3 Agenda 1. Introduction 2. Why inspection? 3. Initial Verification 4. Periodic verification 5. Reference M. Mostafa 3
4 Introduction M. Mostafa 4
5 Introduction M. Mostafa 5
6 Introduction M. Mostafa 6
7 Why inspection? M. Mostafa 7
8 Why inspection? Loss Measure Residential Building Electrical Fires Loss per fire $25,126 Injuries per 1,000 fires Deaths per 1,000 fires 6-7 M. Mostafa 8
9 Why inspection? M. Mostafa 9
10 Initial Verification M. Mostafa 10
11 Periodic verification M. Mostafa 11
12 Periodic verification M. Mostafa 12
13 Contacts M. Mostafa 13
14 Contacts Values with a good connection Current A Voltage drop mv Heat developed mw M. Mostafa 14
15 Values with a bad connection Contacts Current A Voltage drop mv Heat developed mw 20 1,000 2,000 20,000 40, ,200 1,400 18,000 36, ,500 3,000 15,000 30, ,000 4,000 10,000 20, ,000 7,000 3,000 5,000 M. Mostafa 15
16 Contacts M. Mostafa 16
17 Wiring M. Mostafa 17
18 Wiring There are two types of risks involving wiring External exposure of the cable to a fire originating in other combustible materials. The cables consist primarily of insulation material (70%), which means that there is a lot of combustible material available Internal overheating due to overloads or short circuits in cables M. Mostafa 18
19 Wiring There are over 9,000 electrical fires across the UK each year. M. Mostafa 19
20 Wiring M. Mostafa 20
21 When is a periodic inspection needed? It is generally accepted that an electrical installation should be inspected every ten years. When a circuit breaker trips frequently, or sockets, switches, or fuse panels become hot or display burn marks, an inspection and further maintenance is required. In Belgium, an inspection of the electrical installation is required when there is a change of ownership. M. Mostafa 21
22 What to inspect? Adequacy of the earthing and bonding Suitability of the switch gear and control gear Serviceability of the equipment (switches, socket outlets, light fittings) by careful examination for signs of overheating The wiring system and its condition (old types of cables, insulation of the cables) Provision for RCDs Presence of adequate identification and notices Extent of any wear and tear, damage, or other indications Changes in the use of the premises that can lead to deficiencies in the installation M. Mostafa 22
23 Some of the tests that can be carried out with the supply connected Continuity of the protective conductors Equipotential bonding Earth electrode resistance Earth-fault loop impedance Correct operation of the RCDs Correct operation of switches and isolators M. Mostafa 23
24 How to measure the insulation resistance M. Mostafa 24
25 INSPECTION ON THE ELECTRICAL INSTALLATION IN HONG KONG and India s BUILDINGS M. Mostafa 25
26 Agenda 1. Introduction 5. Functional Testing 2. General Requirements 3. Visual Inspection 6. Testing Of Emergency Lighting, Exit Sign And Emergency Generator Installations 7. Conclusion 4. Testing 8. Reference M. Mostafa 26
27 Abbreviations T & C PBSE PBSI C.O.P. Testing and Commissioning Project Building Services Engineer Project Building Services Inspector Code of Practice for the Electricity (Wiring) Regulations M. Mostafa 27
28 Introduction M. Mostafa 28
29 Introduction M. Mostafa 29
30 This procedure is written to facilitate the PBSE and PBSI in carrying out the following aspects of work with respect to T & C. To vet and approve the T & C procedures proposed and submitted by the Contractor. Introduction To witness those T & C procedures as specified. To receive the T & C certificate and other supporting data. M. Mostafa 30
31 General Requirements M. Mostafa 31
32 General Requirements Where tests are required to be witnessed by the PBSE/PBSI, the Contractor shall give due advance notice (usually not less than three days) of his intention and provide details of date, time and type of tests to be performed. Upon completion of such T & C procedure, the Contractor's project engineer shall complete and sign a testing and commissioning certificate, to the effect that agreed T & C procedures have been duly carried out. M. Mostafa 32
33 Visual Inspection A visual inspection shall be carried out in accordance with Code 21A of the C.O.P. before testing of the installation in order to verify the following: The installation has been carried out in compliance with regulations and/or C.O.P., The correctness of the designation of the installation; and There is no visual damage to the installation. M. Mostafa 33
34 Testing 1. Continuity of Ring Final Circuit Conductors M. Mostafa 34
35 1. Continuity of Ring Final Circuit Conductors 2. Continuity of Protective Conductors 3. Earth Electrode Resistance Testing M. Mostafa 35
36 1. Continuity of Ring Final Circuit Conductors 2. Continuity of Protective Conductors 3. Earth Electrode Resistance 4. Insulation Resistance 5. Insulation to Site Built Assembly Testing M. Mostafa 36
37 6. Protection by Barriers and Enclosure 7. Verification of Polarity 8. Earth Fault Loop Impedance 9. Lightning Protection System 10. Equipment Testing Testing M. Mostafa 37
38 Functional Testing Functional test of the fixed electrical installation shall be conducted to produce evidence and verification of the electrical installation which is capable in performing the designated function encapsulated in the original electrical installation design. M. Mostafa 38
39 Testing Of Emergency Lighting, Exit Sign And Emergency Generator Installations M. Mostafa 39
40 Testing Of Emergency Lighting, Exit Sign And Emergency Generator Installations M. Mostafa 40
41 Testing Of Emergency Lighting, Exit Sign And Emergency Generator Installations M. Mostafa 41
42 Testing and Commissioning progress chart M. Mostafa 42
43 Testing and Commissioning progress chart S = Schedule completion % A = Actual completion % M. Mostafa 43
44 Testing and commissioning certificate M. Mostafa 44
45 Testing and commissioning certificate M. Mostafa 45
46 Test Certificate M. Mostafa 46
47 Test Certificate M. Mostafa 47
48 Conclusion M. Mostafa 48
49 Landlords Guide to Electrical Safety in Scotland M. Mostafa 49
