1 The Home Depot Quality System Audit * Example Report * North America Latin America Europe & Middle-East Asia & Asia Pacific India info@proqc.com

2 Presentation Rev. Dear lient, Pro Q International was engaged to help factory XXXXXXX comply with The Home Depot Supplier Requirements. The Home Depot was planning to audit the factory and the goal of this engagement was to ensure that the factory passed the rd party audit and became an approved supplier to The Home Depot. Pro Q started this project in July 18, 2017, by conducting an Initial Evaluation based on The Home Depot Quality System Assessment requirements at supplier XXXXXXXXXXXX. The scope of the initial assessment covered following: hapter 1: Product Finish ontrol hapter 2: Paint ompliance hapter : Packaging Assessment hapter 4: Quality System Assessment The rd page of this document, Initial Audit Summary, provides the results of the Initial Assessment, with level of compliance for each hapter. The green bar shows the level of compliance with the requirement while the yellow and red bar show the level of incompleteness and non-compliance with the requirement respectively. On August 1, 217, Pro Q established a orrective Plan in sheet orrective Plan Follow- Up based on the findings of the Initial Assessment conducted on Juy 18, The sheet presents 1 violations, each describing the content of the Violation, including the corresponding elements of The Home Depot's requirement, a proposed orrective, target date to complete the corrective action and actual date of completion. The orrective Plan was presented to representative members at the factory XXXXXX. Since the factory did not have any knowledge about the requirements of The Home Depot, it was clear that the project leader at Pro Q International would have to lead them with coaching, preparation of documentation, training and monitoring. The page Documentation is the list of documents Pro Q developed and provided to the factory as foundation for the system. In total 12 policies, 8 procedures and around record templates were developed during the phase of coaching. The project was completed in 6 visits to the factory XXXXXX, each visit had an update of the current level of completion as described in the page AP Progress. Photos of evidence of completion were also added under Photo. On August 0, 2017, 2 month after beginning, Pro Q International completed corrective action for 1 violations, around 100% of open violations. Pro Q also conducted a pre-audit to ensure that all members at the factory were ready to receive the final audit from a designated rd party audit firm. The factory XXXXXX was audited by a rd part audit firm and got a score of 87% which is sufficient for the factory XXXXXX to become an approved supplier for The Home Depot. The Home Depot QSA 2/49

3 Initial Audit Summary Rev. 1 Supplier Name Audit Date Report No. 2017//9 XXXXXXXXX SUPPLIER'S INFORMATION LIENT'S INFORMATION NAME : XXXXXXXX NAME : XXXXXXXX ADDRESS : XXXXXXXX ADDRESS : XXXXXXXX XXXXXXXX XXXXXXXX IT : XXXXXXXX IT : XXXXXXXX OUNTR : XXXXXXXX OUNTR : XXXXXXXX PHONE : XXXXXXXX PHONE : XXXXXXXX FAX : XXXXXXXX FAX : XXXXXXXX SUPPLIER'S PERSONNEL PARTIIPATING Mr./Mrs. XXXXXXXXXXXXXXXX Title: XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX Mr./Mrs. XXXXXXXXXXXXXXXX Title: XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX Pro Q PERSONNEL Mr./Mrs. XXXXXXXXXXXXXXXX Title: XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX AUDIT RESULTS I N PRODUT QUALIT FINISH SSTEM ONTROL ASS 0.00% 25.00% 75.00% PAKAGING ASSES 16.67% 16.67% 66.67% PAINT OMPLIA 25.00% 12.50% 62.50% PRODUT FINISH O 16.67% 0.00% 8.% PAINT OMPLIANE PAKAGING ASSESSMENT QUALIT SSTEM ASSESSMENT 0.00% 10.00% 20.00% 0.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% % I N REOMMENDATIONS Systems are effective, you could start or continue business with this supplier System is acceptable, with minor nonconformities, you could use this supplier, and keep pushing them to improve it. System has some major issue, you could temporaly use this supplier and request immediate corrective action in case of long term business. There are serious major issue in this supplier that could impact in your business The better solution will be to source for another supplier The Home Depot QSA /49

4 The Home Depot ompliance orrective Plan Progress PRO-02 The Home Depot QSA ompliance Job Number Visit Date Auditor's name Open NF losed NF % Man-days XXXXXXXXXXXX Aug, 1 XXXXXXXXXXXX Aug, XXXXXXXXXXXX Aug, 8 XXXXXXXXXXXX Aug, 1 XXXXXXXXXXXX Aug, 16 XXXXXXXXXXXX Aug, 25 XXXXXX % 2 XXXXXX % 2 XXXXXX % 2 XXXXXX % 2 XXXXXX % 4 XXXXXX % 4 100% 90% 80% 70% 60% 50% 40% 0% 20% 10% 0% Aug, 1 Aug, Aug, 8 Aug, 1 Aug, 16 Aug, 25 losed NF Open NF The Home Depot QSA 4/49

5 Documentation Rev. 1 Supplier Name Audit Date Report No. 2017//9 XXXXXXXXX A= Policy & Regulation; B = Procedure; = Record Template ategory Name English Name hinese A Quality Manual 质量手册 A Decomposition and evaluation of quality policy and goal 质量方针与目标的分解与测评 A ontinuous improvement Team organization hart 持续改善小组组织结构图 A Inspection Standard(IQ, IPQ, FQ) 检验标准 ( IQ, IPQ, FQ) A ISTA1 Testing Standard ISTA1 测试标准 A Packing material Inspection Specification 包装材料的检验规范 A THD Packing SBA 家得宝包装 SBA A Standard about the Lead content of Oil paint(16 cfr 10) 有关油漆铅含量的标准 ( 如 16 cfr 10) A Quality Management Responsibility 质量管理体系 / 控制关键人员职责 A Factory Organization hart 公司组织架构图 A Quality Organization hart 品管组织架构图 A SP 检验数据统计与分析记录 B Document ontrol Procedure 文件控制程序 B Recording ontrol Procedure 记录的控制程序 B Management Review Procedure 管理评审程序 B Human resource Management Procedure 人力资源管理程序 B Production facility configuration and management and work environment contr生产设施的配置和管理及工作环境控制程序 B Product realization planning control Procedure 产品实现的策划控制程序 B ontrol procedure relating to customer processes 与顾客有关的过程的控制程序 B Design and development control Procedure 设计和开发控制程序 B Procurement control Procedure 采购控制程序 B Production and service provision of control and confirmation Procedure 生产和服务提供的控制和确认程序 B ustomer property management Procedure 顾客财产管理程序 B Product protection Procedure 产品防护程序 B Monitoring and measuring device control Procedure 监视和测量装置的控制程序 B ustomer satisfaction measurement Procedure 顾客满意度的测量程序 B Internal audit Procedure 内部审核程序 B Product monitoring and measurement Procedure 产品的监视和测量程序 B Nonconforming product control Procedure 不合格品控制程序 B Data analysis and control Procedure 数据分析控制程序 B orrective and preventive measures control Procedure 纠正和预防措施控制程序 B SOP for each process 各工序包括包装的作业指导书 / 规格要求 B ustomer complaint handling Procedure 客户投诉处理程序 B ontinuous improvement procedure 持续改进制度 B EN procedure 工程变更程序 B Supplier Management and review Procedure 供应商管理评审程序 B Equipment calibration Procedure 仪器设备校验程序 B Equipment maintenance Procedure 设备维修保养程序 B Packaging material sample management system 包材样品管理制度 B olor printing package color plate to retain the provisions of the update 彩印类包材色板的更新保留规定 B Loading Procedure 装柜程序 B Paint process control management system 油漆过程的控制管理制度 B In-coming Appearance color Inspection Specification 进料外观颜色检查管理制度 B Porcess Appearance color Inspection Specification 过程外观颜色检查管理制度 B Final Appearance color Inspection Specification 成品外观颜色检查管理制度 B Light boxes, color cards and other management system 灯箱, 色卡等管理制度 B Swatch color sample update management system 色板色样更新等管理制度 B Wood products storage and workplace management regulations 木制品存放及工作场所的管理规定 B Pest control Procedure 虫鼠控制程序 B Traceability program for wood products 木制品的追溯性程序 Management review Record 管理评审记录 Internal Audit Record 内部质量审核记录 /N The Home Depot QSA 5/49

