1 Cold Weather Preparedness Plant Winterization Lessons Learned & Best Practices

2 Cold Weather Preparedness RF Criteria For Plant Visits: Generating facilities that experienced repeated freezing or cold weather related issues during the 2013 through 2017 winter periods. Multiple unit generating facilities that experienced freezing or cold weather related issues during the 2014 through 2017 winter periods. New generating facilities. 2

3 Onsite Visit Locations (all) 3

4 Cold Weather Preparedness Each Plant Visit Was NOT: A formal certification that the facility was fully and adequately prepared for winter operations. A comprehensive review of all plant systems, equipment and devices. 4

5 EQUIPMENT PROTECTION: Although some of the observations and practices were unique to an entity, the following can be generally applied: Installation of additional freeze protection. Erecting wind barriers. Fabricating new enclosures or modifying existing ones. Utilizing double insulation. Replacing damaged equipment with a more reliable design. Adding kerosene to fuel oil system to minimize gelling Treating coal and/or limestone systems with anti-freezing solutions. 5

6 Utilizing the system/equipment Resistance Temperature Detectors (RTDs) as ambient temperature indicators to confirm operation of area heaters during periods of unit shutdown. Ensuring that end-of-line heat trace indicators are installed on all plant piping susceptible to freezing conditions. Upgrading the original 3-watt heat trace design with a more effective 5- watt system. Remote monitoring and alarming of all transmitter enclosures exists from a Distributed Control System (DCS) display in the plant control room. Remote monitoring of heat trace circuit amperage from a dedicated display in the plant control room. 6

7 IMPROVING OPERATIONS: Although some of the observations and practices were unique to an entity, the following can be generally applied: Conducting meetings with staff to discuss lessons learned. Completing pre-winterization walk-downs of entire facility. Increasing frequency of operator rounds. Reviewing troubleshooting instructions between electricians and plant operators for heat trace panels/systems. Assigning a dedicated individual to monitor critical areas. Assigning contractors to observe and maintain portable heaters. 7

8 Commencing winter preparations in late summer/early fall to ensure sufficient time to address any deficiencies. Conducting additional winter pre-job briefs prior to beginning outside work to ensure personnel safety. Use of an Operator Actions Matrix to indicate and describe the necessary actions based on different ambient air temperatures. Use of plant staff for installing heat tracing who are more readily available and better understand the impact to plant operations instead of contractors. Use of a Heat Trace Equipment simulator for training personnel on proper installation and troubleshooting techniques. Although the winterization program has provisions for two-man operation based on ambient temperature, in order to ensure personnel safety, a corporate work-alone policy dictates the allowable tasks and responsibilities when operating staff are required to work alone. 8

9 Attempting to resolve inherent design issues with other vendors when the OEM is unable to provide a better or permanent solution. Effectively utilizing the knowledge and skills of a relatively small staff to accomplish all winter readiness objectives. Installation of a new 500 gallon kerosene tank to ensure an adequate supply of kerosene is available for all portable space heaters if fuel delivery is delayed. Design and installation of permanent enclosures surrounding the drum level transmitters with provisions to remove ceiling and floor when cold weather preparedness is no longer required. Ensuring that a formal and thorough heat trace and insulation audit was conducted to ensure winter readiness. Disabling of status lights and removing labeling on local heat trace panels for circuits that are not being utilized. To supplement the onsite emergency diesel generator, a portable generator is available for relocation to other areas of the plant site. 9

10 Review of lessons learned document and participating in post-winter recap meeting with the entire generation fleet. Changing the lubricating oil for the ID Fan Booster lube oil system to another type of oil with a lower operating point of minus 40 degrees F. Implementation of a Conservative Operations and Maintenance Activity during extreme weather events or other conditions which may impact the safety of plant personnel or reliability of the facility. Notifications that conservative operations are in effect are made throughout the plant. Building a roof over top of a Safety Shutoff Valve (SSOV) to prevent the vent from being blocked with ice/snow, causing failure of the CT cavity leak test and initiating a shutdown of the CT during startup. Use of removable metal enclosures on building ventilation louvers. Installation of heat trace and insulation on ID Fan control oil return lines. 10

11 Development of a Plant Freeze Protection Procedure which addresses the following: Areas not protected by the installed systems as well as when and what operator action is required in the event of installed system failure. Establishment of Control Points (points to be monitored in the absence of other obvious indications/alarms) Describing the heating area limitations of temporary heating sources. Directing the practice of maintaining water flow to larger areas or entire systems to prevent freezing. Directing the draining of water from system if feasible upon failure of freeze protection. Describing the heat trace protection boundaries of equipment/systems. Providing lay-up procedures to prevent freezing on idle equipment/systems. Heightening awareness to areas where cold weather readiness may create an undesirable condition: Operating air handling units which may create higher building temperatures during early winter periods when higher outside temperatures may temporarily occur. Closing of building ridge vents which may prevent the escape of hydrogen gas if a generator leak would occur. 11

12 Trough cover designed by plant personnel to prevent water overflow causing large ice formation which if broken free, caused line breaks, damage, and ice accumulation on equipment below. Typical heat trace cabinet located throughout plant site for monitoring, control and alarming of heat tracing circuits. 12

13 Newly installed insulated weather barrier in boiler room to prevent the entry of cold air which caused freezing of feedwater flow transmitter. Newly fabricated enclosure for feedwater flow transmitter. 13

