2014 and 1 st Qtr Ron Neet, CPE, CEM Life Safety, EOC, & EM Manager Providence Health and Services

Size: px
Start display at page:

Download "2014 and 1 st Qtr Ron Neet, CPE, CEM Life Safety, EOC, & EM Manager Providence Health and Services"

Transcription

1 * 2014 and 1 st Qtr 2015 Ron Neet, CPE, CEM Life Safety, EOC, & EM Manager Providence Health and Services

2

3 Learning Objectives - At the conclusion of this presentation, the participant will be able to: 1. Identify the components of a Joint Commission Life Safety & EOC Survey. 2. Identify the top compliance issues in Life Safety and the Environment of Care. 3. Be able to describe the Environment of Care triggers to a CMS Immediate Jeopardy finding and the consequences associated with the finding. 4. Be able to describe and implement tips for a successful survey.

4 Trivia How many light bulbs should you consider for lighting at the exit? Only one is required At least two More than two

5 Trivia - Answer Required illumination shall be arranged so that the failure of any single lighting unit does not result in an illumination level of less than 0.2 ft candles (2 lux) in any designated areas. Surveyors are looking for two bulbs in the outside exit area. Have you evaluated at night?

6 Trivia In Chapter 7 Means of Egress 2000 LSC is it: A. Not an Exit B. No Exit C. I don t care

7 Trivia - Answer Special Signs * No Exit. Any door, passage, or stairway that is neither an exit nor a way of exit access and that is located or arranged so that it is likely to be mistaken for an exit shall be identified by a sign that reads as follows: NO EXIT Such sign shall have the word NO in letters 2 in. (5 cm) high with a stroke width of ⅜ in. (1 cm) and the word EXIT in letters 1 in. (2.5 cm) high, with the word EXIT below the word NO. No Exit not to scale.

8 Trivia What is the maximum height you can mount a portable fire extinguisher? 4ft 3 ½ ft 3 ft 5 ft

9 Trivia - Answer Fire extinguishers having a gross weight not exceeding 40 lb (18.14 kg) shall be installed so that the top of the fire extinguisher is not more 5 ft (1.53 m) above the floor. Fire extinguishers having a gross weight greater than 40 lb (18.14 kg) (except wheeled types) shall be so installed that the top of the fire extinguisher is not more than 3 1/2 ft (1.07 m) above the floor

10 Trivia What is the minimum distance that a portable fire extinguisher is mounted off the floor? 4ft 3 ft 4 inches 12 inches

11 Trivia - Answer: In no case shall the clearance between the bottom of the fire extinguisher and the floor be less than 4 in. (10.2 cm).

12 Trivia What information is required to be shown on a set of Life Safety Drawings? Standard LS , EP 2, requires an organization to have a current SOC. Part of having a current SOC is creating and maintaining an up-to-date and complete Basic Building Information (BBI). The BBI requires organizations to indicate the location of current LS drawings. So, if your organization could not supply current LS drawings, then it was not in compliance with the requirement for a current BBI and consequently an up-to-date SOC

13 Trivia Answer According to The Joint Commission s Life Safety chapter, Life Safety Code drawings must clearly display the following information: 1) A legend that clearly identifies features of fire/life safety 2) Areas of the building that are fully sprinklered (if the building is partially sprinklered) 3) Locations of all hazardous storage areas 4) Locations of all fire-rated barriers 5) Locations of all smoke barriers 6) Suite boundaries, including the sizes of the identified suites both sleeping (maximum 5,000 square feet) and nonsleeping (maximum 10,000 square feet) suites 7) Locations and size (sqft) of designated smoke compartments 8) Locations of chutes and shafts 9) Any approved equivalencies or waivers

14 Trivia Provide some parameters regarding the 18 inch storage rule:

15

16

17 The Rule Sprinklers and storage areas (including perimeter wall shelving) There must be 18 clear from the bottom of the sprinkler deflector to any storage or shelving. This is measured as a horizontal plane in the room (not conical measurement from the sprinkler head). This is a vertical measurement. Horizontally sprinklers can be as close as 4 (closer in some instances with special installations). (See NFPA , Minimum Distances from Walls. Sprinklers shall be located a minimum of 4 in. (102 mm) from a wall. ) and A regarding shelving

18 Trivia What is the height that a manual fire alarm pull station should be mounted off the floor? 2 ½ ft 5 ½ ft 4ft - 5 ft 3 ½ ft - 4 ½ ft 12 inches

19 Trivia Answer Per NFPA Each manual fire alarm box shall be securely mounted. The operable part of each manual fire alarm box shall not be less than 3 ½ feet and not more than 4 ½ feet above the floor.

20 Trivia What is the recommended height to mount a sharps container? inches inches inches It depends Hint: NIOSH DHHS Publication Number Selecting, Evaluating, and Using Sharps Disposal Containers 1998

21 Trivia - Answer

22 The Joint Commission Life Safety and Environment of Care Survey Process

23 The Joint Commission survey process continues to evolve along with its standards. Providence Health & Services has created a CORE SURVEY TEAM to conduct mock Joint Commission surveys at all of its 36 hospitals in the 5 western states.

24 The size and composition of the Joint Commission survey team varies according to the size of the organization and types of services being surveyed. However, the team includes some combination of nurse, physician, and/or administrative surveyor. A life safety code & Environment of Care specialist is also on the survey team for all hospitals.

25 Today, all surveys are unannounced, and organizations are encouraged to maintain a state of continuous readiness. The unannounced survey process emphasizes the need for training and involvement of all staff in managing the patient care environment.

26 The Life Safety Code Specialist The life safety code (LSC) specialist focuses on compliance with the Life Safety Code, the Joint Commission s Statement of Conditions(eSOC) and Plans for Improvement (epfi), the Environment of Care standards, and in most surveys Emergency Management. The Life Safety specialist is usually a Facilities Manager/Director and/or Safety Officer with >20+ years experience. Depending on the size of the facility, the survey process will take anywhere from 1 to 3 days.

27 The Life Safety/EOC survey usually consists of the following elements: 1. Document Review 2 hrs. to half day 2. Building Tour - will tour the building and may want to tour construction sites from half day to 1 ½ days depending on size of facility 3. Environment of Care Session 4. Emergency Management session Note: Some surveys do a combined EOC and EM session

28 The Providence Core Survey Team 1. Core Surveys are designed to mirror actual Joint Commission Surveys, and survey to all of the JC and CMS standards 2. Digs much deeper into standards compliance than typical JC 3. Member of Core Survey Team attends all actual JC surveys to assist facility. (Usually one of the clinical team members) 4. Looks for survey trends and any HOT BUTTONS that the JC surveyors are identifying. 5. Communicates these survey trends and HOT BUTTONS to all Providence Hospitals so they can ensure compliance. 6. Utilize several approaches to communicate information to all affected staff across the Providence System, i.e., mass distribution lists, weekly newsletters, monthly conference calls, regulatory updates when needed, and annual regulatory update 2- day conferences

29 Life Safety, Environment of Care, & Emergency Management Sessions Day 1 - Morning - Life Safety Code Document Review: Attendees: Facilities/Physical Plant Manager, Life Safety Specialist, Construction Project Manager, Physical Plant Engineers/Specialists, Facilities Admin Asst. 1 esoc with epfi's 2 Facility Life Safety Drawings CMS Categorical Waivers in place (Ensure if any door locking arrangements exist that release with 3 FA, waiver has been adopted) 3 Fire Alarm System testing, inspections and repair of deficiencies for last 2 years Inventory of all fire alarm activation, notification, and door release devices (Include AHU shutdown 4 devices and chime strobes) 5 Sprinkler System testing, inspection and repair of deficiencies for last 2 years 6 Generator testing, inspection and repair of deficiencies for last 2 years Qualifications and Certifications for all staff performing maintenance and servicing of Fire/Life Safety 7 Systems, Life Support equipment, and bldg components 8 Elevator fire service monthly testing 9 Medical Gas system testing, inspection and repairs for last 2 years Air exchange rates, air pressure relationships, temperature and humidity checks for all 10 anesthetizing, procedural locations, central processing, and sterile storage areas 11 Construction projects currently underway and locations, daily construction inspection checklists 12 Pre-Construction Risk Assessments, ILSM's and ICRA's implemented or in place at time of survey. 13 Construction Risk Assessment, ILSM and ICRA policies.

