CSTR. (Continuous Stirred Tank Reactors) Operation and Maintenance Manual

Size: px
Start display at page:

Download "CSTR. (Continuous Stirred Tank Reactors) Operation and Maintenance Manual"

Transcription

1 CSTR (Continuous Stirred Tank Reactors) Operation and Maintenance Manual

2

3 CSTR (Continuous Stirred Tank Reactors)

4 Version 2.0, December 2014 Any questions related to this Operation and Maintenance manual should be directed to: Bioprocess Control Sweden AB Scheelevägen 22 SE Lund Sweden Tel: +46 (0) Fax: +46 (0) Web: This document contains proprietary information that is protected by copyright. All rights are reserved. No part of this publication may be reproduced in any form whatsoever or translated into any language without the prior, written permission of Bioprocess Control Sweden AB. Copyright 2014 Bioprocess Control Sweden AB Produced in Sweden

5 TABLE OF CONTENTS 1 PREFACE Bioprocess Control Sweden AB Reactors for continuous fermentation tests DELIVERY CHECKS CSTR-2G (2 l glass digester) CSTR-5G (5 l glass digester) CSTR-5S and CSTR-10S (5 and 10 l stainless steel digesters) PRE-COMMISSIONING QUALITY RULES AND RECOMMENDATIONS Before getting started SAFETY NOTES AND CONSIDERATIONS EQUIPMENT DESCRIPTION (DESIGN/FUNCTION) CSTR-2G CSTR-5G CSTR-5S and CSTR-10S Design/function of CSTR WALL JACKET FEEDING PORT GAS OUTLET SAMPLING PORT VIEWING PORT WINDOW BALL VALVES FOR DISCHARGING AND EMPTYING SELF DISCHARGING PORT & AUTO SLURRY CONTROL ADJUSTABLE FEET MOTORS & STIRRERS Motors & stirrers for CSTR-2G Motors and stirrers for CSTR-5G, CSTR-5S and CSTR-10S CSTR TECHNICAL CHARACTERISTICS CSTR configurations Raw materials of the CSTR parts Tri-clamps and gasket sizes Dimensions of the ports on all CSTR digesters OPERATION First assembly of the CSTR digester FIRST ASSEMBLY OF CSTR-2G FIRST ASSEMBLY OF CSTR-5G FIRST ASSEMBLY OF CSTR-5S AND CSTR-10S Before start up CSTR-2G CSTR-5G, CSTR-5S AND CSTR-10S Start up CSTR-2G CSTR-5G, CSTR-5S AND CSTR-10S Feeding and discharging CSTR-2G CSTR-5G...25

6 8.4.3 CSTR-5S AND CSTR-10S DISCHARGING BY USING A GAS BAG AUTOMATIC FEEDING Monitoring & troubleshooting END OF OPERATION MAINTENANCE AND REPAIRS Disassembly instructions for cleaning and repair DISASSEMBLY OF CSTR-2G DISASSEMBLY OF CSTR-5G DISASSEMBLY OF CSTR-5S AND CSTR-10S Cleaning the reactor Assembly instructions after cleaning and repair ASSEMBLY OF CSTR-2G ASSEMBLY OF CSTR-5G ASSEMBLY OF CSTR-5S AND CSTR-10S Maintenance checks Spare parts for CSTR EQUIPMENT DISPOSAL... 33

7 1 PREFACE 1.1 Bioprocess Control Sweden AB Bioprocess Control Sweden AB (BPC) is a privately held company based in Lund, Sweden. The company is a market leader in the area of advanced control technologies for the commercial biogas industry, providing technologies and services that support the efficient design and operation of biogas plants & processes. The company was founded in 2006, bringing to market more than 15 years of leading research in the area of instrumentation, control and automation of anaerobic digestion processes. At the end of 2009, BPC launched the Automatic Methane Potential Test System (AMPTS), a revolutionary product in the area of on-site lab equipment for methane potential analysis. The number of users of AMPTS grew quickly and today there are users in more than 35 countries, located in the Americas, EMEA, and Asia Pacific regions. In 2012, BPC launched the BioReactor Simulator (BRS), an analytical device for the control and monitoring of anaerobic fermentation processes in a continuous mode of operation. The BRS is an ideal instrument and platform for gaining knowledge and experience of the continuous operation of biogas production processes. It also serves as the complementary tool to AMPTS, which is used for feedstock characterisation and optimisation. The system is controlled by a web-based software running on an efficient cloud computing solution accessible from any computer or mobile device with an Internet connection. As of July 2013, new instruments, Biogas Endeavour and µflow, have been offered to the market for on-line measurements of ultra low biogas flows produced from the anaerobic digestion of biological degradable substrates. The CSTR (Continuous Stirred-Tank Reactors) bioreactors are offered in sizes up to 10 l, and are constructed of stainless steel or high quality glass, all of them might be potentially used to simulate full-scale fermentation processes. These bioreactors have been available on the market since They have several advantages to other similar reactors on the market: The CSTR bioreactors are extremely user friendly and specifically designed with ease of use and maintenance in mind Their wall jacket configuration allows for independent heating and cooling The CSTR bioreactors are suitable for both low and high solid content feedstock The CSTR bioreactors have been designed to be highly flexible for both feeding and process monitoring & control The viewing ports allow for visual inspection of foam formation during the fermentation. The BPC products are designed in a way that offers maximum flexibility without compromising quality. They can be used on their own or connected to each other, in a way that best suit the customer needs. Taking into consideration the high number of the AMPTS units in use today around the world, it is expected that not only BRS, Biogas Endeavour, µflow, but also CSTR will have a similar impact on the biogas industry, becoming the technology of choice for universities, 1

8 private labs and biogas operators interested in the laboratory scale simulation of continuously operated full-scale biogas digesters. 1.2 Reactors for continuous fermentation tests The process of anaerobic degradation is highly complex and dynamic, where microbiological, bio-chemical and physico-chemical aspects are closely interrelated. For optimisation purposes, fermentation tests at laboratory scale are used to determine feedstock characteristics and to simulate continuous operation of biogas reactors. In general, for broadly designed test programs, the combination of batch and continuous methodologies should be used. A large number of batch tests running in parallel deliver results on feedstock characteristics, whereas a continuous test simulates long-process conditions spanning larger time frames. In a conventional continuous fermentation test, the organic matter is added either in stages or continuously to the reactor. The end products are periodically or continuously removed, resulting in a constant and predictable production of biogas. A single digester or multiple digesters in sequence may be used such as: CSTR (Continuous Stirred-Tank Reactors) UASB (Upflow Anaerobic Sludge Blankets) EGSB (Expanded Granular Sludge Beds) IC (Internal Circulation Reactors) The objective of the fermentation tests in the defined continuous procedure is to obtain a reliable long-term database about the gas yield and its composition, and to build up a comprehensive picture regarding the degradation of the organic material, the course of fermentation, and any problems in the degradation process, which may occur. In fact, results from continuous lab-scale fermentation tests have on several occasions been shown to provide a good representation of the full-scale operations. With the help of continuous fermentation tests, it should also be possible to determine how the properties of substrates affect the fermentation process and what process conditions must be put in place in order to achieve an optimal degradation and maximisation of gas yield. Continuous fermentation tests thus deliver the first useful information about the capabilities and loading limits of a process, which is essential for designing and operating a biogas plant as well as for creating models concerning the economical feasibility of a project. Conventional continuous fermentation tests are laboratory-scale methods subject to large variations, not only due to the heterogeneous nature of bio-wastes and bacteria culture used, but also due to differences in experiment setup and non-unified test protocols. For example, reactor configuration, instrumentation and operational modes can all differ from one laboratory to another. In addition, the presentation of the results is often not standardised, which makes comparability between two tests very difficult. Furthermore, the execution of a fermentation test in continuous mode is often a complex and very labour-intensive and timeconsuming procedure, spanning a considerable period of time. The CSTR bioreactors available at BPC are designed as gas tight reactors that allow for a high liquid and gas mass transfer, as well as for different mixing regimes and mixing intensities at controlled temperature. They can be connected to any type of gas flow measuring device such as Bioreactor Simulator (BRS), µflow, etc. 2

9 2 DELIVERY CHECKS At delivery, unpack and check that the contents match the lists in the Box Content section. Chapter 6 (Equipment Description) shows pictures of the included parts. If the packaging or the equipment is broken at delivery, please: 1. Document and take photos of the parts and packaging. 2. Inform the transport company at delivery. 3. Make sure that the transport company documents the incident. 4. Inform your local distributor or BPC of the incident. 2.1 CSTR-2G (2 l glass digester) BOX CONTENT Disclaimer: The delivery checklist for CSTR-2G below is valid only when the order is placed for the BioReactor Simulator (BRS) together with sample incubation unit with six 2-litre reactors. If the order is made for another product, where a different number of CSTR-2G is used, the quantities in the list below will be according to that order. If the order is made for a CSTR-2G glass bottle kit alone, the Bioreactor Agitation Systems (i.e. Brush DC motor-driven agitators or Multifunction Brushless DC motor-driven agitators) are not included. Two different bioreactor agitation systems are available from Bioprocess Control: i) an initial configuration (in left picture) based on standard brush DC motors with a gearbox and ii) a multifunction version (in right picture) based on a unique design of brushless DC stepper motors. 3

10 CSTR-2G glass bottle kit 6 glass bottles with 3 ports (2 l reactors) 6 glass feeding funnels 6 bent glass discharging tubes 24 plastic screw caps (18 with and 6 without holes) 18 silicone sealing rings 6 helical couplings + tool (Allen key 2.5 mm) Brush DC motor-driven agitators 6 plastic caps with agitators/motors 1 motor module 1 long motor cable (for connecting the detection unit to the first motor) 12 short motor cables (for connecting all 6 agitators in serial) 1 power adapter for the motor module 6 rubber stoppers with 2 metal tubes, 1 plastic tube and rotating shaft for mixing 6 plastic tubing clamps Multifunction brushless DC motor-driven agitators 6 plastic caps with agitators/motors 1 Master Control Unit (MCU) Box 1 long signal cable 5 short motor cables (for connecting all 6 agitators in serial) 1 power adapter 6 rubber stoppers with 2 metal tubes, 1 plastic tube and rotating shaft for mixing 6 plastic tubing clamps 6 helical couplings 1 tool (Allen key) 2.2 CSTR-5G (5 l glass digester) BOX CONTENT 1 glass reactor 1 main lid assembly with motor and feeding funnel 1 metal tri-clamp hinge 1 gasket for the tri-clamp hinge 2 plastic screw caps with a hole 2 plastic tube nipples 1 plastic screw cap 1 tubing nipple (for emptying & discharging port) Optional parts: 1 tool (Allen key) 4