14 Portable heaters are used to keep the HRSGs from freezing when off line to keep from draining the boilers. This also shortens the start up time since the boiler is kept warm. Replacement of various transmitter enclosures with improved design to maintain internal temperatures above freezing conditions. 14

15 Positive Observations/Best Practices Remote monitoring and alarming of all transmitter enclosures from Distributed Control System (DCS) display in plant control room. Remote monitoring of each heat trace circuit amperage from a dedicated display in the plant control room. 15

16 Permanent enclosures surrounding the steam drum ends for site glasses and transmitters. The floors and ceilings of the enclosures are only installed in preparation for winter readiness. New O Brien Heat Trace system with exterior clamps. Old design utilized metal clamps that were internally secured to the transmitter sensing lines and directly connected to the structural steel which acted as a heat sink and resulted in freezing of the sensing lines. 16

17 Temporary heaters and ducting utilized to prevent the formation of ice and snow on the surface of the air inlet filters. Specially designed heated blankets are used to prevent the demineralizer lines from freezing. These blankets use Velcro fasteners to attach to the hoses. They can be removed to prevent damage to the blankets during the summer. Lessons Learned and Best Practices slides are posted on the rfirst.org website under the Learning Center tab: Plant Winterization Best Practices ppt 17

18 Configuration of Inlet Bleed Heat (IBH) System used to divert a portion of the combustion turbine compressor hot air from interstage to inlet filter boxes. Lessons Learned and Best Practices slides are posted on the rfirst.org website under the Learning Center tab: Plant Winterization Best Practices ppt 18

19 Disabling the Heat Trace Status lights and removing labeling for circuits not-inuse which aids in the troubleshooting process and avoids confusion if a status light is illuminated for a non-existent circuit. 19

20 Roof built over top of the SSOV actuator to prevent exhaust vent from blocking with ice/snow. 20

21 Removable metal enclosures over the wall louvers in the area of the auxiliary boiler. 21

22 Insulation and heat trace on the ID Fan hydraulic control oil return line. 22

23 Placed Thermometers inside all outside boxes as well as all buildings housing critical components 23 Boxes that did not have glass installed, they drill the box to provide a temperature reading. Without opening the box

24 Pushing this button the operator can visually check if all indicator lights are working properly All indicator lights lit up 24

25 RF Cold Weather Lessons Learned Plant trip Two of three IP drum level transmitters froze causing a lowlow-low drum level indication. Gas turbine and duct burners tripped after 15 second time delay. Two of the three transmitters were in a separate enclosure. Enclosure heater powered from heat trace on instrument tubing. Only wiring for the enclosure heater shorted and failed. Exposed heat trace within the enclosure provided sufficient heat during higher ambient temperatures giving appearance of acceptable operation. Enclosure heater thermostat was not wired to heater circuit which allowed uncontrolled operation and ultimate damage to wiring due to overheating. 25

26 RF Cold Weather Lessons Learned Heat trace system checked once per shift when ambient temperature is below freezing. Normal expected current is 10 amps. Recorded current was 3 amps. No heat trace system alarms existed. Three alarm functions are high & low current, and ground fault. Low current alarm set at 1 amp. Since circuit failed open, ground fault alarm did not register. Ground fault alarm occurred when technician disturbed wires when removing cover. Heat trace circuit was rewired and thermostat properly connected. 26

27 ERCOT 2017 Weatherization Workshop December 18-19, 2016 Issues: Eight (8) generators experienced outages or derates. ERCOT followed up with spot checks. 27

28 ERCOT 2017 Weatherization Workshop Lessons Learned Plant 1 trip Ten critical components froze due to incomplete list of critical components: GT performance heaters (2) Compressor bleed valve air regulators HRSG HP flow transmitter sensing lines (2) HRSG LP flow transmitter HRSG HP attemperator HP bypass Condensate hotwell level flow transmitter Instrument air compressor coalescing filter and air dryer 28

29 ERCOT 2017 Weatherization Workshop Lessons Learned Plant 2 trip Steam seal pressure transmitter froze due to lack of heated wind break enclosure. Plant 3 derate HP superheater attemperator valve froze to the valve seat due to a loose connection on the associated heat trace cable. Plant 4 trip Two of the three main turbine throttle pressure transmitter valve bonnets froze due to inadequate insulation. Plant 5 trip One of the four drum level transmitters froze due to tripping of main breaker in heat trace sub-panel for a ground fault on one of the circuits. Plant 6 trip BFP suction strainer differential pressure due to damaged power connection boot for the heat trace cable on the root valves and heat stress cracks and brittle heat trace cable around the root valve. Plant 7 temporary derate frozen instrument air line caused a pressure transmitter to show a false low reading due to mechanical room louver vents being left open with vent fan in manual and space heaters not working. 29

30 ERCOT 2017 Weatherization Workshop Lessons Learned Plant 8 trip Deaerator level transmitter froze due to heat trace circuit failure as a result of corrosion on termination to fuse block. 30

31 ERCOT 2017 Weatherization Workshop Lessons Learned January 6-7, 2017 Issues: Six (6) generators experienced outages due to cold weather. ERCOT followed up with spot checks on three of the units. 31

