barnet Expiry: 17 April 2012 Final Revisions: APPLICANT: PROPOSAL:

More information

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Location 5 Gratton Terrace London NW2 6QE Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Applicant: WSD (Gratton) Ltd Proposal: The

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

18 Birkbeck Road London NW7 4AA. Reference: 15/02994/HSE Received: 14th May 2015 Accepted: 26th May 2015 Ward: Mill Hill Expiry 21st July 2015

18 Birkbeck Road London NW7 4AA. Reference: 15/02994/HSE Received: 14th May 2015 Accepted: 26th May 2015 Ward: Mill Hill Expiry 21st July 2015 Location 18 Birkbeck Road London NW7 4AA Reference: 15/02994/HSE Received: 14th May 2015 Accepted: 26th May 2015 Ward: Mill Hill Expiry 21st July 2015 Applicant: Proposal: Mrs Tania Kallis Single storey

More information

Ground Floor Flat 15 Redbourne Avenue London N3 2BP

Ground Floor Flat 15 Redbourne Avenue London N3 2BP Location Ground Floor Flat 15 Redbourne Avenue London N3 2BP Reference: 17/4160/FUL Received: 28th June 2017 Accepted: 29th June 2017 Ward: West Finchley Expiry 24th August 2017 Applicant: Proposal: Mr

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location The Avenue Tennis Club The Avenue London N3 2LE Reference: 16/6509/FUL Received: 10th October 2016 Accepted: 10th October 2016 Ward: Finchley Church End Expiry 5th December 2016 Applicant: Mrs

More information

3 Abbey View Mill Hill London NW7 4PB

3 Abbey View Mill Hill London NW7 4PB Location 3 Abbey View Mill Hill London NW7 4PB Reference: 15/03203/HSE Received: 26th May 2015 Accepted: 16th June 2015 Ward: Mill Hill Expiry 11th August 2015 Applicant: Proposal: Mr Richard Benson Alterations

More information

3 Tretawn Gardens London NW7 4NP

3 Tretawn Gardens London NW7 4NP Location 3 Tretawn Gardens London NW7 4NP Reference: 16/7886/HSE Received: 12th December 2016 Accepted: 19th December 2016 Ward: Mill Hill Expiry 13th February 2017 Applicant: Proposal: Mr Murray Two storey

More information

PLANNING COMMITTEE. 14 October 2014

PLANNING COMMITTEE. 14 October 2014 AGENDA ITEM NO 8 PLANNING COMMITTEE 14 October 2014 APPLICATION NUMBER : CA//14/01744/FUL PROPOSAL : Extension and conversion of roof space of an existing detached bungalow together with enhanced parking

More information

Tennis Court Rear Of 3-5 Corringway London NW11 7ED

Tennis Court Rear Of 3-5 Corringway London NW11 7ED Location Tennis Court Rear Of 3-5 Corringway London NW11 7ED Reference: 18/4122/FUL Received: 3rd July 2018 Accepted: 3rd July 2018 Ward: Garden Suburb Expiry 28th August 2018 Applicant: Ms Sarah Robinson

More information

Reference: 16/1234/HSE Received: 25th February 2016 Accepted: 2nd March 2016 Ward: High Barnet Expiry 27th April 2016

Reference: 16/1234/HSE Received: 25th February 2016 Accepted: 2nd March 2016 Ward: High Barnet Expiry 27th April 2016 Location 7 Sunset View Barnet EN5 4LB Reference: 16/1234/HSE Received: 25th February 2016 Accepted: 2nd March 2016 Ward: High Barnet Expiry 27th April 2016 Applicant: Proposal: Mr & Mrs Peter & Anny Woodhams

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Final Revisions: Provision of single storey modular classroom and associated works.