30 Day 1 Afternoon (and day 2 at larger facilities) Building LS & EOC Tour Day 2 or 3 - Environment of Care document review: Attendees: Environment of Care Plan Managers and optional EOC/Safety committee members 1 Safety and Security Risk Assessments 2 All EOC management plans 3 All EOC management plan quarterly reports for last 2 years 4 All EOC annual evaluation of plans (except CAH's) 5 EOC meeting minutes for last 2 years Utilities Equipment inventory list - (Will select random piece of critical equipment to trace for 6 compliance with CMS S&C 14-07) Medical Equipment inventory list - (Will select random piece of critical equipment to trace for 7 8 compliance with CMS S&C 14-07) If AEM is used, are Facility and Bio-Med equipment and systems inventoried by "following mfgs" or "following AEM"? 9 Hazardous Materials inventory list - 6 months hazardous waste manifests 10 Hazardous Waste inventory list - 6 months Medical waste manifests 11 DOT training certifications for HAZMAT handlers and shippers 12 Hazardous Surveillance Rounds (EOC rounds) for last 2 years (including satellites) 13 Performance Improvement data for all EOC Plans 14 Fire Drills and Critiques for last 2 years (including satellites) 15 Fire Response Plan (Fire Plan) 16 Infant and Pediatric Abduction Plans and drills for last 2 years 17 Nuclear Medicine Hot Lab Security Plan and Isotope Courier Delivery Procedure

31 Day 2 - Emergency Management document review Attendees: EM Plan Manager and optional EM committee members 1 Identification of Plan manager and designated Senior leader responsible for Emergency Mgmt 2 Emergency Operations Plan 3 Hazard Vulnerability Analyses 4 Emergency Supply Inventory list 5 Annual evaluations of EOP, HVA and Emergency Supply Inventory 6 Annual reviews of MOU's for alternate care sites and transportation agreements 7 Disaster drill critiques for last 2 years 8 Utility Contingency Plans Documentation that the hospital has communicated, in writing, with each of its licensed 9 independent practitioners regarding his or her role(s) in emergency response and to whom he or she reports to during an emergency. Day 2 or 3 End of survey report Written and verbal report out of survey findings to C-Suite and leadership team. Report all deficiencies identified and any recommendations to assist facility and staff with future compliance.

32 Top Joint Commission Findings in Life Safety and the Environment of Care for 2014 & 1 st Qtr 2015

33 Standard EP Description % In areas designed to control airborne contaminants, ventilation 6 (15) system provides appropriate pressure relationships, air-exchange 33 rates, and filtration efficiencies EC Hospital labels utility system controls to facilitate partial or complete (53%) 8 21 emergency shutdowns. 1 Hospital designs and installs utility systems that meet patient care and operational needs. 10 Exits, exit accesses, exit discharges are clear of obstructions or 13 impediments to public way, such as clutter, construction material, and 22 LS snow and ice. (50%) Doors in a means of egress are not equipped with a latch or lock that 1 17 requires the use of a tool or key from the egress side. EC (56%) Non-Compliance Rate for the Most Challenging EC/LS Standards by EPs 2014 and 1st Qtr Interior spaces meet the needs of the patient population and are safe and suitable to the care, treatment, and services provided. The hospital maintains ventilation, temperature, and humidity levels suitable for the care, treatment, and services provided

34 53% EC : Risks with Utility Systems EP 15 - TJC is scoring problems with pressure differentials and air exchange rates in critical areas. Staff need to know what their special pressure relationship is, either positive or negative and what they can do while working in that environment to maintain the appropriate pressure relationship, such as keeping doors closed. A meter, ball-in-the-wall, or performing a tissue test are all appropriate means to determine air pressure relationships. TJC and CMS are looking for verification that periodic testing and balancing are occurring in critical care areas and staff are aware of what the readings mean, as well as what risks are present when pressure relationships are incorrect.

35 EP 8 This is the EP that addresses Utility system emergency shutdown labeling. TJC is looking for placards mounted on or by the emergency shutoffs of all major utilities and bulk med gas systems. These locations should be the first major isolation points under the facilities control, examples include: Natural gas shutoff valve just past the main regulator Main normal-power electrical breaker(s) Main domestic water and fire sprinkler water valves Bulk O2 source valve Med gas manifold source valves Vacuum and med air plant source valves Main steam shutoff valve(s) Main chilled water shutoff valve (s) Diesel or propane tank main shutoff valve (s) Placards should list: name of utility Emergency Shutoff, area(s) served, and cautionary language shut in event of emergency only.

36 50% LS : Maintaining means of Egress EP 13 Exit access and discharge clear of obstructions, to public way. This is the corridor clutter or junk in the hallways. CMS has allowed a categorical waiver for corridor clutter and if adopted, will allow crash carts, infection control Isolation carts, rolling (portable) patient lift equipment, and patient transport equipment (stretchers and wheel chairs) to be stored in corridors providing there is an unobstructed 5 clear width, and the entity has addressed in their fire plan, removal of such equipment during an emergency or fire event. EP 1 Doors in means of egress unlocked in direction of egress. CMS has also allowed a categorical waiver for door locking arrangements when their are clinical needs as long as certain procedures are followed, i.e. Behavioral health units, mother/baby units, some inpatient rehab units. Entity must adopt the waiver and have a written summary of the clinical need.

37 56% EC Maintains safe functional environment EP 1 Interior spaces meet the needs of the patient population and are safe and suitable to the care, treatment, and services provided. This is kind of a catch-all. This EP is also used for serious pressure relationship deficiencies and if cited, will be cited as a condition-levelfinding requiring a re-survey in 45 days. In some instances where immediate corrections have occurred, TJC has rolled these back to EC EP 15 as a standard-level finding. EP 1 is also where TJC will soon be surveying for correct special relocatable power taps in the healthcare setting. EP 13 Maintains ventilation, temp, humidity levels suitable for care. Operating room environments, Cath Labs, C-section OR s, sterile processing, decontam, sterile supply storage areas all have special requirements relative to temperature and humidity. Temp and humidity in these areas must be either continuously monitored and alarmed, or logged daily on a special log sheet. Out-of-parameter temp and/or humidity excursions must be addressed by entities policy/procedure.