32 ERCOT 2017 Weatherization Workshop Lessons Learned Plant 1 trip BFP suction strainer differential pressure transmitter sensing line froze due to heat trace failure causing a pump trip signal and subsequent unit trip. Plant 2 derate Lower steam coil developed a leak inside the FD fan intake resulting in ice forming on the bottom side of steam coil which damaged the fan blades. Plant 3 trip HRSG HP steam flow transmitters froze due to failed heat trace panel control modules resulting in two heat trace circuits not being energized. Plant 4 trip Deaerator flow transmitter sensing line froze creating a false high flow rate and causing the DA level control valves to close which allowed the DA level to drop resulting in a MFT. 32

33 ERCOT 2017 Weatherization Workshop Lessons Learned Plant 5 trip Loss of instrument air was caused by freezing of the air dryer pre-filter which restricted instrument air flow resulting in closure of the gas trip valve. Plant 6 trip HRSG HP feedwater high range flow transmitter, low side sensing line froze. Contractor that performed the fall audit on heat trace did not correctly terminate the associated heat trace circuit in a junction box. 33

34 Questions & Answers Forward Together ReliabilityFirst 34

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES SOLAR ENERGY GATHERING EQUIPMENT Solar Field 6500-6559 Thermal Storage 6570-6589 Operational Problems 6590-6599 STEAM TURBINE

More information

PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES

PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES James R. Favor & Company PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES A resource for Fraternity and Sorority House Corporation Officers Prevent Your Sprinkler System from

More information

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Boiler Piping System 0500-0620 Condensing System 3110-3199 Circulating Water Systems 3210-3285 Waste Water (zero discharge) 3290-3299 Condensate

More information

User s Information Manual

User s Information Manual 48AJ,AK,AW,AY020-060 Single-Package Rooftop Gas Heating Units with COMFORTLINK Controls and Scroll Compressors User s Information Manual NOTE TO INSTALLER This manual should be left with the equipment

More information

Appendix B9 Geothermal Unit Cause Codes

Appendix B9 Geothermal Unit Cause Codes Appendix B9 Geothermal Unit Cause Codes GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES (Unit Codes 800 899) Cause Code BOILER Ranges Page No. Boiler Piping System 0500-0620 B-GE-2 BALANCE OF PLANT

More information

Guidelines for Preparing for a Temporary Steam Plant

Guidelines for Preparing for a Temporary Steam Plant Guidelines for Preparing for a Temporary Steam Plant Trailer-Mounted Boilers Skid Mounted Boilers Mobile Boiler Rooms Mobile Feedwater Vans Mobile Steam Plants Emergency Preparedness Plan Table of Contents

More information

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s) Electrical Problems Fuse(s) blow or circuit breaker trips Does the unit use circuit breakers or fuses? Fuse(s) Circuit breakers Are the fuses dual element time delay? Is the circuit breaker HACR rated?

More information

User s Information Manual

User s Information Manual 62DA,DB,DC,DD07-38 Vertical or Horizontal Dedicated 100% Outdoor Air Unit with Optional Gas Heat User s Information Manual NOTE TO INSTALLER This manual should be left with the equipment owner. : If the

More information

USER'S MANUAL PGE Single Package Rooftop

USER'S MANUAL PGE Single Package Rooftop USER'S MANUAL PGE Single Package Rooftop Gas Heating/Electric Cooling Units Sizes 036-150 3 to 12-1/2 Tons NOTE TO INSTALLER: This manual should be left with the equipment owner. WARNING: If the information

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

Equipment Maintenance Checklist

Equipment Maintenance Checklist The Hartford Steam Boiler Inspection and Insurance Co. One State Street P.O. Box 5024 Hartford, CT 06102-5024 Tel: 800-333-4677 Fax: 484-582-1811 Internet: http://www.hsb.com Equipment Maintenance Checklist

More information

CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES

CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES Where to Install Pipe Temperature Sensors for Freeze Protection 1 WHICH PIPES SHOULD I MONITOR FOR FREEZE

More information

User s Information Manual

User s Information Manual 48N2,N3,N4,N5,N6,N7,N8,N9 75-150 Ton Gas Heating/Electric Cooling Units with ComfortLink Controls User s Information Manual NOTE TO INSTALLER: This manual should be left with the equipment owner. : If

More information

Packaged Gas/Electric Units. Owner s Guide to Operating and Maintaining Your Gas/Electric Unit

Packaged Gas/Electric Units. Owner s Guide to Operating and Maintaining Your Gas/Electric Unit Packaged Gas/Electric Units Owner s Guide to Operating and Maintaining Your Gas/Electric Unit ELECTRICAL SHOCK HAZARD. FIRE OR EXPLOSION HAZARD Disconnect power at fuse box or service panel before performing

More information

SECTION AUXILIARY HEATER

SECTION AUXILIARY HEATER 14-301.03/ 1 2010MR12 SECTION 14-301.03 GENERAL DESCRIPTION The Thermo 300 auxiliary heating system is used in conjunction with the vehicle s heating system, in order to heat the passenger compartment

More information

Guide To Troubleshooting INEFFICIENT COOLING FANS

Guide To Troubleshooting INEFFICIENT COOLING FANS Guide To Troubleshooting INEFFICIENT COOLING FANS TABLE OF CONTENTS Introduction Enclosure Cooling Basics Key Attributes of Enclosure Cooling Symptoms of Poor Enclosure Cooling Typical Cooling Fan Problems