6 Documentation Rev. 1 Supplier Name Audit Date Report No. 2017//9 XXXXXXXXX ategory Internal audit failed report ustomer complaint handling Record ontrolled list of documents EN record Supplier review Record Equipment maintenance Plan Equipment maintenance Record Package-like packing list Loading record Swatch color sample list Pest control Record Traceability record for wood products Moisture detection records A= Policy & Regulation; B = Procedure; = Record Template Name English Document delivery, change, destruction records ontinuous improvement Record(5S, Q, training etc.) Training Record Production lead time Record Inspection record of First sample piece New product development record BOM Sheet Material Procurement ontract (ontains THD Requirements) Inspection Record(IQ, IPQ, FQ) SP Record Measuring instrument alibration Plan Nonconforming product handling Record Shorten the production cycle plan orrective and preventive Record ISTA1 Testing Record Inspection record of package material Exterior color inspection inspector training and assessment records Name hinese 内部审核不合格项报告客户投诉处理记录受控文件清单文件收发, 变更, 销毁记录持续改进记录 ( 如 5S, Q, 培训等 ) 培训记录出货交期记录首件样品检查记录新产品开发记录 BOM 表工程变更记录供应商评审记录材料采购合同 ( 包含 THD 要求规定 ) 检验记录 ( IQ, IPQ, FQ) 检验数据统计与分析记录计量仪器校准计划设备维修保养计划设备维修保养记录不良品处理记录缩短生产周期计划纠正预防记录 ISTA1 测试记录包装材料的检验记录包材封样的清单装柜记录外观颜色检查检验员的培训和考核记录色板色样清单虫鼠控制记录木制品的追溯性记录水分检测记录 /N The Home Depot QSA 6/49

7 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 1 Section 2: ontinuous Improvement Facility had tracked production plan to check if it was finished on time, but the production lead time was not measured and lead time reduction plan was not feasible. Section 2: ontinuous Improvement Requirements A07 1.heck the real deadline 2.Develop a lead time reduction plan then put it into effect.train the related workers The facility has set up realistic lead time reduction plan; implements the plan with records. XXXXXXX 25-Aug-17 lose The Home Depot QSA 7/49

8 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 2 Section 2: ontinuous Improvement Training had been provided for staff according to training plan but was not sufficient nor implemented effectively. For example: 1) Facility representative claimed that oral training had been provided for operators about AR/I activities, but relevant training records were not available. Train related staff on this issue losed since August 0. The facility has trained the operators about AR/I activities and line stoppage rules, and maintained the records. XXXXXXX 0-Aug-17 lose Section 2: ontinuous Improvement Requirements A09 The Home Depot QSA 8/49

9 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved Section : Quality System 2) Facility representative claimed that oral training had been provided for operators about line stoppage rules when defective materials were identified, but relevant training records were not available. Section : Quality System Requirements A16 Train the related staff on this issue losed since August 0. The facility has trained the operators about AR/I activities and line stoppage rules, and maintained the records. XXXXXXX 0-Aug-17 lose The Home Depot QSA 9/49

10 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 4 Section 4: Purchasing Approval assessment was not conducted for some key suppliers (e.g. password lock supplier: bojiaya etc.).(p) Section 4: Purchasing Requirements A20 1. Assess the supplier immediately 2.Train the related staff losed since August 15. The facility has conducted the approval assessment for the password lock supplier bojiaya. XXXXXXX 15-Aug-17 lose The Home Depot QSA 10/49

11 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 5 Section 4: Purchasing 1) Inspection standard was not established for some incoming materials (e.g. flannelette and plasterboard etc.). 2) AQL defined for all inspection items of password lock was 1.0, but IQ used AQL(2.5) to inspect the appearance of password lock. (P) 1. Develop the incoming inspection rules on carpet and fireboard; unified the sampling standard on e-lock 2. Train the related staff The facility has established the inspection standard for flannelette and plasterboard. In addition, the facility has trained the IQ employees about AQL, and maintained the record. XXXXXXX 0-Aug-17 lose Section 4: Purchasing Requirements A21 The Home Depot QSA 11/49

12 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 6 Section 4: Purchasing D - Paint ompliance Ongoing performance assessment based on the quality, on time delivery and service etc. was not conducted for some suppliers (e.g. password lock supplier: bojiaya and screen printing supplier: lashing etc.).(p) Section 4: Purchasing Requirements A22 D - Paint ompliance Requirements D11 1.Assemble the supplier of e-lock and silkscreen on service etc. and annual assemble 2.Train the related staff losed since August 15. The facility has conducted ongoing performance assessments for some suppliers (e.g. password lock supplier: bojiaya and screen printing supplier: lashing etc.). XXXXXXX 15-Aug-17 lose The Home Depot QSA 12/49

13 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 7 Section 4: Purchasing Some key suppliers (e.g. password lock supplier: bojiaya etc.) were not registered in approved supplier list.(p) Section 4: Purchasing Requirements A2 1.Assemble the supplier was mentioned, if it was passed, list it in supplier list. 2.Train the related staff to identify the supplier. Some key suppliers (e.g. password lock supplier: bojiaya etc.) have been registered in approval supplier list. XXXXXXX 25-Aug-17 lose 8 Section 4: Purchasing Facility representative claimed that process/product change would be informed by suppliers and facility also would communicate the change with customers and get approval, but relevant implementation records were not available. (P) Section 4: Purchasing Requirements A25 1. Explain to the supplier that if they need to change the product, they should notify the facility first 2. Train the related staff. Purchasing dept. should received the change letter from suppliers The facility has updated the purchasing process. Records available prove EN process is effectively followed. XXXXXXX 25-Aug-17 lose The Home Depot QSA 1/49

14 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 9 Section 4: Purchasing Some incoming steel plates and flannelettes etc. stored in warehouse were not identified with necessary information (e.g. PO/batch number, quantity, incoming date and inspection status etc.) to ensure the traceability. Section 4: Purchasing Requirements A26 1.Mark the steel and carpet with labels 2.Train the related staff Some incoming steel plates and flannelettes etc. stored in warehouse have been identified with necessary information (e.g. PO/batch number, quantity, incoming date and inspection status etc.) to ensure traceability. XXXXXXX 10-Jul-17 lose The Home Depot QSA 14/49

15 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 10 Section 5: Inspection and test- Process ontrol Most operating parameters of necessary production processes were well controlled by facility, but the line speed of the powder coating process and the shot blasting time of the shot blasting process etc. were not effectively monitored and relevant monitoring records were not properly documented. Section 5: Inspection and test- Process ontrol Requirements A0 1.The group leader should supervise the records 2.Train the staff on importance of the data losed since August 15.The line speed of powder coating process and shot blasting time of shot blasting process etc. have been effectively monitored and relevant monitoring records were properly documented. The facility used the document to record the first product and confirmed. XXXXXXX 15-Aug-17 lose The Home Depot QSA 15/49

16 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 11 Section 5: Inspection and test- Process ontrol Most finished goods stored in warehouse were not identified with necessary information (e.g. order number, quantity, production date and inspection status etc.) to ensure traceability. Section 5: Inspection and test- Process ontrol Requirements A6 1.Mark the goods in warehouse immediately 2.Train the staff to use the correct labels to identify the goods. All finished goods stored in warehouse have been identified with necessary information (e.g. order number, quantity, production date and inspection status etc.) to ensure traceability. XXXXXXX 25-Aug-17 lose The Home Depot QSA 16/49

17 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 12 Section 5: Inspection and test- Process ontrol IPQ had conducted in-process inspection for all production processes, but some inspection records were not properly documented, for example: 1) In-process inspection records were not properly documented for assembling process. 2) In-process inspection records were not properly documented for metal working process on the auditing day. 1.heck again everyday by group leader and keep records 2.Train the inspectors The facility has set up documented inspection records for assembling process and metal working process, and started to maintain records. XXXXXXX 0-Aug-17 lose Section 5: Inspection and test- Process ontrol Requirements A42 The Home Depot QSA 17/49

18 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 1 Section 6: ontrol of Test equipment E - Product Finish ontrol Some measuring equipment (e.g. micrometer: serial number and light box etc.) was not calibrated and relevant calibration certificates were not available. Section 6: ontrol of Test equipment Requirements A46 E - Product Finish ontrol Requirements E08 1.alibrate the micrometer and light box immediately 2.Train the staff The facility has obtained the calibration certificate of the micrometer. XXXXXXX 0-Aug-17 lose The Home Depot QSA 18/49

19 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 14 Section 6: ontrol of Test equipment Facility representative claimed preventative maintenance had been conducted for the measuring equipment and most of them ran in a good condition, but relevant preventative maintenance records were not properly documented. Section 6: ontrol of Test equipment Requirements A48 1.Perform preventative maintenance on the equipment mentioned and keep records 2.Train the staff The facility developed the annual equipment preventative maintenance plan. Moreover the preventative maintenance records have been properly documented. XXXXXXX 0-Aug-17 lose The Home Depot QSA 19/49