11 2.3 CSTR-5S and CSTR-10S (5 and 10 l stainless steel digesters) BOX CONTENT 1 steel reactor 1 main lid assembly with motor and feeding funnel 1 plastic tri-clamp hinge 1 gasket for the tri-clamp hinge 1 tube nipple ID/OD 10/12 mm 1 tube nipple ID/OD 4/6 mm (for the CSTR-5S version with 4 ports on the main lid) Optional parts: 1 Allen key 3 PRE-COMMISSIONING The following items are not delivered with the CSTR digesters, however they will/may be required for operating them: A recirculating water bath as a heating/cooling source for the CSTR with a wall jacket configuration Tubing o Silicon tubing for connecting the recirculating water bath to the wall jacket o Tygon tubing for connecting the gas outlet to the gas detection unit o Tubes for discharging pipes Suitable tube clamps and valves Long, thin, bendable tool (i.e. plastic strips or cable ties) Syringe (100 ml) Gas bag 4 QUALITY RULES AND RECOMMENDATIONS The product guarantee provided corresponds to the guarantee stipulated on the confirmed product order form and shipping documentation. Only the parts delivered with the product can be used in the system in order to guarantee the quality and performance of the product. BPC reserves the right to correct any possible text and image errors as well as changes to technical data in this manual. 5

12 4.1 Before getting started Read this manual and additional separate manuals for the individual instruments before installing and using the equipment. (E.g. BioReactor Simulator, µflow And Bioreactor Agitation Systems manuals.) Keep the instruction manual for future reference and make sure it is easily available for people who regularly use the CSTR digesters. 5 SAFETY NOTES AND CONSIDERATIONS The CSTR Bioreactors should be used in an indoor environment with good ventilation, since the content inside them may generate very high volumes of toxic or slightly aggressive gases. The gas outlet on the reactor must always be placed in a fume hood or be connected to a gas bag. Always wear protective clothing, glasses and gloves when handling bio-waste and inoculum. A digestion process produces explosive gas, so it is important to check regularly for clogging in the discharging tubes. When the reactor is in use, the lid on the feeding funnel must never be attached with the tri-clamp. The lid acts as a potential safety valve in case the pressure in the reactors got too high. The power supply must be unplugged from the motor before assembling or disassembling any parts on the CSTR. Always be cautious when handling electrical devices close to water. When the motor is running, its rotating parts could potentially cause damage, so make sure to tie back long hair, remove loose hanging clothing, jewellery or similar before operating the motor. The wall jacket construction of the reactors will attain the same temperature as the water circulating inside it. Normally, the temperature used for experiments is not high enough to cause any damage, but be sure to check that the external heating source has the correct temperature settings and is working properly. 6

13 6 EQUIPMENT DESCRIPTION (DESIGN/FUNCTION) The CSTR bioreactors offered by Bioprocess Control are available in two configurations: glass (G) and stainless steel (S). There are three size options: 2, 5 and 10 l (which are stated in the model names). 6.1 CSTR-2G CSTR-2G (1) Silicone stopper (6) Glass bottle (2) Glass feeding funnel (7) Motor unit (3) Helical coupling (8) Bent glass pipe (4) Rubber stopper with metal pipes for gas outlet (9) Sampling port with plastic cap (T, ph, etc.) (5) Plastic cap with hole (10) Stirrer 7

14 The glass feeding funnel (2), the silicone stopper (1) and the bent glass pipe (8) are shown separately in the pictures below (from left to right). 6.2 CSTR-5G 8

15 CSTR-5G (1) Feeding port for high solid content feedstock (6) Sampling port (T, ph, etc.) (2) Gas outlet (7) Tri-clamp hinge (3) Heating/cooling water outlet (8) Motor (4) Heating/cooling water inlet (9) Liquid feeding port (for attaching a suitable tube nipple) (5) Emptying & discharging port (10) Motor holder 9

16 6.3 CSTR-5S and CSTR-10S The only difference between CSTR-5S and CSTR-10S is their volume and width. Both sizes come in two versions. One has fixed emptying (5a) and discharging (5b) ports and 3 ports on the main lid. The other version has detachable emptying and discharging ports and 4 ports on the main lid. The pictures and legend below show a CSTR-10S. 10

17 CSTR-5S and CSTR-10S (1) Feeding port for high solid content feedstock (7) Tri-clamp hinge (2) Gas outlet (not visible in the picture) (8) Motor (3) Heating/cooling water outlet (9) Liquid feeding port (continues into a tube on the inside of the main lid) (4) Heating/cooling water inlet (10) Motor holder (5a) Emptying port (5b) Discharging port (11) Extra port similar to (9), but does not have a tube attached on the inside of the lid. (12) Adjustable feet (6) Sampling port (T, ph, etc.) (13) Viewing port window 11

18 6.4 Design/function of CSTR WALL JACKET The wall jacket on the CSTR creates a double wall, where water can be circulated for heating or cooling. By connecting the reactor to an external recirculating water bath equipped with a pump, the temperature in the reactor can be controlled throughout the experiment. Each CSTR can be heated individually or connected in a series, since many recirculating water bath pumps have the capacity to generate a high enough flow rate (20-30 l/min) FEEDING PORT The CSTR Bioreactors have feeding ports in two different sizes. The large one (1) makes it easy for solid feedstock to reach down below the surface of the reactor contents. Liquids can be fed through the smaller port (9), either manually with the help of a syringe, or automatically by a pump GAS OUTLET The gas outlet (2) is designed to have a narrow and gas tight tube (such as Tygon ) attached to it, in order to lead the gas into a bag or through a detection unit SAMPLING PORT Through the universal sampling port (6), it is possible to take samples for off-line analysis of parameters such as temperature (T) and ph. A plastic adapter (pictured below) can be used for inserting a ph sensor for on-line monitoring. This plastic adaptor can be supplied upon request VIEWING PORT WINDOW The stainless steel versions have two viewing ports on opposite sides, where foam formation can be detected during the digestion process. Make sure to remove the protective film. To get a clear view inside the tank, shine a lamp through the back window, while inspecting through the front window. 12

19 6.4.6 BALL VALVES FOR DISCHARGING AND EMPTYING The ports for emptying (5a) and discharging (5b) the stainless steel tanks are easily opened and closed using ball valves. ON means that the valve is open, and OFF means that it is closed. See picture below of the discharging port ball valve SELF DISCHARGING PORT & AUTO SLURRY CONTROL The stainless steel configuration offers an automatic slurry level control. On the inside of the reactor, the discharging tube reaches up along the side of the tank to drain any slurry that reaches above its rim (see picture below) ADJUSTABLE FEET The stainless steel configuration has adjustable feet, which make it easy to stabilize and level the reactor. 13

20 6.4.9 MOTORS & STIRRERS Motors & stirrers for CSTR-2G Two different bioreactor agitation systems for CSTR-2G are available from Bioprocess Control: i) an initial configuration (in left picture) based on standard brush DC motors with a gearbox and ii) a multifunction version (in right picture) based on a unique design of brushless DC stepper motors. For full specifications and description, please refer to the Bioreactor Agitation Systems Manual Motors and stirrers for CSTR-5G, CSTR-5S and CSTR-10S There are two motor versions available for the 5 l and 10 l reactors: a Brush DC Motor and a Multifunction brushless DC motor. Descriptions follow below. BRUSH DC MOTOR 14

21 Brush DC motor (technical characteristics) Type of motor Permanent magnet DC motor with planetary gearhead Voltage 24 V Output power 12 W Output torque 0.58 Nm Output speed 194 min -1 Maximum radial load 250 F R (N) Maximum axial load 150 F A (N) Weight 0.59 kg Length 105 mm Ambient temperature -20 to +80 ( 0 C) Diameter 42 mm Features Speed and mixing intervals controlled by an external power supply Power supply for Brush DC motor (technical characteristics) Output voltage 0-24 V (adjustable) Ripple voltage 1 mv Output current 0-3 A (adjustable) Dimensions 130 x 215 x 150 mm Weight 4.9 kg Features LCD display & fine adjustment for voltage and current Protection mode: current-limiting Output connectors IEC1010 Fuse-protected MULTIFUNCTION BRUSHLESS DC MOTOR The multifunction brushless DC motor has a control panel with different settings, shown in the picture and legend below. 15

22 (1) Auto (ON/OFF) This switch is used to control the direction during the rotation of the mixers (i.e. singe or bidirectional rotations). (2) Timer (0-9) The timer dial can be set to 10 different intervals, which refer to the rotary switch delays. Below are the intervals for each setting: 0 5 s 1 15 s 2 30 s 3 45 s 4 60 s (1 min) s (2 min) s (5 min) s (10 min) s (30 min) s (60 min) (3) Speed The rotation speed control dial shows the speed in percentage, where 100% equals full rotation speed of 300 RPM % of full rotation equals RPM in a linear relation. (4) Signal INT/EXT When signal is set to EXT, the motor can be controlled from an external signal (e.g. the BRS detection unit). INT means that the motor speed can be controlled manually with the adjustment knob. (5) CTRL This is an analogue signal input port, where an external control signal can be connected. (6) Power supply Power supply inlet. Technical description for Multifunction Brushless DC Motor Power supply 24 V Minimum speed 15 V signal output set to 5% (over 0.5 V) Maximum speed 300 V signal output set to 100% (over 12 V) Maximum current A Peak current A maximum Maximum power 53 W output 16

23 7 CSTR TECHNICAL CHARACTERISTICS 7.1 CSTR configurations CSTR-2G CSTR-5G CSTR-5S CSTR-10S Reactor type CSTR CSTR CSTR CSTR Volume 2 l 5 l 5 l 10 l Wall jacket volume NA * 2.7 l 0.7 l 1 l Materials Mixing Temperature control High quality glass Mechanical agitation** High quality glass and stainless steel (AISI 316) High quality stainless steel (AISI 316) Mechanical agitation External Dimension H x W 26 x 13 mm (without motor) 38 x 24 mm 74.5 x 28.5 mm 77.5 x 32.5 mm 45 x 13 mm (with motor) Weight 1.3 kg 7.8 kg 12.8 kg 16.5 kg *Heating control is performed using a thermostatic water bath where the 2 litre reactors are placed. It is supplied by BPC together with a stabilizing and evaporation minimizing lid with 6 circular openings for reactors. **Agitators/motors can be provided with CSTR-2G upon request. 7.2 Raw materials of the CSTR parts a) NG600WH plastic is moulded from glass-reinforced Nylon USP. b) EPDM rubber is ethylene propylene diene monomer rubber. c) AISI316 is an acid proof stainless steel material with a high resistance to corrosion and heat. d) Borosilicate glass is a type of glass, which is less sensitive to thermal shock. e) PTFE and FEP is polytetrafluoroethylene and fluorinated ethylene propylene, respectively, a material known as Teflon. For more details on the materials, please check chapter 10.5 for. 17