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

Preventative Maintenance Tables

Preventative Maintenance Tables Preventative Maintenance Tables Table of Contents I. Table : Gas Fired Domestic Hot Water Heater II. III. IV. Table : Circulating Pump Table : Convectors Table 4: Grille and Diffusors V. Table 5: Unit

More information

DANFOSS OPTYMA PLUS INVERTER UNITS

DANFOSS OPTYMA PLUS INVERTER UNITS Optyma Plus Inverter Condensing Units Danfoss Optyma Plus Inverter Units are designed with the unique benefits of stepless inverter scroll technology resulting in a 20-30% higher energy efficiency in a

More information

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV ClearFire Economizer Model ECF Integral or External Addendum to manuals 750-295 CFH and 750-269 CFV CB-8466 08/2011 1-GENERAL The Model ECF economizer is a stainless steel coil tube arrangement using

More information

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8) Table of Contents Refrigeration Cycle Service Procedures Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8) Solving Problems Identifying Low System Charge (9-11) Identifying High

More information

Operation Manual SCT14B and SCT18B. Inspection. 3 General Description. 3 General Requirements. 3 Standard Features.

Operation Manual SCT14B and SCT18B. Inspection. 3 General Description. 3 General Requirements. 3 Standard Features. Spot Cooling Systems, Inc. 120 Century Drive Suite 00 Carrollton, TX 7006 00-6-776 Operation Manual SCT1B and SCT1B Warning! Improper installation, adjustment, alteration, service, or maintenance can cause

More information

Packaged Gas/Electric

Packaged Gas/Electric Packaged Gas/Electric Units Owner's Guide to Operating and Maintaining Your Gas/Electric Unit ELECTRICAL SHOCK HAZARD. FIRE OR EXPLOSION HAZARD Failure to follow this warning can result in Disconnect power

More information

Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC. Installation and Operating Service Manual BOILER FEED SYSTEM

Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC. Installation and Operating Service Manual BOILER FEED SYSTEM 0 Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC Installation and Operating Service Manual BOILER FEED SYSTEM INSTALLATION AND OPERATION SERVICE MANUAL BOILER FEED SYSTEM Bryan Steam LLC 783 North

More information

Boiler Basics. Design and operation

Boiler Basics. Design and operation Boiler Basics Design and operation A boiler is an enclosed vessel that provides a means for combustion heat to be transferred into water until it becomes heated water or steam. The hot water or steam under

More information

User s Information Manual

User s Information Manual User s Information Manual Series 3 Models 550 and 750 MBH Commercial Condensing Gas-fired water boilers If the information in this manual is not followed exactly, a fire or explosion may result, causing

More information

Troy's Home Inspection Services LLC

Troy's Home Inspection Services LLC Cover Page Property Inspection Report 33706 Inspection prepared for: Cord King & Patricia King Real Estate Agent: Jane Freel - RE/MA Date of Inspection: 3/4/2017 Time: 8:30 Age of Home: 2008 Size: 3279

More information

User s Information Manual

User s Information Manual 48TJD005-014 48TJE004-014 48TJF004-012 Single-Package Rooftop Heating/Cooling Units User s Information Manual NOTE TO INSTALLER This manual should be left with the equipment owner. FOR YOUR SAFETY Do not

More information

INSTALLATION AND OPERATION MANUAL ISM-4081 INTEGRATED SHUTDOWN MODULE

INSTALLATION AND OPERATION MANUAL ISM-4081 INTEGRATED SHUTDOWN MODULE INSTALLATION AND OPERATION MANUAL ISM-4081 INTEGRATED SHUTDOWN MODULE SYSTEM CONCEPT When not transferring fuel, the pressure in the underground piping system for gasoline distribution may fall due to

More information

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler ClearFire Model CFH Horizontal Steam Boiler Startup Guide 750-293 www.cleaverbrooks.com Improper installation, adjustment, service, or maintenance can cause equipment damage, personal injury, or death.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS FOR AQUECOIL HYDRONIC HEATING UNITS GENERAL INFORMATION The AQUECOIL Hydronic Heating Unit is offered in many different capacities and physical configurations in order to match

More information

Installation and Operating Service Manual

Installation and Operating Service Manual Installation and Operating Service Manual SPRAY-TYPE DEAERATOR Bryan Steam LLC, 783 N. Chili Avenue, Peru, IN 46970, Phone 765.473.6651, Fax 765.473.3074 www.bryanboilers.com Form 2141 Revision Date 5/1/2015

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL 2017 Lennox Industries Inc. Dallas, Texas, USA 506737-01 04/2017 Supersedes 03/2017 USER S INFORMATION MANUAL EL195UHE SERIES GAS FURNACE Improper installation, adjustment, alteration, service or maintenance

More information

CHAPTER 3 BASIC STEAM CYCLE

CHAPTER 3 BASIC STEAM CYCLE CHAPTER 3 BASIC STEAM CYCLE To understand steam generation, you must know what happens to the steam after it leaves the boiler. A good way to learn the steam plant on your ship is to trace the path of

More information

TM Series. Induced Draft, Counter Flow Optional Accessories

TM Series. Induced Draft, Counter Flow Optional Accessories ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.