20 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 15 Section 7: ontrol of Nonconforming Product Some non-conforming and/or idle finished goods were not identified and yet they were stored together with good ones in finished goods warehouse. Section 7: ontrol of Nonconforming Product Requirements A49 1.Settle the non-conforming goods and mark the clearly 2.Train the staff losed August 0. The facility has developed rules for the storage of the non-conforming goods and idle finished goods have been identified and distinguished from good ones. XXXXXXX 0-Aug-17 lose 16 Section 8: orrective and preventive orrective and preventive action was not conducted for all rejected key incoming materials (e.g. electric magnet etc.) and relevant records were not available. Section 8: orrective and preventive Requirements A54 1.Fill in the corrective and preventive action document for electric magnets as the process requires, and confirm by facility 2.Train the staff APAs for electric magnet have been documented and records are available. XXXXXXX 20-Jun-17 lose The Home Depot QSA 20/49

21 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 17 Section 10: Handling, Storage, Packaging, & Delivery Some WIPs of shelf manufacturing process and metal working process which were stored in workshop were not identified with necessary information (e.g. order number, production stage, quantity and production time etc.). Section 10: Handling, Storage, Packaging, & Delivery Requirements A61 1.Identify the process label immediately 2.Train the staff The WIPs of shelf manufacturing process and metal working process which were stored in workshop have been identified with necessary information (e.g. order number, production stage, quantity and production time etc.). The facility checked them by 5S. XXXXXXX 0-Aug-17 lose The Home Depot QSA 21/49

22 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 18 Section 10: Handling, Storage, Packaging, & Delivery Most WIPs of shelf manufacturing process, some WIPs of assembling process and finished goods were found stored directly on the floor in the workshop and without effective protection measures. Section 10: Handling, Storage, Packaging, & Delivery Requirements A62 1.Use a carpet or canvas on the floor immediately 2.Ruled it as a process.train the staff losed since August 15. All semi finished goods and finished goods has been stored on the carpet or canvas and with effective protection measures. XXXXXXX 15-Aug-17 lose The Home Depot QSA 22/49

23 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 19 Section 2 packaging quality control capability Packaging material inspection specifications were established, but which only had the material test requirement and didn t contain the performance test requirements. Section 2 packaging quality control capability Requirements B04 1.Inspect the cartons via a performance test 2.Train the staff. Study the HD s requirements deeply The facility has updated the inspection process and added the performance test in. XXXXXXX 25-Aug-17 lose 20 Section 2 packaging quality control capability Standard samples of packaging structure (e.g. corrugated board of master carton etc.) were not established by facility. Section 2 packaging quality control capability Requirements B06 1.Get the standard samples of packaging structure 2.ensure the sample load in good environment and marked.study the HD s requirements deeply The facility has established the standard samples of packaging structure(e.g. corrugated board of master carton etc.). XXXXXXX 25-Aug-17 lose The Home Depot QSA 2/49

24 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 21 Section 2 packaging quality control capability Renewing plan was not established for color standards of packaging materials and also relevant renewing actions were not conducted. Section 2 packaging quality control capability Requirements B10 1.set up the sample form and ensure each item. 2.Study the HD s requirements deeply. losed since 0. The facility has renewed plan for color standards of packaging materials and conducted the relevant renewing action. XXXXXXX 0-Aug-17 lose 22 Section 2 packaging quality control capability Facility didn t know any about THD packaging requirements (e.g. Supplier Reference Guide etc.). Section 2 packaging quality control capability Requirements B11 1.Meet THD packing requirements 2.Train the staff base on SRG.Study the HD s requirements deeply The facility has arranged training about THD packaging requirements for all relevant employees and management and maintained the training record. XXXXXXX 0-Aug-17 lose The Home Depot QSA 24/49

25 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 2 D - Paint ompliance Lead content requirement was not set for each individual incoming paint color (e.g. coating powder etc.) and each kind of incoming painted components (e.g. screen printing products etc.). (P) D - Paint ompliance Requirements D02/D10 Update the purchase order with color/ item and component losed since August 0. The facility has updated the purchase order with color/ item and component, and the lead content requirement has been set. XXXXXXX 0-Aug-17 lose The Home Depot QSA 25/49

26 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 24 D - Paint ompliance IQ just carried out random lead content verification for the incoming paint color (e.g. coating powder etc.) and incoming painted components (e.g. screen printing products etc.). (P) Doing lead test on the powder and silkscreen Get the lead report from the supplier losed since August 0. The facility has obtained the lead report from the supplier. XXXXXXX 0-Aug-17 lose D - Paint ompliance Requirements D04/D12 The Home Depot QSA 26/49

27 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 25 D - Paint ompliance Production control sheet just defined the color of coating powder used during the production, but which didn't include other information (e.g. supplier/brand name, model#, and lead content information etc.). (P) D - Paint ompliance Requirements D05 hange the production control sheet, list such information (supplier name, model# and lead content) The facility has updated the BOM list, making sure of the power information. Moreover the facility has changed the production control sheet to include other information (e.g. supplier/brand name, model#, and lead content information etc.). XXXXXXX 0-Aug-17 lose The Home Depot QSA 27/49

28 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 26 D - Paint ompliance Workers just checked the color of coating powder before use, but other information (e.g. supplier/brand name, model#, and lead content information etc.) was not verified. D - Paint ompliance Requirements D06 1.Set up the new rules and include all the power information as THD requires. 2.Train the related staff The facility has updated the painting checklist, include the power information. And Inspector verifies the proper paint used against all the information included in the product control sheet. XXXXXXX 0-Aug-17 lose The Home Depot QSA 28/49

29 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 27 D - Paint ompliance Facility just carried out lead content test for finished goods according to customer requirements and lead content sampling test was not set in finished goods inspection standards.(p) D - Paint ompliance Requirements D07/D1 Be certain of THD requirements, do lead content test every 4 months and keep the reports. losed since August 0. The facility has maintained the lead content test report according to THD requirements. Moreover Lead content sampling test was set in Final Quality heck process for every lot. XXXXXXX 0-Aug-17 lose 28 D - Paint ompliance Line clearances have been done for the changing over of the powder coating process, but lead content was not checked for related products after the changing.(p) D - Paint ompliance Requirements D08 Testing THD products more than 5 times each year after changing lines, and keep the reports. losed since August 0. The facility has set up the process document and ensuring to clear the painting lines every time after changing. XXXXXXX 0-Aug-17 lose The Home Depot QSA 29/49

30 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 29 E - Product Finish ontrol Facility had obtained some reference samples to inspect the finish of the materials and products, but necessary facilities (e.g. spectrophotometer or AAT gray scale comparison chart Purchase the gray scale comparison etc.) were not available.(p) chart. losed since August 0. The facility has purchased the AAT gray scale comparison chart. XXXXXXX 0-Aug-17 lose E - Product Finish ontrol Operation and Awareness Requirements E06 The Home Depot QSA 0/49

31 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 0 E - Product Finish ontrol Inspectors had been validated by a Munsell Farnsworth test to ensure that they had enough capabilities to conduct the color visual check, but the score was not below 16. (P) E - Product Finish ontrol Operation and Awareness Requirements E07 Retest the inspectors Update the SOP as required losed since August 0. The facility has trained and retested the inspectors via a Munsell Farnsworth test, and the score of all the inspectors was below 16. XXXXXXX 0-Aug-17 lose The Home Depot QSA 1/49

32 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 1 E - Product Finish ontrol Standard samples just kept by Q and randomly placed at the inspection area. Moreover, no designated area with good condition was established to store the standard samples. E - Product Finish ontrol Sample Management Requirements E10 Designate a special space to store the samples The facility has maintained the standard samples in designated area with good condition. XXXXXXX 0-Aug-17 lose The Home Depot QSA 2/49

33 orrective Plan Follow-Up PRO-02 The Home Depot QSA ompliance orrective : after the visit in orrective lose Date lose=solved 2 E - Product Finish ontrol Renewing plan was not established for reference samples which were used to inspect the surface appearance and color of necessary incoming materials, semi-finished goods and finished goods etc. and also relevant renewing actions were not implemented. E - Product Finish ontrol Sample Management Requirements E11 Marked the sample with item / date and confirmed person, set up the process such as who take the charge of the samples The facility has established the sample renewing plan, and color of necessary incoming materials, semi-finished goods and finished goods etc. and also relevant renewing actions were implemented. XXXXXXX 0-Aug-17 lose The Home Depot QSA /49

34 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction the production lead time was not measured and lead time reduction plan was not feasible. Photo 1-1: Production lead time reduction plan Photo 1-2: Production lead time reduction plan Facility representative claimed that oral trainings had been provided for operators about AR/I activities, but relevant training records were not available. Photo 2-1: Training records Photo 2-2: Training records The Home Depot QSA 4/49