38 25 Documentation of maintenance, testing, and inspection activities for fire alarm and water-based fire protection systems. 17 EC (48%) Every 12 months, the hospital tests duct detectors, electromechanical releasing devices, heat detectors, manual fire alarm boxes, and smoke detectors. Every 12 months, the hospital tests automatic smoke-detection shutdown devices for air-handling equipment. Every 12 months, the hospital tests visual and audible fire alarms, including speakers. At least quarterly, the hospital tests water-flow devices. Every 6 months, the hospital tests valve tamper switches. Every quarter, the hospital tests fire alarm equipment for notifying offsite fire responders The space around pipes, conduits, bus ducts, cables, wires, air ducts, or pneumatic tubes that penetrate fire-rated walls and floors are protected with an approved fire-rated material. 24 LS (46%) 5 Doors required to be fire rated have functioning hardware, including positive latching devices and self-closing or automatic-closing devices. Gaps between meeting edges of door pairs are no more than 1/8 inch wide, and undercuts are no larger than 3/4 inch Openings in 2-hour fire-rated walls are fire rated for 1 1/2 hours. 17

39 48% EC Maintains fire safety equipment and bldg. features. TJC looks at most/all of the 21 EPs in this standard during document review. There are 6 EPs that have risen to the top. EP 25 Documentation of maintenance, testing, and inspection activities for fire alarm and water-based fire protection systems includes the following: - Name of the activity, - Date of the activity, - Required frequency of the activity, - Name and contact information, including affiliation, of the person who performed the activity, - NFPA standard(s) referenced for the activity, - Results of the activity EP 3 Most of the FA devices are tested under this EP. Over half the hospitals across the nation are failing this. TJC is looking for complete inventories of all devices, by device and location, with pass/fail results for each device. A common flaw is not meeting the new timing requirements for the PM s, or not including an inventor list of door release devices. Another flaw is not closing the loop when making device repairs and retest.

40 EP 19 Every 12 months, the hospital tests the automatic smoke-detection shutdown devices for air handling equipment. Common flaws are either not completing this separate AHU shutdown test in addition to the EP3 duct detector tests, or not including a complete inventory of all air handlers showing pass/fail of each when auto shutdown is tested. EP 4 This covers the testing of all audible/visual FA devices, including speakers. The most common flaw found with this EP is doing the tests by saying something like all strobes or all audible & visual devices were tested and passed. But TJC is looking for a complete and detailed inventory of strobes, chimes, horns, speakers, etc., by location or other identifier, with pass/fail results for each device. EP 2 Quarterly testing of water flow devices and 6-mo testing of valve tamper switches. Hospitals cited under this EP either are not providing complete inventories of devices with pass/fail, or are not meeting the timing requirements for testing. Another flaw is not closing the documentation loop on repairs and retest. EP 5 Quarterly testing of FA equipment for notifying off-site responders. The most common flaw here is not documenting the completion of this test or not showing response times on report.

41 Joint Commission s Maintenance Timing Requirements Every 36 months/every 3 years = 36 months from the date of the last event, plus or minus 45 days Annually/every 12 months/once a year/every year = 1 year from the date of the last event, plus or minus 30 days Every 6 months = 6 months from the date of the last event, plus or minus 20 days Quarterly/every quarter = 4 times a year, once in each quarter every three months, plus or minus 10 days Monthly/30-day intervals/every month = 12 times a year, once per month

42 46% LS Building Features Minimize Effects of Fire and Smoke. This standard is usually scored at EP 5 for fire doors, or EP 9 for penetrations. EP 5 The fire door issue is often that the door does not auto-close and latch appropriately. This is usually caused from doors being banged into by carts, stretchers, and or rolling equipment. Another flaw found here is the gap between meeting door edges >1/8 th inch or undercuts >3/4 inch. EP 9 The penetration issue is usually due to lack of an above ceiling permit program or contractors not sealing around conduits and pipes during new installations. A vigorous barrier inspection PM program along with inspection of new installation work by the facilities staff can usually catch most of these deficiencies. EP 4 Openings in 2-hour fire-rated walls are fire rated for 1 ½ hours. Usually this EP is cited for missing labels on 90 minute fire doors including trash and linen chute doors, or failure of auto-closing and latching devices.

43 LS (43%) 2 All hazardous areas are protected by walls and doors Corridor doors are fitted with positive latching hardware, are arranged to restrict the movement of smoke, and are hinged so that they swing. The gap between meeting edges of door pairs is no wider than 1/8 inch, and undercuts are no larger than 1 inch Smoke barriers extend from the floor slab to the floor or roof slab above, through any concealed spaces, and extend continuously from exterior wall to exterior wall. All penetrations are properly sealed. 14 LS (43%) EC (36%) Piping for automatic sprinkler systems is not used to support any other item. Sprinkler heads are not damaged and are free from corrosion, foreign materials, and paint. There are 18 inches or more of open space maintained below the sprinkler deflector to the top of storage. Hospital minimizes risks associated with selecting, handling, storing, transporting, using, and disposing of hazardous chemicals. Hospital minimizes risks associated with selecting and using hazardous energy sources

44 43% LS Protects Against Hazards of Fire & Smoke. These EP s are primarily scored due to smoke door issues or problems with hazardous areas. EP 2 If a space meets the definition of a Hazardous Areas, it must be protected per NFPA / This includes auto-closing doors and positive latching. Again, door closure and/or latch failures, or door damage usually leads to this finding. EP 11 Corridor doors. Common findings under this EP include door damage, gaps >1/8 th inch in meeting edges of double door assemblies, malfunctioning positive latching hardware, or undercuts >1 inch. EP 18 Smoke barriers. This EP is usually cited for penetration issues found in your smoke barrier walls. TJC has a history of choosing one or more smoke barrier walls and inspecting them from exterior wall to exterior wall.

45 43% LS Maintains Systems for Extinguishing Fires EP 4 Usually cited during building tour when discovered that things are tied off or draping over sprinkler pipe above the ceiling. Contractors and staff placing cables or wiring often tie these off to the sprinklers. EP 5 Damaged, dirty, corroded, or painted sprinkler heads are cited under this EP. Also dust bunnies on sprinkler heads deposited from the air handler system are also cited. EP 6 The infamous 18 clearance from the bottom of the sprinkler head deflector.

46 36% EC Manage Risks Related to Hazardous Material & Waste EP 5 This deals with hazardous waste and hazardous product management. Quite often the finding is related to hazardous chemicals and not having an eye wash station in the immediate area where the corrosive or toxic chemical is being used. Another common finding is the eye wash weekly logs. They are either missing or have gaps in the testing entries. EP 7 You will see hazardous radiation issues scored against this EP, either staff not returning their dosimeter badges or failure to inspect lead shields each year.

47 CMS Immediate Jeopardy triggers Immediate Jeopardy - A situation in which the provider s noncompliance with one or more requirements of participation has caused, or is likely to cause, serious injury, harm, impairment, or death to a resident. Only ONE INDIVIDUAL needs to be at risk. Identification of Immediate Jeopardy for one individual will prevent risk to other individuals in similar situations. Serious harm, injury, impairment, or death does NOT have to occur before considering Immediate Jeopardy. The high potential for these outcomes to occur in the very near future also constitutes Immediate Jeopardy. After determining that the harm meets the definition of Immediate Jeopardy, consider the following points regarding entity compliance: The entity either created a situation or allowed a situation to continue which resulted in serious harm or a potential for serious harm, injury, impairment or death to individuals. The entity had an opportunity to implement corrective or preventive measures

48 Infection Control ISSUE Failure to protect from widespread nosocomial infections; e.g., failure to practice standard precautions, failure to maintain sterile techniques during invasive procedures and/or failure to identify and treat nosocomial infections TRIGGERS 1. Pervasive improper handling of body fluids or substances from an individual with an infectious disease; 2. High number of infections or contagious diseases without appropriate reporting, intervention and care; 3. Pattern of ineffective infection control precautions; or 4. High number of nosocomial infections caused by cross contamination from staff and/or equipment/supplies.