More information

BasicTroubleshooting Information and Guidelines

BasicTroubleshooting Information and Guidelines BasicTroubleshooting Information and Guidelines BasicTroubleshooting Information and Guidelines Information and Guidelines May 2017 BasicTroubleshooting PRIOR TO CONTACTING CLIMATEMASTER TECHNICAL SUPPORT,

More information

SERVICE MANUAL FOR ROOF TOP AIR CONDITIONERS

SERVICE MANUAL FOR ROOF TOP AIR CONDITIONERS SERVICE MANUAL FOR ROOF TOP AIR CONDITIONERS PREFACE This service manual is primarily intended for the use of qualified individuals specially trained and experienced in the service of this type of equipment

More information

Rental Boiler Specifications (Nebraska Boiler)

Rental Boiler Specifications (Nebraska Boiler) Rental Boiler Specifications (Nebraska Boiler) ESI's 72,000 pph trailer-mounted watertube steam boilers are designed and built in accordance with ASME Code. Each boiler is arranged for natural gas or #2

More information

Maintenance Matters. Maintaining Your Heat Recovery Ventilation System

Maintenance Matters. Maintaining Your Heat Recovery Ventilation System NUMBER 16 Maintenance Matters BUILDING MAINTENANCE BULLETIN Maintaining Your Heat Recovery Ventilation System New homes are built to be airtight to reduce heat loss and potential moisture damage to the

More information

SERVICING PROCEDURE R-410A LEAK TEST EVACUATION CHARGING. Bard Manufacturing Company, Inc. Bryan, Ohio Manual Page 1 of 11

SERVICING PROCEDURE R-410A LEAK TEST EVACUATION CHARGING. Bard Manufacturing Company, Inc. Bryan, Ohio Manual Page 1 of 11 SERVICING PROCEDURE R-410A LEAK TEST EVACUATION CHARGING Bard Manufacturing Company, Inc. Bryan, Ohio 43506 Since 1914...Moving ahead, just as planned. Manual No.: 2100-479 Supersedes: NEW File: Volume

More information

Heat Treatment Considerations Before, During & After. Ole Dosland Director of Technical Training & E-Learning

Heat Treatment Considerations Before, During & After. Ole Dosland Director of Technical Training & E-Learning Heat Treatment Considerations Before, During & After Ole Dosland Director of Technical Training & E-Learning 1 History of Heat Early 1900 s Gaining Popularity Considerations Evolving 2 Heat Treatment 120

More information

GCW SERIES Gas Cylinder Warmers

GCW SERIES Gas Cylinder Warmers GCW SERIES Gas Cylinder Warmers TABLE OF CONTENTS IMPORTANT SAFETY INSTRUCTIONS Introduction... 2 Safety Alert Symbol... 2 Important Safety Instructions... 3 Specifi cations... 4 Installation / Operation

More information

ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER OPERATIONS AND MAINTENANCE MANUAL

ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER OPERATIONS AND MAINTENANCE MANUAL ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER 2001829 OPERATIONS AND MAINTENANCE MANUAL Prepared by: 860 Douglas Way PO Box 530 Natural Bridge Station, VA 24579 1.0 SCOPE: This Operations and Maintenance

More information

HEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods

HEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods 230520 HEAT GENERATION Cornell s Design and Construction Standards provide mandatory design constraints and acceptable or required products for all construction at Cornell University. These standards are

More information

Installation, Operation, and Maintenance Information

Installation, Operation, and Maintenance Information Installation, Operation, and Maintenance Information Low Velocity Unit Coolers Bulletin No. IOM 110.3 Table of Contents Inspection... 2 Installation... 2 4 General... 2 Location... 2 Drain Line... 3 Refrigerant

More information

Heat Pump Training Course 128 hours, 128 NATE CEHs, 12.8 CEUs Volume Pages, Volume Pages

Heat Pump Training Course 128 hours, 128 NATE CEHs, 12.8 CEUs Volume Pages, Volume Pages Volume 1 Lesson 1 - Heat Pump Fundamentals Explain principles of physics that apply to heat transfer and the refrigeration cycle. Explain the relationship between heat quantity and heat intensity. Explain

More information

LHE OIL LINE HEATER ELECTRIC TYPE

LHE OIL LINE HEATER ELECTRIC TYPE INSTRUCTIONS LHE OIL LINE HEATER ELECTRIC TYPE WARNING These instructions are intended for use only by experienced, qualified combustion start-up personnel. Adjustment of this equipment and its components

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0593 TESTING, ADJUSTING, AND A. Testing, adjustment, and balancing of air systems. B. Testing, adjustment, and balancing of hydronic, steam, and refrigerating

More information

Welcome! Today s topic: Small Home Repairs. November 14, 2015

Welcome! Today s topic: Small Home Repairs. November 14, 2015 Welcome! Today s topic: Small Home Repairs November 14, 2015 Small Home Repairs Course Presented by Monique Johnson Environmental Green Solutions, LLC Objective Educate homeowners on basic technical skills

More information

TWINTEMP JR. HYDRONIC SYSTEM 2/2013

TWINTEMP JR. HYDRONIC SYSTEM 2/2013 TWINTEMP JR. HYDRONIC SYSTEM 2/2013 TwinTemp Description of Operation and Sequence of Operation Technical Description of Operation The TwinTemp systems provide quiet space heating utilizing liquid to air