50 Outlines 1. Introduction 6. Portable Appliances + Safety Checks 2. Electrical Installation + Regular Visual Safety Checks 3. Periodic Inspection 7. Compliance with Building Regulation + Flowchart 8. Steps when Electrical Installation not certified 4. P.I.R + Examples 9. Competent Electrician Register 5. Interval between Periodic Inspection & Testing 10. Conclusion Eng. Ahmed Abo Elkhair 50
51 Introduction Eng. Ahmed Abo Elkhair 51
52 Electrical Installations As BS ) Sufficient number of sockets 2) covers in places for live parts 3) Using appropriate (RCD) 4) Satisfactory earthing bonding 5) Enough circuits to avoid danger 6) Cables CSA are correctly selected Eng. Ahmed Abo Elkhair 52
53 Regular visual safety checks 1) broken accessories (sockets and Light switches) 2) overheating of electrical equipment 3) Damaged cables Eng. Ahmed Abo Elkhair 53
54 The periodic inspection including 1) adequacy of earthing 2) suitability of the CBs 3) wiring systems condition 4) damage parts of the installation 5) Provision of (RCDs) 6) Presence of identification and notices Eng. Ahmed Abo Elkhair 54
55 Periodic inspection report 1) Record the findings of the inspection 2) Purpose : safety condition of an existing installation 3) Identify any damage within the installation Eng. Ahmed Abo Elkhair 55
56 Examples of a domestic periodic inspection report Eng. Ahmed Abo Elkhair 56
57 Examples of a domestic periodic inspection report Eng. Ahmed Abo Elkhair 57
58 Examples of a domestic periodic inspection report Eng. Ahmed Abo Elkhair 58
59 Examples of a domestic periodic inspection report Eng. Ahmed Abo Elkhair 59
60 Examples of a domestic periodic inspection report Eng. Ahmed Abo Elkhair 60
61 Examples of a domestic periodic inspection report Eng. Ahmed Abo Elkhair 61
62 Examples of a domestic periodic inspection report Eng. Ahmed Abo Elkhair 62
63 The interval between periodic inspection and testing depends on 1) Age of an installation 2) Installation use & level of misuse 3) Damage found at last inspection. 4) Inspector apply engineering judgment 5) on the change of tenancy 6) carried out at least every 5 years 7) examination at least every 3 years Eng. Ahmed Abo Elkhair 63
64 Portable Appliances 1) An appliance has at least the CE Mark 2) additional safety marks, Kite mark & BEAB 3) the electrical installation is suitable for the equipment Eng. Ahmed Abo Elkhair 64
65 Safety Checks 1) checking that there are no cuts in (sheath) 2) the plug body is not damaged 3) there are no loose parts or missing screws Note: BS 7671 requires sockets rated at up to 20 A use RCD Eng. Ahmed Abo Elkhair 65
66 Compliance with Building Regulations The Scottish Building Standards electrical work requires a warrant Eng. Ahmed Abo Elkhair 66
67 Scottish Building Regulations / An overview Eng. Ahmed Abo Elkhair 67
68 Where electrical installation work is NOT Certified 1) Seek submission of a relevant certificate 2) require an independent inspection and test 3) take no action at all, if the verifier is satisfied Note: In certain cases, failure to comply with the Building Regulation can also lead to prosecution Eng. Ahmed Abo Elkhair 68
69 Competent Electrician Register 1) can deal with all of the new requirements 2) will provide an authenticated certificate 3) a refund on the building warrant fee 4) access to a formal complaints 5) entitled to use the Certifier logo Eng. Ahmed Abo Elkhair 69
70 Conclusion Eng. Ahmed Abo Elkhair 70
71 The Iceland Construction Authority Reda El-Khadrawy 71
72 Content Organization. Main Activities. About Building Safety Fee. Electrical Safety. Conclusion. Reda El-Khadrawy 72
73 The Iceland Construction Authority (ICA) ICA is established on 1 st January 2011, and responsible for the administration of laws and regulations. Reda El-Khadrawy 73
74 The Iceland Construction Authority (ICA) Purpose: accurately estimate the condition of the electrical installations and electrical equipment in specific building. Reda El-Khadrawy 74
75 The Iceland Construction Authority (ICA) Authority Sectors: Construction. Fire brigades and fire safety. Fire safety. Electrical safety. The Fire Service Technical College. Reda El-Khadrawy 75
76 Main Activities Administration and preparations of laws. Regulations and guidelines regarding construction. Control with building materials. Oversees matters about access for the disabled, certification of workers. Issues authorization to electrical contractors. Reda El-Khadrawy 76
77 Main Activities Publishes information and training material. Electrical safety. Oversees activities of Fire. Approves the fire safety plan. Recording accidents from electrical causes. Reda El-Khadrawy 77
78 Building Safety Fee This fee is only relevant for insurers underwriting insurance against fire. The Building safety fee shall be Fees are also proportional to the duration. The Building safety fee shall be stated separately on the receipt for the premium. Reda El-Khadrawy 78
79 Electrical Safety Authorization of Electrical Contractors Safe Control of Electrical Contractors Supervision of Installations of Buildings Safety Control of Electrical Utilities Electrical equipment Fires and Accidents caused by Electricity Electrical Inspection Agencies Reda El-Khadrawy 79
80 Electrical Safety Main tasks: Safety of electrical installations. Market surveillance of electrical equipment. Composition and interpretation of electrical safety rules and regulations. Education regarding electrical safety. Authorization of electrical contractors. Investigation and registration of accidents and damages caused by electricity. Reda El-Khadrawy 80
81 Electrical Safety Authorization of Electrical Contractors A authorization B authorization C authorization CA authorization CB authorization Reda El-Khadrawy 81
82 Electrical Safety Authorization of Electrical Contractors Reda El-Khadrawy 82
83 Electrical Safety Authorization of Electrical Contractors Education Experience Authorized Contractor Reda El-Khadrawy 83
84 Application form. Documents which have to follow the application. Applicant education and work experience. Occupational Safety and Health concerning facility (workshop). Operation: Contractor position in his company. Facilities and Equipment. Application for Authorization Documented Safety Control System. Reda El-Khadrawy 84
85 Electrical Safety Authorization of Electrical Contractors Reda El-Khadrawy 85