24 7.3 Tri-clamps and gasket sizes A tri-clamp connection consists of two ferrules joined by a clamp with a gasket. Tri-clamp size was determined by the outside diameter of the pipe, NOT the outside diameter of the ferrule. See picture below for a schematic representation of a tri-clamp connection. The ferrule (i.e. the metal ring put around the pipe) is about 12.7 mm (1/2 ) larger than the tri-clamp size. In the picture below, (A) represents the internal diameter (ID) of the metallic pipe and (B) is the outer diameter (OD) of the ferrule. 18

25 Tri-clamp and gasket sizes (mm) Usage Tri-clamp size Pipe ID Ferrule OD (A)* (B)* Liquid feeding port Emptying & discharging ports on the version of CSTR-5S and CSTR-10S where the ports are detachable Feeding funnel lid for 5 l reactors Feeding funnel holder Motor holder Feeding funnel lid for 10 l reactors Viewing port holes Plastic hinge clamp for CSTR-5S Plastic hinge clamp for CSTR-10S *In picture above 7.4 Dimensions of the ports on all CSTR digesters Ports CSTR-2G CSTR-5G CSTR-5S CSTR-10S (mm) Feeding funnel ID/OD 12/15 ID 22 ID 22 ID 22 or 16/19 Liquid feeding NA ID/OD 10/12 ID/OD 10/12 ID/OD 10/12 Gas outlet ID/OD 3/4 ID/OD 4/6 ID/OD 4/6 ID/OD 4/6 Wall jacket NA ID/OD 8/10 ID/OD 10/12 ID/OD 10/12 Emptying & discharging ID/OD 12/15 or 16/18 ID/OD 12/15 ID/OD 13.5/16.6 or 15.3/18.6 ID/OD 13.5/16.6 or 15.3/18.6 When tubing is attached to the ports on the reactors, it is important that it has an airtight fit to maintain anaerobic conditions in the reactor during the experiment. A suggestion is that the tubing should have an inner diameter (ID), which is 2 mm smaller than the outer diameter (OD) of the port it will be attached to. e.g. the liquid feeding port for the CSTR-5S has an OD of 12 mm, which means that the tubing should have an ID of 10 mm. Tygon tubing must be used on the gas outlet ports, but the other ports can use any type of silicone tubing used for laboratory purposes. 19

26 8 OPERATION 8.1 First assembly of the CSTR digester All 5 and 10 l reactors are delivered partly assembled, so final assembly will be easy. The main lid is placed on the tank with a gasket in between, and then sealed by a tri-clamp hinge. Be careful when inserting the propellers into the tank and check that they do not hit the discharging tube, or come too close to it when the main lid is closed. The CSTR-2G (2 l glass reactors) differ most from the others in design and how to assemble FIRST ASSEMBLY OF CSTR-2G 1. Put the reactor bottle on a stable surface. 2. Put a screw cap on the bent glass pipe, and then add a silicone gasket with the hard plastic side towards the screw cap. 3. It is recommended to use the openings that are at angle of 180 o from each other, to have some distance between the feeding and the discharging tubes. (See picture above.) Insert the long, straight side of the glass pipe into one of the openings shown in the picture to the above left. Push it gently as far down as possible into the digester and make sure it is parallel to the side of the reactor sidewall. Screw the cap tight onto the reactor. 4. Repeat step 2 above on the glass feeding funnel. Insert the pipe as far down as possible. 5. Close the third small opening by attaching a screw cap, or attach a sensor (T, ph, etc.) by using a screw cap with a hole. 6. (The picture above shows the reactor with a motor unit attached. Please refer to the Bioreactor Agitation Systems manual for details about the motor unit.) 20

27 8.1.2 FIRST ASSEMBLY OF CSTR-5G 1. Put the reactor tank on a stable surface. 2. Put the large gasket on the rim around the opening of the reactor. 3. Gently work the stirrer and the feeding tubes into the opening of the reactor until the main lid rests on the gasket on top of the reactor rim. Take care to ensure that the gasket seals properly and is not in the wrong position. 4. Fasten the main lid with the tri-clamp hinge. 5. Put the screw cap on the emptying port. 6. Insert the tube nipples into the screw caps with holes, and put them on the two ports (3) & (4), which lead in and out of the reactor wall jacket FIRST ASSEMBLY OF CSTR-5S AND CSTR-10S 1. Put the reactor tank on a stable surface and adjust the feet if necessary. 2. Attach the emptying and discharging pipes if the reactor was shipped with these ports removed (valid only for the versions with detachable ports). 3. Put the large gasket on the rim around the opening of the reactor. 4. Before inserting the stirrer and feeding tubes into the reactor, look inside the tank to note the discharging pipe that runs close to the inside wall. The propeller blades and the feeding tubes must be placed so they cannot touch that tube. Take care to ensure that the gasket seals properly and is not in the wrong position. 5. Close the main lid by attaching the plastic tri-clamp hinge around it. 6. Remove the protection film from the viewing porthole windows. 21

28 8.2 Before start up CSTR-2G 1. Use protective clothing, gloves and glasses when handling bio-waste and inoculum. 2. Place the reactor on a stable and horizontal surface in an environment with good ventilation. See chapter for reactor preparations before starting the experiment. 3. Cut 6 pieces of tubing of a dimension that fits the size of the bent glass pipe, and attach them to the end of the pipe. Close the tube with a clamp or a valve. This will be helpful during the discharging procedure. (Described in chapter 8.4). 4. If needed, attach a sensor (T, ph, etc.) to the sampling port. 5. Fill the reactor with inoculum and substrate in the proportions needed for the experiment. 6. Lubricate rubber stoppers on the side that is in contact with the glass bottle, preferably with silicone spray or silicone stick. 7. Place the rubber stopper (with two metal tubes and a stirrer) in the opening of each bottle and press the rubber part in order to close the bottle. Avoid pressing the metallic rod as this will lead to separation of the white plastic cap from the bottom of the stirring rod and allow gas or liquid leakage from the reactor. (First picture from the left above.) 8. Pull out the metallic rod from the bent stirrer into the helical coupling and attach it. (Second picture from the left.) 9. Place the plastic screw thread cap/motor support over it and screw until the thread on the bottle is no longer visible and the lid is properly sealed. (Third picture from left above.) Refer to the Bioreactor Agitation Systems manual for more details on the motor units. 10. Connect the bent stir rod to the motor by carefully tightening the two screws on the helical coupling. Make sure that the helical coupling is not touching the plastic motor support or the metallic screws holding the motor in place, to avoid friction from the movement of the helical coupling. 11. Put each reactor in a thermostatic water bath (fitted with the 6 hole lid) after preparing it to this stage. 12. Cut 6 pieces of Tygon tubing of sufficient length to connect one of the small metal tubes on top of the rubber lids of each reactor to a detection unit. See chapter 8.4 (Feeding and discharging) for suggestions on gas outlet set up. 13. Cut 6 pieces of Tygon tubing at lengths of about 10 cm and connect them to each of the free small metal tubes on top of the rubber lids of the reactors. Close the tubing pieces with the help of plastic tubing clamps. 22

29 8.2.2 CSTR-5G, CSTR-5S AND CSTR-10S 1. Use protective clothing, gloves and glasses when handling bio-waste and inoculum. 2. Place the reactor on a stable and horizontal surface in an environment with good ventilation. 3. Use a tri-clamp and a gasket to fasten a tube nipple to the liquid feeding port. (If the stainless steel version with 4 ports on the main lid is used, check that the selected port continues into a metal tube on the inside of the lid.) 4. If needed, attach a sensor (T, ph, etc.) to the sampling port. 5. Check that the ball valve handle on the emptying and the discharging ports are in the off (closed) position (on the steel configuration) or that the emptying and discharging port on the glass configuration is closed by a screw cap or a clamped tube attached by a tube nipple. 6. Fill the reactor with inoculum and substrate in the proportions needed for the experiment. The recommended filling level is to reach the top edge of the discharging tube that is mounted along the inside of the tank, as seen in the picture in chapter Put the main gasket on the rim of the reactor and carefully insert the stirrer and feeding tubes into the tank. Close the main lid and fasten the tri-clamp hinge. 8. See chapter 7.4 for suggestions on gas outlet set up. Cut Tygon tubing long enough to reach from the gas outlet on the reactor to the detection unit, or to fit a set up where a T-connection is used to connect both a detection unit and a gas bag. Close it with a tube stopper. 9. Attach the Tygon tubing on the gas outlet and close the tubing with a clip. 10. Check that the sampling port is closed by a sealing bolt or the plastic adapter with a sensor (T, ph, etc.). 11. Connect tubes to the in- and outlet ports to the wall jacket and prepare the recirculating water bath. 12. Add tubing to the discharging ports to help during the discharging procedure (described in chapter 8.4). CSTR-5S or CSTR-10S: Connect a piece of tubing to the end of the discharging tube. CSTR-5G: This type of reactor can either be discharged by using suction created by holding a syringe to the liquid feeding port, or by connecting a piece of tubing to the emptying port (by a tube nipple and a screw cap with a hole). If the latter method is chosen, it is important to close the tube with a valve, and to place the reactor close enough to the edge of a bench, so discharging can be done into a jar placed at a level lower than the tank. 13. Check that all feeding ports are covered by a lid or are connected to a tube (if a feeding pump is used), but do not use tri-clamps to fasten any feeding port lids during the experiment! 23

30 8.3 Start up CSTR-2G 1. If CSTR-2G is used as part of the BioReactor Simulator, refer to that manual when starting up the system. 2. Refer to the Bioreactor Agitation Systems Manual for a full description of connecting and starting the Brush DC Agitation System or the Multifunction Brushless DC Agitation System, depending on which one of them that is used. 3. Always make sure the agitation systems are disconnected from the mains while assembling and connecting them. If the Multifunction Brushless DC Agitation System is used, it is also recommended to set the switch on each motor unit and on the Motor Controller to OFF before connecting or disconnecting the components of the system CSTR-5G, CSTR-5S AND CSTR-10S 1. Turn on the recirculating water bath and set the correct temperature. 2. Choose motor settings according to description in chapter Connect the power supply for the motor(s). 4. If a 5 or 10 l reactor is used, make sure the lid on the feeding funnel is not attached with a tri-clamp in order to let accidental over-pressure out of the reactor. 24