49 Physical Environment ISSUE Failure to provide safety from fire, smoke and environment hazards and/or failure to educate staff in handling emergency situations. TRIGGERS 1. Nonfunctioning or lack of emergency equipment and/or power source; 2. Smoking in high risk areas; 3. Incidents such as electrical shock, fires; 4. Ungrounded/unsafe electrical equipment; 5. Widespread lack of knowledge of emergency procedures by staff; 6. Widespread infestation by insects/rodents; 7. Lack of functioning ventilation, heating or cooling system placing individuals at risk; 8. Use of non-approved space heaters, such as kerosene, electrical, in resident or patient areas; 9. Improper handling/disposal of hazardous materials, chemicals and waste; 10. Locking exit doors in a manner that does not comply with NFPA 101; 11. Obstructed hallways and exits preventing egress; 12. Lack of maintenance of fire or life safety systems; or 13. Unsafe dietary practices resulting in high potential for food borne illnesses.

50 TIPS for a Successful Life Safety and EOC survey Be present at the opening conference (Facilities Mgr/Director and Safety Officer) At the opening conference, disclose verbally and/or in writing, which CMS categorical waivers the facility has formally adopted. Adoption means approved by the facility s EOC committee and the waivers have been written into comments section of ebbi on JC website. Have at least 2 years of operational and maintenance records available, organized, inventory s of all devices, and easy to read. Recommend organizing them by JC standard and EP. Be familiar with the LS and EOC standards and elements of performance. Have a written policy and program in place that includes periodic air balance and pressurization checks of critical spaces, i.e., OR s, C-Section rooms, Cath Labs, Sterile Processing, Decontam, Endoscopy procedure rooms, Scope cleaning rooms, Negative Pressure Isolation rooms, etc. How do you ensure you are in compliance 100% of the time?

51 Tips..Continued Are you monitoring temperature and humidity in all required locations? i.e., OR s, C-Section rooms, Sterile Core areas, Cath Labs, Sterile processing, all sterile supply storage locations, etc. Are the spaces monitored via a building automation system or are you using manual devices and logs? How do you ensure the continual accuracy of all field mounted temp and humidity devices? Have a written humidity and temperature policy that describes your program and also describes actions for clinical and non-clinical staff to take when excursions from the established operating ranges occur. Have an effective above-the-ceiling permit program in place as part of your barrier management program. Strongly enforce it with staff and contractors. Ensure your EOC program includes management of all off-site and satellite buildings under the hospital s license. This includes annual evacuation fire drills, FA and sprinkler testing/maintenance (same as hospital), EM drills, environmental tours, etc.

52 Have representation from your I.S. department on your EOC committee to represent and ability to speak to those vital network and communication utility systems. Have representation for all construction processes on your EOC committee. During EOC and EM sessions, brag about your accomplishments. Have staff attend that can represent and talk about all EOC functional areas. Note: The more you share and talk during the sessions, the less questions the JC surveyor will ask.

2016 Joint Commission Update

2016 Joint Commission Update 2016 Joint Commission Update Bert M. Gumeringer, MBA, CHFM, FASHE Asst. Vice President-Facilities Operations Texas Children s Hospital August 12, 2016 11:30am-12:30pm Top 10 Findings Comparison-2015 vs.2016

More information

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN Title/Description: Life Safety & Fire Prevention Management Department: Facilities Management Personnel: All Effective Date: 5/97 Revised: 7/00, 7/01, 7/02, 7/03, 7/04, 7/05, 7/08 LIFE SAFETY & FIRE PREVENTION

More information

Other EC and LS documents may be requested by surveyors, as needed, throughout the survey.

Other EC and LS documents may be requested by surveyors, as needed, throughout the survey. Documentation required by the Hospital Accreditation program Life Safety (LS) and selected Environment of Care (EC) standards is presented in the following pages. These documents will be reviewed by the

More information

10/28/2015. Enjoy Your TJC Survey. Bill H. McCully CHFM SASHE. Senior Consultant MSL Healthcare Partners. MSL Healthcare Partners, 2015 PREPARATION

10/28/2015. Enjoy Your TJC Survey. Bill H. McCully CHFM SASHE. Senior Consultant MSL Healthcare Partners. MSL Healthcare Partners, 2015 PREPARATION Enjoy Your TJC Survey Bill H. McCully CHFM SASHE Senior Consultant MSL Healthcare Partners PREPARATION 1 Top Eight Most Cited Standards (George Mills) EC News May 2015 Top Citations EC.02.06.01 56% EC.02.05.01

More information

Changes to Environment of Care and Life Safety Chapters Related to Life Safety Code Updates

Changes to Environment of Care and Life Safety Chapters Related to Life Safety Code Updates Issued June 28, 207 Changes to Environment of Care and Life Safety Chapters Related to Life Safety Code Updates Environment of Care (EC) Chapter Nursing Care Center (NCC) Accreditation Program Standard

More information

2017 Accreditation Updates

2017 Accreditation Updates 2017 Accreditation Updates Tennessee Healthcare Engineers Association 2017 Spring Conference Pickwick Landing State Park Counce, Tennessee 38326 Presented May 17, 2017 By Ken Gregory Vice President, Accreditation

More information

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

First Aspen Federal Regulation Set: K LSC 2000 Health Existing First Aspen Federal Regulation Set: K 01.01 LSC 2000 Health Existing K 0000 Title CFR Type INITIAL COMMENTS Memo K 0011 If the building has a common wall with a nonconforming building, the common wall

More information

TIPS FOR BETTER JOINT COMMISSION SURVEYS

TIPS FOR BETTER JOINT COMMISSION SURVEYS TIPS FOR BETTER JOINT COMMISSION SURVEYS Washington Society for Healthcare Engineering September 21, 2011 Yakima, Washington The BASICS Most Failed Standards. Scoring. Electronic S. O. C. I.L.S.M. Building

More information

The Physical Environment Portal: Module 5, LS Leadership

The Physical Environment Portal: Module 5, LS Leadership The Physical Environment Portal: Module 5, LS.02.01.10 - Leadership Fire Safety: Background Fire safety impacts both the lives of the occupants and the physical structures. In the early 1900 s many buildings

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 11 Page 1 of 12 I. PURPOSE This procedure establishes a tool to help maintain a safe environment for all patients, visitors and staff by evaluating the loss of a life safety feature during

More information

EC 5.10 FIRE PREVENTION MANAGEMENT

EC 5.10 FIRE PREVENTION MANAGEMENT EC 5.10 FIRE PREVENTION MANAGEMENT The organization manages fire safety risks. 1 The organization develops and maintains a written management plan describing the processes it implements to effectively

More information

THE HEALTHCARE ENVIRONMENT UPDATE. Anne M. Guglielmo, Engineer Engineering Department The Joint Commission. Copyright, The Joint Commission

THE HEALTHCARE ENVIRONMENT UPDATE. Anne M. Guglielmo, Engineer Engineering Department The Joint Commission. Copyright, The Joint Commission 2013 THE HEALTHCARE ENVIRONMENT UPDATE Anne M. Guglielmo, Engineer Engineering Department The Joint Commission Standard/NPSG 2012 Non Compliance 2013 Non Compliance (1 st Six Months) RC.01.01.01 61% 55%

More information

Top 8 Findings & SAFER Matrix for the 2017 ACE Summit & Expo

Top 8 Findings & SAFER Matrix for the 2017 ACE Summit & Expo Top 8 Findings & SAFER Matrix for the 2017 ACE Summit & Expo February 20, 2017 Atlanta, GA Larry F. Rubin CHFM, CHSP, CPE, CEM Life Safety Code Surveyor The Joint Commission Engineering Department 2015-1

More information

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #6

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #6 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #6 WELCOME Moderator: Richard Schieferdecker support.webinato.com Audio 1 QUESTIONS How To Ask a Question: POLLING There will be occasional

More information

FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH)

FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH) FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH) Presented by: Alise Howlett, Assoc. AIA, CFPE, CHFM Standards Advisor, EM/PE/LS HFAP A better healthcare survey experience 1 FREQUENT

More information

FACILITY MANAGEMENT DEFICIENCIES IN ACUTE CARE SETTINGS

FACILITY MANAGEMENT DEFICIENCIES IN ACUTE CARE SETTINGS FACILITY MANAGEMENT DEFICIENCIES IN ACUTE CARE SETTINGS Presented by: Alise Howlett, Assoc. AIA,CFPE, CHFM Standards Advisor, EM/PE/LS HFAP A better healthcare survey experience 1 FREQUENT PHYSICAL ENVIRONMENT

More information

Danilo B. Concepcion, CBNT, CCHT-A Operations Manager St. Joseph Hospital Renal Services

Danilo B. Concepcion, CBNT, CCHT-A Operations Manager St. Joseph Hospital Renal Services Life Safety Code Danilo B. Concepcion, CBNT, CCHT-A Operations Manager St. Joseph Hospital Renal Services danilo.concepcion@stjoe.org 714-771-8944 The findings and conclusions in this presentation are

More information

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE California Society for Healthcare Engineering SOUTHERN CALIFORNIA SEMINAR LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE 1 PROGRAM AGENDA Adoption of 2012 LSC CMS Final Rule / Amendments

More information

Life Safety Code Common Discepancies Course# LSC102. EZpdh.com All Rights Reserved

Life Safety Code Common Discepancies Course# LSC102. EZpdh.com All Rights Reserved Life Safety Code Common Discepancies Course# LSC102 EZpdh.com All Rights Reserved 1. K147 Electrical - Electrical wiring and equipment shall be in accordance with NFPA 70, National Electrical Code. 9.1.2

More information

Standards Revisions Related to Life Safety Code Update

Standards Revisions Related to Life Safety Code Update Prepublication Issued Requirements The Joint Commission has approved the following revisions for prepublication. While revised requirements are published in the semiannual updates to the print manuals

More information

EXPLORING LIFE SAFETY COMPLIANCE FOR HEALTH CARE

EXPLORING LIFE SAFETY COMPLIANCE FOR HEALTH CARE 2016 EXPLORING LIFE SAFETY COMPLIANCE FOR HEALTH CARE James Woodson, Engineer Engineering Department The Joint Commission HOSPITAL BREAKFAST BRIEFINGS PART 6 Disclosure Statement The following staff and

More information

Beth Israel Deaconess Medical Center BIDMC Manual

Beth Israel Deaconess Medical Center BIDMC Manual Beth Israel Deaconess Medical Center BIDMC Manual Title: Life Safety/Fire Safety Management Plan Policy #: EOC-04 Purpose: The BIDMC Life Safety Management Plan defines the program to minimize the probability

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 92 ST - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS Type Memo Tag These guidelines are meant solely to provide guidance to surveyors in the survey process. ST - K0100 - General Requirements

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 6 Page 1 of 5 I. PURPOSE This procedure provides guidance to EH&S office staff to coordinate notifications of appropriate internal staff who will need to respond to an unannounced Joint Commission

More information

Accreditation Program: Hospital

Accreditation Program: Hospital ccreditation Program: Hospital Life Safety 2008 The Joint ommission on ccreditation of Healthcare Organizations ccreditation Program: Hospital hapter: Life Safety Standard LS.0001 The [organization] designs

More information

Changes to Environment of Care, Equipment Management, and Life Safety Chapters Related to Life Safety Code Updates

Changes to Environment of Care, Equipment Management, and Life Safety Chapters Related to Life Safety Code Updates Issued September 20, 2017 Changes to Environment of Care, Equipment Management, and Life Safety Chapters Related to Life Safety Code Updates Environment of Care (EC) Chapter Home Care (OME) Accreditation

More information

Top (15) Life Safety Code Deficiencies and Tips for Compliance (10/01/2011 thru 02/22/2012)

Top (15) Life Safety Code Deficiencies and Tips for Compliance (10/01/2011 thru 02/22/2012) 1. K62 Automatic Sprinkler Systems - Automatic sprinkler systems are continuously maintained in reliable operating condition and are inspected and tested periodically. 18.7.6, 19.7.6, 4.6.12, NFPA 13,

More information

New DATE OF BLDG. PERMIT OR PLAN APPROVAL: SURVEYOR (SIGNATURE) TITLE OFFICE DATE REVIEW AUTHORITY OFFICIAL (SIGNATURE) TITLE OFFICE DATE

New DATE OF BLDG. PERMIT OR PLAN APPROVAL: SURVEYOR (SIGNATURE) TITLE OFFICE DATE REVIEW AUTHORITY OFFICIAL (SIGNATURE) TITLE OFFICE DATE DEPARTMENT OF HEALTH & HUMAN SERVICES CENTERS FOR MEDICARE & MEDICAID SERVICES FIRE SAFETY SURVEY REPORT - AMBULATORY SURGICAL CENTERS Medicare 1. (A) PROVIDER NUMBER Identifying information as shown in

More information

Crosswalk of 2014 HFAP Standards against HFAP Standards Acute Care Hospital Manual

Crosswalk of 2014 HFAP Standards against HFAP Standards Acute Care Hospital Manual 09.00.01 Operations Plan 11.07.01 09.00.02 Hazard Vulnerablity Analysis (HVA) 09.01.01 Safety & Security 11.00.02 New Name 09.01.02 Supplies 09.01.03 482.41(a)(2) Utilities 11.03.21; 11.03.22 09.01.04

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 41 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS CFR Type Memo Tag FED - K0011 - LIFE SAFETY CODE STANDARD If the building has a common wall with a nonconforming building, the common

More information

Procedure DESCRIPTION/OVERVIEW

Procedure DESCRIPTION/OVERVIEW Applies To: UNMH Responsible Department: Life Safety Revised: 07.08.16 Procedure Patient Age Group: (X ) N/A ( ) All Ages ( ) Newborns ( ) Pediatric ( ) Adult DESCRIPTION/OVERVIEW To assure the safety

More information

The Surveyor s Perspective. Understanding How The Joint Commission Surveyors Conducts Surveys

The Surveyor s Perspective. Understanding How The Joint Commission Surveyors Conducts Surveys The Surveyor s Perspective Understanding How The Joint Commission Surveyors Conducts Surveys Tim Markijohn MBA\MHA, CHFM, CHE Field Director, Life Safety Learning Objectives At the conclusion of this presentation,

More information

Presented by: Brad Keyes, CHSP Senior Consultant Keyes Life Safety Compliance, LLC

Presented by: Brad Keyes, CHSP Senior Consultant Keyes Life Safety Compliance, LLC Presented by: Brad Keyes, CHSP Senior Consultant Keyes Life Safety Compliance, LLC Changes to Life Safety Compliance Healthcare leaders will have to deal with many changes in Life Safety compliance when

More information

This policy may also be used for routine work orders that are Life Safety in nature and cannot be completed within 45-days.