35 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Facility representative claimed that oral trainings had been provided for operators about line stoppage rules when defective materials were identified, but relevant training records were not available. Photo -1: Training records Photo -2: Training records Approval assessment was not conducted for some key suppliers (e.g. password lock supplier: bojiaya etc). Photo 4-1:Approval assessment Record Photo 4-2: Approval assessment Record The Home Depot QSA 5/49

36 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction 1) Inspection standard was not established for some incoming materials (e.g. flannelette and plasterboard etc). 2) AQL defined for all inspection items of password lock was 1.0, but IQ used AQL(2.5) to inspect the appearance of password lock. (P) Photo 5-1: In-coming Inspection standard Photo 5-2: In-coming Inspection standard & inspection records Ongoing performance assessment based on the quality, on time delivery and service etc was not conducted for some suppliers (e.g. password lock supplier: bojiaya and screen printing supplier: lanhong etc). Photo 6-1: Ongoing performance assessment Record Photo 6-2: Ongoing performance assessment Record The Home Depot QSA 6/49

37 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Some key suppliers (e.g. password lock supplier: bojiaya etc) were not registered in approval supplier list.(p) Photo 7-1: Approval supplier list Photo 7-2: Approval supplier list Facility representative claimed that process/product change would be informed by suppliers and facility also would communicate the change with customer and get approval, but relevant implementing records were not available. (P) Photo 8-1: EN processrecord Photo 8-2: EN record The Home Depot QSA 7/49

38 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Some incoming steel plates and flannelettes etc stored in warehouse were not identified with necessary information (e.g. PO/batch number, quantity, incoming date and inspection status etc) to ensure the traceability. Photo 9-1: Identified label of raw materials Photo 9-2: Identified label of raw materials Most operating parameter of necessary production processes were well controlled by facility, but still line speed of powder coating process and shot blasting time of shot blasting process etc were not effectively monitored and relevant monitoring records were not properly documented. Photo 10-1: Production process control record Photo 10-2: Production process control record The Home Depot QSA 8/49

39 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Most finished goods stored in warehouse were not identified with necessary information (e.g. order number, quantity, production date and inspection status etc) to ensure the traceability. Photo 11-1: Identified Label of finished goods Photo 11-2: Identified Label of finished goods 1) In-process inspection records were not properly documented for assembling process. 2) In-process inspection records were not properly documented for metal working process on the auditing day. Photo 12-1: Documented inspection records Photo 12-2: Documented inspection records The Home Depot QSA 9/49

40 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Some measuring equipment (e.g. micrometer: serial number and light box etc) were not calibrated and relevant calibration certificates were not available. Photo 1-1: alibrated plan & calibration certificate Photo 1-2: alibrated plan & calibration certificate Facility representative claimed preventative maintenance had been conducted for the measuring equipment and most of them ran in a good condition, but relevant preventative maintenance records were not properly documented. Photo 14-1: Preventative maintenance records Photo 14-2:Preventative maintenance records The Home Depot QSA 40/49

41 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Some non-conforming and/or idle finished goods were not identified and stored together with good ones in finished goods warehouse. Photo 15-1: Identify the idle finished goods Photo 15-2: Identify the idle finished goods orrective and preventive action was not conducted for all rejected key incoming materials (e.g. electric magnet etc) and relevant records were not available. Photo 16-1: orrective and preventive action Photo 16-2: orrective and preventive action The Home Depot QSA 41/49

42 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Some WIPs of shelf manufacturing process and metal working process which were stored in workshop were not identified with necessary information (e.g. order number, production stage, quantity and production time etc). Photo 17-1: Identified label of WIP of shelf manufacturing process Photo 17-2: Identified label of WIP of shelf manufacturing process Most WIPs of shelf manufacturing process, some WIPs of assembling process and finished goods were found stored on the floor directly in workshop and without effective protection measures. Photo 18-1: Stored without effective protection measures Photo 18-2: Stored with effective protection measures The Home Depot QSA 42/49

43 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Packaging material inspection specifications were established, but which only had the material test requirement and didn t contain the performance test requirements. Photo 19-1: Packaging material inspection requiremen Photo 19-2: Packaging material inspection requirement Standard samples of packaging structure (e.g. corrugated board of master carton etc) were not established by facility. Photo 20-1: Standard samples of packaging structure Photo 20-2: Standard samples of packaging structure The Home Depot QSA 4/49

44 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Renewing plan was not established for color standards of packaging materials and also relevant renewing actions were not conducted. Photo 21-1: Renewing plan and action Photo 21-2: Renewing plan and action Facility didn t know any about THD packaging requirements (e.g. Supplier Reference Guide etc). Photo 22-1: THD packaging requirements Photo 22-2: THD packaging requirements and training The Home Depot QSA 44/49

45 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Lead content requirement was not set for each individual incoming paint color (e.g. coating powder etc) and each kind of incoming painted components (e.g. screen printing products etc). (P) Photo 2-1: Lead content requirement Photo 2-2: update purchase order and BOM IQ just carried out random lead content verification for the incoming paint color (e.g. coating powder etc) and incoming painted components (e.g. screen printing products etc). (P) Photo 24-1: the lead report Photo 24-2: the lead report The Home Depot QSA 45/49

46 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Production control sheet just defined the color of coating powder used during the production, but which didn't include other information (e.g. supplier/brand name, model#, and lead content information etc). (P) Photo 25-1: Production control sheet Photo 25-2: Production control sheet Workers just checked the color of coating powder before the using, but other information (e.g. supplier/brand name, model#, and lead content information etc) were not verified. Photo 26-1: Verify the lead content information Photo 26-2: Verify the lead content information The Home Depot QSA 46/49

47 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Facility just carried out lead content test for finished goods according to customer requirements and lead content sampling test was not set in finished goods inspection standards.(p) Photo 27-1: lead content sampling test documented Photo 27-2: lead content sampling test documented Line clearances had been done for changing over of powder coating process, but lead content was not checked for related products after the changing.(p) Photo 28-1: lead content checked record Photo 28-2: lead content checked record and SOP The Home Depot QSA 47/49

48 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Facility had obtained some reference samples to inspect the finish of the materials and products, but necessity facilities (e.g. spectrophotometer or AAT gray scale comparison chart etc) were not available.(p) Photo 29-1: AAT gray scale Photo 29-2: AAT gray scale Inspectors had been validated by Munsell Farnsworth test to ensure that they had enough capabilities to conduct the color visually checking, but the scoring was not below the16. (P) Photo 0-1: onduct the color visually checking for inspectors Photo 0-2: onduct the color visually checking for inspectors The Home Depot QSA 48/49

49 Photo Evidence PRO-02 The Home Depot QSA om How is was before How it became after correction Standard samples just kept by Q and randomly placed at the inspection area. Moreover, no designated area with good condition was established to store the standard samples. Photo 1-1: standard samples area Photo 1-2: standard samples area Renewing plan was not established for reference samples which were used to inspect the surface appearance and color of necessary incoming materials, semi-finished goods and finished goods etc and also relevant renewing actions were not implemented. Photo 2-1:Renewing plan Photo 2-2: Renewing plan and Standard sample managementprocedure The Home Depot QSA 49/49

说明书 澳大利亚 ARTUSI KH90A-F1N160 薛孝田 印刷说明 : 2.. 此印刷品自 起开始实施 3. 此印刷品最终成品大小为 A4 纸一半大小 4. 此印刷品黑白印刷 5. 此印刷品要求字迹清晰 不能有漏印 错印 模糊现象 客户名称 产品型号 会签 型号经理

说明书 澳大利亚 ARTUSI KH90A-F1N160 薛孝田 印刷说明 : 2.. 此印刷品自 起开始实施 3. 此印刷品最终成品大小为 A4 纸一半大小 4. 此印刷品黑白印刷 5. 此印刷品要求字迹清晰 不能有漏印 错印 模糊现象 客户名称 产品型号 会签 型号经理 说明书 客户名称 澳大利亚 ARTUSI 设计 于丽 产品型号 KH90A-F1N160 会签 型号经理 业务经理 薛孝田 会签 电气工程师 设计时间 2014.10.29 审核 版次 03 批准 印刷说明 : 1. 此印刷品专用号 Cod:0103080351 2.. 此印刷品自 起开始实施 3. 此印刷品最终成品大小为 A4 纸一半大小 4. 此印刷品黑白印刷 5. 此印刷品要求字迹清晰 不能有漏印

More information

Rosemount 214C Sensor. Quick Start Guide , Rev BB March 2019

Rosemount 214C Sensor. Quick Start Guide , Rev BB March 2019 Rosemount 214C Sensor 00825-0400-2654, Rev BB Safety Messages NOTICE This guide provides basic guidelines for Rosemount 214C Sensor models.if the sensor was ordered assembled to a temperature thermowell