86 Electrical Safety Revoking of an Authorization Electrical installation has poor finishing of wirings. Sample inspections show number of comments. Follow-up inspections show previous comments has not been fixed. Electrical contractor does not attend to instructions, not finish the assigned job. Reda El-Khadrawy 86
87 Supervision with Installations of Buildings Reda El-Khadrawy 87
88 Supervision with Installations of Buildings Inspections Notification about works Improvement of comments Follow-up inspection Final inspection Final notification Reda El-Khadrawy 88
89 Electrical Inspection Agencies Reda El-Khadrawy 89
90 Electrical Inspection Agencies Inspections Investigations Supervisions Reda El-Khadrawy 90
91 Electrical Inspection Agencies Inspection Procedures Requirements Admittance to electrical installation. Responsibility of administrators. Responsible party. Instructions to electrical utilities. Danger- and emergency situation. Skilled persons and training. Reda El-Khadrawy Archival control. Lists and reports. Lists on installations. Processing of comments and improvements. Work-processes. Internal inspections. 91
92 Inspection report It is a list of the comments from the inspection. Who supervise the inspection process classify all comments on their seriousness (in what risk category they fall into) explained and the deadline for improvements specified. ICA can utilize such reports in introduction and educational material. Reda El-Khadrawy 92
93 Fires and Accidents caused by Electricity Reda El-Khadrawy 93
94 Conclusion Our goal is to provide secure environments to people and equipment. So periodic inspection must be done by authorized contractor for electrical installations and equipment. Reda El-Khadrawy 94
95 Mine Safety Management Reda El-Khadrawy 95
96 Content Establishment Mine Safety Management Plans Electrical Engineering Safety Plan Electrical Accident Investigation and Reporting Conclusion Reda El-Khadrawy 96
97 Establishment During the period 1850 to 1930 the South Wales coalfield had the worst disaster record. There were nearly forty underground explosions in the areas of the coalfield during this time. The total death from these disasters was 3,119 people. Health and Safety Executive (HSE) is created by government in the United Kingdom in Reda El-Khadrawy 97
98 Introduction Year Deaths Accident! Gas Explosion Gas Explosion Explosion Explosion Reda El-Khadrawy 98
99 Establishment Introduction: Reda El-Khadrawy 99
100 Scope How to work safely with high voltage, low voltage, and extra low voltage equipment. Reda El-Khadrawy 100
101 Authority Reda El-Khadrawy 101
102 Management Structure Each operation should have a documented management structure detailing : Positions. Incumbents. Responsibility. Mine Safety Management Plans Accountability for the electrical engineering safety arrangements. Reda El-Khadrawy 102
103 Mine Safety Management Plans Contractor Management Competence of people and fitness for purpose of equipment. Contractor s competency and subcontractors. Reda El-Khadrawy 103
104 Mine Safety Management Plans Electrical Engineering decisions are critical to attaining safe production at mine sites. The electrical engineering safety arrangements must be : Included in the Mine Safety Management Plan. An integral part of the Health and Safety management plan. Total Power defines qualification of workers. Reda El-Khadrawy 104
105 Mine Safety Management Plans Plant Safety Reda El-Khadrawy 105
106 Mine Safety Management Plans Plant Safety The mine operator must provide plant that is adequately rated for the activity and fit for purpose in the proposed working environment, including : Equipment. Workers. Information relating to plant safety. Plant registration. Reda El-Khadrawy 106
107 Risk Management Mine Safety Management Plans Hand held power tools are used, they should be extra low voltage battery operated, not 240 volt. Welding equipment should have an ELV output. Earthling systems are of an inherently safer design, that is, maximum potential rise of an earth grid should be below 55V. Reda El-Khadrawy 107
108 Instruction and Training Mine Safety Management Plans Reda El-Khadrawy 108
109 Instruction and Training Mine Safety Management Plans Plan must specify the competencies required for such types of work and where necessary ensure the appropriate training and instruction is given Reda El-Khadrawy 109
110 Communication Mine Safety Management Plans Plan must specify minimum time to communicate periodically, usually day by day. In particular voice communication systems such as telephones must be provided at strategic points underground and on the surface. Reda El-Khadrawy 110
111 Site Safety Rules Mine Safety Management Plans Reda El-Khadrawy 111
112 Site Safety Rules Mine Safety Management Plans All electrical engineering safety matters are included in these site safety rules. Reda El-Khadrawy 112
113 Mine Safety Management Plans Document Control and Records Reda El-Khadrawy 113
114 Mine Safety Management Plans Document Control and Records Records of electrical testing, safety and compliance certificates and the like are to be part of the records kept at the mine are documented via the document control system. Reda El-Khadrawy 114
115 Mine Safety Management Plans Emergency Management Sufficient transport and allow the safe evacuation of people Cover the treatment of electric victims Reda El-Khadrawy 115
116 Emergency Management Fire and Explosion: Mine Safety Management Plans Reda El-Khadrawy 116
117 Emergency Management Fire and Explosion: Mine Safety Management Plans Detection and suppression must be designed with appropriate safety integrity. Reda El-Khadrawy 117
118 Mine Safety Management Plans Consultation Reda El-Khadrawy 118
119 Mine Safety Management Plans Consultation Where actions by "non-electrical people such as mining engineers, production managers, mechanical engineers and purchasing officers can involved in electrical work. Reda El-Khadrawy 119
120 Mine Safety Management Plans Other OH&S Regulation Requirements: Noise management. Atmospheric contaminants. Levels of oxygen Falling objects and Lifts. Building maintenance and others. Reda El-Khadrawy 120
