1 MITIGATION MANAGEMENT AND MONITORING PLAN BAYFRONT PARK WETLAND RESTORATION MILL VALLEY, CA PREPARED FOR: THE CITY OF MILL VALLEY PARKS AND RECREATION DEPARTMENT 180 CAMINO ALTO AVENUE MILL VALLEY, CA PREPARED BY: PHILIP WILLIAMS & ASSOCIATES 550 KEARNY STREET, SUITE 900 SAN FRANCISCO, CA PHYLLIS FABER WETLANDS BIOLOGIST 212 DEL CASA MILL VALLEY, CA DIANE RENSHAW CONSULTING ECOLOGIST 607 PACO DRIVE LOS ALTOS, CA MAY 11, 2007 BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 1
2 MITIGATION MANAGEMENT AND MONITORING PLAN BAYFRONT PARK WETLAND RESTORATION MILL VALLEY, CA A. INTRODUCTION In 1993 the City of Mill Valley was the lead agency for the then proposed development of the Mill Valley Community Center, located at the northern end of Richardson Bay. To offset loss of 0.04 acres of seasonal wetland filled by the development, the City of Mill Valley required that 3,500 square feet of seasonal wetlands be established within the Bayfront Park area. In 1999 the City had its consultant, Philip Williams & Associates, prepare a conceptual design for a tidal marsh in Bayfront Park to fulfill the wetland mitigation requirement. The Mill Valley Community Center has now been constructed. The proposed restoration will reconfigure and enhance an existing filled wetland area, creating a net gain of approximately 0.12 acres (5,280 square feet) of low, middle, and high marsh habitat, exceeding the minimum of 3,500 square feet required by the City of Mill Valley as mitigation. B. RESPONSIBLE PARTIES The City of Mill Valley is the project applicant, and the project work will be overseen by the Mill Valley Parks and Recreation Department. The project mitigation plan has been prepared by Philip Williams & Associates, Phyllis Faber, Wetlands Biologist, and Diane Renshaw, Consulting Ecologist. The City of Mill Valley will be the sole party responsible for the successful implementation and completion of this mitigation measure. C. PROJECT REQUIRING MITIGATION 1. Location: The project site is at the northern end of Bayfront Park in Mill Valley, Marin County, CA (USGS 7.5 San Rafael topographic quadrangle (37 53' 50"N, ' 27"W) (Figure 1). 2. Brief Summary of Overall Project: The proposed project will improve habitat values on the site by lowering elevations over as much of the site as is practical, implementing a conceptual wetland mitigation design prepared for the City of Mill Valley by PWA (1999) (Figure 2, 3). This will result in a greater exposure to the twice-daily tides with a resulting increase in the extent of cordgrass, pickleweed, and salt grass (Figure 5). The benefits of this downward shift of elevations include improved habitat potential for clapper rail, saltmarsh harvest mouse, and the numerous invertebrate species that live in the mud and provide food for shore BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 2
3 birds. In addition the increased tidal inundation will increase the productive contribution of the marsh to the Bay ecosystem. Existing exotic upland vegetation will be cleared and removed from the site prior to excavation activities. An area of existing marsh vegetation will be preserved on the outboard side of the project site to provide a vegetation buffer between the lowered site and the tidal channel. The majority of the earthwork and grading will be the removal of fill and excavation of material to lower the overall site to elevations at which tidal salt marsh vegetation will establish. Some of the grading and excavation will occur in existing wetland areas; these areas will be reconfigured and are expected to reestablish as lower tidal marsh habitat. Soil will be excavated and hauled off-site for disposal at a suitable upland location to be determined by the contractor. The material to be excavated consists of fill of an unknown origin. Composite soil sampling will be conducted prior to any grading activities to characterize possible pollutants at the project site. This information will be provided to the contractor to ensure proper disposal of the excavated material. Excavation activities will be conducted to minimize the potential release of sediments by timing construction in the sub-tidal zone to coincide with low tides as well as by maintaining the vegetation buffer described above. It is anticipated that construction equipment will be working from the existing upland area, but soil conditions may require the use of mats in some areas of the project site. Construction activities will be scheduled to begin outside the Clapper Rail breeding season (February 1 to August 31) and will end before October 15 to comply with City of Mill Valley grading requirements. It is anticipated that the restoration activities will be conducted between September 1 and October 15, 2007 to comply with these restrictions. 3. Site Characteristics: a. Physical characteristics The 0.3 acre (13,000 square feet) project site was historically part of a large area of salt marsh fringing upper Richardson Bay (Figure 6). Over the years the site and much of the surrounding area was filled and the hydrology modified by various urban uses. The proposed project site has been partially filled to above tidal elevations and is currently a combination of upland fill and wetland areas. The current elevation of the site ranges from approximately 1.5 feet NGVD to 7.5 feet NGVD, with the majority of the site situated within an elevation range of 3.0 feet NGVD to 7.5 feet NGVD. The length of shoreline adjacent to the project site is approximately 210 feet. b. Biological characteristics BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 3