More information

HEATER. Fan Forced IMPORTANT INSTRUCTIONS READ & SAVE OWNER S MANUAL. Model No.: DR W 120V 60Hz DR W 240V 60Hz

HEATER. Fan Forced IMPORTANT INSTRUCTIONS READ & SAVE OWNER S MANUAL. Model No.: DR W 120V 60Hz DR W 240V 60Hz Fan Forced HEATER OWNER S MANUAL Model No.: DR218-1500 1500W 120V 60Hz DR218-3000 3000W 240V 60Hz IMPORTANT INSTRUCTIONS READ & SAVE TABLE OF CONTENTS Important Instructions. 3 Specifications and Wiring

More information

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY Bousquet Technologies Inc. 2121, Nobel, Ste Julie, Quebec, Canada, J3E1Z9 SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL Oil-Fired air heater for industrial and commercial use. FOR YOUR SAFETY Do not

More information

User s Information Manual

User s Information Manual User s Information Manual Series 2 Models 1000-2000 MBH Commercial Condensing Gas-fired water boilers If the information in this manual is not followed exactly, a fire or explosion may result, causing

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS 1F83-51 Non-Programmable Electronic Digital Multi-Stage Thermostat INSTALLATION AND OPERATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL

More information

Appendix B3 System/Component Cause Codes

Appendix B3 System/Component Cause Codes Appendix B3 System/Component Cause Codes NUCLEAR UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES (Unit Codes 200-299) Cause Code NUCLEAR REACTOR Ranges Page No. Core/Fuel 2010-2090 B-NU-3 Control Rods and

More information

Habitability Guidelines

Habitability Guidelines Habitability Guidelines for Relocated Manufactured Homes dced.pa.gov/mh @PADCEDnews Purpose The purpose of these habitability guidelines is to provide a reasonable level of assurance that the relocated

More information

User s Manual. For the SHORE POWER CONNECTION MONITOR MODEL 9151

User s Manual. For the SHORE POWER CONNECTION MONITOR MODEL 9151 User s Manual For the SHORE POWER CONNECTION MONITOR MODEL 9151 Table of Contents: Product Description... 3 Installation... 4 Optional Remote Alarm Installation... 7 Operator Test... 8 Alarms... 9 Figures...

More information

cussons Refrigeration Assembly Range TECHNOLOGY REFRIGERATION AND AIR CONDITIONING CUSSONS TECHNOLOGY LABORATORY RECOMMENDATION

cussons Refrigeration Assembly Range TECHNOLOGY REFRIGERATION AND AIR CONDITIONING CUSSONS TECHNOLOGY LABORATORY RECOMMENDATION REFRIGERATION AND AIR CONDITIONING CUSSONS LABORATORY RECOMMENDATION Cussons Refrigeration laboratories are offered to provide teaching to a range of different skill levels. In all the laboratories teaching

More information

STEAM & POWER ENGINEERS

STEAM & POWER ENGINEERS Page 1 STEAM & POWER ENGINEERS Project Site: M/s. Jamkhandi Sugars Ltd. INDIA.(Karnataka) Boiler Capacity: 90 TPH X 72.4 kg/cm2 Traveling Grate Boiler Resister Office Address: A-4/306, Rakshak Nagar Gold,

More information

User's Infomation Manual

User's Infomation Manual User's Infomation Manual 574A GAS HEATING/ELECTRIC COOLING Cancels: OM01-69 OM10-28 02-07 NOTE: Read the entire instruction manual before starting the installation. SAFETY CONSIDERATIONS Note to Installer:

More information

CORTEC. CORTEC

CORTEC. CORTEC Case Study 1 How do you cut lay-up costs...25%... 50%... even 75%? A large processing plant in Texas was going to take a system out of service for two years and then bring it back on line. The system contains

More information

OPERATIONS AND MAINTENANCE MANUAL FOR THE 8-TON TURF CART ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER

OPERATIONS AND MAINTENANCE MANUAL FOR THE 8-TON TURF CART ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER OPERATIONS AND MAINTENANCE MANUAL FOR THE 8-TON TURF CART ENVIRONMENTAL CONTROL UNIT (ECU) PART NUMBER 2001927 Prepared by: 860 Douglas Way PO Box 530 Natural Bridge Station, VA 24579 1 1.0 SCOPE: This

More information

P.O. Box , Dallas, TX USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces

P.O. Box , Dallas, TX USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces P.O. Box 799900, Dallas, TX 75379-9900 USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces This is a safety alert symbol and should never be ignored. When you see this symbol on labels or in manuals,

More information

Heat Reclaim. Benefits,Methods, & Troubleshooting By Dave Demma, Manager Supermarket Sales, Sporlan Division - Parker Hannifin Corporation

Heat Reclaim. Benefits,Methods, & Troubleshooting By Dave Demma, Manager Supermarket Sales, Sporlan Division - Parker Hannifin Corporation Form 30-217 / January 2007 Heat Reclaim Benefits,Methods, & Troubleshooting By Dave Demma, Manager Supermarket Sales, Sporlan Division - Parker Hannifin Corporation While the vapor-compression cycle has

More information

Checklists LAUNDRY GREENKEYGLOBAL.COM

Checklists LAUNDRY GREENKEYGLOBAL.COM Checklists INFO@GREENKEYGLOBAL.COM GREENKEYGLOBAL.COM Laundry In-house laundry is one of the most energy-intensive areas of a hotel's operation. Its use of energy per square foot may even surpass the kitchen.