121 It is expected the Electrical Engineering Safety arrangements will have a positive impact on other matters and be fully integrated within the Mine Safety Management Plan, including: Electrical Installations. Electrical Protection and Earthing. Commissioning and Testing. Electrical Engineering Safety Plan Maintenance of Electrical Installations. Reda El-Khadrawy 121
122 Electrical Installations Electrical Engineering Safety Plan Reda El-Khadrawy 122
123 Electrical Installations Electrical Engineering Safety Plan The electrical installation system should be sectionalized so : Facilitate inspection, maintenance, testing (minimal disruption to the part of the installation not being maintained) and fault finding. Withstand the maximum prospective through fault current and electromagnetic radiation interference. Reda El-Khadrawy 123
124 Electrical Protection System Fault detection. Isolation Faulty parts. Restore healthy parts. Electrical Engineering Safety Plan Reda El-Khadrawy 124
125 Earthing System Electrical Engineering Safety Plan Reda El-Khadrawy 125
126 Earthing System Electrical Engineering Safety Plan When designing earthing systems, a safe design should be the first option and maximum potential rise and touch voltages must be defined. Reda El-Khadrawy 126
127 Electrical Engineering Safety Plan Commissioning and Testing Reda El-Khadrawy 127
128 Electrical Engineering Safety Plan Commissioning and Testing Tests must be done by a licensed electrician or qualified electrical engineer. A certificate of compliance is used for ALL electrical work. Reda El-Khadrawy 128
129 Electrical Engineering Safety Plan Maintenance of Electrical Installations Reda El-Khadrawy 129
130 Electrical Engineering Safety Plan Maintenance of Electrical Installations Prevent interference. Detect damage ageing and wear. Ensure insulation and barriers are effective. Earthing remains effective. Reda El-Khadrawy 130
131 Electrical Accident Investigation and Reporting Reda El-Khadrawy 131
132 Electrical Accident Investigation and Reporting Were safety rules violated causing the electrocution? How did the victim receive the shock? what injuries were caused by it? Did contact with a metal surface or the victim s apparel affect the shock? Reda El-Khadrawy 132
133 Conclusion To work Safe, all people and equipment must be comply with all mine safety regulations and assessment risk management. Reda El-Khadrawy 133
134 Systems of inspecting the existing building and the procedures of auditing engineering plans 134
135
Checking electrical equipment conformity with standards. M. Mostafa
Checking electrical equipment conformity with standards M. Mostafa 2 KTL Certification Eng. Ahmed Abo Elkhair 3 Outline 1. Introduction KTL 4. Factory Inspection 2. Certification Process Flow Chart 3.
More informationThe extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate.
This safety certificate is an important and valuable document which should be retained for future reference DETAILS OF THE CLIENT Client / DETAILS OF THE INSTALLATION Extent of the installation covered
More informationElectrical Management
5 WHS PROCEDURE P23-01 Page 1 of 9 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment within the mission
More informationContents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671
Contents 1 The IET Regulations, BS 7671, and this Guide 1 1.1 The need for this Electrician s Guide 1 1.2 The IET Regulations BS 7671 2 1.2.1 International basis 2 1.2.2 The Seventeenth Edition 3 1.2.3
More information(date) except for the departures, if any, detailed as follows: Name (CAPITALS) N/A. Name (CAPITALS) N/A
Electrical Installation & Test Engineers DETAILS OF THE CLIENT Client / Freshco Food Stores, Kiln Park Business Estate, Milton Keynes, MK3 5FS ELECTRICAL INSTALLATION CERTIFICATE Issued in accordance with
More informationAllianz Engineering Inspection Services Ltd. Electrical Services. Product Information
Allianz Engineering Inspection Services Ltd Electrical Services Product Information Electrical Testing and Inspection Services The Electricity at Work Regulations (EaWR) states that all electrical systems
More informationPeriodic inspection reporting - recommendation codes for domestic and similar electrical installations
4 Periodic inspection reporting - recommendation codes for domestic and similar electrical installations This is one of a series of Best Practice Guides produced by the Electrical Safety Council* in association
More informationGuide to Condition Reports for Domestic Electrical Installations
Guide to Condition Reports for Domestic Electrical Installations Guide to condition reports for domestic electrical installations Courtesy of Greater Manchester Fire and Rescue Service What is an electrical
More informationBS Outcomes 6
BS7671 2015 Outcomes 6 Inspection and testing 6.1 Identify the general requirements for inspection and testing of installations 6.2 State the need for diagrams, charts or tables to be available e prior
More informationConsumer unit replacement in domestic and similar premises
Consumer unit replacement in domestic and similar premises 6 Issue 2 The Electrical Safety Council is indebted to the following organisations for their contribution and/or support to the development of
More informationAmendment Number 3 of BS how it might affect you
Amendment Number 3 of BS7671 2008 - how it might affect you Geoff Cronshaw provides us with a look ahead at the proposals of Amendment 3 to BS 7671:2008 IET Wiring Regulations and the resulting changes
More informationGuided Learning Hours (GLH) 8 Invigilated Assessment Hours (IA) 2 Total Qualification Time (TQT) 10
Qualification: Date Completed: 02 Feb 17 Unit: FIA AO Level 3 Fire Detection and Alarm Advanced Installer Development Group: FD&A Development Group Guided Learning Hours (GLH) 8 Invigilated Assessment
More informationCourse outline: 442 Capstone G105A UEENEEG105A - Verify compliance and functionality of low voltage general electrical installations
RTO Code 41319 Course outline: 442 Capstone G105A UEENEEG105A - Verify compliance and functionality of low voltage general electrical installations Qualification: Applicable to: Unit of competency: Related
More informationGuide to condition reports for domestic electrical installations.