Final Revisions: Provision of single storey modular classroom and associated works. LOCATION: St Catherines Catholic Primary School, Vale Drive, Barnet, Herts, EN5 2ED REFERENCE: B/01924/12 Received: 17 May 2012 Accepted: 28 May 2012 WARD(S): Underhill Expiry: 23 July 2012 Final Revisions:

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ Committee Date: 11/07/2013 Application Number: 2013/03520/PA Accepted: 20/05/2013 Application Type: Full Planning Target Date: 15/07/2013 Ward: Sutton Vesey Land Adj. 63 Sunny Bank Road, Sutton Coldfield,

More information

49 Broughton Avenue London N3 3EN

49 Broughton Avenue London N3 3EN Location 49 Broughton Avenue London N3 3EN Reference: 17/3448/RCU Received: 30th May 2017 Accepted: 1st June 2017 Ward: Finchley Church End Expiry 27th July 2017 Applicant: Mr P Atwal Proposal: Erection

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS Planning Area Committee 25 June 2018 Addendum to Officers Report 17/8150/RMA West Hendon Regeneration Area (Phase 6) Pages 11 54 The conditions section shall be changed as follows: RESTRICTION OF PERMITTED

More information

46 Burley Street, Leeds, LS3 1LB Retail Statement

46 Burley Street, Leeds, LS3 1LB Retail Statement , LS3 1LB Retail Statement , LS3 1LB Retail Statement October 2014 Indigo Planning Indigo Planning Limited Toronto Square Leeds LS1 2HJ Tel: 0113 380 0270 Fax: 0113 380 0271 info@indigoplanning.com indigoplanning.com

More information

Great Easton Neighbourhood Plan Statement of Basic Conditions

Great Easton Neighbourhood Plan Statement of Basic Conditions Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..

More information

Final Revisions: Reason: For the avoidance of doubt and in the interests of proper planning.

Final Revisions: Reason: For the avoidance of doubt and in the interests of proper planning. LOCATION: Totteridge Village Hall, Badgers Croft, London, N20 8AH REFERENCE: B/01780/12 Received: 11 May 2012 Accepted: 25 May 2012 WARD(S): Totteridge Expiry: 20 July 2012 Final Revisions: APPLICANT:

More information

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. ITEM 9 Application Number: 18/00266/DISCON Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. AT The Point, 602 Midsummer Boulevard,

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location Victoria Park Ballards Lane London N3 Reference: 17/1030/FUL Received: 20th February 2017 Accepted: 20th February 2017 Ward: West Finchley Expiry 17th April 2017 Applicant: Mrs Mia Freedman Proposal:

More information

CA//17/02777/FUL. Scale 1:1,250. Planning Services Canterbury City Council Military Road Canterbury Kent CT1 1YW

CA//17/02777/FUL. Scale 1:1,250. Planning Services Canterbury City Council Military Road Canterbury Kent CT1 1YW O CA//17/02777/FUL Scale 1:1,250 Map Dated: 15/03/2018 Planning Services Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 16 PLANNING COMMITTEE APPLICATION NUMBER: SITE LOCATION:

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 11 October 2016 by Mike Hayden BSc DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 21 November 2016 Appeal

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A07-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: Development Management Committee (South) Development Manager DATE: 21 June 2016 DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Outline application for

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13

More information

Brookside Walk Children's Play Area, London, NW4

Brookside Walk Children's Play Area, London, NW4 LOCATION: Brookside Walk Children's Play Area, London, NW4 REFERENCE: H/05584/13 Received: 26 November 2013 Accepted: 11 December 2013 WARD(S): Hendon Expiry: 05 February 2014 Final Revisions: APPLICANT:

More information

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Planning Committee 04/02/2015 Schedule Item 6 Ref: Address: Ward: Proposal: PP/2014/5145 Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Greenford Broadway Installation of sports pitch, reconstruction

More information

Planning and Sustainability Statement

Planning and Sustainability Statement Land adjacent to Manor Farm, Catterick Village Pallett Hill Sand and Gravel Co Ltd Proposed 10 new dwellings, (6 No market dwellings and 4 No affordable dwellings) with access, associated car parking and