More information

LEC TF55207W(CE-BCD275WM-SQ) 重量 (g) WEIGHT. 比例 scale 第页 NO. OF SHEETS

LEC TF55207W(CE-BCD275WM-SQ) 重量 (g) WEIGHT. 比例 scale 第页 NO. OF SHEETS 设计 DESIGN 校对 CO.BY 林芳芳图纸名称 PART NAME 2017.04.27 LEC TF55207W(CE-BCD275WM-SQ) 蒋卨敏说明书 图号 / 物料编码 PART NO. 1111 标准化 STANDARD 业务 seller 许岩 图样标记 REL 版本号 REV.NO. 重量 (g) WEIGHT 比例 scale 材料 MATERIAL 80g 双胶纸 批准

More information

A New Generation of Active Intrusion Detection System for Physical Protection

A New Generation of Active Intrusion Detection System for Physical Protection A New Generation of Active Intrusion Detection System for Physical Protection Yuan Zhe Shanghai Nuclear Engineering Research & Design Institute 上海核工程研究设计院 www.snerdi.com.cn 知识产权声明 本文件的知识产权国家电力投资集团公司及其相关产权人所有,

More information

SOLARBOX Models 1500e RH and 3000eRH Accelerated xenon light fastness and weathering test chambers

SOLARBOX Models 1500e RH and 3000eRH Accelerated xenon light fastness and weathering test chambers SOLARBOX Models 1500e RH and 3000eRH Accelerated xenon light fastness and weathering test chambers SOLARBOX 氙灯耐光色牢度和气候加速老化仪 1500e RH 型和 3000e RH 型 The worldwide known SOLARBOXe light fastness testers are

More information

PREVENT ALL INJURIES IN THE KITCHEN. GO HOME SAFE AND HEALTHY.

PREVENT ALL INJURIES IN THE KITCHEN. GO HOME SAFE AND HEALTHY. PREVENT ALL INJURIES IN THE KITCHEN. GO HOME SAFE AND HEALTHY. 防止厨房工伤事故 安全和健康地工作 AGENDA 议程 Company Profile Risk Management Kitchen WSH Best Practices Building & Advancing A Total WSH Culture COMPANY PROFILE

More information

Gas Pipeline Locating Leak detection and Safety Assessment

Gas Pipeline Locating Leak detection and Safety Assessment Gas Pipeline Locating Leak detection and Safety Assessment 天然气管线探测检测新技术及安全评估 Yingjie (Robert)Li,PhD 李英杰 博士 YJ Hiequipment Internationa Co. Wuhan Energy Technology & Engineering Co., Ltd 武汉安耐捷科技工程有限公司 Sensit

More information

TSI FMS Particle Monitoring Applications TSI FMS 在线粒子监控系统的应用. 2008, TSI Incorporated

TSI FMS Particle Monitoring Applications TSI FMS 在线粒子监控系统的应用. 2008, TSI Incorporated TSI FMS Particle Monitoring Applications TSI FMS 在线粒子监控系统的应用 目录 Contents TSI 背景 TSI Background 粒子计数技术 Particle Counting Technology 手持式粒子计数器 Handhelds 便携式粒子计数器 Portables 远程粒子计数器 Remotes 监控系统 Monitoring

More information

LEVEL SENSORS & FLOAT SWITCHES

LEVEL SENSORS & FLOAT SWITCHES SKYWEAL LEVEL SENSORS & FLOAT SWITCHES 直通活塞可调式流量开关 流量设定 : 液体 :3L/m-80L/m 开关接口 :G1/2",G3/4",G1",G1-1/2",G2" 主要结构材质 : 黄铜, 不锈钢设置类型 : 可调式 流量开关 - 直接连接活塞式可调系列 流量设定 : 接口主要结构材质设置类型 3L/m-80L/m G1/2",G3/4",G1",G1-1/2",G2"

More information

Personal Care Appliances in Sweden

Personal Care Appliances in Sweden Personal Care Appliances in Sweden Customer Service Hotline:400-666-1917 Page 1 of 10 一 调研说明中商情报网全新发布的 Personal Care Appliances in Sweden 主要依据国家统计局 国家发改委 商务部 中国海关 国务院发展研究中心 行业协会 工商 税务 海关 国内外相关刊物的基础信息以及行业研究单位等公布和提供的大量资料,

More information

Shaking Peltier Device

Shaking Peltier Device Shaking Peltier Device Integration Manual Biomek 3000 Laboratory Automation Workstation Beckman Coulter PN A36985 Revision AC February 2010 Beckman Coulter, Inc 250 S. Kraemer Blvd., Brea, CA 92821 Copyright

More information

Personal Care Appliances in Thailand

Personal Care Appliances in Thailand Personal Care Appliances in Thailand Customer Service Hotline:400-666-1917 Page 1 of 11 一 调研说明中商情报网全新发布的 Personal Care Appliances in Thailand 主要依据国家统计局 国家发改委 商务部 中国海关 国务院发展研究中心 行业协会 工商 税务 海关 国内外相关刊物的基础信息以及行业研究单位等公布和提供的大量资料,

More information

Collaborative efforts for sustainable campus 可持续校园建设多方协作机制的初探

Collaborative efforts for sustainable campus 可持续校园建设多方协作机制的初探 Collaborative efforts for sustainable campus 可持续校园建设多方协作机制的初探 华颖 Ying Hua Ph.D. 华颖 Dr. Ying Hua Assistant Professor Department of Design and Environmental Analysis Cornell University Co-Director International

More information

KMART Corrective Action Plan

KMART Corrective Action Plan KMART Corrective Action Plan Report No.: A4578873 Vendor Code: V001842 Factory Code: F004469 Vendor Name (English): Fun Jewellery And Fashion Accessories PTY Ltd Vendor Name (Local Language): Not provided

More information

BUREAU VERITAS GREATER CHINA 必维国际检验集团 大中华区 CRANE SERVICES 起重机服务

BUREAU VERITAS GREATER CHINA 必维国际检验集团 大中华区 CRANE SERVICES 起重机服务 BUREAU VERITAS GREATER CHINA 必维国际检验集团 大中华区 CRANE SERVICES 起重机服务 TRANSPORTATION, LOGISTICS & EQUIPMENT DEPARTMENT CRANE BUSINESS UNIT ( TLE - CRANE ) A dedicated team of professionals offering a wide range

More information

Portable Ionizing Air Gun PIA 型离子风枪 型号 : 94101

Portable Ionizing Air Gun PIA 型离子风枪 型号 : 94101 WE TEK Portable Ionizing Air Gun PIA 型离子风枪 型号 : 94101 小毛刷 挂钩 ION GUN SPIwe tek Ion 指示灯 出风口 电池盒 DC 6V 220VAC-6VDC 插口 高压进气口 SPI WESTEK 是 DESCO 静电消除器品牌 MADE IN AMERICA 页 1 根据 ANSI/ESD S20.20 中 6.2.3.1 内容规定,

More information

Work Report of Chinese Steering Commi.ee of Landscape Architecture Educa8on

Work Report of Chinese Steering Commi.ee of Landscape Architecture Educa8on Work Report of Chinese Steering Commi.ee of Landscape Architecture Educa8on 风 专业 导 员 汇报 YANG Rui Director of Chinese Steering Commi.ee of Landscape Architecture Educa8on Professor, Chairman, Department

More information

Indesit,CVTAA 55 NF UK, CVTAA 55 NF UK S( CE-BCD275W-S, ) 英文说明书 版本号 REV.NO. 重量 (g) WEIGHT

Indesit,CVTAA 55 NF UK, CVTAA 55 NF UK S( CE-BCD275W-S, ) 英文说明书 版本号 REV.NO. 重量 (g) WEIGHT 设计周军 DESIGN 2014.5.12 校对毛娅男 CO.BY 标准化 STANDARD 马凯 图纸名称 PART NAME Indesit,CVTAA 55 NF UK, CVTAA 55 NF UK S( CE-BCD275W-S,520027510004) 英文说明书 图号 / 物料编码 PART NO. 50200101D225 材料 MATERIAL 业务 seller 杨志成 图样标记

More information

Walmart Responsible Sourcing. * Example Report * North America Latin America

Walmart Responsible Sourcing. * Example Report * North America Latin America Walmart Responsible Sourcing * Example Report * North America +1-81-252-4770 Latin America +52-1--2010712 Europe & Mile-East +49-8122-552 9590 Asia & Asia Pacific +886-2-282-2990 Inia +91-120-4291971 Email

More information

Prospects and challenges for sustainable urbanization in China

Prospects and challenges for sustainable urbanization in China Prospects and challenges for sustainable urbanization in China Li Shantong, Department of Development Strategy and Regional Economy Development Research Center of the State Council Note: views presented

More information

MultiTemp IV Thermostatic Circulator

MultiTemp IV Thermostatic Circulator GE Healthcare Life Sciences MultiTemp IV Thermostatic Circulator Operating Instructions Original instructions Table of Contents Table of Contents 1 Introduction... 1.1 About this operating instructions...