Guide to condition reports for domestic electrical Courtesy of Greater Manchester Fire and Rescue Service What is an electrical installation? An electrical installation is a fixed wiring system made up
More informationElectrical Contractors Association. presents. The Hidden Perils of Poor Electrical Installation in Domestic Property
Electrical Contractors Association presents The Hidden Perils of Poor Electrical Installation in Domestic Property THE HIDDEN PERILS OF ELECTRICITY & FIRE RISKS Main Issues Improperly executed work can
More informationPOLICY FOR THE SAFE WORKING WITH ELECTRICITY
AGENDA ITEM 2.3 7 October 2010 POLICY FOR THE SAFE WORKING WITH ELECTRICITY Report of Executive Director of Planning Paper prepared by Purpose of Paper Action/Decision required Link to Health Care Standards:
More informationManaging Ex Asset Integrity
Managing Ex Asset Integrity White Paper Electrical Considerations for Hazardous Areas Authors: D Evans / T Jones February 2015 www.cpengineering.co.uk T: +44 (0)1792 897002 Copyright 2015 C&P Engineering
More informationRutgers Environmental Health and Safety (REHS)
Rutgers Environmental Health and Safety (REHS) Program Name: Laboratory Laser Safety Program Responsible Executive: Executive Director of REHS Adopted: February 20, 2001 Reviewed/Revised: July 10, 2018
More informationBuilding Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems
Building Standards Division Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems Crown Copyright 2015 Produced by the Buildings Standards Division February 2015 Version
More informationELECTRONIC SECURITY THEORY/REGULATIONS EXAMINATION 19 November 2011
Candidate Code No. ESAI 27 For Board Use Only Result Date Result Date Int ELECTRONIC SECURITY THEORY/REGULATIONS EXAMINATION 19 November 2011 QUESTION AND ANSWER BOOKLET Time Allowed: 3 Hours INSTRUCTIONS
More informationFIRE AND ENVIRONMENTAL SAFETY INSPECTOR II
CITY OF ROSEVILLE FIRE AND ENVIRONMENTAL SAFETY INSPECTOR I FIRE AND ENVIRONMENTAL SAFETY INSPECTOR II DEFINITION To perform technical and professional duties in the fields of fire and life safety inspection,
More informationSafety of Electrical Installations
Safety of Electrical Installations EUEW General Assembly Brussels 6 June 2008 Roger Lovegrove ECA Technical Committee AIE What is AIE? Association of European Electrical Contractors Associations Who are
More information3 o/c2 The symbol used to show that a BS 88 device has a motor circuit application is a gg b gm c l z d I 2.
Sample Questions - C&G 2382 17th Edition PaperB 1 o/c1 Electrical installation design shall take into account a electromagnetic disturbances b direct lightning strikes c current world copper prices d local
More informationPERIODIC ELECTRICAL TESTING POLICY
PERIODIC ELECTRICAL TESTING POLICY Originator: Policy and Strategy Team Approval date: 19 July 2016 Review date: d July 2017 1 Introduction 1.1 1.2 Pine Court Housing Association (PCHA) treats the health
More informationRisk Control Guide ELECTRICAL EQUIPMENT
ELECTRICAL EQUIPMENT RCG015 (E)-v01-09/2017 Page 1 2017 Royal & Sun Alliance Insurance plc Contents Introduction... 3 Electrical Fires... 4 Fixed Electrical Installations - Physical Controls... 4 Fixed
More information9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.
Chapter 1 GROUNDING AND BONDING 1 Proper grounding practices protect people from the hazards of electric shock and ensure the correct operation of overcurrent protection devices. Grounding is the intentional
More informationYour specialist partner for total electrical compliance. Electrical Testing
Your specialist partner for total electrical compliance Electrical Testing "To achieve compliance with the legal requirements of the Electricity at Work Regulations 1989 requires proof that an electrical
More informationQUALIFICATIONS AND CREDIT FRAMEWORK (QCF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION
QUALIFICATIONS AND CREDIT FRAMEWORK (QCF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION LEVEL 4 CERTIFICATE IN GAS SAFETY MANAGEMENT IN RESIDENTIAL PREMISES (601/0956/8) 1.0 Area and scope
More informationGuide to Membership Assessments
Issue 10 July 2008 Guide to Membership Assessments 1. Introduction This guide is intended to assist companies in preparing for an assessment visit by SELECT. It supplements the SELECT Assessment Criteria
More informationPeriodic Electrical Testing Policy
Periodic Electrical Testing Policy Originator: Executive Management Team Approval Date: Policy and Strategy Team 18 July 2017 Review date: July 2018 1 Introduction 1.1 1.2 OVH treats the health and safety
More informationIIPP. Injury & Illness Prevention Program Hartog Drive San Jose CA Responsibilities. Workplace Hazards. Training. Incident Investigations
Injury & Illness Prevention Program Responsibilities Training Workplace Hazards IIPP Recordkeeping Incident Investigations Employee Communications 1876 Hartog Drive San Jose CA 95131 Page 1 of 23 IIPP
More informationCode of Practice // For the installation, inspection and testing of electrical installations tel/fax:
Code of Practice // For the installation, inspection and testing of electrical installations tel/fax: 0870 241 7687 email: mpba@mpba.biz Introduction // This code of practice provides guidance for manufacturers,
More informationSafety Inspector III Class Description
Human Resources Department Class Description Definition Under general direction, inspects fire protection systems, construction sites, buildings, uses, occupancies, and structures to ensure an appropriate
More informationLogbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater
APPROVED BY: JBJ Precept EN Fire Detection/Alarm Panel & Precept EN Repeater Logbook PAGE 1 of 19 List of Contents 1. FIRE ALARM SYSTEM MAINTENANCE... 3 2. USER RESPONSIBILITIES... 3 2.1. RESPONSIBLE PERSON...
More informationSOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.
SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P-01-05 THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS October, 2005 Society of Fire Protection Engineers - 1 - Position Statement
More informationNATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY
A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -
More information7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST
7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS The Permits, forms and checklists shown within this section are an example of the type of controls that should be in place to help effectively manage Health & Safety
More informationEDA Scottish Section Regional Business Forum
EDA Scottish Section Regional Business Forum 1 The trade association for Electrical Contractors in Scotland Founded in 1900 as the Electrical Contractors Association of Scotland Over 1200 members SELECT
More informationContractor Worksheet Underground Fires Major Hazard Standard
WMC Environment, Health & Safety Management System Worksheet Major Hazard Standard MHS-02 DocsOpen Ref: 57267, 17/10/2001 Uncontrolled copy check web for latest revision Revision Reviewed Description of
More informationTHE SAFE USE OF ELECTRICITY
Reference: RCDS 015 THE SAFE USE OF ELECTRICITY Description of Activity Statutory requirements apply to all use and potential use of electricity. This Data Sheet applies to:- 1. All Mains voltage Portable
More informationNECA S System Approach to Electrical Safety for NFPA 70E
NECA S System Approach to Electrical Safety for NFPA 70E NECA s Systems Approach to NFPA 70E Easy to understand NFPA 70E employer requirements, Provides Supervisors with key on the job information, De-energize
More informationCertification of Thermographers
CFPA-E No 3:2011 F Certification of Thermographers CFPA-E -GUIDELINES FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation
More informationThe Facilities Manager s Guide to: Electrical Testing, Fire Alarms and Emergency Lighting Regulations. Updated May 2016
The Facilities Manager s Guide to: Electrical Testing, Fire Alarms and Emergency Lighting Regulations Updated May 2016 CONTENTS Introduction 1 Chapter 1: PAT (Portable Appliance Testing) 2 Chapter 2: Fixed
More informationAlan Wells Technical and Standards Director Certsure LLP trading as NICEIC
Introduction Alan Wells Technical and Standards Director Certsure LLP trading as NICEIC Who are Certsure? Where do we come from? 1923 - A National Register created 1956 - NICEIC established as a Charity
More informationIOWA STATE FIRE MARSHAL DIVISION Attn: Licensing Administrator
IOWA STATE FIRE MARSHAL DIVISION Attn: Licensing Administrator 215 E Seventh Street; Des Moines, IA 50319 Email: sfmlicense@dps.state.ia.us APPLICATION CHECKLISTS (EFFECTIVE IMMEDIATELY) 1. DO NOT mail
More informationDCP3/ DETAILS OF THE CLIENT ADDRESS OF THE INSTALLATION
Issued in accordance with British Standard 7671 - Requirements for Electrical Installationsby a Domestic Installer enrolled with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable LU5
More informationRisk Management Services. Electrical Safety Inspection and Testing. We can show you more.
Risk Management Services Electrical Safety Inspection and Testing We can show you more. Risk Management Services Electricity is a potential hazard that impacts both personal safety and property. Adequate
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,
More informationElectrical safety tips
Electrical safety tips To help you stay safe when using electricity, ActewAGL has compiled these electrical safety tips. For natural gas safety tips please see ActewAGL s natural gas safety brochure, available
More informationUEE30811 Q-Tracker Work Tasks
UEE30811 Q-Tracker Work Tasks UEENEEC020B Participate in electrical work and competency development activities Q-Tracker requirements: 40 hours of practical training. 1. Comply with electrical industry/enterprise
More informationCourse outline: 311 Cable Selection G107A UEENEEG107A - Select wiring systems and cables for low voltage general electrical installations
RTO Code 41319 Course outline: 311 Cable Selection G107A UEENEEG107A - Select wiring systems and cables for low voltage general installations Qualification: Applicable to: Unit of competency: Related policies:
More informationElectrical Safety Program.