31 8.4 Feeding and discharging The methods and procedures for feeding and discharging the reactors may vary depending on the reactor configuration and whether they are fed manually or automatically. The procedures described below are suggestions, which can be used as a starting point. Some of the equipment mentioned below is listed in chapter 3, as it may not be included in the CSTR delivery package CSTR-2G 1. Close the tubing clip (8) to the detection unit. 2. Hold a container under the opening of the bent glass pipe. (See picture in chapter 6.1.) 3. Add feedstock through the feeding funnel. If it does not sink into the reactor by itself, it can help to tap the silicone stopper into the funnel opening, to gently force it down. 4. Make sure that the amount of slurry that comes out equals the amount of feedstock that was added. If the glass pipe is clogged, insert a syringe into the tubing that is attached to the pipe, and use suction to clear it. A cable tie can be inserted to help unclogging. 5. Open the tubing clip to the detection unit (8) so gas registration can continue CSTR-5G 1. Close the tubing clip (8) to the detection unit. 2. Add feedstock through the feeding funnel (1). It may be necessary to alternate between this step and step 3 to equal the pressure in the tank so the feedstock can enter properly through the funnel tube into the reactor contents. 3. Discharging can be done in two ways. The first one is the safest since it does not risk emptying the reactor by accident. a. Attach a piece of tubing to the liquid feeding port, and then insert a syringe and extract it by suction. b. Hold a container under the tube attached to the emptying port (5), and open the valve slowly. 4. Make sure that the amount of slurry that comes out equals the amount of feedstock that was added. 5. Open the tubing clip to the detection unit (8) so gas registration can continue. 25

32 8.4.3 CSTR-5S AND CSTR-10S The stainless steel reactors have a separate discharging port with an automatic level control, which helps balancing the amount of substrate that is added and discharged. 1. Close the tubing clip (8) to the detection unit. 2. Hold a container under the opening of the discharging tube, and open the valve (3). 3. Add substrate to the reactor. 4. If any clogging has developed in the discharging tube, use a syringe to create suction in the tube piece that has been connected to the end of the discharging tube, or try to insert something like a cable tie to clear out the clogging. Leave the valve open until no more slurry stops coming comes out. It The discharged amount should roughly should equal the amount that was fed to the reactor. 5. Open the tubing clip to the detection unit (8) so the gas registration can continue DISCHARGING BY USING A GAS BAG The 5 and 10 l reactors can be set up with a gas bag according to the picture below. (In one version of the steel configuration, the extra port on the lid can be used instead of a T- connector as shown below.) At the start of the experiment, the gas bag can be filled by letting the bag be expanded by gas generated from the start of the experiment, which takes 1-2 days. It can also be manually filled with a standard gas. The bag will provide a gas buffer, which can balance any negative pressure in the tank during discharging. It can also be pushed as a way to apply force during discharging, in case any clogging needs to be cleared. The tube clamp at the gas bag (9) is optional. 26

33 8.4.5 AUTOMATIC FEEDING When automatic feeding is used, a pump will push the feedstock into the reactor, and discharging can be done at a separate time, in the way described in the previous sections of this chapter. If the stainless steel reactors are used, the automatic slurry level function can be used, by leaving the ball valve on the discharging port open. However, the reactor still needs to be monitored regularly to limit clogging problems. When an automatic feeding routine is used, the tube connecting the reactor to the detection unit must be left open at all times. 8.5 Monitoring & troubleshooting If discharging is difficult, clogging may the problem. Attaching a tube to the discharging port and inserting a syringe to create suction can help removing the problem. The set up with a gas bag described in chapter can also be helpful if clogging occurs. With the steel reactor configuration, the emptying port can be used as an alternative discharging port, but it must be opened very slowly to avoid emptying all of the reactor contents. Foam formation can be detected through the viewing port. Shine a lamp through the back window to get a better view through the front window into the reactor. If the windows are smudged, they can be briefly removed for cleaning, but it will let some oxygen into the reactor, so try to be quick. Check that the mixing is working properly, and adjust the speed or intervals if necessary. Refer to the Bioreactor Agitation Systems manual for details on the motors (e.g. how the reset button works, and how to change the fuse in the Motor Controller). 9 END OF OPERATION Always wear protective clothing (lab coat, glasses and gloves) when emptying the reactor. The motors on the 5 and 10 l reactors are turned off by unplugging the motors from the power mains. If the CSTR-2G is used as part of the BRS, the motors must first be turned off from the software interface. (See BRS manual for full description in the Software section.) The agitation systems for CSTR-2G are turned off in different ways: o The Multifunction Brushless DC Agitation System is powered off at the switch on the Motor Controller. It is recommended to also unplug the Motor Controller from the mains, and to set the switch on each motor unit to the OFF position. (See Bioreactor Agitation Systems manual for full description.) o The Brush DC Agitation System is powered off by unplugging the power adapter from the mains. Dispose of the bio-waste in an appropriate way (e.g. by taking it back to a biogas plant). Disassemble the reactor according to instructions in chapter 10 and clean the parts. Use water and regular washing liquid. Inspect the gaskets and screw caps and check the spare parts list if new ones are needed. When the reactor is not in use, store it disassembled in a dry place. 27

34 10 MAINTENANCE AND REPAIRS 10.1 Disassembly instructions for cleaning and repair Always unplug the power supply from the motor before assembling or disassembling any parts of the CSTR reactor DISASSEMBLY OF CSTR-2G 1. Before disconnecting any cables from the motor system, turn off the motors according to the procedure described in the Bioreactor Agitation Systems manual. 2. Remove any tubing that is attached to the reactor. 3. Remove the feeding funnel and the bent glass pipe. 4. Turn the helical coupling to find the screws that fasten the stir rod, and unscrew them. 5. Remove the plastic motor screw caps from the reactor opening. 6. Remove the metal rod from the helical coupling. 7. Pull out the bent stir rod from the reactor bottle. 8. Empty the reactor according to chapter DISASSEMBLY OF CSTR-5G 1. Turn off the motor. 2. Remove any tubing that is attached to the reactor. 3. Remove lids, tube nipples and gaskets from the feeding ports, and take out the large feeding funnel from the main lid. 4. Remove the tri-clamp hinge from the main lid. 5. Lift the main lid and be careful when pulling the stirrer out of the tank. Place the main lid with the stirrer still attached on a horizontal surface. The propellers can be removed with an Allen key (2.5 mm) that is delivered with the CSTR. 6. Remove the tri-clamp that attaches the motor shaft to the main lid. 7. When the propellers have been removed, pull out the stirrer and remove the gasket from the motor holder. 8. Remove the main lid gasket. 9. Remove the screw caps and tube nipples from the emptying port and the wall jacket ports. 28

35 DISASSEMBLY OF CSTR-5S AND CSTR-10S 1. Turn off the motors. 2. Remove any tubing that is attached to the reactor. 3. Remove lids, tube nipples and gaskets from the feeding ports, and remove the large feeding funnel from its holder on the main lid. 4. Remove the tri-clamp hinge from the main lid. 5. Lift the main lid and be careful when pulling the stirrer out of the tank. Place the main lid with the stirrer still attached on a horizontal surface. The propellers can be removed with the Allen key (2.5 mm) that is delivered with the CSTR. 6. Remove the tri-clamp that holds the motor shaft to the main lid. 7. When the propellers have been removed, pull out the stirrer and remove the gasket from the motor holder. 8. Remove the main lid gasket. 9. Remove the tri-clamps, windows and gaskets from the viewing ports on the sides of the reactor. 10. Unscrew the bolt from the sampling port. 11. If there are any tri-clamps around the tubes located at the bottom of the reactor, remove them with their tubes and gaskets. (Note: there is one version of the CSTR where the emptying and discharge tubes are fixed to the tank, and cannot be removed.) 10.2 Cleaning the reactor The motor should be protected from water even though it is water resistant according to IP class. Be careful when cleaning the stirring rod. The bent stir rod for the CSTR-2G reactor should be detached from the motor coupler before washing. The glass and stainless steel parts of the reactor can be cleaned with regular washing liquid. Remember to leave the ball valves on the emptying and discharging ports in the on (open) position when cleaning them Assembly instructions after cleaning and repair Always unplug the power supply from the motor before assembling or disassembling any parts of the CSTR tank ASSEMBLY OF CSTR-2G 1. Put the reactor on a stable surface. 2. Put a screw cap on the bent glass pipe, and then a silicone gasket with the hard plastic side towards the screw cap. (See the picture in chapter ) Then insert the glass pipe and screw the cap tight onto one of the 3 small openings. 3. Repeat step 2 above on the glass feeding funnel. 4. Put a screw cap on the third small opening. If you want to attach a sensor (T, ph, etc.), attach a cap with a hole in the top and a silicone gasket the same way as described in step Repeat the steps in chapter to assemble the reactor completely before start-up. 29

36 ASSEMBLY OF CSTR-5G 1. Put the reactor tank on a stable surface. 2. Put the screw cap on the emptying port. 3. Insert the tube nipples into the screw caps with holes, and put them on the two ports that lead in and out of the wall jacket. 4. Put the large gasket on the rim around the opening of the reactor. 5. If the propellers and the motors have been detached from the main lid, put a gasket on the motor holder and then insert the stirrer. Fasten the motor with a tri-clamp. 6. Attach the propellers to the stirrer, using the Allen key (2.5 mm). The top propeller should be placed about half way down the stirrer. 7. Gently work the stirrer and pipes into the opening of the reactor until the main lid rests on the gasket on top of the reactor. 8. Attach the tri-clamp around the edge of the main lid and adjust it if needed. 9. Put a gasket on the feeding funnel hole and insert the feeding funnel. Fasten with a triclamp. 10. Put a gasket on the small feeding port and add a tube nipple. Fasten with a tri-clamp ASSEMBLY OF CSTR-5S AND CSTR-10S 1. If you have a CSTR with removable ports for discharging and emptying, attach the gaskets and tubes, and fasten them by the tube clamps. The shortest, L-shaped tube should be attached to the outlet at the centre of the reactor bottom, and the longer tube with two U-bends should be fastened at the outlet to the side of the reactor bottom. 2. Put the viewing port gaskets and windows back on the sides of the reactor, and fasten with the tri-clamps. 3. If the propellers and motor have been detached from the main lid, put the gasket on the motor holder, and insert the stirrer. Then fasten with a tri-clamp. 4. Put the propellers back on the stirrer and fasten them with the Allen key (2.5 mm). The top propeller should be placed about half way down the stirrer. 5. Put the main lid gasket on the rim of the tank. 6. Before inserting the stirrer and feeding tubes into the reactor, look inside the tank to note the pipe that runs close to the inside wall. (See picture in section ) The stirrer and the feeding tubes must be placed so they cannot touch that tube. 7. Fasten the main lid by attaching the tri-clamp hinge around it. 8. Put the gasket on the feeding funnel hole on the main lid, and insert the feeding funnel. Fasten with a tri-clamp Maintenance checks Keep the reactors clean when they are not in use. Make sure that the gaskets and ball valves are intact. Refer to the Bioreactor Agitation Systems manual for the agitators for the CSTR-2G. 30