4 Vegetation at the site is a mix of upland species and species typical of tidal estuarine salt marshes in San Francisco Bay. It includes cordgrass (Spartina foliosa), found around MSL to MHW (1.5-2 feet NGVD); pickleweed (Sarcocornia pacifica, formerly Salicornia virginica), found from MHW to MHHW (2-3.5 feet NGVD); saltgrass (Distichlis spicata), found above MHHW to EHW ( feet NGVD); and a variety of upland plants and grasses at higher elevations (>4.5 feet NGVD). Biological resources at the site were analyzed in the Mitigated Negative Declaration adopted for the Mill Valley Community Center project in Biological reports prepared by Entrix, Inc. in 1991 and 1993 looked at the tidal marshland habitat near the project site for sensitive plants and wildlife and reviewed contemporary California Department of Fish and Game Natural Diversity Data Base (CNDDB) records for sensitive species in the project site vicinity. Three species of wildlife (salt marsh harvest mouse, California clapper rail, great blue heron) and two plants (Marin knotweed, Pt. Reyes bird s beak) were reported by CNDDB from the project vicinity, but no sensitive plants or animals were found in the tidal marshland at this proposed mitigation site. D. MITIGATION DESIGN 1. Basis for Design: The mitigation site was chosen for its proximity to the original project site, because it is owned by the City of Mill Valley, and because it was historically part of a large marshland fringing upper Richardson Bay. The site has been partially filled to above tidal elevations. Because it is still adjacent to free-flowing tidal waters it presents an opportunity to restore subtidal and low tide functions through removal of artificial overburden and selective grading to lower overall elevations at the site. 2. Proposed Restoration Project: a. Proposed enhancement actions: PWA conducted vegetation surveys at and near the project site in 1999 and This information was compiled and compared to develop target vegetation criteria for mudflat, cordgrass, pickleweed, and salt grass. The elevation ranges are summarized in Table 1. Table 1: Vegetation Elevation Ranges Vegetation Range Vegetation Type (feet NGVD) unvegetated mudflat < 0.5 cordgrass (Spartina foliosa) pickleweed (Sarcocornia pacifica) salt grass (Distichlis spicata) upland vegetation >4.5 BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 4
5 Table 2 shows the area of habitat that will be created versus existing habitat that will be impacted by the restoration project. Table 2: Summary of Habitat Areas Existing Habitat Area Impacted by Project (ft 2 ) Estimated New Habitat Area Created by Project (ft 2 ) Net Area (ft 2 ) Vegetation Type unvegetated mudflat cordgrass (Spartina foliosa) 0 2,880 2,880 pickleweed (Sarcocornia pacifica) 710 3,770 3,060 salt grass (Distichlis spicata) 2,330 1, upland vegetation 10,750 5,470-5,280 Figure 2 shows the grading plan for the restoration project. b. Target vegetational communities: upland plantings, wetland communities The reconfigured wetland areas will be allowed to revegetate naturally. Based on experience at other North Bay marshes, PWA (1999) expects that pickleweed will establish in the middle marsh area within the first year, with dense coverage within about five years. Cordgrass is expected to colonize and establish in the low marsh within three to five years, with dense coverage within ten years. Over the long term (15 to 50 years) the site is expected to evolve into a dynamically stable system, with a mix of vegetation types characteristic of natural wetlands (PWA, 1999). Upland areas will be planted with a variety of native plants. The concept plan specifies the use of native vegetation that will allow the restored wetland area to be visible from the adjacent pedestrian trail. Native plants used in the mitigation plantings will be derived from local stock. Upland plantings will be irrigated as needed and maintained by the City of Mill Valley. Native shrubs and perennials that will be planted on the upland area will be selected from appropriate species, including the following: Arroyo willow (Salix lasiolepis), toyon (Heteromeles arbutifolia), California rose (Rosa californica), coyote brush (Baccharis pilularis), gumplant (Grindelia stricta), sea lavender (Limonium californicum). All restoration plantings will be raised from stock taken from local sources, or will be cuttings or seeds collected from local plant material. Other native species suitable for the upland area may be substituted on the recommendation of a qualified native plant restoration specialist. BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 5
6 Upland areas not planted with native shrubs will be seeded with a mix of saltgrass (Distichlis spicata), meadow barley (Hordeum brachyantherum), yarrow (Achillea millefolium), California brome (Bromus carinatus), annual lupine (Lupinus sp.), California poppy (Eschscholtzia californica) and/or other native species recommended by a revegetation specialist approved by the City. Time of application, application rates, and irrigation requirements will be determined by the native plant restoration specialist. d. Maintenance Upland plantings will be irrigated from an underground City-owned recycled water line already in place at the edge of the restoration area. Irrigation to the upland plantings will be installed and maintained in good working order by the Parks and Recreation Department, who will also be responsible for maintaining the plantings in a healthy condition. Irrigation will be used for the first two or three years to allow the plantings to become established, and may be discontinued when the plantings are capable of surviving without supplemental summer water. Invasive weedy species noted in the annual survey will be removed from the project site. E. Success Criteria and Monitoring 1. Success Criteria: Upland plantings will be replaced as needed to provide 50% survivorship or a satisfactory visual screen at the end of the five year monitoring program. Upland plantings are not part of the wetland mitigation requirement. The wetland mitigation will be deemed successful if, at the end of five years, there is a minimum of 3,500 square feet of low, middle, and upper marsh habitat. The presence of indicator species (Spartina foliosa, Sarcocornia pacifica, Distichlis spicata) and/or evidence of tidal inundation will define the extent of the tidal marsh habitat. 