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

St Marys Church Of England High School Downage London NW4 1AB

St Marys Church Of England High School Downage London NW4 1AB Location St Marys Church Of England High School Downage London NW4 1AB Reference: 16/2877/FUL Received: 29th April 2016 Accepted: 10th May 2016 Ward: Hendon Expiry 5th July 2016 Applicant: Proposal: Governors

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

LOCATION: 592 Finchley Road, London, NW11 7RX REFERENCE: F/03977/12 Received: 22 October 2012 Accepted: 29 November 2012 WARD(S): Childs Hill Expiry:

LOCATION: 592 Finchley Road, London, NW11 7RX REFERENCE: F/03977/12 Received: 22 October 2012 Accepted: 29 November 2012 WARD(S): Childs Hill Expiry: LOCATION: 592 Finchley Road, London, NW11 7RX REFERENCE: F/03977/12 Received: 22 October 2012 Accepted: 29 November 2012 WARD(S): Childs Hill Expiry: 24 January 2013 Final Revisions: APPLICANT: Mr S Kapoor

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) 345786 Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 APPROVAL OF RESERVED MATTERS FROM APPLICATION CHE/12/00234/OUT (1) LAYOUT,

More information

2014/0943 Reg Date 06/11/2014 Lightwater

2014/0943 Reg Date 06/11/2014 Lightwater 2014/0943 Reg Date 06/11/2014 Lightwater LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: LAND REAR OF 4, 6 & 8 MACDONALD ROAD, LIGHTWATER, GU18 5TN Erection of 2 linked-detached two storey dwellings with

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 23 January 2017 by Gareth Wildgoose BSc (Hons) MSc MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 6 February

More information

Aylesbury Estate, Southwark. Notting Hill Housing Trust. Planning Statement Revised February 2015

Aylesbury Estate, Southwark. Notting Hill Housing Trust. Planning Statement Revised February 2015 Aylesbury Estate, Southwark Notting Hill Housing Trust Planning Statement Revised February 2015 Planning Statement / February 2015 / Deloitte Real Estate Contents 1 Introduction 1 2 Aylesbury Estate Site

More information

The Compton School, Summers Lane, London, N12 0QG

The Compton School, Summers Lane, London, N12 0QG LOCATION: The Compton School, Summers Lane, London, N12 0QG REFERENCE: F/04511/12 Received: 30 November 2012 Accepted: 30 November 2012 WARD(S): Woodhouse Expiry: 01 March 2013 Final Revisions: APPLICANT:

More information

3.1 The hybrid planning application proposes the following description of development:

3.1 The hybrid planning application proposes the following description of development: CHAPTER 3: PROPOSED DEVELOPMENT 3.1 The hybrid planning application proposes the following description of development: Hybrid (part-outline/part-full) planning application for a single composite development

More information

Newcombe House and Kensington Church Street Planning Statement Addendum

Newcombe House and Kensington Church Street Planning Statement Addendum Newcombe House and Kensington Church Street Planning Statement Addendum July 2018 1 Contents 1 Executive Summary 2 2 Introduction 3 3 Background 6 4 Proposed Amendments 8 5 Planning Policy Update 14 6

More information

2015/0291 Reg Date 13/04/2015 Parkside

2015/0291 Reg Date 13/04/2015 Parkside 2015/0291 Reg Date 13/04/2015 Parkside LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: BROOK GREEN & TINYBROOK, WAVERLEY CLOSE, CAMBERLEY, GU15 1JH Outline application for the erection of two blocks of flats

More information

2. The application, which is a full plans application, is for a commercial development comprising B1, D1, D2 and A3 uses.