More information

PolyBox TM. Edition II. Operation Manual

PolyBox TM. Edition II. Operation Manual PolyBox TM Edition II Operation Manual 1 polybox.polymaker.com CONTENTS Introduction Important Safety Instructions Specifications 4 5 6 Information on Disposal for Users of Waste Electrical & Electronic

More information

Beijing Urban Design Studio Summer 2008

Beijing Urban Design Studio Summer 2008 MIT OpenCourseWare http://ocw.mit.edu 11.307 Summer 2008 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. 首钢再整合 Re-integrating the Shougang Industrial

More information

EJX-A and EJA-E Series Differential Pressure and Pressure Transmitters

EJX-A and EJA-E Series Differential Pressure and Pressure Transmitters EJX-A and EJA-E Series Differential Pressure and Pressure Transmitters Change No. 15-015 The following explosion protected types and marine certificate types are added for EJX-A and EJA-E series. Please

More information

DC MOTOR FAN COIL UNIT 直驅無刷电机风机盤管

DC MOTOR FAN COIL UNIT 直驅無刷电机风机盤管 MOTOR FAN COIL UNIT 直驅無刷电机风机盤管 Contents 目录 Features 特点 Model Number Nomenclature 产品编号基准表 Specification 规格 Dimensions & Wiring Diagram 尺寸及电机线路接驳图 1 2-3 4 5 6 Features 特点 SAIVER offers three different models

More information

矿用电缆 矿 用 电 缆 江苏亨通电力电缆有限公司

矿用电缆 矿 用 电 缆 江苏亨通电力电缆有限公司 亨通股票代码 600487 矿 用 电 缆 线缆解决之道 尽在亨通 亨通 全球线缆主力供应商 ELECTRIC SAMPLES OF MINE CABLES Total solution for cables,it's HENGTONG HENGTONG,the main global supplier in the wire&cables industry JIANGSU HENGTONG POWER

More information

Question? 有疑问? Contact Philips 请联系飞利浦 FC6132 FC6130

Question? 有疑问? Contact Philips 请联系飞利浦 FC6132 FC6130 Question? 有疑问? Contact Philips 请联系飞利浦 FC6132 FC6130 1 ENGLISH 6 简体中文 15 FC6132, FC6130 6 ENGLISH Introduction Congratulations on your purchase and welcome to Philips! To benefit fully from the support

More information

EJX-A and EJA-E Series Differential Pressure and Pressure Transmitters

EJX-A and EJA-E Series Differential Pressure and Pressure Transmitters User s EJX-A and EJA-E Series Differential Pressure and Pressure Transmitters Change No. 15-015 The following explosion protected types and marine certificate types are added for EJX-A and EJA-E series.

More information

CW-5000/ 5200 INDUSTRIAL CHILLER USER MANUAL

CW-5000/ 5200 INDUSTRIAL CHILLER USER MANUAL CW-5000/ 5200 INDUSTRIAL CHILLER USER MANUAL Contents Cautions ---------------------------------------------------------------- 3 Parts introduction ---------------------------------------------------

More information

Register your product and get support at 在以下网站注册并获得支持

Register your product and get support at 在以下网站注册并获得支持 Register your product and get support at 在以下网站注册并获得支持 www.philips.com.cn/welcome 7 8 Question?? Contact Philips 2016 Koninklijke Philips N.V. 保留所有权利 EN User manual ZH-CN 用户手册 3140 035 39634 Emphasized

More information

EJX / EJA-E series. For the description on the applicable page of users manual as shown in the item 1, please use revised information as shown in 2.

EJX / EJA-E series. For the description on the applicable page of users manual as shown in the item 1, please use revised information as shown in 2. EJX / EJA-E series Change No. 15-013 For the description on the applicable page of users manual as shown in the item 1, please use revised information as shown in 2. 1. Applicable Users and Page IM No.

More information

TRANSPORTATION EXISTING 交通现状

TRANSPORTATION EXISTING 交通现状 PLANNING PROGRAM TRANSPORTATION EXISTING 交通现状 The transportation network is an essential component of our communities. Enhancing sustainable transportation choices and supporting all modes of movement

More information

美的吸尘器 使用说明书 VACUUM CLEANER OPERATION INSTRUCTIONS MANUAL C5 PRO (C5-L121D) 使用产品前请仔细阅读本说明书 并请妥善保管

美的吸尘器 使用说明书 VACUUM CLEANER OPERATION INSTRUCTIONS MANUAL C5 PRO (C5-L121D) 使用产品前请仔细阅读本说明书 并请妥善保管 美的吸尘器 使用说明书 VACUUM CLEANER OPERATION INSTRUCTIONS MANUAL C5 PRO (C5-L121D) 江苏美的清洁电器股份有限公司 通讯地址 : 苏州市相城经济开发区漕湖大道39号 邮政编码 : 215000 400-8899-315 24h 服务 热线 免长途 www.midea.com 执行标准 : GB4706.7-2014 / GB4706.1-2005

More information

Senab Interior established on the Bund introducing Scandinavian design and new ways to organize the office

Senab Interior established on the Bund introducing Scandinavian design and new ways to organize the office Press release Senab Interior Shanghai 2016-10-17 Senab Interior established on the Bund introducing Scandinavian design and new ways to organize the office Senab Interior is now established in Shanghai

More information

Rosemount 848T High Density Temperature Measurement Family

Rosemount 848T High Density Temperature Measurement Family Product Data Sheet 00813-0100-4697, Rev RA Rosemount 848T High Density Temperature Measurement Family Innovative temperature measurement for high density applications that provide installation and operational

More information

Consumer Appliances in Germany

Consumer Appliances in Germany Consumer Appliances in Germany Customer Service Hotline:400-666-1917 Page 1 of 25 一 调研说明中商情报网全新发布的 Consumer Appliances in Germany 主要依据国家统计局 国家发改委 商务部 中国海关 国务院发展研究中心 行业协会 工商 税务 海关 国内外相关刊物的基础信息以及行业研究单位等公布和提供的大量资料,

More information

Kitchen Exhaust Duct (KED) Requirements

Kitchen Exhaust Duct (KED) Requirements Kitchen Exhaust Duct (KED) Requirements WSH forum Safe working in kitchens 2017 1/29 Scope : Objectives Introduction Fire Safety Concerns KED Requirements Enforcement Conclusion 2/ Objectives Why

More information

Retailing in Romania. Customer Service Hotline: Page 1 of 23

Retailing in Romania. Customer Service Hotline: Page 1 of 23 Retailing in Romania Customer Service Hotline:400-666-1917 Page 1 of 23 一 调研说明中商情报网全新发布的 Retailing in Romania 主要依据国家统计局 国家发改委 商务部 中国海关 国务院发展研究中心 行业协会 工商 税务 海关 国内外相关刊物的基础信息以及行业研究单位等公布和提供的大量资料, 结合深入的市场调研资料,

More information

TECHNICAL PRODUCT DATASHEET

TECHNICAL PRODUCT DATASHEET ISO 9001 CERTIFIED Phone: (352) 629-5020 or 800-533-3569 Fax: (352)-629-2902 SUITABLE FOR EXTERNAL DISTRIBUTION ENFO IV P/N 108661 P/N 112600 (metric) P/N 112600-03 (metric, Chinese) PAGE 1 of 12 1. REVISION

More information

YVP110 Advanced Valve Positioner. Please use the attached sheets for the pages listed below in the following manuals. IM 21B04C01-01E (10th)

YVP110 Advanced Valve Positioner. Please use the attached sheets for the pages listed below in the following manuals. IM 21B04C01-01E (10th) User s Advanced Valve Positioner Change No. 15-006 Please use the attached sheets for the pages listed below in the following manuals. IM 21B04C01-01E (10th) Page and Item Page 1-3 1.8 EMC Conformity Standards

More information

HC1089 HC Koninklijke Philips N.V. All rights reserved 保留所有权利 (25/9/2017) > 75% 循环再造纸

HC1089 HC Koninklijke Philips N.V. All rights reserved 保留所有权利 (25/9/2017) > 75% 循环再造纸 HC089 HC088 207 Koninklijke Philips N.V. All rights reserved 保留所有权利 4222.002.875.2 (25/9/207) > 75% 循环再造纸 >75% recycled paper >75% papier recyclé 2 3 2 4 5 6 7 8 9 2 2 0 2 3 4 5 2 6 7 5 6 7 2 3 8 9 4 0

More information

美的冰箱事业部 C353 技术要求. 1 尺寸 :32k 2 印刷颜色 : 黑色 3 样板需送设计部门封样 4 标记变更内容 修改日期. 80g 双胶纸 图号 / 物料编码 PART NO. 图纸名称 PART NAME 材料 MATERIAL 版本号 REV.NO.