This policy may also be used for routine work orders that are Life Safety in nature and cannot be completed within 45-days. Policy: It is the policy of the St. Joseph Mercy Health System (SJMHS- Ann Arbor, Oakland, Livingston, Brighton, Chelsea and St. Mary Mercy Hospital- Livonia) and associated satellite facilities to assure

More information

Fire & Life Safety Code Compliance. Common Safety Deficiencies and Tips for Compliance for Long Term Care and Skilled Nursing Facilities

Fire & Life Safety Code Compliance. Common Safety Deficiencies and Tips for Compliance for Long Term Care and Skilled Nursing Facilities Fire & Life Safety Code Compliance Common Safety Deficiencies and Tips for Compliance for Long Term Care and Skilled Nursing Facilities LTC, Skilled Nursing Facilities COMMON LIFE SAFETY DEFICIENCIES

More information

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #5

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #5 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #5 AGENDA: Ambulatory Health Care & Business Occupancies Definitions / Examples Mixed & Contiguous Occupancies Ambulatory Health Care &

More information

Measures (ILSM) Process

Measures (ILSM) Process Managing the Interim Life Safety Measures (ILSM) Process 1 A Program for The Texas Association of Healthcare Facility Management Monday, April 30, 2012 Robert H. Bartels, CHFM CHSP CHEP SASHE President,

More information

DEPARTMENT OF HEALTH AND HUMAN SERVICES K 011 K 011 NFPA 101 LIFE SAFETY CODE STANDARD

DEPARTMENT OF HEALTH AND HUMAN SERVICES K 011 K 011 NFPA 101 LIFE SAFETY CODE STANDARD CENTERS FOR MEDICARE & MEDICA SERVICES OMB NO. 0938-0391 (X1) PROVER/SUPPLIER/CLIA ENTIFICATION NUMBER: (X3) SURVEY NAME OF PROVER OR SUPPLIER PROVER'S PLAN OF CORRECTION K 011 NFPA 101 LIFE SAFETY CODE

More information

NFPA 101 and NFPA 99, 2012 Editions Code Update. where art meets engineering

NFPA 101 and NFPA 99, 2012 Editions Code Update. where art meets engineering NFPA 101 and NFPA 99, 2012 Editions Code Update where art meets engineering Austin Dallas Denver Houston Kansas City Miami Nashville Phoenix Richmond Washington DC NFPA 101 and NFPA 99 where art meets

More information

The Healthcare Environment Update

The Healthcare Environment Update 2017 The Healthcare Environment Update John Maurer, SASHE, CHFM, CHSP Engineering Department The Joint Commission Engineering Department 2017-1 Most Cited Standards Standard 2015 % Noncompliance 2016 %

More information

UPDATE. The Healthcare Environment. George Mills, Sr. Engineer Standard Interpretation Group The Joint Commission. Copyright, The Joint Commission

UPDATE. The Healthcare Environment. George Mills, Sr. Engineer Standard Interpretation Group The Joint Commission. Copyright, The Joint Commission 2010 UPDATE The Healthcare Environment George Mills, Sr. Engineer Standard Interpretation Group The Joint Commission Human Factor Trust Report Improve TRUST REPORT IMPROVE Communication SIG Engineering

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 94 ST - K0000 - Initial Comments Title Initial Comments Statute or Rule Type Memo Tag These guidelines are meant solely to provide guidance to surveyors in the survey process. ST - K0100 - General

More information

JOINT COMMISSION PREPAREDNESS / STATEMENT OF CONDITIONS DRAWINGS WSSHE SOUTHWEST CHAPTER NOVEMBER 19, 2015

JOINT COMMISSION PREPAREDNESS / STATEMENT OF CONDITIONS DRAWINGS WSSHE SOUTHWEST CHAPTER NOVEMBER 19, 2015 JOINT COMMISSION PREPAREDNESS / STATEMENT OF CONDITIONS DRAWINGS WSSHE SOUTHWEST CHAPTER NOVEMBER 19, 2015 AGENDA INTRODUCTION OF PRESENTERS SOC VS. FIRE & LIFE SAFETY DRAWINGS HAZARDOUS AREAS VS. INCIDENTAL

More information

CMS Announcement 3/27/2017. Adoption of 2012 Life Safety Code Health Care Facilities Code. Kenneth Daily, LNHA

CMS Announcement 3/27/2017. Adoption of 2012 Life Safety Code Health Care Facilities Code. Kenneth Daily, LNHA Adoption of 2012 Life Safety Code Health Care Facilities Code Kenneth Daily, LNHA kenn@qissurvey.com CMS Announcement May 2016 Life Safety Code Health Care Code Effective July 5 th Numerous changes many

More information

Building Codes & Standards for Healthcare. Healthcare Construction Certificate - Level 1

Building Codes & Standards for Healthcare. Healthcare Construction Certificate - Level 1 Building Codes & Standards for Healthcare Building Codes and Standards AHJs Codes Defend in Place Walls Sprinklers Fire Alarm Important Dates for Healthcare Facilities 7/5/16 NFPA Life Safety Code 101

More information

THE HEALTHCARE ENVIRONMENT UPDATE. George Mills, Director Engineering Department The Joint Commission. Copyright, The Joint Commission

THE HEALTHCARE ENVIRONMENT UPDATE. George Mills, Director Engineering Department The Joint Commission. Copyright, The Joint Commission 2013 THE HEALTHCARE ENVIRONMENT UPDATE George Mills, Director Engineering Department The Joint Commission Standard/NPSG 2012 Non Compliance 2013 Non Compliance (1 st Six Months) RC.01.01.01 61% 55% LS.02.01.20

More information

TJC's New 2009 Scoring System

TJC's New 2009 Scoring System TAHFM Interlink 2012 Environment of Care & Life Safety Accreditation Challenges Dean Samet, CHSP, Regulatory Compliance Officer TSIG Consulting cell: 917-991-2168 sametd@tsigconsulting.com Copyright 2012

More information

Michigan Society for Healthcare Engineering Environment of Care, Life Safety, and Emergency Management Update

Michigan Society for Healthcare Engineering Environment of Care, Life Safety, and Emergency Management Update Michigan Society for Healthcare Engineering Environment of Care, Life Safety, and Emergency Management Update Kathy Tolomeo, CHEM, CHSP, Certified Yellow Belt Engineering Department The Joint Commission

More information

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1 Interim Life Safety Measures Purpose of Interim Life Safety Management BASIC SAFETY: During renovations projects in healthcare occupancies, the basic level of protection for the occupants must be maintained

More information

Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7

Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7 AGENDA: Life Safety Code Referenced Publications Overview Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99

More information

FHCA 2014 Annual Conference & Trade Show

FHCA 2014 Annual Conference & Trade Show FHCA 2014 Annual Conference & Trade Show CE Session #5 Preparing for the Upcoming Code Changes Don t Look Back Tuesday, July 8 8:15 to 9:15 a.m. Canary 3 Operations/Quality Improvement Upon completion

More information

Statement of Conditions

Statement of Conditions Alabama Society for Healthcare Engineering Environment of Care, Life Safety, and Emergency Management Update May 2017 Kathy Tolomeo, CHEM, CHSP, Certified Yellow Belt Engineering Department The Joint Commission

More information

NFPA 101 Life Safety Code Culture change 2012

NFPA 101 Life Safety Code Culture change 2012 NFPA 101 Life Safety Code Culture change 2012 Produced by Kansas Fire Marshal April, 2012 On March 9, 2012 Centers for Medicare & Medicaid Services implements a policy where they have formally adopted

More information

Building Analytics and Compliance: How analytics can be used to aid in performancebased certifications. Bryant M. Kirkland Jr, PE, CCP, LEED AP

Building Analytics and Compliance: How analytics can be used to aid in performancebased certifications. Bryant M. Kirkland Jr, PE, CCP, LEED AP Building Analytics and Compliance: How analytics can be used to aid in performancebased certifications Bryant M. Kirkland Jr, PE, CCP, LEED AP AIA Quality Assurance The Building Commissioning Association

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 34 ST - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS Statute or Rule Type Memo Tag These guidelines are meant solely to provide guidance to surveyors in the survey process. ST - K0001 - OTHER

More information

WHEA FSE inspections.