37 10.5 Spare parts for CSTR CSTR offered by Bioprocess Control are fabricated from stainless steel (S) or glass (G) and are available in three size options (2, 5 and 10 l) and 3 different configurations: CSTR-5S CSTR-10S CSTR-5G Inquiries about parts that are not listed below can be addressed to your local distributor, directly to Bioprocess Control, or trough our web site ( The main spare parts for these digesters are presented in the tables following below: CSTR-2G No. Description Size Material Qty Placed (mm) 1 Feeding funnel ID/OD Glass 1 Small port 10/12 2 Feeding funnel ID/OD Glass 1 Small port 16/19 3 Bent glass pipe ID/OD Glass 1 Small port 10/12 4 Bent glass pipe ID/OD Glass 1 Small port 16/19 5 Screw cap with ID 15 Plastic 3 Small port hole (GL25) 6 Screw cap with ID 20 Plastic 3 Small port hole (GL32) 7 Screw cap N/A Plastic 1 Small port (GL25) 9 Silicone ring ID 12 Silicone 3 Small port gasket (GL25) 10 Silicone ring ID 18 Silicone 3 Small port gasket (GL32) 11 Silicone stopper Bottom diameter 38 Silicone 1 Feeding funnel 31

38 CSTR-5G No. Description Size (mm) Material Qty Placed 1 Quick release 150 Stainless steel 1 Lid clamp 2 O-ring 150 FEP/Silicone 1 Lid 3 Tri-clamp gasket 38 EPDM rubber 1 Feeding 4 Tri-clamp gasket 12 EPDM rubber 1 Extra port 5 Shaft gasket 8 EPDM rubber 3 Stirrer 6 Shaft coupling Stainless steel 1 Stirrer 7 Shaft 500 Stainless steel 1 On motor via coupling 8 Propeller 76 (7.9) 3 (5/16 ) Stainless steel 1 Stirrer CSTR-5S No. Description Size (mm) Material Qty Placed 1 Tri-clamp hinge 150 NG600WH plastic 1 Lid 2 Tri-clamp gasket 150 EPDM rubber 1 Lid 3 Tri-clamp gasket 51 EPDM rubber 2 Sight glass 4 Tri-clamp gasket 38 EPDM rubber 2 Feeding (up and down) 5 Tri-clamp gasket 25 EPDM rubber 1 Motor 6 Tri-clamp gasket 12 EPDM rubber 1 Extra port 7 Tri-clamp sight glass 51 AISI316 stainless steel/ Borosilicate glass 1 Reactor cylinder 8 Ball valve 9.5 (3/8 ) ASI316/PTFE 2 Discharge/Emptying port 9 Shaft gasket 8 EPDM rubber 3 Stirrer 10 Shaft coupling Stainless steel 1 Between motor and shaft 11 Shaft 500 Stainless steel 1 On motor via coupling 12 Propeller 76 (7.9) 3 (5/16 ) Stainless steel 1 Stirrer 32

39 CSTR-10S No. Description Size (mm) Material Qty Placed 1 Tri-clamp hinge 200 NG800WH plastic 1 Lid 2 Tri-clamp gasket 200 EPDM rubber 1 Lid 3 Tri-clamp gasket 51 EPDM rubber 3 Sight glass Feeding (up) 4 Tri-clamp gasket 38 EPDM rubber 1 Feeding down 5 Tri-clamp gasket 25 EPDM rubber 1 Motor 6 Tri-clamp gasket 12 EPDM rubber 1 Extra port 7 Tri-clamp sightglass 51 AISI316 stainless steel/ Borosilicate glass 1 Sight glass 8 Ball valve 9.5 (3/8 ) ASI316/PTFE 2 Discharge/Emptying port 9 Shaft gasket 8 EPDM rubber 3 Stirrer 10 Shaft coupling Stainless steel 1 Between motor and shaft 11 Shaft 600 Stainless steel 1 On motor via coupling 12 Propeller 76 (7.9) 3 (5/16 ) Stainless steel 1 Stirrer 11 EQUIPMENT DISPOSAL Please dispose of your CSTR equipment according to your local waste and recycling regulations for electromechanical devices (regarding the motor) and for the materials specified in chapters 6 and 10.5 (regarding the reactor tank). Keep in mind that it could be your responsibility to decontaminate the equipment from any biological and chemical contamination, to protect from health hazards during recycling of the equipment. By doing this, you will help to conserve natural and environmental resources and you will ensure that your equipment is recycled in a manner that protects human health. Thank you! 33

CSTR. (Continuous Stirred Tank Reactors) Operation and Maintenance Manual

CSTR. (Continuous Stirred Tank Reactors) Operation and Maintenance Manual CSTR (Continuous Stirred Tank Reactors) Operation and Maintenance Manual CSTR (Continuous Stirred Tank Reactors) Version 3.1, September 2017 Any questions related to this Operation and Maintenance manual

More information

Shop. Item Information. Rotavapor R-300 B-305, SJ24/40, C, P+G, WB, 110V. Send item information. Show item in shop. Add item to cart.

Shop. Item Information. Rotavapor R-300 B-305, SJ24/40, C, P+G, WB, 110V. Send item information. Show item in shop. Add item to cart. Shop Item Information Send item information Show item in shop Add item to cart Rotavapor R-300 B-305, SJ24/40, C, P+G, WB, 110V Item Information Item No. Availability 11R300252C112 Available within 2 weeks

More information

ASSEMBLY & OPERATING INSTRUCTIONS

ASSEMBLY & OPERATING INSTRUCTIONS SD-BASIC SPRAY DRYER ASSEMBLY & OPERATING INSTRUCTIONS 1) Introduction 2) Safety / COSHH 3) General Safety Rules 4) Components Included 5) Packing List 6) Connection to Electrical Supply 7) Assembly and

More information

Digital 7 Square Plate Magnetic Stirrer

Digital 7 Square Plate Magnetic Stirrer Digital 7 Square (Hotplate) Magnetic Stirrer User Manual MS7-Pro Digital 7 Square Plate Magnetic Stirrer MS7-H550-Pro Digital 7 Square Hotplate Magnetic Stirrer Please read the User Manual carefully before

More information

2016 Catalogue. Bioreactor / Fermentor

2016 Catalogue. Bioreactor / Fermentor 2016 Catalogue Bioreactor / Fermentor NEW Winpact Parallel System FS-05 Series The Winpact Parallel System is the ultimate and true parallel system for your parallel experiment. Whether you need to run

More information

MS-H-Pro-T Magnetic Hotplate-Stirrer with Timer

MS-H-Pro-T Magnetic Hotplate-Stirrer with Timer MS-H-Pro-T Magnetic Hotplate-Stirrer with Timer User Manual MS-H-Pro T Magnetic Hotplate-Stirrer with Timer Please read the User Manual carefully before use, and follow all operating and safety instructions!

More information

Incubators THE BENCHTOP EQUIPMENT HYGIENE SOLUTION

Incubators THE BENCHTOP EQUIPMENT HYGIENE SOLUTION Incubators THE BENCHTOP EQUIPMENT HYGIENE SOLUTION 25 Incubators Stuart has a number of incubators specially designed for accurate and reproducible temperature controlled applications. All incubators have

More information

Incubators. with BioCote antimicrobial protection

Incubators. with BioCote antimicrobial protection Incubators with BioCote antimicrobial protection Stuart has a number of incubators specially designed for accurate and reproducible temperature controlled applications. All incubators have state of the

More information

ACQUITY UPLC HT Column Heater Instructions

ACQUITY UPLC HT Column Heater Instructions ACQUITY UPLC HT Column Heater Instructions Note: This document is an addendum to Revision C of the ACQUITY UPLC System Operator s Guide. Contents: Topic Page Overview 1 Connecting the cable 4 Installing

More information

Conical Fermenter. Instructions

Conical Fermenter. Instructions Conical Fermenter Instructions What s in the Box?: 01. AIRLOCK Rubber Bung Fermenter lid Fermenter Body CONTENTS WHAT S IN THE BOX...P1 ANATOMY/SCHEMATICS...P2 FERMENTING WITH THE STANDARD FERMENTER...P.5

More information

Multifunctional individualists

Multifunctional individualists Premium Laboratory Equipment Rotary Evaporators Multifunctional individualists Don t compromise Evaporation unlimited options Heidolph Premium Laboratory Equipment stands for reliability, precision, and

More information

ASPIRE Laboratory Aspirator

ASPIRE Laboratory Aspirator ASPIRE Laboratory Aspirator USER MANUAL Rev 2/14/18 Accuris Instruments / Benchmark Scientific Ph: (908) 769-5555 E-mail: info@accuris-usa.com (C) Benchmark Scientific, 2018 THE ACCURIS ASPIRE LABORATORY

More information

Fisher Scientific Model 281A Vacuum Oven. Installation and Operating Manual Rev. 0

Fisher Scientific Model 281A Vacuum Oven. Installation and Operating Manual Rev. 0 Fisher Scientific Model 281A Vacuum Oven Installation and Operating Manual 30979 Rev. 0 Preface Models covered in this manual: Catalog numbers Models numbers Voltage 13-262-50 6288 120V 13-262-51 6289

More information

ROTARY VACUUM EVAPORATOR RVO 004

ROTARY VACUUM EVAPORATOR RVO 004 INGOS Ltd. ROTARY VACUUM EVAPORATOR RVO 004 User manual PRAGUE April 11 2006 INGOS Ltd. Laboratory Instruments division Page 1 Producer : Laboratory Instruments division of INGOS Ltd. Supplier and service

More information

G-10s. Instruction Manual. G-Series Cooler UPRIGHT COOLER. Part No.11IPA

G-10s. Instruction Manual. G-Series Cooler UPRIGHT COOLER. Part No.11IPA G-Series Cooler UPRIGHT COOLER Part No.11IPA-062800 Instruction Manual FOR YOUR FUTURE REFERENCE Thank you for using our product. This manual will guide you in getting the best use of your cooler. Remember