美的冰箱事业部 C353 技术要求. 1 尺寸 :32k 2 印刷颜色 : 黑色 3 样板需送设计部门封样 4 标记变更内容 修改日期. 80g 双胶纸 图号 / 物料编码 PART NO. 图纸名称 PART NAME 材料 MATERIAL 版本号 REV.NO. 设计 DESIGN 严岩 2013.3.4 图纸名称 PART NAME 图号 / 物料编码 PART NO. 校对 CO.BY 标准化 STANDARD 业务 seller 批准 AUTHORIZE 李艳琴马凯封秋杰于清 MIDEA WHD-113FW1 WHD-113FB1 WHD-113FSS1 (UR-BCD87-S) 说明书 图样标记 REL 版本号 REV.NO. 3 共页 TOTAL

More information

User Manual. OCTAVIUS Detector 729 (T10040) and Detector Interface 4000 (T16039)

User Manual. OCTAVIUS Detector 729 (T10040) and Detector Interface 4000 (T16039) User Manual OCTAVIUS Detector 729 (T10040) and Contents Operating Manual Technical Manual Service Manual D913.131.00/04 en 2015-03 Sa General Information General Information The product bears the CE-mark

More information

Retrospect And Prospect Of Master Land Use Plan In China

Retrospect And Prospect Of Master Land Use Plan In China Retrospect And Prospect Of Master Land Use Plan In China Bing ZHAO, Jian LIN and Yu GAN, China Key words: master land use plan, development process, development direction, China SUMMARY The purpose of

More information

Premium Desoldering station with Electric Pump Ref. DIS-D

Premium Desoldering station with Electric Pump Ref. DIS-D www.jbctools.com Premium Desoldering station with Electric Pump Ref. DIS-D Packing List The following items should be included: DI Control Unit... 1 unit Ref. DI-1D (120V) DI-2D (230V) DI-9D (100V) Electric

More information

WPHO - LED HIGH OUTPUT WALL PACKS

WPHO - LED HIGH OUTPUT WALL PACKS WPHO - LED HIGH OUTPUT WALL PACKS New completely redesigned premium wall pack utilizing CREE LED chips and IP67 rated Meanwell Drivers. Easy hinge out/detachable front section allows for ease of install.

More information

所有的资料是按最新出版的产品资料编写而成遥科勒公司保留任何时候不经通知即可改变产品特性尧包装或产品可供类型的权利遥 说明书包括重要的安装内容袁请把这些资料交给用户阅读遥

所有的资料是按最新出版的产品资料编写而成遥科勒公司保留任何时候不经通知即可改变产品特性尧包装或产品可供类型的权利遥 说明书包括重要的安装内容袁请把这些资料交给用户阅读遥 所有的资料是按最新出版的产品资料编写而成遥科勒公司保留任何时候不经通知即可改变产品特性尧包装或产品可供类型的权利遥 说明书包括重要的安装内容袁请把这些资料交给用户阅读遥 All information is based on the latest product information available at the time of publication. Kohler Co. reserves

More information

Ethical Audit Report

Ethical Audit Report Client Anonymous Client AI Service No R-us3-1538869 Supplier Glasses Factory Ltd. Auditor Billy Huang Factory Glasses Factory Ltd. Date 10-11/Jun/2015 Industry Homeware & Gardenware Country China Factory

More information

SUNSTAR 单片机专用电路 TEL: FAX: Features 6 Digit 6 Function LCD Alarm Watch with RGB LE

SUNSTAR 单片机专用电路   TEL: FAX: Features 6 Digit 6 Function LCD Alarm Watch with RGB LE Features 6 igit 6 Function LC Alarm Watch with RGB LE Backlight plit operative stopwatch(accurate to 1/100 ond) Hour, inuet, econd, onth and date normal display 6 digit chronograph: Auto ranging after

More information

Service Manual. Solar Direct Drive Vaccine Refrigerator / Freezer. Model :HTC-40/110; HTCD-90 Pictures :

Service Manual. Solar Direct Drive Vaccine Refrigerator / Freezer. Model :HTC-40/110; HTCD-90 Pictures : Internal training document for Haier service providers. External disclosure is forbidden Service Manual Solar Direct Drive Vaccine Refrigerator / Freezer Model :HTC-40/110; HTCD-90 Pictures : HTC-40/110

More information

BT9290. English. 1 Make sure the appliance is switched off and the laser guide is in off position.

BT9290. English. 1 Make sure the appliance is switched off and the laser guide is in off position. Register your product and get support at www.philips.com/welcome BT9290 4222.002.8403.1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 English Introduction Congratulations on

More information

说明书递交文档 美的冰箱事业部 INDESIT 冷柜通用说明书 (UK ) B693 技术要求 1. 尺寸 :16K 2. 印刷颜色 : 封面彩印, 内文黑白 3. 样板需送设计部门封样 4. 标记 MARKER 变更内容修改日期签名

说明书递交文档 美的冰箱事业部 INDESIT 冷柜通用说明书 (UK ) B693 技术要求 1. 尺寸 :16K 2. 印刷颜色 : 封面彩印, 内文黑白 3. 样板需送设计部门封样 4. 标记 MARKER 变更内容修改日期签名 说明书递交文档 设计 DESIGN 刘克亮 2011.8.2 图纸名称 PART NAME 图号 / 物料编码 PART NO. 校对 CO.BY 毛娅男 INDESIT 冷柜通用说明书 (UK ) 50200105B693 标准化 STANDARD 马凯 材料 MATERIAL 业务 seller 曹筱峰 图样标记 REL 版本号 REV.NO. 重量 (g) WEIGHT 比例 scale 封面

More information

FOB NINGBO PORT PRICE: 29,000USD

FOB NINGBO PORT PRICE: 29,000USD FBN-01s Cotton Swab Machine (speed:1200pcs/min) FOB NINGBO PORT PRICE: 29,000USD we are the professional manufacturer of cotton swab machine in China. All of our cotton swab machine are including making

More information

PMAC202 Branch Circuit Power Meter User Manual V1.0

PMAC202 Branch Circuit Power Meter User Manual V1.0 PMAC202 Branch Circuit Power Meter User Manual V1.0 Installation & Operation Manual Danger and Warning! This device can be installed only by professionals. The manufacturer shall not be responsible for

More information

PE Series Jaw Crusher P E

PE Series Jaw Crusher P E P E 系列鄂式破碎机 品质与文明之光闪耀世界! ISO 9001:2000 Quality System Certification+CQC SBM COMPANY PRODUCTIONS >>> PE Series Jaw Crusher WWW.SBMCHINA. SHANGHAI SHIBANG MACHINERY CO., LTD 01 WWW.SBMCHINA. Main Structure

More information

Installation Instructions for the MICRO SWITCH VPX Series Valve Position Indicator for Hazardous Locations

Installation Instructions for the MICRO SWITCH VPX Series Valve Position Indicator for Hazardous Locations Installation Instructions for the MICRO SWITCH VPX Series Valve Position Indicator for Hazardous Locations Issue J 32312068 Multiple language versions of installation instructions and other documents are

More information

Jiangbei New District, Nanjing ISOCARP Urban Planning Advisory Team Report

Jiangbei New District, Nanjing ISOCARP Urban Planning Advisory Team Report Jiangbei New District, Nanjing ISOCARP Urban Planning Advisory Team Report 南京江北新区 ISOCARP 城市顾问组报告 December 2013 2013 年 12 NANJING URBAN PLANNING BUREAU Jiangbei New District, Nanjing ISOCARP Urban Planning

More information

Hitachi Highly. Spezifikation Manual

Hitachi Highly. Spezifikation Manual Hitachi Highly Rollkolbenverdichter Rotary Compressors Spezifikation Manual WHP02250BCN-H6AU RIES GmbH, Rudolf-Diesel-Str. 10, D 64569 Nauheim, GERMANY Phone: +49 6152 9741 0, Fax: +49 6152 9741 21, Email:

More information

Contents. Precision Lead-free Reflow Oven. Model: AT-R3028

Contents. Precision Lead-free Reflow Oven. Model: AT-R3028 深圳市安泰信电子有限公司 使用手册 User 无铅回焊炉 一 功能简介 2 二 主要技术参数.... 3 三 各部分名称及功能简介............................................................................ 4 四 功能按键说明.... 4-5 五 温度曲线的作用与功能 5-7 六 : 常用合金钎料的温度曲线调整参数....