2. Monitoring: a. Methods 1. Photo documentation. Photos will be taken of the existing site before restoration work begins. Following the final grading and installation of upland plantings, a minimum of three photo stations will be established at the site. Stations will be positioned to record the low marsh area, the middle and upper marsh area, and the upland area. Stations will be marked by pvc posts sunk in the ground to a point not over six inches above ground. Photos will be taken at a fixed height from these stations, duplicating the view of prior years. Photos will be taken at the same season at least once each year for the 5-year monitoring period. Photographs will be included in an annual report to be provided to interested agencies. BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 6
7 2. Vegetation Analysis An annual survey of vegetation at the site will be undertaken in July or August (to capture maximum growth and bloom of marsh vegetation). Two transects each with 50 foot intervals will be established in the first year after grading and will record percent plant cover and species distribution. These data are expected to be adequate to determine if the project objectives are being met given that a range of elevations appropriate for species establishment is known. Pickleweed should begin to establish by the second year and cordgrass by the third or fourth year. Any weedy species will be noted for corrective action or other maintenance, as described above in section D. 2. d., Maintenance. b. Schedule Following completion of the restoration project, the restoration area will be monitored by the City of Mill Valley or by its consultant on an annual basis for a minimum of five years. c. Corrective Management If annual surveys show that the tidal wetland areas are not performing as expected, the City will consult with PWA or another qualified wetland consultant for recommended corrective measures. If, at the end of five years, the target wetland area has not been obtained, the City will consult with interested agencies and with PWA or another qualified wetland consultant, and will institute corrective measures, which may include selective regrading of the site. If performance standards are not met at the end of five years, and if corrective management is required at that time, another five year monitoring program adhering to the specifications of this document will be initiated. d. Reporting Annual monitoring will be conducted in July or August, and an annual report will be prepared by the end of October. Copies of the annual report will be kept on file at the City of Mill Valley Parks and Recreation offices. Copies of the annual report will also be provided to all interested agencies. BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 7
8 REFERENCES Entrix, Inc Impact assessment of the proposed community center for the City of Mill Valley. Prepared for the City of Mill Valley Impact assessment of the preferred site for the new Mill Valley Community Center. Prepared for the City of Mill Valley Parks and Recreation Department. Philip Williams & Associates (PWA) Mill Valley Community Center tidal wetland mitigation conceptual design. Memorandum report prepared for Don Hunter, City of Mill Valley. BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 8
9 FIGURES 1-6 BAYFRONT PARK TIDAL WETLAND RESTORATION 1. VICINITY MAP 2. GRADING PLAN 3. GRADING CROSS-SECTION 4. BCDC LIMITS 5. VEGETATION HABITAT AREAS 6. HISTORIC TIDAL MARSH BAYFRONT PARK WETLAND MITIGATION PLAN CITY OF MILL VALLEY PAGE 9
10
11
12
13
14 Vegetation Type Existing Habitat Area Impacted (ft 2 ) Total New Habitat Area Created (ft 2 ) Net Change in Habitat Area unvegetated mudflat cordgrass (Sparina foliosa) 0 2,880 2,880 pickleweed (Sarcocornia pacifica) 710 3,770 3,060 salt grass (Distichlis spicata) 2,330 1, upland vegetation 10,750 5,470-5,280 (ft 2 )
15
Subject: Sea Level Rise Constraints and Opportunities for India Basin
Memorandum To: Monica Melkesian, Build Inc Cc: From: Leslie Lazarotti lazarotti@wra-cacom Ext 1300 Subject: Sea Level Rise Constraints and Opportunities for Date: July 8, 2015 The impetus for this study
More informationAppendix 5 Vegetation Management of Tidal Marsh Edges, San Francisco Estuary
Vegetation Management of Tidal Marsh Edges, San Francisco Estuary Working examples of vegetation management strategies for tidal marsh terrestrial edges 5.1. Sonoma Baylands, Sonoma County. Shoreline type:
More informationApril 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept
TO: FROM: SUBJECT: April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept RECOMMENDATION A. THAT the Vancouver
More informationStormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers
Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...