More information

BENCHTOP FERMENTOR & BIOREACTOR SYSTEMS

BENCHTOP FERMENTOR & BIOREACTOR SYSTEMS BENCHTOP FERMENTOR & BIOREACTOR SYSTEMS A SELECT NEW RANGE OF VERSATILE, HIGH PERFORMANCE 3-20L AUTOCLAVABLE SYSTEMS WITH EASY-TO-USE TOUCHSCREEN CONTROLS www.cleaverscientifi c.com ...Introducing a new

More information

hp Dust Collector With Vacuum Attachment

hp Dust Collector With Vacuum Attachment Please dispose of packaging for the product in a responsible manner. It is suitable for recycling. Help to protect the environment, take the packaging to the local amenity tip and place into the appropriate

More information

Rotary Evaporators designed

Rotary Evaporators designed Rotary Evaporators designed to work perfectly 1 Rotary Evaporators Distillation made easy! The IKA RV 10 rotary evaporator s award winning design and performance have made a significant difference in your

More information

Mitocell: Instructions for Use

Mitocell: Instructions for Use Mitocell: Instructions for Use 1 Introduction The Mitocell (MT200) is designed for the measurement of the respiration rate of either 50 or 100µl sample volumes of mitochondria and cell suspensions. The

More information

Magnetic Stirring Systems with Heat

Magnetic Stirring Systems with Heat Sharing your passion for making jewelry. Products. Service. Know-how. Magnetic Stirring Systems with Heat 335-212 Digital Ceramic Magnetic Stirring System with Heated Stand 335-211 Ceramic Magnetic Stirring

More information

Operation Manual R205BV, R209BV

Operation Manual R205BV, R209BV Operation Manual R205BV, R209BV 1 Safety Instruction The rotary evaporator is manufactured according to current methods and accepted safety regulations. However, risks still exist during the installation,

More information

Vacuum Pump V-100 Technical data sheet

Vacuum Pump V-100 Technical data sheet Vacuum Pump V-100 Technical data sheet The Vacuum Pump V-100 is an economical and chemically resistant PTFE diaphragm vacuum pump with a space saving design. It covers the essential needs in vacuum generation.

More information

Chemical resistant Vacuum Pumps

Chemical resistant Vacuum Pumps Chemical resistant Vacuum Pumps C300 / C400 / C410 / C510 / C600 / C610 English Operating Manual WIGGENS labortechnik GmbH Mühsamstrasse 3610249 Berlin Germany Fon:+49 30 42105470 Fax:+49 30 42105971 E-Mail:

More information

This site is based on a but applies to all 1971-on Saab 99 and Saab 900.

This site is based on a but applies to all 1971-on Saab 99 and Saab 900. by Mark Jeter updated: December 8, 2004 originally web-published June 27, 2001 This document shows how the original waterpump in a Saab "B" engine can be eliminated and replaced with a reliable, efficient

More information

Cleaning unit for coolant. :_decftez`_>r_fr] Book No.: V2

Cleaning unit for coolant. :_decftez`_>r_fr] Book No.: V2 Cleaning unit for coolant :_decftez`_>r_fr] Book No.: 1271526-02 V2 Alfa Laval Separation AB Separator Manuals, dept. SKEL S-147 80 Tumba, Sweden Telephone: +46 8 53 06 50 00 Telefax: +46 8 53 03 10 40

More information

Models Series Series

Models Series Series Models 3180-Series 3181-Series INDUSTRIAL DIAPHRAGM PUMPS Commercial Duty, 3 GPM/1 LPM FEATURES Sealless Easy Installation Run Dry Ability Flow to 3 GPM/1 LPM Self-Priming Low Amp Draw Thermal Overload

More information

INSTRUCTION MANUAL. Stirring hotplate (with probe and stand) Brand : (Dragon laboratory)

INSTRUCTION MANUAL. Stirring hotplate (with probe and stand) Brand : (Dragon laboratory) INSTRUCTION MANUAL Stirring hotplate (with probe and stand) Model : Brand : MS-H280-pro (Dragon laboratory) User Manual MS-H280-Pro MS-PA BlueSpin LED Digital Hotplate Magnetic Stirrer BlueSpin LED Digital

More information

PTWS 120D USP/EP Tablet Dissolution Testing Instrument

PTWS 120D USP/EP Tablet Dissolution Testing Instrument PTWS 120D USP/EP Tablet Dissolution Testing Instrument The PTWS 120D is a 6 position, single drive compact tablet dissolution testing instrument for solid dosage forms as described in USP chapter

More information

Aquamax KF Oil Evaporator. User Manual

Aquamax KF Oil Evaporator. User Manual Aquamax KF Oil Evaporator User Manual Edition 1.1 - April 2015 Contents Chapter 1 Introduction... 2 1.1 Instrument Description... 2 1.2 Principle of Measurement... 2 1.3 Instrument Connections... 2 Chapter

More information

Hei-VAP Precision. for the highest level of accuracy. Vacuum Pumps. RPM Regulated Vacuum Pumps

Hei-VAP Precision. for the highest level of accuracy. Vacuum Pumps. RPM Regulated Vacuum Pumps Vacuum Pumps Advantages of all chemical-resistant diaphragm vacuum pumps Precision All components which come in contact with media are built from chemically resistant fluoropolymer The durable PTFE design

More information

G-7s. Instruction Manual. G-Series Cooler COUNTERTOP COOLER. Part No.11IPA

G-7s. Instruction Manual. G-Series Cooler COUNTERTOP COOLER. Part No.11IPA G-Series Cooler COUNTERTOP COOLER Part No.11IPA-061000 Instruction Manual FOR YOUR FUTURE REFERENCE This easy-to-use manual will guide you in getting the best use of your cooler. Remember to record the

More information

JASOPELS ROTATING FLESHING MACHINE 1-BEAM

JASOPELS ROTATING FLESHING MACHINE 1-BEAM USER MANUAL JASOPELS ROTATING FLESHING MACHINE 1-BEAM ITEM NO. 32200067 Our quality Your choice 2 www.jasopels.com TABLE OF CONTENTS About this document... 3 Declaration of Conformity... 6 Safety... 6

More information

INSTRUCTION MANUAL HETO CBN 8 / 18 / C Cooling Baths ID: IM.doc Revision 1

INSTRUCTION MANUAL HETO CBN 8 / 18 / C Cooling Baths ID: IM.doc Revision 1 Revision 1 INSTRUCTION MANUAL HETO CBN 8 / 18 / 28-30 - 30 C Cooling Baths ID: 88872215 Page 2 / 9 INSTRUCTION MANUAL CBN 8 / 18 / 28-30 Important user information Please read this entire manual to fully

More information

User Manual. MS7-H550-Pro MS7-H550-S MS7-Pro MS7-S

User Manual. MS7-H550-Pro MS7-H550-S MS7-Pro MS7-S User Manual MS7-H550-Pro MS7-H550-S MS7-Pro MS7-S LCD Digital 7 Square Hotplate Magnetic Stirrer LED Digital 7 Square Hotplate Magnetic Stirrer LCD Digital 7 Square Plate Magnetic Stirrer Classic 7 Square

More information

Advance Humidity Pump with Octagon 20 and 40 Advance EX Upgrade

Advance Humidity Pump with Octagon 20 and 40 Advance EX Upgrade Advance Humidity Pump with Octagon 20 and 40 Advance EX Upgrade User Instructions Contents Section Subject Page 1 Introduction 2 2 Unpacking 3 3 Humidity Pump Installation 3 4 Egg Basket and Divider Cushions

More information

1 L Rotary Vacuum Evaporator Instruction Manual

1 L Rotary Vacuum Evaporator Instruction Manual 1 L Rotary Vacuum Evaporator Instruction Manual Important This manual is designed for safe and optimal performance of this unit Please read manual carefully before operating this unit Keep this manual

More information

Snifter ATEX22 VERSION. User Manual. Distributor

Snifter ATEX22 VERSION. User Manual. Distributor Snifter ATEX22 VERSION User Manual Distributor Version 1.4 09/09/2009 Table of Contents 1. INTRODUCTION... 3 1.1. Safety... 3 1.2. Product overview... 4 1.3. How does it work?... 4 2. INSTALLATION... 5

More information

MAINTENANCE MANUAL TAIYO SEIKI CO., LTD.

MAINTENANCE MANUAL TAIYO SEIKI CO., LTD. MAINTENANCE MANUAL TAIYO SEIKI CO., LTD. Introduction This Maintenance Manual explains how to replace and adjust the major components of the Automatic Taping Machine when required in daily operation.

More information

Reacti-Therm I and III Heating/Stirring Modules

Reacti-Therm I and III Heating/Stirring Modules INSTRUCTIONS Reacti-Therm I and III Heating/Stirring Modules TS-18821 TS-18823 Number TS-18821 TS-18823 Description Reacti-Therm I Heating/Stirring Module (single block) Reacti-Therm III Heating/Stirring

More information

GCG-10. Instruction Manual. G-Series Cooler. Manual is for the following models: GCG-10-N33EB G-10-N33EB UPRIGHT COOLER

GCG-10. Instruction Manual. G-Series Cooler. Manual is for the following models: GCG-10-N33EB G-10-N33EB UPRIGHT COOLER G-Series Cooler GCG-10 UPRIGHT COOLER Manual is for the following models: GCG-10-N33EB G-10-N33EB Instruction Manual Manual is for the following models: GCG-10-N33EB G-10-N33EB Instruction Manual GCG-10

More information

SERVICE MANUAL REFRIGERATION

SERVICE MANUAL REFRIGERATION SERVICE MANUAL REFRIGERATION Electrolux Home Products S.p.A. Spares Operations Italy Corso lino Zanussi, 30 I - 33080 Porcia (PN) Fax +39 0434 394096 S.O.I. Edition: 10.2006 Publication no. 599 38 38-50

More information

PolyMax H2-24 Dutch Bucket System

PolyMax H2-24 Dutch Bucket System 11234 PolyMax H2-24 Dutch Bucket System *Actual system may differ. PolyMax Dutch Buckets Versatile PolyMax Dutch Buckets are ideal for both small- and large-scale hydroponic growing. 2017 FarmTek All Rights

More information

POLYMIX PX-IG 2000 Operating Instructions

POLYMIX PX-IG 2000 Operating Instructions POLYMIX PX-IG 2000 Operating Instructions Voltage D 100-120V, 50/60 Hz D 210-250V, 50/60 Hz Please check that the voltage is correct and corresponds with the nameplate on the back of the machine. Manual

More information

7165 Dust Collector Owner s Manual

7165 Dust Collector Owner s Manual 7165 Dust Collector Owner s Manual Oliver Machinery M-7165 12/2016 Seattle, WA Copyright 2003-2017 info@olivermachinery.net www.olivermachinery.net CONTENTS IMPORTANT SAFETY RULES----------------------------------------------------------------

More information

MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS) MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS) FOR PROPER AND SAFE USE OF THIS CHEMCHAMP EQUIPMENT, PLEASE FOLLOW THIS DOCUMENT AND LOCAL AUTHORITY. KEEP THIS DOCUMENT FOR FUTURE REFERENCE.