More information

WineZone Ceiling Mount Ductless Split 15

WineZone Ceiling Mount Ductless Split 15 WineZone Ceiling Mount Ductless Split 15 Requires an HVAC technician to install and charge with R-22 refrigerant. Easy to install. Unit plugs into wall outlet. Industrial grade unit for longer life. Indoor

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

ML180UH SERIES GAS FURNACE WARNING WARNING

ML180UH SERIES GAS FURNACE WARNING WARNING 2017 Lennox Industries Inc. Dallas, Texas, USA 506525-01 04/2017 Supersedes 10/2015 ML180UH SERIES GAS FURNACE Improper installation, adjustment, alteration, service or maintenance can cause property damage,

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15515 Watertube Boilers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in

More information

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER 1 Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER FOR YOUR SAFETY This manual supplies information on the application,

More information

A Newsletter published by ESI. The Steam and Power SPECIAL FORCES

A Newsletter published by ESI. The Steam and Power SPECIAL FORCES ENERGY SOURCE A Newsletter published by ESI The Steam and Power SPECIAL FORCES Spring 2003 THE BUYER S GUIDE TO PACKAGE BOILER DESIGN By: William L. Reeves, P.E., President, ESI Editor s Note: This article

More information

be liable for any other loss or damage, whether direct, indirect, incidental or consequential.

be liable for any other loss or damage, whether direct, indirect, incidental or consequential. Integrated HydroStat 3200-Plus for Slant Fin Boilers Part No. 48-3200-03 and 48-3200-04 120 VAC Input / 24 VAC Burner Circuit PATENT S. 8.391,708; 7,891,572; 8,844,834; Others Pending INSTALLATION INSTRUCTIONS

More information

IFT-RC150 IntelliFire Touch Remote Control Installation Instructions

IFT-RC150 IntelliFire Touch Remote Control Installation Instructions IFT-RC150 IntelliFire Touch Remote Control Installation Instructions Leave this manual with party responsible for use and operation. 1. Introduction The IFT-RC150 is a wall mounted device that is designed

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SLP98UH SERIES VARIABLE CAPACITY GAS FURNACE WARNING WARNING

SLP98UH SERIES VARIABLE CAPACITY GAS FURNACE WARNING WARNING 2015 Lennox Industries Inc. Dallas, Texas, USA 506443-01 01/2015 Supersedes 08/2012 SLP98UH SERIES VARIABLE CAPACITY GAS FURNACE Improper installation, adjustment, alteration, service or maintenance can

More information

The HRSG User s Group is going back to Florida!

The HRSG User s Group is going back to Florida! The HRSG User s Group is going back to Florida! Mark your calendar for the 17th Annual Conference Hyatt Regency Jacksonville April 6-8, 2009 Please visit www.hrsgusers.org for conference details as they

More information

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS:

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS: INSTALLATION AND OPERATION MANUAL GAS BOILERS MODELS: CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) southbend A MIDDLEBY COMPANY 1100 Old Honeycutt Road Fuquay-Varina, NC 27526 (919) 552-9161

More information

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA 99336 www.jmcvr.com 1-509-586-9893 Table of Contents TABLE OF FIGURES...1 OVERVIEW OF THE HRC CAPABILITIES...2 INSTALLATION AND

More information

Contractor Worksheet Underground Fires Major Hazard Standard

Contractor Worksheet Underground Fires Major Hazard Standard WMC Environment, Health & Safety Management System Worksheet Major Hazard Standard MHS-02 DocsOpen Ref: 57267, 17/10/2001 Uncontrolled copy check web for latest revision Revision Reviewed Description of

More information

PDF Created with deskpdf PDF Writer - Trial ::

PDF Created with deskpdf PDF Writer - Trial :: Instruction Manual Index Introduction Uncrating and Checking for Damage Locating Your Unit Installation Fill Tank Process Connections Pre Startup Startup Sequence Trouble Shooting Chart Operating Lights

More information

Muskogee Public Schools. Lockout/Tagout. Program

Muskogee Public Schools. Lockout/Tagout. Program Muskogee Public Schools Lockout/Tagout Program May 15, 2014 1 MUSKOGEE PUBLIC SCHOOLS PROGRAM FOR THE CONTROL OF HAZARDOUS ENERGY Table of Contents I. Scope.3 II. Purpose..3 III. Definitions Applicable

More information

IMPORTANT SAFETY INFORMATION! WARNING ALWAYS keep electric cords, home furnishings, drapes, clothing, papers, or other combustibles at least 3 feet (0

IMPORTANT SAFETY INFORMATION! WARNING ALWAYS keep electric cords, home furnishings, drapes, clothing, papers, or other combustibles at least 3 feet (0 Electric Fireplace Factory Model: EF-30D CONSUMER SAFETY INFORMATION Read this manual before installing and operating this appliance Failure to follow these instructions may result in electric shock, fire

More information

Paragon. Induced Draft, Counter Flow Optional Accessories

Paragon. Induced Draft, Counter Flow Optional Accessories ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.

More information

T-Series Air Conditioner T15 Model

T-Series Air Conditioner T15 Model INSTRUCTION MANUAL T-Series Air Conditioner T15 Model Protecting Electronics. Exceeding Expectations. McLean Cooling Technology 11611 Business Park Blvd N Champlin, MN 55316 USA Tel 763-323-8200 Fax 763-576-3200

More information

Safety & Installation Instructions

Safety & Installation Instructions Premium Programmable Thermostat Safety & Installation Instructions Model 8570 READ AND SAVE THESE INSTRUCTIONS TABLE OF CONTENTS PAGE SPECIFICATIONS............................. 1 WIRE REQUIREMENTS.........................