More informationRestoring Soil Ecology and Native Plant Communities in an Altered Salt Pond Ecotone
Restoring Soil Ecology and Native Plant Communities in an Altered Salt Pond Ecotone Dylan Chapple Save The Bay/UC Berkeley dylanchapple@berkeley.edu 10/24/2012 Overview Eden Landing Ecological Reserve
More informationBurrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006
Burrowing Owl Habitat Project at the Albany Plateau (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006 Submitted by The City of Berkeley Project history During
More informationPRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION
PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION Project Background November 19, 2007 Executive Summary The Grand Canal is an important tidal waterway in the Venice community of Los Angeles, California,
More informationAquatic Park Natural Resource Management Study (NRMS)
Aquatic Park Natural Resource Management Study (NRMS) Prepared by: Laurel Marcus & Associates Hydroikos Associates 3661 Grand Ave. Suite 204 2175 East Francisco Blvd Suite A Oakland, California 94610 San
More informationI. Executive Summary of Project Goals and Results
I. Executive Summary of Project Goals and Results During the 12 months of this contract (April 1, 2009- March 31, 2010), the Save The Bay (STB) Shoreline Habitat Restoration Project has completed enhancement
More informationBaylands Segment J. Bay between the Golden Gate and Segment J. Coyote Point. of For managed ponds. included habitat enhancement.
Baylands Segment J Crissy Field Alameda Naval Air Station Heron's Head Park COLMA CREEK SFO Millbrae San Mateo BAYLANDS 2009 SAN FRANCISCO AREA san francisco area Western side of central San Francisco
More informationME DOT Route 3. File No.: City and State: Bar Harbor, ME
ME DOT Route 3 File No.: 199600361 City and State: Bar Harbor, ME General Impacts: 0.28 acre tidal emergent 0.77 acre non-tidal forested 0.15 acre non-tidal emergent 0.51 acre non-tidal scrub-shrub Functions
More informationNew Brighton Park Shoreline Habitat Restoration Project
Vancouver Board of Parks and Recreation and Port Metro Vancouver New Brighton Park Shoreline Habitat Restoration Project Conceptual Design Public Consultation August 26 September 9, 2015 Discussion Paper
More informationBaylands Segment P. 206 The Baylands and Climate Change: What We Can Do COYOTE CREEK
Baylands Segment P BAYLANDS coyote 2009 creek area COYOTE Southern CREEK end of San Francisco Bay AREA between Alviso Slough and Albrae Slough Southern end of San Francisco Bay Baylands between Alviso
More informationCaler Cove Lobster Company
File No.: 199800920 City and State: Addison, ME Caler Cove Lobster Company General Impacts: 0.17 acre tidal emergent Functions and Values Lost: Production Export Nutrient Exchange Sediment Filtration Fishery
More informationPLANTING OF LARGE SCALE MARSH PROJECTS. Eddie Seidensticker, biologist, Natural Resources Conservation Service
PLANTING OF LARGE SCALE MARSH PROJECTS Eddie Seidensticker, biologist, Natural Resources Conservation Service As the Houston-Galveston Navigation Channel is expanded, the Beneficial Uses Group (BUG), the
More informationBalancing Conservation and Development on the Jordan River
Balancing Conservation and Development on the Jordan River Jordan River Parkway Trail Regional Athletic Complex Conservation & Restoration Balancing Conservation and Development on the Jordan River Jordan
More information[FWS R8 R 2015 N087; FXRS282108E8PD0 156 F ] South Bay Salt Pond Restoration Project, Phase 2; Don Edwards National Wildlife
Surname Billing Code: 4310 55 Deputy RD ARD Refuges DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Solicitor Refuge Supervisor Asst. Refuge Supervisor Ch. Natural Resources Project Leader [FWS R8
More informationOPPORTUNITIES AND CONSTRAINTS ANALYSIS
OPPORTUNITIES AND CONSTRAINTS ANALYSIS ALBANY BEACH RESTORATION AND PUBLIC ACCESS FEASIBILITY STUDY EASTSHORE STATE PARK, CALIFORNIA January 14, 2011 OPPORTUNITIES AND CONSTRAINTS ANALYSIS ALBANY BEACH
More informationWetland Types. Grade Level: Basic. Duration: 30 minutes. Setting: Classroom
Wetland Types Adapted from: An original Creek Connections activity created by Cassandra Hamilton. Creek Connections, Box E, Allegheny College, Meadville, PA 16335 http://creekconnections.allegheny.edu
More informationCommercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary
Commercial Launch Site Addendum to Wetland Mitigation Plan Revision 2 April 25, 2017 SpaceX Proprietary Contents 1.0 Project Information... 1 1.1 Background... 1 2.0 Compensatory Mitigation... 2 2.1 Goals
More informationENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN
ENVIRONMENTAL INITIAL STUDY FOR THE BERKELEY CITYWIDE POOLS MASTER PLAN CITY OF BERKELEY PARKS RECREATION AND WATERFRONT DEPARTMENT SEPTEMBER 1, 2009 ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS
More informationKootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update
Kootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update Kootenai River Habitat Restoration Program Multi-year habitat restoration program Restoration treatments
More informationChesapeake Bay Critical Area Conservation Plan
The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.