More information

INSTRUCTION MANUAL FOR ROVA-2L/3L ROTARY EVAPORATORS PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION

INSTRUCTION MANUAL FOR ROVA-2L/3L ROTARY EVAPORATORS PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION INSTRUCTION MANUAL FOR ROVA-2L/3L ROTARY EVAPORATORS PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION 3, Hagavish st. Israel 58817 Tel: 972 3 5595252, Fax: 972 3 5594529 mrc@mrclab.com MRC.VER.02-11.10

More information

Recirculating Coolers

Recirculating Coolers 09 Recirculating Coolers (chillers) General Recirculating Coolers Low Temp. Recirculating Coolers Advanced Low Temp. Recirculating Coolers High Temp. Recirculating Coolers Compact Recirculating Cooler

More information

Instruction Manual. Model AccuPlate Hotplate AccuPlate Stirrers AccuPlate Hotplate Stirrer 12/10 CLS-EQ-LHP01REV

Instruction Manual. Model AccuPlate Hotplate AccuPlate Stirrers AccuPlate Hotplate Stirrer 12/10 CLS-EQ-LHP01REV Instruction Manual Model AccuPlate Hotplate AccuPlate Stirrers AccuPlate Hotplate Stirrer 12/10 CLS-EQ-LHP01REV2 9296050000 About This Manual This manual is designed to assist you in optimal usage of your

More information

Leading Safety Standards Superior Ease of Use Reduced Cost of Ownership. Intelligent. Evaporation

Leading Safety Standards Superior Ease of Use Reduced Cost of Ownership. Intelligent. Evaporation Leading Safety Standards Superior Ease of Use Reduced Cost of Ownership Intelligent Evaporation Leading Safety Standards Two independent safety circuits avoid an overheat situation of your heating bath:

More information

Order by phone Order on-line Order by fax Website

Order by phone Order on-line  Order by fax Website LABOROTA 4000 Series, Rotary Evaporators The LABOROTA 4000 series comprises the LABOROTA efficient models, the LABOROTA digital models and the LABOROTA control models; all are available with either handlift

More information

BlueHeat AirTop 2000 Heater

BlueHeat AirTop 2000 Heater BlueHeat AirTop 000 Heater Air Heater Installation Manual Ford E-Series 6.0L Diesel Beginning Model Year: 006 Special instructions for these models Part locations may differ slightly dependent on the vehicle

More information

ZD-985 Desoldering Station

ZD-985 Desoldering Station ZD-985 Desoldering Station 2 Contents Contents... 3 Unpacking and Setting Up Your ZD-985 Desoldering Station... 4 Setting Up the Unit... 5 Auto Tip Saver Function... 8 Tips and Techniques... 8 Alloy Melt

More information

Draft beer dispenser

Draft beer dispenser Draft beer dispenser Référence : DOM330 Version : 1.3 Langue : English WWW.DOMOCLIP.COM There are numerous beers to choose from available in 5 liters party kegs. Before using the dispenser, please read

More information

Evaporators. In this section. Rotary Evaporators Crystalisation Distillation Drying Reflux Solution Concentration Volatiles Glassware

Evaporators. In this section. Rotary Evaporators Crystalisation Distillation Drying Reflux Solution Concentration Volatiles Glassware Cometa Cientifica s.l. In this section Rotary Crystalisation Distillation Drying Reflux Solution Concentration Volatiles Glassware 162 Rotary LABO ROTA 4000, 4001, 4002 and 4003 Features Distillation with

More information

IKA WERKE. IKA Vibrax VXR basic BETRIEBSANLEITUNG D 3 OPERATING INSTRUCTIONS GB 7 MODE D EMPLOI F 11. VXR Reg.-No

IKA WERKE. IKA Vibrax VXR basic BETRIEBSANLEITUNG D 3 OPERATING INSTRUCTIONS GB 7 MODE D EMPLOI F 11. VXR Reg.-No 31 791 00 IKA WERKE IKA Vibrax VXR basic BETRIEBSANLEITUNG D 3 OPERATING INSTRUCTIONS GB 7 MODE D EMPLOI F 11 Reg.-No. 4343-01 Contens Page Guarantee 2 Safety instructions 7 Proper use 8 Unpacking 8 Useful

More information

Parts and Service Manual

Parts and Service Manual Section II Parts and Service Manual (70241A) CLARKE TECHNOLOGY Operator's Manual - MINI MAX Page -29- Frame and Front Cover Assembly Drawing 2/01 Page -30- CLARKE TECHNOLOGY Operator's Manual -MINI MAX

More information

English Manual for Jewelry Casting and Investing The professional choice

English Manual for Jewelry Casting and Investing The professional choice English Manual for Jewelry Casting and Investing The professional choice QUICK START GUIDE: For thorough instructions, please review attached instructions. However, below, you will find a simplified start-up

More information

Multi-Mode Electrode pro

Multi-Mode Electrode pro Multi-Mode Electrode pro Manual 8.110.8018EN / 2015-06-30 Metrohm AG CH-9100 Herisau Switzerland Phone +41 71 353 85 85 Fax +41 71 353 89 01 info@metrohm.com www.metrohm.com Multi-Mode Electrode pro 6.1246.120

More information

Instruction Manual. For All Corning Hot Plates, Stirrers, Stirrer/Hot Plates with Digital Displays, and External Temperature Controller (6795PR)

Instruction Manual. For All Corning Hot Plates, Stirrers, Stirrer/Hot Plates with Digital Displays, and External Temperature Controller (6795PR) Instruction Manual For All Corning Hot Plates, Stirrers, Stirrer/Hot Plates with Digital Displays, and External Temperature Controller (6795PR) Corning Cat. No. 230V 230V Model No. Product Top Plate Size

More information

A2 Automatic Dispenser. User Manual. 100% Recirculation. Hummingbird. A2 Automatic Dispenser V3.0 0

A2 Automatic Dispenser. User Manual. 100% Recirculation. Hummingbird. A2 Automatic Dispenser V3.0 0 A2 Automatic Dispenser 100% Recirculation Hummingbird User Manual A2 Automatic Dispenser V3.0 0 Contents 1.Using Requirement 1 2.Specifications. 2 3.Safety Instructions. 2 4.Machine Composition 3 5.Installation.

More information

AOYUE INT. Advanced Repairing System NT 701A++ INSTRUCTION MANUAL. Correct Disposal of this product

AOYUE INT. Advanced Repairing System NT 701A++ INSTRUCTION MANUAL. Correct Disposal of this product This appliance can be used by children aged form 8 years and above and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision

More information

Jetstream Series HPLC - PELTIER COLUMN-THERMOSTATS 1. GENERALITIES

Jetstream Series HPLC - PELTIER COLUMN-THERMOSTATS 1. GENERALITIES Generalities HPLC - PELTIER COLUMN-THERMOSTATS GENERALITIES This manual has been updated to the actual standard. It now covers all the features of the actual Jetstream series models. All rights concerning

More information

30GH Air-Cooled Liquid Chillers 30GH Nominal cooling capacity kw

30GH Air-Cooled Liquid Chillers 30GH Nominal cooling capacity kw Air-Cooled Liquid Chillers Nominal cooling capacity 21-94 kw Carrier is participating in the Eurovent Certification Programme. Products are as listed in the Eurovent Directory of Certified Products. The

More information

Models Series Series

Models Series Series Models 31800-Series 31801-Series INDUSTRIAL DIAPHRAGM PUMPS 4 GPM/15 LPM FEATURES Self-Priming Easy Installation Can run dry without damage Low Amp Draw Flow to 4 GPM/15 LPM Compact Size Thermal Overload

More information

MODEL A18 SOLVENT RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

MODEL A18 SOLVENT RECOVERY SYSTEMS (EXPLOSION PROOF UNITS) MODEL A18 SOLVENT RECOVERY SYSTEMS (EXPLOSION PROOF UNITS) FOR PROPER AND SAFE USE OF THIS CHEMCHAMP EQUIPMENT, PLEASE FOLLOW THIS DOCUMENT AND LOCAL AUTHORITY. KEEP THIS DOCUMENT FOR FUTURE REFERENCE.

More information

Advanced Laundry Chemical Dosing System for Single and Multi-Washers

Advanced Laundry Chemical Dosing System for Single and Multi-Washers Advanced Laundry Chemical Dosing System for Single and Multi-Washers The On-Premise Elite sets the new standard for laundry chemical dosing systems by which all others will be measured! Innovative smart

More information

CryoFit. Handling of Flow Cell and Capillaries. User Guide. Version 002

CryoFit. Handling of Flow Cell and Capillaries. User Guide. Version 002 CryoFit Handling of Flow Cell and Capillaries User Guide Version 002 Copyright by Bruker BioSpin NMR GmbH. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system,

More information

G-10f/GCG-10f UPRIGHT COOLER

G-10f/GCG-10f UPRIGHT COOLER G-Series Cooler G-10f/GCG-10f UPRIGHT COOLER Manual is for the following models: G-10F, G-10-F33EB GCG-10F, GCG-10-F33EB GCG-10F2, GCG-10-F233EB G-10-F33EB-HC, GCG-10-F33EB-HC GCG-10-F233EB-HC Instruction

More information

Rotavapor R-220 Pro Technical data sheet

Rotavapor R-220 Pro Technical data sheet Rotavapor R-220 Pro Technical data sheet The Rotavapor R-220 Pro is designed to fulfill a wide range of distillation applications in the industrial environment. Safety, robustness and easy handling are

More information

Dissolved Oxygen Sensors

Dissolved Oxygen Sensors Instruction Sheet PN 51A-HxDO/rev.E July 2005 Models Hx438 and Gx448 Dissolved Oxygen Sensors For additional information, please refer to the Instruction Manuals CD shipped with this product, or visit

More information

ZETA MAGNETIC AGITATORS

ZETA MAGNETIC AGITATORS ZETA MAGNETIC AGITATORS For sterile liquid processing www.zeta.com ZETA AGITATORS A VERSATILE PRODUCT FAMILY Proven agitator technology that meets the highest standards of sterile design and reliability.

More information

GASS Module. User Manual. Gas Analysis Sampling System PERMA PURE

GASS Module. User Manual. Gas Analysis Sampling System PERMA PURE GASS Module Gas Analysis Sampling System User Manual PERMA PURE 8 Executive Drive Toms River, N.J. 08755 Phone: 800-337-3762 732-244-0010 Fax: 732-244-8140 e-mail: info@permapure.com Web Site: www.permapure.com

More information

Operator s Manual. The Bullet Blender 50 BB50-AU, BB50-DX. Contents. Congratulations!