University of North Carolina Wilmington Environmental Health & Safety Workplace Safety Electrical Safety Program GENERAL The UNCW Environmental Health & Safety Department (EH&S) is authorized by UNCW Policy
More informationDOMESTIC INSTALLATIONS COMMERCIAL INSTALLATIONS LIGHTING SOLAR PV REPAIRS LANDLORDS SWITCH ON TO SWH ELECTRICAL SOLUTIONS
DOMESTIC INSTALLATIONS COMMERCIAL INSTALLATIONS LIGHTING SOLAR PV REPAIRS LANDLORDS SWITCH ON TO SWH ELECTRICAL SOLUTIONS SWH ELECTRICAL SOLUTIONS Domestic INSTALLATIONS Expert and reliable electrical
More informationLegislation associated with Hazardous Locations. Pieter Coetzee ZONE 2 ZONE 1 ZONE 0. Be safe be Ex
Legislation associated with Hazardous Locations Pieter Coetzee ZONE 2 ZONE 0 ZONE 1 Be safe be Ex Contents History Introduction Occupational Health and Safety Act. (Act 85 of 1993) General Machinery Regulation
More informationUser Information Sheet 008 : 2010
User Information Sheet 008 : 2010 Formerly UIS008, July 2009 ELECTRICAL INSTALLATIONS ASSOCIATED WITH BULK LPG INSTALLATIONS 1. Introduction This Information Sheet describes some of the principles and
More informationNFPA 70E Electrical Safety & Arc Flash Training
NFPA 70E Electrical Safety & Arc Flash Training OSHA 1910.332(a) Training, 1910.332(a) Scope. The training requirements contained in this section apply to employees who face a risk of electric shock that
More informationGeneral safety precautions English
English 1 1 1.1 About the documentation The original documentation is written in English. All other languages are translations. The precautions described in this document cover very important topics, follow
More informationThe Legal Obligations of Employers to Maintain all Electrical Installations in a Safe Condition
The Legal Obligations of Employers to Maintain all Electrical Installations in a Safe Condition Issued in the interests of safety by The Legal Obligations of Employers to Maintain all Electrical Installations
More informationAS/NZS :2014. Electrical equipment for coal mines Introduction, inspection and maintenance AS/NZS :2014. Part 1: For hazardous areas
AS/NZS 2290.1:2014 Australian/New Zealand Standard Electrical equipment for coal mines Introduction, inspection and maintenance Part 1: For hazardous areas Superseding AS/NZS 2290.1:2005 AS/NZS 2290.1:2014
More informationEmergency Response Plan
Emergency Response Plan Developing an Emergency Response Plan As a practice owner, you likely already have some form of an emergency response plan developed for your practice. Our desire here is to guide
More informationReplacing a consumer unit in domestic premises where lighting circuits have no protective conductor
Replacing a in domestic premises where lighting circuits have no protective conductor This is one of a series of Best Practice Guides produced by the Electrical Safety Council* in association with leading
More informationAllfire Site No. a division of Allsaved Ltd. Fire Safety Log Book. Premises Address: Responsible Person:
Site No. a division of Allsaved Ltd. Fire Safety Log Book Premises Address: Responsible Person: Introduction An Introduction to Your Fire Safety Log Book The Regulatory Reform (Fire Safety) Order 2005
More informationElectrical Safety Tips. Help us keep you safe.
Electrical Safety Tips. Help us keep you safe. To help you stay safe when using electricity, Evoenergy has compiled these electrical safety tips. For natural gas safety tips please see Evoenergy s natural
More informationTroy's Home Inspection Services LLC
Cover Page Property Inspection Report 33706 Inspection prepared for: Cord King & Patricia King Real Estate Agent: Jane Freel - RE/MA Date of Inspection: 3/4/2017 Time: 8:30 Age of Home: 2008 Size: 3279
More informationNeil Hewitt Electrical & Air Conditioning P/L
VISUAL SAFETY EXAMINATION / INSPECTION CHECKLIST Examination / inspection checklist Customer:... Date:... Address:... Phone:...... Mobile:... Contact:... Inspection Activity Yes No NA General Basic protection
More informationElectrical Safety Program
Electrical Safety Program Developed by: The Office of Environmental Health and Safety June, 2010 Table of Contents Introduction 3 Scope..3 Definitions.3-5 CSU Electrical Shop...5 Responsibilities.5-6 Employees.....5
More informationElectrical Safety Requirements
Electrical Safety Requirements Purpose This document defines the minimum required control measures to reduce the risk of injury or illness related to electricity. Scope Applicable to all Coca-Cola system
More informationElectrical Safety Program
Electrical Safety Program How Electricity Works Operating an electric switch is like turning on a water faucet. Behind the faucet or switch there must be a source of water or electricity with something
More informationEMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations
A DETAILS OF THE CLIENT Client/ B DETAILS OF THE EMERGENCY LIGHTING INSTALLATION Extent of the installation covered by this certificate The Owner 19 Walker Grove, Hatfield, Hertfordshire 19 Walker Grove,
More informationNFPA Fire Inspector I Study Guide
NFPA 1031-2003 Fire Inspector I Study Guide National Certification Program October 2004 This document is provided This document at no cost is provided to the user at no by cost Kansas to the user Fire
More informationFIRE ALARMS EMERGENCY LIGHTS NURSE CALL ACCESS CONTROL GK FIRE & SECURITY LTD, UNIT 1 GREBE RD, PRIORSWOOD IND EST, TAUNTON, TA2 8PZ
BS5839-1 : 2013 FIRE ALARMS EMERGENCY LIGHTS NURSE CALL ACCESS CONTROL Forward It is recommended that this logbook be maintained by a relevant member of the premises management, to ensure that every entry
More informationCO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE
CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.017 Version 2 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group
More informationREGULATED QUALIFICATIONS FRAMEWORK (RQF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION
REGULATED QUALIFICATIONS FRAMEWORK (RQF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION LEVEL 4 CERTIFICATE IN GAS SAFETY MANAGEMENT IN SOCIAL HOUSING (601/1725/4) 1.0 Area and scope of
More informationNECA S System Approach to Electrical Safety for NFPA 70E
NECA S System Approach to Electrical Safety for NFPA 70E NECA s Systems Approach to NFPA 70E Easy to understand NFPA 70E employer requirements, Provides Supervisors with key on the job information, De
More informationSEMPEO SQA Unit Code H02H 04 Wiring electrical equipment and circuits
Overview This standard covers a range of basic competences that you need to wire up electrical equipment and circuits. It will prepare you for entry into the engineering or manufacturing sectors, creating
More informationTampa, FL Fire Cause Classification Task Group Tue, 14 April 2011
Fire Cause Classification Tampa, FL Tue, 12 April 2011 Proposals: CP2 - Chapter 19 (New 19 is a portion of old 19) CP3 - Chapter 20 (New 20 is the remainder of old 19) CP4-2 definitions in Chapter 3, as
More informationNZQA registered unit standard version 1 Page 1 of 5. Install fixed gas detection apparatus in hazardous areas
Page 1 of 5 Title Install fixed gas detection apparatus in hazardous areas Level 4 Credits 2 Purpose This unit standard covers the installation, calibration, and response checking of fixed gas detection
More informationFor the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems
BAFE Scheme: SP203-1 Version 5: May 2011 Fire Protection Industry Scheme, Reference SP203 Part 1 For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems British
More informationTo: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard
SOCIAL ACCOUNTABILITY ACCREDITATION SERVICES To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard Background: After an
More informationSECTION SECURITY TESTING AND COMMISSIONING
SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,
More informationA Communications Cable Supervisor is responsible for laying out,
1-6-84 ASSISTANT COMMUNICATIONS CABLE WORKER, 3808 COMMUNICATIONS CABLE WORKER, 3802 SENIOR COMMUNICATIONS CABLE WORKER, 3801 COMMUNICATIONS CABLE SUPERVISOR, 3800 Summary of Duties : Assists in the installation,
More informationMinimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016
1. Introduction The intent of this document is to establish minimum standards for the practice of fire protection engineering within the State of Oklahoma as conducted by licensed professional engineers.