2. The application, which is a full plans application, is for a commercial development comprising B1, D1, D2 and A3 uses. Former Taff Vale Shopping Centre, Taff Street, Pontypridd, CF37 4TR PLANNING APPLICATION SUPPORTING STATEMENT May 2017 Ref.11431/1 INTRODUCTION AND APPLICATION CONTEXT 1. This planning application statement

More information

Ebbsfleet Development Corporation

Ebbsfleet Development Corporation Title of Paper Planning and Housing Delivery Report September 2018 Presented by Sub-Committee Mark Pullin, Chief Planning Officer Planning Committee Purpose of Paper and Executive Summary This paper provides

More information

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION) AGENDA ITEM NO: Report to: PLANNING BOARD Date: 10 September, 2003 Report from: Borough Planning Officer Application Address: Proposal: Application No: Recommendation: Ward: File No: Applicant: Interest:

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

Report Author/Case Officer: Paul Keen Senior Planning Officer (Dev Control) Contact Details:

Report Author/Case Officer: Paul Keen Senior Planning Officer (Dev Control) Contact Details: APP 03 Application Number: 17/02060/FUL Description A full planning application for the demolition of an existing bungalow (C3 use class) and associated out buildings and the erection of two, two storey

More information

Ward: West Wittering. Proposal Change of use from public highway pavement to residential garden use.

Ward: West Wittering. Proposal Change of use from public highway pavement to residential garden use. Parish: West Wittering Ward: West Wittering WW/17/03295/FUL Proposal Change of use from public highway pavement to residential garden use. Site Izora 1 Watersedge Gardens West Wittering PO20 8RA Map Ref

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley Application Number 17/00982/REM Proposal Site Applicant Recommendation Reason for report Application for the approval of reserved matters (means of access, landscaping, layout, scale and appearance) relating

More information

APP/G1630/W/15/

APP/G1630/W/15/ Appeal Decision Site visit made on 20 October 2015 by William Fieldhouse BA (Hons) MA MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 20 November

More information

Introduction. Grounds of Objection

Introduction. Grounds of Objection Planning application ref. number 18/04496/APP Planning application to Aylesbury Vale District Council for the erection of 17 dwellings and associated works to the South of Hogshaw Road Granborough. Granborough

More information

Chief executive's department Planning division Development management (5th floor - hub 2) PO Box LONDON SE1P 5LX

Chief executive's department Planning division Development management (5th floor - hub 2) PO Box LONDON SE1P 5LX Mr Guy Bransby JLL 30 Warwick Street W1B 5NH Dear Mr Bransby Chief executive's department Planning division Development management (5th floor - hub 2) PO Box 64529 LONDON SE1P 5LX Your Ref: Our Ref: 17/EQ/0421

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Outh SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Director for Planning and Economic Development S/0179/18/OL. Histon. Approval.

Outh SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Director for Planning and Economic Development S/0179/18/OL. Histon. Approval. Outh SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 4 April 2018 AUTHOR/S: Joint Director for Planning and Economic Development Application Number: Parish(es): Proposal: Site address:

More information

37 NAGS HEAD LANE BRENTWOOD ESSEX CM14 5NL

37 NAGS HEAD LANE BRENTWOOD ESSEX CM14 5NL SITE PLAN ATTACHED 37 NAGS HEAD LANE BRENTWOOD ESSEX CM14 5NL RAISE RIDGE, EXTEND HIPPED ROOF TO GABLE AND ADD SIDE DORMER WITH PART SINGLE PART TWO STOREY REAR EXTENSION INCORPORATING JULIETTE BALCONY

More information

The term 'development' in the conditions below means the development permitted by this consent.