Operator s Manual. The Bullet Blender 50 BB50-AU, BB50-DX. Contents. Congratulations! Operator s Manual The Bullet Blender 50 BB50-AU, BB50-DX Congratulations! Congratulations on your purchase of a Bullet Blender 50 by Next Advance, Inc., for mixing, lysing, disrupting, and homogenizing

More information

173 Index of Materials

173 Index of Materials 73 Index of Materials IBC Tank 9 Polystyrene Sheet 2 200 Litter Blue Barrels 0 Plumbers Tape (Teflon) 3 Fish Tank Shading Cable Ties 4 Plastic Net 2 Waterproof Eclectic Box 5 Concrete Blocks 3 0 mm Wide

More information

RCM-77. Instruction Manual. G-Series Cooler. U.S. Patent No. 8,215,125 RECHARGE COLD MERCHANDISER

RCM-77. Instruction Manual. G-Series Cooler. U.S. Patent No. 8,215,125 RECHARGE COLD MERCHANDISER G-Series Cooler RECHARGE COLD MERCHANDISER U.S. Patent No. 8,215,125 Instruction Manual FOR YOUR FUTURE REFERENCE This easy-to-use manual will guide you in getting the best use of your cooler. Remember

More information

AC-12200E Portable Air Conditioner

AC-12200E Portable Air Conditioner AC-12200E Portable Air Conditioner OWNERS MANUAL Read and save these instructions. A Name You Can Trust Trust has to be earned and we will earn yours. Customer happiness is the focus of our business. 2

More information

Safety Lab Goggles are required! Apron is optional!

Safety Lab Goggles are required! Apron is optional! Goggles are required! Apron is optional! Station 1: What would acid do to your eye? Materials: 6M hydrochloric acid, dropper, two petri dishes, egg whites. Procedure: 1. Separate the egg white from the

More information

Rotavapor R-220 Pro Technical data sheet

Rotavapor R-220 Pro Technical data sheet Rotavapor Technical data sheet The Rotavapor is designed to fulfill a wide range of distillation applications in the industrial environment. Safety, robustness and easy handling are the key benefits of

More information

General System Layout Sketch

General System Layout Sketch General System Layout Sketch EZ-37 Solar Panels PV panel Glycol Fill Valve Expansion Tank ` 1 Introduction This document describes how to install a Heliatos GH type solar water heating system. These systems

More information

Portable Air Conditioner

Portable Air Conditioner AC-12200E AC-12200H Portable Air Conditioner OWNER S MANUAL v1.0 Read and save these instructions. 2 A Name You Can Trust Trust should be earned and we will earn yours. Customer happiness is the focus

More information

Thermostats designed

Thermostats designed Thermostats designed to work perfectly 1 High-precision temperature control solutions IKA is proud to introduce several highprecision temperature control systems from +20 to +250 o C. This wide product

More information

Tornado Operations & Maintenance Manual

Tornado Operations & Maintenance Manual TORNADO INDUSTRIES 7401 W. LAWRENCE AVENUE CHICAGO, IL 60706 (708) 867-5100 FAX (708) 867-6968 www.tornadovac.com Tornado Operations & Maintenance Manual MODEL NO. 99690 BD 22/14, 99720 BD 26/14 L9722

More information

SEALED THERMAL STORE

SEALED THERMAL STORE ISSUE 3 0717 INSTALLATION AND USER GUIDE ENERGYMANAGER SEALED THERMAL STORE ADVANCE APPLIANCES LTD PLEASE RETAIN AND ENSURE SERVICE RECORDS ARE KEPT UP TO DATE. SCHEMATIC DIAGRAM OF ENERYMANAGER THERMAL

More information

The Heidelberg Integrated 14 CO 2 Sampler Institute of Environmental Physics, ICOS CRL

The Heidelberg Integrated 14 CO 2 Sampler Institute of Environmental Physics, ICOS CRL The Heidelberg Integrated 14 CO 2 Sampler Institute of Environmental Physics, ICOS CRL 1. Description of the sampling technique and operation mode With the 14 CO 2 sampler atmospheric CO 2 is being collected

More information

Interscan Corporation. Instruction Manual Series Compact Portable Analyzer

Interscan Corporation. Instruction Manual Series Compact Portable Analyzer Interscan Corporation Instruction Manual 4000 Series Compact Portable Analyzer 1 2 INTERSCAN CORPORATION Simplified 4000 SERIES MANUAL TABLE OF CONTENTS SECTION TITLE PAGE 1.0 Equipment Description 4 2.0

More information

SIHI dry Dry running vacuum pumps

SIHI dry Dry running vacuum pumps SIHI dry Dry running vacuum pumps ATEX CERTIFIED STERLING FLUID SYSTEMS GROUP www.sterlingfluidsystems.com SIHI dry Your Application Dry running vacuum pumps for the chemical, pharmaceutical and other

More information

2017 BROCHURE. Bioreactor / Fermentor

2017 BROCHURE. Bioreactor / Fermentor 2017 BROCHURE NEW WCC-100 WCC-101 Winpact Chiller Laboratory Cat. No. WCC-100 WCC-101 Display LED display Power 1000W Bath capacity 10L Chamber SUS#304 Controller PID control, PT100 sensor Temperature

More information

INSTALLATION AND MAINTENANCE GUIDE TRENDY 1000 T ELECTRONIC LAVATORY FAUCET

INSTALLATION AND MAINTENANCE GUIDE TRENDY 1000 T ELECTRONIC LAVATORY FAUCET INSTALLATION AND MAINTENANCE GUIDE TRENDY 1000 T ELECTRONIC LAVATORY FAUCET 1 INDEX 1 TECHNICAL DATA 2 TEMPERATURE ALTERNATIVES 3 PACK CONTENTS 4 PRE-INSTALLATION INFO 5-6 FAUCET INSTALLATION 7 ADJUSTING

More information

Operating Instructions

Operating Instructions Operating Instructions TEKA Cartmaster Type PF-W 1, PF-W 2 TEKA Absaug- und Entsorgungstechnologie GmbH Industriestraße 13 D-46342 Velen Postfach 1137 D-46334 Velen Tel.: +49 (0) 2863 9282-0 Fax: +49 (0)

More information

Benchtop System Overview

Benchtop System Overview Benchtop System Overview Winpact Parallel Fermentation System (FS-05 Series) The Winpact Parallel Fermentation System is the ultimate and true parallel system for your parallel experiment. Whether you

More information

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration in tap Boiling water to in tap sink Drain Valve (as high as possible) REDITAP CONNECTION SUMMARY Amp mains supply cold mains water into in tap optional filter cold water in hot water BOILING UNIT Installation

More information

20600 SERIES OFFICE SHREDDERS C EC C EC EC EC EC

20600 SERIES OFFICE SHREDDERS C EC C EC EC EC EC 20600 SERIES OFFICE SHREDDERS 20606 C 20606 EC 20612 C 20612 EC 20614 EC 20630 EC 20634 EC OPERATION MANUAL 20606.90.0881-09/2007 Congratulations on your purchase of a DAHLE Paper Shredder! We here at

More information

1/2011 V1. Puzer AINO USER MANUAL. Read this instruction before using the vacuum cleaner! Keep the instructions near the vacuum cleaner for later use!

1/2011 V1. Puzer AINO USER MANUAL. Read this instruction before using the vacuum cleaner! Keep the instructions near the vacuum cleaner for later use! Puzer AINO USER MANUAL Read this instruction before using the vacuum cleaner! Keep the instructions near the vacuum cleaner for later use! 1 Vacuum cleaner parts 1 Part numbers 1. Wall inlet 2. Display

More information

PolyMax H1-10 Dutch Bucket System

PolyMax H1-10 Dutch Bucket System 112529 PolyMax H1-10 Dutch Bucket System *Actual system may differ. PolyMax Dutch Buckets Versatile PolyMax Dutch Buckets are ideal for both small- and large-scale hydroponic growing. STK# DIMENSIONS 112529

More information

GLYCOL CHILLER INSTRUCTIONS IMPORTANT: BEFORE OPERATING PLEASE SEE INSTRUCTIONS ON PAGE 5

GLYCOL CHILLER INSTRUCTIONS IMPORTANT: BEFORE OPERATING PLEASE SEE INSTRUCTIONS ON PAGE 5 GLYCOL CHILLER INSTRUCTIONS IMPORTANT: BEFORE OPERATING PLEASE SEE INSTRUCTIONS ON PAGE 5 CONTENTS Key features...p.1 Product contents...p.1 Safety information...p.2 Maintenance...p.2 How it works...p.5

More information

Eldex Column Heater. Operator s Manual

Eldex Column Heater. Operator s Manual Eldex Eldex Column Heater Operator s Manual Eldex Laboratories, Inc. 30 Executive Court Napa, CA 94558 Tel: (707) 224-8800 Fax: (707) 224-0688 www.eldex.com Rev. B: 081700 2000Eldex Laboratories, Inc.

More information

Rotary evaporator RS 100 PRO

Rotary evaporator RS 100 PRO Rotary evaporator RS 100 PRO rotary evaporator RS100 PRO model RS 100-PR0 We present the new rotary evaporator RSLAB model RS 100-PRO which expands our product line of evaporators. It includes some innovations:

More information

(Inside illumination as option available.) Biogas Batch Fermentation System. With Automatic Data Logging in Real Time

(Inside illumination as option available.) Biogas Batch Fermentation System. With Automatic Data Logging in Real Time (Inside illumination as option available.) Biogas Batch Fermentation System With Automatic Data Logging in Real Time Maximum precise measurement results with individually calibrated RITTER MilliGascounters

More information

Sintrol Snifter A2 EX. Manual. Version 1.2.3

Sintrol Snifter A2 EX. Manual. Version 1.2.3 Sintrol Snifter A2 EX Manual Version 1.2.3 Table of Contents 1 INTRODUCTION... 3 1.1 Safety... 3 1.2 Product overview... 4 1.3 How does it work?... 4 2 INSTALLATION... 4 2.1 Selecting the installation

More information

5HP CYCLONE DUST COLLECTOR MANUAL

5HP CYCLONE DUST COLLECTOR MANUAL 5HP CYCLONE DUST COLLECTOR MANUAL LAGUNA TOOLS 2072 Alton Parkway Irvine, California 92606 Ph: 800.234.1976 www.lagunatools.com 2018, Laguna Tools, Inc. LAGUNA and the LAGUNA Logo are the registered trademarks

More information