More information

Better Design, Better Control, Better Systems.

Better Design, Better Control, Better Systems. Product Catalog Better Design, Better Control, Better Systems. At tekmar Control Systems, we believe the indoor comfort of a building depends on the performance of its heating, ventilating & air conditioning

More information

Freightliner Refrigerator Troubleshooting Guide For (TJ18F) (TJ22F) (TJ18FP3)

Freightliner Refrigerator Troubleshooting Guide For (TJ18F) (TJ22F) (TJ18FP3) www.dometic.com Freightliner Refrigerator Troubleshooting Guide For Before initiating troubleshooting, the following equipment is recommended: Multimeter, 20 gauge (min) wires to use as jumpers, and 12Vdc

More information

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview Overview Modern combustion (or gas) turbine packages typically include an axial compressor, a combustion section and a turbine. Both compressor and turbine sections consist of one or more sets of fixed

More information

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Niles Steel Tank Hot Water Generator Installation and Operation Manual Niles Steel Tank Hot Water Generator Installation and Operation Manual Contents: Contents 1 Hazard definitions 1 1. General Information.... 2 Availability... 3 Optional Control Packages... 5 2. Installation....

More information

EL195DFE SERIES GAS FURNACE WARNING

EL195DFE SERIES GAS FURNACE WARNING 2011 Lennox Industries Inc. Dallas, Texas, USA 506739 01 06/2011 EL195DFE SERIES GAS FURNACE Litho U.S.A. FIRE OR EXPLOSION HAZARD. Failure to follow safety warnings exactly could result in serious injury,

More information

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION AIR SERIES SYSTEM INSTALLATION MANUAL CONTENTS CONSIDERATIONS General Plumbing Component Connection 2 2 2 ILLUSTRATION Control System 3 CONFIGURATION Voltage Verification 4 CONNECTION Component Connection

More information

CONSIDERATIONS IN CONVERTING A DUAL SHELL OR A DUAL PRESSURE COAL FIRED PLANT CONDENSER INTO A COMBINED CYCLE PLANT CONDENSER

CONSIDERATIONS IN CONVERTING A DUAL SHELL OR A DUAL PRESSURE COAL FIRED PLANT CONDENSER INTO A COMBINED CYCLE PLANT CONDENSER Proceedings of the ASME 2013 Power Conference POWER2013 July 29-August 1, 2013, Boston, Massachusetts, USA POWER2013-98062 CONSIDERATIONS IN CONVERTING A DUAL SHELL OR A DUAL PRESSURE COAL FIRED PLANT

More information

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING UNIT OBJECTIVES After studying this unit, the reader should be able to Select the correct instruments for checking an air conditioning unit

More information

Universal Fire Tube Boiler Wall Mount Models

Universal Fire Tube Boiler Wall Mount Models Universal Fire Tube Boiler Wall Mount Models USER S INFORMATION MANUAL Models WBRU**80W / 100W / 120W / 140W / 175W / 199W **NG denotes Natural Gas Model, LP Denotes Propane Model Heat Exchanger Bears

More information

Natural Gas Appliance Testing Action Guidelines (Non ESA/Low Income 5 )

Natural Gas Appliance Testing Action Guidelines (Non ESA/Low Income 5 ) Natural Gas Appliance Testing Action Guidelines (n ESA/Low Income 5 ) The purpose of these Action Guidelines is to describe the actions participating contractors and/or inspectors should take in the event

More information

about your house Assessing the Comfort and Safety of Your Home s Mechanical Systems

about your house Assessing the Comfort and Safety of Your Home s Mechanical Systems about your house CE 28 k Assessing the Comfort and Safety of Your Home s Mechanical Systems The heating, ventilating and air conditioning (HVAC) systems are a vital part of every home. These mechanical

More information

This document was created with FrameMaker 4.0.4

This document was created with FrameMaker 4.0.4 This document was created with FrameMaker.0. WELCOME TO TODAY S GENERATION OF COMFORT Congratulations! Your new, higher efficiency gas furnace is a sound investment which will reward you and your family

More information

OPERATION AND MAINTENANCE INSTRUCTIONS FOR ROOF TOP HEAT PUMPS AND CEILING PLENUMS

OPERATION AND MAINTENANCE INSTRUCTIONS FOR ROOF TOP HEAT PUMPS AND CEILING PLENUMS OPERATION AND MAINTENANCE INSTRUCTIONS FOR ROOF TOP HEAT PUMPS AND CEILING PLENUMS RV Products A Division of Airxcel, Inc. P.O. Box 4020 Wichita, KS 67204 1976H207 (10-06) PP TABLE OF CONTENTS I. General

More information

FGR. Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM. FGR-8 through FGR-22 (25 HP to 1000 HP)

FGR. Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM. FGR-8 through FGR-22 (25 HP to 1000 HP) FGR Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM FGR-8 through FGR-22 (25 HP to 1000 HP) Gas, Light Oil or Combination MANUFACTURED BY JOHN ZINK COMPANY, LLC

More information

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model BWXP OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)

More information