More informationWisconsin Dept. of Transportation November 2017
Wisconsin Dept. of Transportation November 2017 Jennifer Gibson WisDOT Environmental Coordinator Mike Helmrick WisDOT Environmental Coordinator Background on compensatory wetland mitigation Site purpose
More informationRestoring Water Ecosystems in NYC Parks
Restoring Water Ecosystems in NYC Parks Hooked on our Waters Con October 19, 2013 - CUNY Graduate Center Marit Larson NYC Parks Landscape and ecosystem focus Watershed Streams Freshwater wetlands Tidal
More informationImproving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment
Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Arroyo Seco Headwaters in the San Gabriel Mountains Major tributary to the Los Angeles River 44 square mile
More informationCONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 4 To conserve, manage, appropriately use and protect the natural resources of the City ensuring continued resource availability and environmental
More informationNatural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.
Natural Shorelines for Inland Lakes A Landowner s Guide to using NATURAL MATERIALS to STABLIZE SHORELINES, IMPROVE WATER QUALITY and ENHANCE WILDLIFE HABITAT along Michigan s inland lakeshore. Natural
More informationPrioritizing Tidal Wetlands: A Landscape Approach
Prioritizing Tidal Wetlands: A Landscape Approach Laura Brophy Director, Estuary Technical Group Institute for Applied Ecology Corvallis, OR College of Earth, Ocean and Atmospheric Sciences, Oregon State
More informationCounty of Santa Barbara Department of Public Works. SWCA Environmental Consultants. Prepared for: Prepared by:
for the Goleta Beach Park Bridge Replacement Project, Santa Barbara County, California 05-SB-0-CR Federal Project Number BRLO-5951 (120) Prepared for: County of Santa Barbara Department of Public Works
More informationSection 3 Non-Structural BMPs
3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide
More informationA Priceless Opportunity
AN OPPORTUNITY A Priceless Opportunity Whoever you are, wherever you live, whatever you do, access to parks and open space improves your life. FOUR RICHMOND SHORELINE JEWELS TO POINT PINOLE REGIONAL PARK
More informationBUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.
ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,
More informationPLANT LIST FOR SHORELINE MANAGEMENT
SHORELINE EVALUATION PROGRAM PLANT LIST FOR SHORELINE MANAGEMENT Following is a list of native s recommended for shoreline management. This list is not comprehensive. Rather, it lists s that are known
More informationShoreline Master Program Town of La Conner, Washington
Shoreline Master Program Town of La Conner, Washington Department of Ecology approval effective Adopted September 24, 2013 by Town of La Conner Ordinance No.1106 Amended May 13, 2014 by Town of La Conner
More informationHunts Point Landing, Bronx, New York
Hunts Point Landing, Bronx, New York Sustainable Shorelines in an Urban Environment John Roebig, PhD. HDR Engineering, Inc. John.Roebig@hdrinc.com Promoting Resilient Shorelines along the Hudson River
More informationDraft TISCORNIA ESTATE SPECIFIC PLAN/EIR
Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR Submitted CONTENTS 1. PLAN SUMMARY II. INTRODUCTION IX. SPECIFIC PLAN RELATIONSHIPS X. XI. List of Figures 1. Regional Location 2. Point Richmond Area 3. Planning
More informationBAYLANDS SAN FRANCISQUITO CREEK FLOOD CONTROL2.0. June 2016 A PRODUCT OF FLOOD CONTROL 2.0. landscape change metrics analysis
SAN FRANCISQUITO CREEK BAYLANDS landscape change metrics analysis June 2016 PROJECT DIRECTION Robin Grossinger Scott Dusterhoff PRIMARY AUTHORS Micha Salomon Scott Dusterhoff DESIGN AND LAYOUT Ruth Askevold
More informationIntroduction to Ecology and Regulation of Tidal Wetlands in Central California and the San Francisco Bay. August 17, 2005
Bibliography and Additional Resources for Hydrology, Soils, and Plants NERR Coastal Training Program, Workshop on Tidal Wetlands GENERAL ARTICLES Allen, J. R. L., and K. Pye. 1992. Saltmarshes : Morphodynamics,
More informationJuneau Watershed Partnership
Juneau Watershed Partnership Native Plant Resource Center Final Report A Partners for Fish and Wildlife Project Prepared for: U.S. Fish and Wildlife Service For Grant #F11C00552 Prepared by: The Juneau
More informationVolume 2, Chapter 12 - Revegetation
Volume 2, Chapter 12 - Revegetation Users Guidance: If a UDFCD Section number in this chapter is skipped: It was adopted as is; please refer to that Section in the corresponding UDFCD Manual, Volume, Chapter
More informationHABITAT RESTORATION PLAN FOR WHITE POINT LANDSLIDE REPAIR
HABITAT RESTORATION PLAN FOR WHITE POINT LANDSLIDE REPAIR MITIGATION OCTOBER 30, 2014 1 INTRODUCTION This habitat restoration plan was prepared for the White Point Nature Preserve, for 1.5 acres that were
More informationA comparison of Traditional and Prefabricated Encapsulated Soil Lifts
A comparison of Traditional and Prefabricated Encapsulated Soil Lifts Jane Herbert, Senior Extension Educator 2014 Wisconsin Lakes Convention Background on shoreline erosion control in MI KBS Shoreline
More informationAPPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM
APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM This form is intended for use by applicants (primarily private landowners) who need to conduct a Scoped EIS in support of minor development
More informationNorth Carolina Coastal Federation
North Carolina Coastal Federation Erosion Control: Non-Structural Alternatives A Shorefront Property Owner s Guide Shoreline erosion and landward migration of marshes are natural processes, and are important
More informationRule D Wetland and Creek Buffers
Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions
More informationSTREAM BUFFERS
88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve
More informationPHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK
PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK Sheet List L1.0 L2.0 L3.0 L4.0 L5.0 L6.0 L7.0 L8.0 L9.0 L10.0 L11.0 L12.0 L13.0 L14.0 L15.0 L16.0 L17.0 L18.0 L19.0 L20.0 L21.0 L22.0 Cover Open Space Context
More informationADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION
ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:
More informationMEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION
MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION 410-728-2900 Fax: 410-728-3160 www.rkk.com To: From: CC: U.S. Fish and Wildlife Service, Pennsylvania Fish and Boat Commission Jennifer A Ottenberg Miller,
More informationPlanning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore
Habitat Restoration and Green Infrastructure Planning for Staten Island s North Shore Community Board 1 March 1, 2018 NYC Parks Forestry, Horticulture, and Natural Resources Funded by the NYS Department
More informationALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI
ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI Project supported via financial assistance provided by the Coastal Zone Management Act of 1972, as amended, administered by the Office of the Ocean
More informationDRAFT MAP AMENDMENT FLU 04-4
DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,
More informationPort of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018
Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda
More informationGreen Design Principles
Green Design Principles restoration planting Ecosystem restoration, including preserving and enhancing existing vegetation and where feasible, introducing new vegetative communities, benefits the stream
More informationCITY OF LARKSPUR, CALIFORNIA GENERAL PLAN CHAPTER 6, ENVIRONMENTAL RESOURCES CONTENTS
CITY OF LARKSPUR, CALIFORNIA GENERAL PLAN CHAPTER 6, ENVIRONMENTAL RESOURCES CONTENTS Chapter 6, Environmental Resources Open Space Hillsides and Ridges Shoreline and Marsh Areas Balance Between Recreational
More informationConserving Ca[ifomiaJs Wi[tf[ife Si~e 1870
State of California - The Resources Aqency DEPARTMENT OF FISH AND GAME huo:/ /www.dfg.ca.gov POST OFFICE BOX 47 YOUNTVillE, CALIFORNIA 94599 (707) 944-5500 ARNOLD SCHWARZENEGGER. Governor October 5,2007
More informationWorking Group Meeting
April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome
More informationRD:VMT:JMD 10/14/2015 RESOLUTION NO.