The term 'development' in the conditions below means the development permitted by this consent. APPENDIX 1 Conditions The term 'development' in the conditions below means the development permitted by this consent. 1 Approved plans The development hereby permitted shall be carried out in accordance

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

ROBINSON ESCOTT PLANNING LLP

ROBINSON ESCOTT PLANNING LLP ROBINSON ESCOTT PLANNING LLP CHARTERED TOWN PLANNING AND DEVELOPMENT CONSULTANTS DOWNE HOUSE, 303 HIGH STREET. ORPINGTON KENT BR6 ONN TEL, 01689 836334 FAX, 01689878091 ernail: enquiries@replanning.co.uk

More information

Wallingford Neighbourhood Plan

Wallingford Neighbourhood Plan Wallingford Neighbourhood Plan Introduction What is neighbourhood planning? Neighbourhood planning was introduced by the Localism Act 2011 to give local people more influence over how development comes

More information

25 Clarry Drive, Sutton Coldfield, Birmingham, B74 2QT

25 Clarry Drive, Sutton Coldfield, Birmingham, B74 2QT Committee Date: 04/09/2014 Application Number: 2014/02480/PA Accepted: 09/04/2014 Application Type: Full Planning Target Date: 04/06/2014 Ward: Sutton Four Oaks 25 Clarry Drive, Sutton Coldfield, Birmingham,

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

PLANNING APPLICATION BY RICHTON PROPERTIES RELATING TO A PROPOSED REDEVELOPMENT OF TREES, CONISTON ROAD, BROMLEY, BR1 4JB

PLANNING APPLICATION BY RICHTON PROPERTIES RELATING TO A PROPOSED REDEVELOPMENT OF TREES, CONISTON ROAD, BROMLEY, BR1 4JB PLANNING APPLICATION BY RICHTON PROPERTIES RELATING TO A PROPOSED REDEVELOPMENT OF TREES, CONISTON ROAD, BROMLEY, BR1 4JB PLANNING STATEMENT OUR REF: JA/PR/17/268 1. INTRODUCTION 1.1. We are instructed

More information

Called-in by Cllr Richard Stay for the following reasons: DETERMINE. Application recommended for refusal

Called-in by Cllr Richard Stay for the following reasons: DETERMINE. Application recommended for refusal Item No. 13 APPLICATION NUMBER CB/15/00275/OUT LOCATION Prebendal Farm, Grove Road, Slip End, Luton, LU1 4BZ PROPOSAL Outline Development: Redevelopment of land previously used as a farm yard to residential

More information

PLANNING APPLICATION FOR ERECTION OF 258 DWELLINGS AND ASSOCIATED WORKS LAND TO THE REAR OF MILTON CRESCENT, LUPSET

PLANNING APPLICATION FOR ERECTION OF 258 DWELLINGS AND ASSOCIATED WORKS LAND TO THE REAR OF MILTON CRESCENT, LUPSET SEPTEMBER 2017 EH YOR.2801 PLANNING APPLICATION FOR ERECTION OF 258 DWELLINGS AND ASSOCIATED WORKS PLANNING STATEMENT LAND TO THE REAR OF MILTON CRESCENT, LUPSET ON BEHALF OF KEEPMOAT HOMES TOWN & COUNTRY

More information

Fixing the Foundations Statement

Fixing the Foundations Statement Fixing the Foundations Statement 13 th August 2015 The Heritage Alliance is the largest coalition of non-government heritage interests in England, bringing together 98 national organisations which are

More information

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT. OPEN SPACE TEMPLE COWLEY LIBRARY library beyond Proposed apartments Proposed apartments Proposed houses Temple Road * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT. * Welcome

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement

BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement Planning, Design and Access Statement Revised: 28 th Jan 2016 Peter Pendleton & Associates Ltd Introduction Planning permission will be sought for a refurbishment of existing courts and extension to provide

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 14 July 2015 by I Radcliffe BSc(Hons) MCIEH DMS an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 18 August 2015 Appeal

More information

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Having reviewed the documents, the Society has made the following response: Housing Delivery Q 7. Do you agree

More information

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation. Story Homes An Introduction to Story Homes Founded by Fred Story in 1987, Story Homes has a long and successful reputation of building high quality and high specification homes. The family owned business

More information