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC
More informationPART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...
CONTENTS Schedule of amendments for this part of the scheme document Page 1 of 14 3-O Introduction...3 3-O.1 Scope of Maintenance and Supervision...3 3-O.2 Certification conditions...5 3-O.3 LPS 1233 Service
More informationSELECTION, INSTALLATION & TESTING OF ELECTRICAL EQUIPMENTS IN HAZARDOUS AREA
Training Title SELECTION, INSTALLATION & TESTING OF ELECTRICAL EQUIPMENTS IN HAZARDOUS AREA Training Duration 5 days Training Venue and Dates REF EE019 Selection, Installation & Testing of Electrical Equipments
More informationPREMISES FIRE SAFETY LOGBOOK
0844 740 3473 PREMISES FIRE SAFETY LOGBOOK PREMISES ADDRESS: LOG BOOK TO BE KEPT IN THIS LOCATION: AN INTRODUCTION TO YOUR LOG BOOK. The Regulatory Reform (Fire Safety) Order 2005 (FSO) requires that the
More informationFIRE & LIFE SAFTEY STANDARD
Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications
More informationINSPECTION AND TESTING OF ELECTRICAL INSTALLATIONS: RESIDUAL CURRENT DEVICES
INSPECTION AND TESTING OF ELECTRICAL INSTALLATIONS: RESIDUAL CURRENT DEVICES [The basis of this article was first published in Wiring Matters in issue 15, Summer 2005 and reflected the requirements of
More informationNFPA 70E Edition Update
NFPA 70E- 2018 Edition Update Paul Colangelo- STSC, CHST, CET, CRIS National Director of Compliance Programs ClickSafety 1 ASSE Construction Practice Specialty Quarterly Meeting 11/17/2017 Agenda Overview
More informationUnderstanding and implementing an electrical safety regime in your organisation. Dispelling the myths and promoting a risk-based approach
Understanding and implementing an electrical safety regime in your organisation Dispelling the myths and promoting a risk-based approach Presented by: Richard Slade Who are we? Market leaders in the manufacture
More informationInformation for persons seeking acceptance as Independent Qualified Persons (IQP)
Information for persons seeking acceptance as Independent Qualified Persons (IQP) The Manawatu District Council and Palmerston North City Council are required to determine that Independent Qualified Persons
More informationDR J H BURGOYNE AND PARTNERS LLP FORENSIC SERVICES
DR J H BURGOYNE AND PARTNERS LLP FORENSIC SERVICES ROSEPARK CARE HOME Investigation of the cause of the Fire on 31 January 2004 POLICE CONTACTED BURGOYNES Initial contact, evening of Saturday 31 January
More information(1135/2016) Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland
Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland Electrical Safety Act (1135/2016) By decision of Parliament, the following is enacted:
More informationSpa Control System OWNER S MANUAL
LIMITED WARRANTY ONE YEAR LIMITED WARRANTY: UNITED SPAS, INC. warrants, to the original purchaser, the Spa Equipment against defects in materials or workmanship for a period of one year from date of purchase.
More information7903 Allison Way Arvada CO fax JOB DESCRIPTION
7903 Allison Way Arvada CO 80005 303-424-3012 303-432-7995 fax JOB DESCRIPTION Position: Fire Inspector Supervisor: Code Compliance & Investigation Manager-Deputy Fire Marshal Division: Life Safety Division
More informationSafety Systems Review Retail Guidance and specification Version
Systems Review Retail Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Systems Review 1 1 Specification for Systems
More informationFIRE SAFETY LOGBOOK PREMISES ADDRESS: LOG BOOK TO BE KEPT IN THIS LOCATION: DSFRS Log book Version 1.0 (October 2007)
FIRE SAFETY LOGBOOK PREMISES ADDRESS: LOG BOOK TO BE KEPT IN THIS LOCATION: AN INTRODUCTION TO YOUR LOG BOOK. This Fire Safety Log book has been prepared to assist the responsible person in coordinating
More information2.8KW ELECTRIC FAN HEATER
2.8KW ELECTRIC FAN HEATER MODEL NO: DEVIL 2800 PART NO: 6925800 OPERATION & MAINTENANCE INSTRUCTIONS ORIGINAL INSTRUCTIONS GC0817 INTRODUCTION Thank you for purchasing this CLARKE product. Before attempting
More information.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code