WHEA FSE inspections. WHEA FSE inspections www.jfahern.com FEC.02.03.05 Features of Fire Safety Buildings are protected from fire by a series of detection, notification and suppression devices Each feature of fire safety must

More information

California Society for Healthcare Engineering, Inc. Environment of Care, Life Safety, and Emergency Management Update 2017

California Society for Healthcare Engineering, Inc. Environment of Care, Life Safety, and Emergency Management Update 2017 California Society for Healthcare Engineering, Inc. Environment of Care, Life Safety, and Emergency Management Update 2017 Kathy Tolomeo, CHEM, CHSP, Certified Yellow Belt Engineering Department The Joint

More information

Developing a Healthcare Facility Fire Door Inspection Program

Developing a Healthcare Facility Fire Door Inspection Program Developing a Healthcare Facility Fire Door Inspection Program WELCOME Moderator: Richard Schieferdecker support.webinato.com Audio QUESTIONS How To Ask a Question: 1 POLLING There will be occasional interactive

More information

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

NFPA 101 Code Update from 2012 Edition to the 2015 Edition NFPA 101 Code Update from 2012 Edition to the 2015 Edition Presented by: Gary Furdell AHCA Fire Protection Specialist 1 2 2012 Update to 2015 Chapter 18 New Health Care Occupancies 4 18.1.3.2 Atrium walls

More information

UNIVERSITY OF TOLEDO

UNIVERSITY OF TOLEDO UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect

More information

Center for Clinical Standards and Quality /Survey & Certification Group

Center for Clinical Standards and Quality /Survey & Certification Group DEPARTMENT OF HEALTH & HUMAN SERVICES Centers for Medicare & Medicaid Services 7500 Security Boulevard, Mail Stop C2-21-16 Baltimore, Maryland 21244-1850 Center for Clinical Standards and Quality /Survey

More information

Medical Gas Inspections and Maintenance Programs. HESNI Annual Conference NIU Conference Center May 10-11, 2018 Presented by Mathis Carlson

Medical Gas Inspections and Maintenance Programs. HESNI Annual Conference NIU Conference Center May 10-11, 2018 Presented by Mathis Carlson Medical Gas Inspections and Maintenance Programs HESNI Annual Conference NIU Conference Center May 10-11, 2018 Presented by Mathis Carlson Mathis Carlson I have worked for the last 15+ years in the Medical

More information

PRINTED: 06/09/2017 FORM APPROVED CENTERS FOR MEDICARE & MEDICAID SERVICES OMB NO (X2) MULTIPLE CONSTRUCTION A. BUILDING 03 - A BUILDING

PRINTED: 06/09/2017 FORM APPROVED CENTERS FOR MEDICARE & MEDICAID SERVICES OMB NO (X2) MULTIPLE CONSTRUCTION A. BUILDING 03 - A BUILDING SUMMARY PROVER'S PLAN OF CORRECTION K 000 INITIAL COMMENTS K 000 A Life Safety Code Survey was conducted by the State Fire Marshal beginning on May 9th, 2017 and ending on May 10th, 2017. Adair Acute Care

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 51 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS CFR Type Memo Tag FED - K0130 - MISCELLANEOUS Title MISCELLANEOUS OTHER LSC DEFICIENCY NOT ON 2786 FED - K9999 - FINAL OBSERVATIONS Title

More information

ASCs & LSC. Alice Epstein, DFASHRM, FNAHQ

ASCs & LSC. Alice Epstein, DFASHRM, FNAHQ , DFASHRM, FNAHQ Disclaimer The purpose of this presentation is to provide information, rather than advice or opinion. It is accurate to the best of the speaker's knowledge as of the date of the presentation.

More information

POLICY NUMBER ISSUE DATE REVISED DATE REVIEW DATE

POLICY NUMBER ISSUE DATE REVISED DATE REVIEW DATE POLICY NAME: IMPLEMENTATION OF INTERIM LIFE SAFETY MEASURES, FIRE SYSTEM IMPAIRMENTS, AND FIRE WATCH (formerly Implementation of Interim Life Safety Measures) POLICY NUMBER: S06-10 ISSUE DATE: FEBRUARY

More information

DUKE CLINIC SITE-SPECIFIC FIRE PLAN Part II General Statement. Fire Procedures

DUKE CLINIC SITE-SPECIFIC FIRE PLAN Part II General Statement. Fire Procedures OCCUPATIONAL AND ENVIRONMENTAL SAFETY OFFICE DUKE CLINIC SITE-SPECIFIC FIRE PLAN Part II General Statement This Department also adheres to the Duke University Safety Manual located at http://www.safety.duke.edu.

More information

The Joint Commission: 2018 Update

The Joint Commission: 2018 Update The Joint Commission: 2018 Update Who we are Survey Process and Methods Standards Kenneth A. Monroe, PE, MBA, CHC, PMP Director - Engineering Learning Objectives z At the conclusion of this presentation,

More information

Interim Life Safety Assessments and Infection Prevention Assessments

Interim Life Safety Assessments and Infection Prevention Assessments Interim Life Safety Assessments and Infection Prevention Assessments 1 Healthcare Construction ILSM and ICRAs PRESENTED BY Bob Dubiel, CHFM, CHC -Mayo Clinic Health System NWWI -Projects and Construction

More information

LIFE SAFETY CODE MAINTENANCE MANUAL

LIFE SAFETY CODE MAINTENANCE MANUAL LIFE SAFETY CODE MAINTENANCE MANUAL 1 P a g e Table of Contents Introduction 3 Alcohol Based Hand Rub (ABHR) Dispensers 4 Corridor Walls 4 Corridor Width 5 Doors 5 Electrical 6 Elevators & Dumbwaiters

More information

K SURVEY FOR DATE OF PLAN APPROVAL SURVEY UNDER

K SURVEY FOR DATE OF PLAN APPROVAL SURVEY UNDER DEPARTMENT OF HEALTH AND HUMAN SERVICES CENTERS FOR MEDICARE & MEDICA SERVICES FIRE SAFETY SURVEY REPORT - HEALTH CARE Form Approved OMB No. 0938-0242 1. (A) PROVER NUMBER 1. (B) MEDICA I.D. NO. 1. HOSPITAL

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 92 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS Type Memo Tag FED - K9999 - FINAL OBSERVATIONS Title FINAL OBSERVATIONS Type Memo Tag FED - KA100 - General Requirements - Other Title

More information

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4 THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4 WELCOME Moderator: Richard Schieferdecker support.webinato.com Audio 1 QUESTIONS How To Ask a Question: POLLING There will be occasional

More information

Q1 Advocacy Webinar 3/24/15

Q1 Advocacy Webinar 3/24/15 2014 American Society for Healthcare Engineering 155 N. Wacker Drive, Suite 400 Chicago, IL 60606 ashe.org ashe@aha.org 312-422-3800 Q1 Advocacy Webinar 3/24/15 ASHE Advocacy Team Chad E. Beebe, AIA, CHFM,

More information

Standards Revisions Related to Life Safety Code Update

Standards Revisions Related to Life Safety Code Update Prepublication Issued Requirements The Joint Commission has approved the following revisions for prepublication. While revised requirements are published in the semiannual updates to the print manuals

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 75 ST - K0000 - Initial Comments Title Initial Comments Statute or Rule Type Memo Tag These guidelines are meant solely to provide guidance to surveyors in the survey process. ST - K0001 - OTHER

More information

Changes to Environment of Care and Life Safety Chapters Related to Life Safety Code Updates