RD:VMT:JMD 10/14/2015 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE ADOPTING THE EDENVALE AVENUE PLANNED DEVELOPMENT REZONING PROJECT MITIGATED NEGATIVE DECLARATION, FOR WHICH AN INITIAL
More informationlas vegas wash coordination committee
las vegas wash coordination committee lvwash.org DU Wetlands No. 1 Weir Planting Plan February 2013 DU Wetlands No. 1 Weir Planting Plan SOUTHERN NEVADA WATER AUTHORITY Las Vegas Wash Project Coordination
More informationSTAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001
STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460
More informationDepartment of Community Development. Planning and Environmental Review Division Revised Notice of Preparation
Department of Community Development Michael J. Penrose, Acting Director Divisions Building Permits & Inspection Code Enforcement County Engineering Economic Development & Marketing Planning & Environmental
More informationReWild Mission Bay PUBLIC WORKSHOP #2
ReWild Mission Bay PUBLIC WORKSHOP #2 What is ReWild Mission Bay? WELCOME With ReWild Mission Bay, San Diego Audubon is facilitating a three-year planning process that includes collecting community input
More informationReWild Mission Bay PUBLIC WORKSHOP #2
ReWild Mission Bay PUBLIC WORKSHOP #2 WELCOME What is ReWild Mission Bay? With ReWild Mission Bay, San Diego Audubon is facilitating a three-year planning process that includes collecting community input
More informationSan Francisco Bay Area Upland Habitat Goals Project
San Francisco Bay Area Habitat Preserving Biological Diversity for Future Generations A of the Bay Area Open Space Council funding provided by: California State Coastal Conservancy Gordon and Betty Moore
More informationKaren A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary
Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary March 20, 2009 Low-Impact Shoreline Stabilization Cumulative
More informationYEAR 2 FIRST QUARTER REPORT
ENVIRONMENTAL STEWARDSHIP PROJECT YEAR 2 FIRST QUARTER REPORT DECEMBER 23, 2009 Prepared for: NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION Prepared by: CITY OF TACOMA 1.0 Introduction In accordance
More informationBuilding Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance
Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance Stacy Small-Lorenz National Wildlife Federation Restore America s Estuaries Summit New Orleans,
More information2001 Southeastern Pennsylvania Stormwater Management Symposium Villanova University. Jean K. Akers
2001 Southeastern Pennsylvania Stormwater Management Symposium Villanova University Abstract Planting For Water Quality Incorporating plantings into stormwater BMP design to improve water quality. Jean
More informationEcological Restoration at the Las Vegas Springs Preserve. Von K. Winkel, Ph.D.
Ecological Restoration at the Las Vegas Springs Preserve Von K. Winkel, Ph.D. The Las Vegas Springs Before Disturbance The springs are very large. A small creek flows from each of 3 or 4 springs and
More informationResponse to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)
Environmental Science & Assessment, LLC MEMORANDUM DATE: August 13, 2010 TO: Oregon City Planning CC: Jill Long Lane Powell FROM: RE: Jack Dalton Response to Comments (July 28, 2010 Oregon City Determination
More informationZANDER ASSOCIATES Environmental Consultants
ZANDER ASSOCIATES Environmental Consultants June 23, 2011 Massy Mehdipour 1425 Dana Ave. Palo Alto, CA 94301 Supplemental Biological Resource Assessment 1170 Signal Hill Road Pebble Beach, Monterey County,
More informationLake Ogallala Bathometric Project
THE CENTRAL NEBRASKA PUBLIC POWER AND IRRIGATION DISTRICT Lake Ogallala Bathometric Project Mitigation Area Vegetation Monitoring Year 2 Mark Peyton 9/20/2012 Lake Ogallala Bathometric Project Mitigation
More informationSustainable TamAlmonte 215 Julia Avenue Mill Valley, CA 94941
Sustainable TamAlmonte 215 Julia Avenue Mill Valley, CA 94941 July 5, 2016 Marin County Community Development Agency, Planning Division 3501 Civic Center Dr., Room 308 San Rafael, CA 94903 Attention: Planner
More informationMelissa McMaster Restoration Coordinator
Melissa McMaster Restoration Coordinator wildlife habitat specific threatened and endangered species habitat grazing shade recreation water storage fire risk reduction community stewardship ecosystem resiliency
More information5.0 Storm Water Landscape Guidance Introduction
5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can
More informationGrave Creek Riparian Revegetation 2011 Implementation Report
Task Order #1008 Grave Creek Riparian Revegetation 2011 Implementation Report Prepared for: Kootenai River Network P.O. Box 491 Libby, MT 59923 Prepared by: Geum Environmental Consulting, Inc. 307 State
More informationNature-Based Adaptation Projects Challenges and Opportunities in California Marilyn Latta, Project Manager California State Coastal Conservancy
Nature-Based Adaptation Projects Challenges and Opportunities in California Marilyn Latta, Project Manager California State Coastal Conservancy Restore America s Estuaries California State Coastal Conservancy
More informationRegional Restoration Planning:
Regional Restoration Planning: A Case Study in Collaborative Restoration Science and Planning Campbell Ingram, Executive Officer NCER August 28, 2018 Co-Equal Responsibilities Act as a primary state agency
More informationPublic Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan
Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan Prepared for City of Oceanside Planning Department 300 N. Coast Highway Oceanside, CA 92054 Prepared by Ogden Environmental
More informationIII. PROJECT DESCRIPTION
III. PROJECT DESCRIPTION A. PROJECT LOCATION Regional Setting The project site is located in the southeast quadrant of the City of Chico in Butte County, California and is comprised of four parcels totaling
More informationCity of Larkspur. Notice of Mitigated Negative Declaration for the 285
Notice of Mitigated Negative Declaration for the 285 Magnolia Avenue Mixed-Use Project Date: December 2, 2013 Responsible Agency: Project Title: 285 Magnolia Avenue Mixed-Use Project Project Address: 285
More informationTentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total
HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996),
More informationAPPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES
APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES TABLE C-1: Resource Actions and Priorities GOAL NRM-4 Objective 4.1: Restore Natural floodplain functions. Objective 4.2: Define and
More informationMonitoring and Maintenance Permit Process
Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary April 9, 2010 Living Shorelines for Contractors and Project
More informationFlat Lake, Highway 103, HADD Compensation Project (DFO HADD Authorization 03-G8-068): 2010 Vegetation Monitoring
Flat Lake, Highway 103, HADD Compensation Project (DFO HADD Authorization 03-G8-068): 2010 Vegetation Monitoring Year 5 Final Diane LaRue, Vegetation Consultant Environmental Services, NSTIR Monitored
More informationPlanning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore
Habitat Restoration and Green Infrastructure Planning for Staten Island s North Shore Walker Park December 7, 2017 NYC Parks Forestry, Horticulture, and Natural Resources Funded by the NYS Department of
More informationRAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION
ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed
More informationAshbridges Bay Erosion and Sediment Control Project
Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control
More informationTable of Contents TABLE OF CONTENTS SECTION TITLE PAGE
TABLE OF CONTENTS SECTION TITLE PAGE 1 INTRODUCTION AND OVERVIEW 1-1 1.1 Purpose and Need 1-1 1.2 Goals and Objectives 1-3 1.3 Overview of the Planning Process 1-5 1.4 Federal and State Requirements and
More informationBristol Marsh Heritage Conservancy
Bristol Marsh Heritage Conservancy The Pennsylvania Environmental Council (PEC) protects and restores the natural and built environments through innovation, collaboration, education and advocacy. PEC believes
More informationPike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass
Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass Alice Thompson, PWS & Heather Patti, PWS Pike River Re-imaginedfrom Cabbage
More informationThe use of heavy machinery to remove Ammophila arenaria from native sand dunes at. Point Reyes National Seashore. Ben Peterson
Ben Peterson Point Reyes National Seashore Point Reyes National Resource Management The use of heavy machinery to remove Ammophila arenaria from native sand dunes at Point Reyes National Seashore Native
More informationThe Napa River Flood Protection Project
The Napa River Flood Protection Project Creating Flood Protection and Restoring Geomorphic and Biological Processes Jeremy Sarrow, Napa County Flood Control & Water Conservation District June 2, 2014.
More informationThe Reedville Living Shoreline
E The Reedville Living Shoreline Teaching Garden Garden This garden was designed to demonstrate an environmentally friendly approach to shoreline stabilization and natural landscaping. Established in 2005
More informationTRCA Field Staking Protocol December 2016
Page 1 of 6 TRCA Field Staking Protocol December 2016 This Protocol describes TRCA staff s current practice for field staking the physical top of bank, the physical toe of slope, and the limit of existing
More informationENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report
Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION
More informationMorro Shoulderband Snail Protocol Survey Report for the Parcel at 3093 Beachcomber Drive, Morro Bay, San Luis Obispo County, California
Morro Shoulderband Snail Protocol Survey Report for the Parcel at 3093 Beachcomber Drive, Morro Bay, San Luis Obispo County, California Prepared for: John K. Construction Inc. Prepared by: SWCA Environmental
More informationHabitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach
Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach Edward Alkiewicz 1, Stephen Schoenwiesner 1, Jeff Gerlach 1, Morris Perot 2, Scott Ault 2, Mark
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ CAMPUS PLANNING 9500 GILMAN DRIVE # 0074 TEL: (858) 534 6515 LA JOLLA,
More information