Changes to Environment of Care and Life Safety Chapters Related to Life Safety Code Updates Issued September 20, 2017 Changes to Environment of Care and Life Safety Chapters Related to Life Safety Code Updates Environment of Care (EC) Chapter Critical Access Hospital (CAH) Accreditation Program

More information

Compliance w/ the 2012 Life Safety Code

Compliance w/ the 2012 Life Safety Code Compliance w/ the 2012 Life Safety Code Implications of the 2012 NFPA Code Set for Existing & New ASCs William E. Lindeman, AIA http://www.weldesigns.com Financial Interest Disclosure The presenter provides

More information

Barrier Management- Defending the Safety of Patients, Visitors, & Staff

Barrier Management- Defending the Safety of Patients, Visitors, & Staff Barrier Management- Defending the Safety of Patients, Visitors, & Staff About Your Speaker Rick Tinsley: 3 Years as Healthcare Construction Electrician 38 Years in Healthcare Facility Maintenance 13 Years

More information

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES Sharon S. Gilyeat, P.E., Principal Koffel Associates, Inc. www.koffel.com sgilyeat@koffel.com Expertly Engineering Safety From Fire

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 3 Page 1 of 10 I. PURPOSE This procedure establishes the steps required for off-site Business occupancy locations to perform the required annual fire drill and disaster drill reports as required

More information

Is the address of your property clearly visible and marked in large numbers that can be easily seen from the street?

Is the address of your property clearly visible and marked in large numbers that can be easily seen from the street? PRE-INSPECTION CHECKLIST THE FOLLOWING INFORMATION IS PROVIDED TO YOU TO ASSIST YOUR FACILITY IN BECOMING COMPLIANT WITH THE NEW YORK STATE FIRE CODE, LOCAL LAWS, AND ORDINANCES GOVERNING THE TOWN OF BABYLON.

More information

Renovation Program. Renovation Program GENERAL

Renovation Program. Renovation Program GENERAL Renovation Program GENERAL This program provides guidance and protocols for renovation projects in occupied, operational acute hospitals. Team building is essential to quality control and HFD Services

More information

Ohio Department of Health NFPA 2012 Life Safety Code Tips Sheet

Ohio Department of Health NFPA 2012 Life Safety Code Tips Sheet Ohio Department of Health NFPA 2012 Life Safety Code Tips Sheet This document is used for frequently cited Life Safety Code violations. This is not an all-inclusive list and is intended for reference only.

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 100 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS CFR Type Memo Tag FED - K9999 - FINAL OBSERVATIONS Title FINAL OBSERVATIONS CFR Type Memo Tag FED - KA100 - General Requirements - Other

More information

1. Are there any annual sprinkler head inspection forms available? No, there are none available at this time.

1. Are there any annual sprinkler head inspection forms available? No, there are none available at this time. Sprinkler 1. Are there any annual sprinkler head inspection forms available? No, there are none available at this time. 2. Does the annual sprinkler head inspection have to be done by a licensed technician

More information

UPMC Hamot. Safety Rounds. conducted for. Document No Audit Title 3 Main / West. Conducted on 8:15 10/23/12. Prepared by Ramsey

UPMC Hamot. Safety Rounds. conducted for. Document No Audit Title 3 Main / West. Conducted on 8:15 10/23/12. Prepared by Ramsey Safety Rounds conducted for UPMC Hamot Document No. Audit Title 3 Main / West Conducted on 8:15 10/23/12 Prepared by Ramsey Personnel Ramsey, Moryc Completed on 13:52 10/26/12 Table of Contents SAFETY

More information

Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH)

Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH) Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH) The following represents a review of the Life Safety chapter of the new 2018 Joint Commission CAMH manual for

More information

Tennessee Department of Health Bureau of Health Licensure and Regulations Division of Health Care Facilities

Tennessee Department of Health Bureau of Health Licensure and Regulations Division of Health Care Facilities Tennessee Department of Health Bureau of Health Licensure and Regulations Division of Health Care Facilities 1 Colby Henson Fire Safety Supervisor 665 Mainstream Drive 2nd floor 615-806-4798 Colby.Henson@tn.gov

More information

The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99

The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99 The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99 Sharon S. Gilyeat, P.E. Lauren Schrumpf August 8, 2018 Expertly Engineering

More information

CMS CATEGORICAL WAIVER CHECKLIST Page 1 of 7 Waiver Topic, description & location:

CMS CATEGORICAL WAIVER CHECKLIST Page 1 of 7 Waiver Topic, description & location: FACILITY NAME: CMS CATEGORICAL WAIVER CHECKLIST Page 1 of 7 Waiver Topic, description & location: CITY: If the facility desires to use any of the CMS categorical waivers listed below, it should follow

More information

a) Establishment of emergency procedures to be followed at the time of an emergency;

a) Establishment of emergency procedures to be followed at the time of an emergency; 5.10 Fire Safety 5.10.1 Introduction The Corporation is responsible for carrying out the provisions of the Ontario Fire Code. This section outlines our responsibilities as well as inspections and testing

More information

EC EP 14 All other electrical K-920 equipment in patient care vicinity NFPA , Chapter 10

EC EP 14 All other electrical K-920 equipment in patient care vicinity NFPA , Chapter 10 MSL Healthcare Partners, Inc. Wild Card EPs Paraphrase K-tag # EC.02.04.03 EP 14 All other electrical K-920 equipment in patient care vicinity NFPA 992012, Chapter 10 K-924 K-928 K-931 K-tag Description

More information

St. Vincent s Health System Page 1 of 6

St. Vincent s Health System Page 1 of 6 St. Vincent s Health System Page 1 of 6 TITLE: Fire Plan Code Red FACILITY: St. Vincent s East FUNCTION: ORIGINATING DEPT: HOSPITAL SHARED POLICY? EFFECTIVE DATE: _X Yes No DOCUMENT NUMBER: 801 ORIGINATION

More information

Fire/Life Safety Policy

Fire/Life Safety Policy Fire/Life Safety Policy On Campus Student Housing A. Purpose The University supports and maintains a strong commitment to the safety and health of each student living in On Campus Student Housing. The

More information

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN Page 1 of 11 CENTRAL STATE HOSPITAL PLAN SUBJECT: PLANT OPERATIONS UTILITIES MANAGEMENT PLAN ANNUAL REVIEW MONTH: RESPONSIBLE FOR REVIEW: March CSH Safety Officer LAST REVISION DATE: November 2003 I. SCOPE:

More information

FIRE SAFETY SURVEY REPORT 2000 CODE - HEALTH CARE Medicare Medicaid

FIRE SAFETY SURVEY REPORT 2000 CODE - HEALTH CARE Medicare Medicaid DEPARTMENT OF HEALTH AND HUMAN SERVICES CENTERS FOR MEDICARE & MEDICA SERVICES FIRE SAFETY SURVEY REPORT - HEALTH CARE Medicare Medicaid 1. (A) PROVER NUMBER PART I Life & Safety Code, New and Existing

More information

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins Today's Moderator Cathy Jakicic Editor Today's Presenter Esteban Cota National Business Manager for Fire Safety

More information

Chapter 43, Building Rehabilitation allows for degrees of compliance based on the work category such as the extent of work.

Chapter 43, Building Rehabilitation allows for degrees of compliance based on the work category such as the extent of work. 3610 COMMERCE DR SUITE 817 BALTIMORE MD 21227 P 410.737.8677 F 410.737.8688 www.haifire.com May 5, 2014 Review of Regulations 42 CFR Parts 403, 416, 418, 460, 482, 483 and 485 Medicare and Medicaid Programs;

More information

City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control

City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control 11-27-12 This document is designed as a summary guide using IFC requirements for the provisions associated with exiting,

More information