More information

安装使用说明书. 维格一体化智能座便器 305mm/400mm 坑距 VOGUE INTELLIGENT INTEGRATED TOILET305mm/400mm RI 20127T-M-WK/20128T-M-WK

安装使用说明书. 维格一体化智能座便器 305mm/400mm 坑距 VOGUE INTELLIGENT INTEGRATED TOILET305mm/400mm RI 20127T-M-WK/20128T-M-WK 安装使用说明书 维格一体化智能座便器 305mm/400mm 坑距 VOGUE INTELLIGENT INTEGRATED TOILET305mm/400mm RI 20127T-M-WK/20128T-M-WK CONTENTS 目录 安装之前注意事项...01 产品简介...02 功能...02 安全注意事项...03 技术参数...06 尺寸图纸...07 配件示意图...06 安装...07

More information

践行里约 +20 决议, 示范新型城镇化 : 国际人居环境范例新城倡议

践行里约 +20 决议, 示范新型城镇化 : 国际人居环境范例新城倡议 Special Notes: This proposal is only for authorized personage s perusal. Right of originality belongs to GFHS. Dissemination and duplication is strictly prohibited. International Green Model City Implement

More information

COMPARATIVE ANALYSIS AND PEDESTRIAN SIMULATION EVALUATION ON EMERGENCY EVACUATION TEST METHODS FOR URBAN RAIL TRANSIT STATIONS

COMPARATIVE ANALYSIS AND PEDESTRIAN SIMULATION EVALUATION ON EMERGENCY EVACUATION TEST METHODS FOR URBAN RAIL TRANSIT STATIONS ZIJIA WANG FENG CHEN E-mail: fengchen@bjtu.edu.cn XIAOHONG LI Beijing Jiaotong University Department of Civil and Architecture Engineering Beijing 100044, PR China Transport Engineering Review Accepted:

More information

Characteristics of nitrogen, phosphorus and potassium absorption and optimum fertilization in Sugarcane Liuqiang ZHOU, Hongwei TAN

Characteristics of nitrogen, phosphorus and potassium absorption and optimum fertilization in Sugarcane Liuqiang ZHOU, Hongwei TAN Characteristics of nitrogen, phosphorus and potassium absorption and optimum fertilization in Sugarcane Liuqiang ZHOU, Hongwei TAN Sugarcane Research Institute, Guangxi Academy of Agricultural Sciences

More information

2016 Koninklijke Philips N.V. All rights reserved 保留所有权利 (12/2016) > 75% 循环再造纸 BT9290. >75% recycled paper >75% papier recyclé

2016 Koninklijke Philips N.V. All rights reserved 保留所有权利 (12/2016) > 75% 循环再造纸 BT9290. >75% recycled paper >75% papier recyclé BT9290 2016 Koninklijke Philips N.V. All rights reserved 保留所有权利 4222.002.8403.3 (12/2016) > 75% 循环再造纸 >75% recycled paper >75% papier recyclé 2 3 4 CLASS 1 LASER PRODUCT 5 6 7 8 9 10 11 12 13 14 15 16

More information

亚太地区世界遗产培训与研究中心 ( 上海 ) 简讯 World Heritage Institute of Training and Research - Asia and Pacific, Shanghai

亚太地区世界遗产培训与研究中心 ( 上海 ) 简讯 World Heritage Institute of Training and Research - Asia and Pacific, Shanghai WHITR-AP (Shanghai) N e w s l e t t e r 亚太地区世界遗产培训与研究中心 ( 上海 ) 简讯 World Heritage Institute of Training and Research - Asia and Pacific, Shanghai 特别报道 : 联合国教科文组织 34 C/40 文件 UNESCO 34C /40 Document Special

More information

Always there to help you

Always there to help you Always there to help you Register your product and get support at www.philips.com/welcome SCF902 Question? Contact Philips EN User manual 1 ZH-CN 用户手册 16 Contents 1 Important 2 Electromagnetic Fields (EMF)

More information

空管 航空电子 通信 导航与雷达设备厂商. Adaptaspace Inc.

空管 航空电子 通信 导航与雷达设备厂商. Adaptaspace Inc. 空管 航空电子 通信 导航与雷达设备厂商 Adaptaspace Inc. AaronHarvey V.P. Business Development 55-4511 Glenmore Trail SECalgary T2C 2R9Canada Provider of complete solutions for facilities requiring the integration of computers,

More information

GreenUp Lowbay G2 BY288P. Lucia Liu Indoor Segment, PLP Growth Market Feb. 2016

GreenUp Lowbay G2 BY288P. Lucia Liu Indoor Segment, PLP Growth Market Feb. 2016 GreenUp Lowbay G2 BY288P Lucia Liu Indoor Segment, PLP Growth Market Feb. 2016 1 Contents Product Features and Benefits Product Applications Product Image Product Photometry Product Specifications Product

More information

Preparation. Name of Each Part. Safety Precautions (Be sure to always follow these precautions) ECLEAR MIST. HCE-HU03 Series. Turning the power on

Preparation. Name of Each Part. Safety Precautions (Be sure to always follow these precautions) ECLEAR MIST. HCE-HU03 Series. Turning the power on Household Humidifier Instruction Manual HCE-HU0 Series If you made your purchase in another country, please refer to manual from the relevant country. www.elecom.co.jp/global/download-list/manual/ Thank

More information

Hot Air Station without Extractor desk Ref. JTSE-QA

Hot Air Station without Extractor desk Ref. JTSE-QA www.jbctools.com Hot Air Station without Extractor desk Ref. JTSE-QA Packing List The following items should be included: JTSE Control Unit...1 unit Ref. JTSE-1A (100V / 120V) JTSE-2A (230V) Stand...1

More information

The Professional Laundry Experience

The Professional Laundry Experience Welcome to the Texcare Asia Forum: Profile The Professional Laundry Experience Shanghai, China Profile Welcome Remarks & Introduction CINET CINET: Building a Global Network Profile By Peter N.M. Wennekes

More information

qianlong garden restoration project 乾隆花园修复工程

qianlong garden restoration project 乾隆花园修复工程 qianlong garden restoration project 乾隆花园修复工程 w o r l d m o n u m e n t s f u n d The Significance and Survival of the Garden The Qianlong Garden (built 1771 1776) is a unique architectural and historic

More information

Award-winning and absolutely new, Very stacks, swivels, and flexes far beyond ordinary seating to inject comfort and life into any space.

Award-winning and absolutely new, Very stacks, swivels, and flexes far beyond ordinary seating to inject comfort and life into any space. Very Very Family Meet Very a friendly, highly sustainable seating family born out of global design and science-led comfort. With four versatile models each offering a variety of smart styles and options

More information

Catering Service System Based on Environmental Design A Design Practice On Shengming Farm. Zhang Zhao Interior Design

Catering Service System Based on Environmental Design A Design Practice On Shengming Farm. Zhang Zhao Interior Design Catering Service System Based on Environmental Design A Design Practice On Shengming Farm Zhang Zhao Interior Design ABSTRACT Abstract: Shengming Farm is located at Kunshan. It will be a place for new

More information

RAS-DX18HDK/RAC-DX18HDK

RAS-DX18HDK/RAC-DX18HDK RAS-DX18HDK/RAC-DX18HDK RAC-DX18HDK RAS-DX18HDK 1 22 23 44 - 2 - - 3 - 18 FILTER LAMP Light indicator showing that it is time to clean the filter. 15 RAS-DX18HDK 1050 290 220 RAC-DX18HDK 792 420 299-4

More information

Model 685B1001A10. Electronic Vibration Switch. Installation and Operating Manual

Model 685B1001A10. Electronic Vibration Switch. Installation and Operating Manual Model 685B1001A10 Electronic Vibration Switch Installation and Operating Manual For assistance with the operation of this product, contact PCB Piezotronics, Inc. Toll-free: 800-959-4464 24-hour SensorLine:

More information

brass material mould. 500USD (2 pcs) Baby safety swab 500USD (2 pcs) Cosmetic swab brass material mould. 500USD (2 pcs) Cosmetic swab

brass material mould. 500USD (2 pcs) Baby safety swab 500USD (2 pcs) Cosmetic swab brass material mould. 500USD (2 pcs) Cosmetic swab FBN-01 Cotton Swab Machine (speed:1200pcs/min) FOB NINGBO PORT PRICE: 23,000USD we are the professional manufacturer of cotton swab machine in China. All of our cotton swab machine are including making

More information

RECENTLY, multicarrier modulation techniques, such

RECENTLY, multicarrier modulation techniques, such IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I: REGULAR PAPERS, VOL. 52, NO. 5, MAY 2005 911 New Continuous-Flow Mixed-Radix (CFMR) FFT Processor Using Novel In-Place Strategy Byung G. Jo and Myung H. Sunwoo,

More information

WARNING/CAUTION DESCRIPTION OF COMPONENTS FUNCTION EXPLANATION OPERATION INSTRUCTIONS CONTINUOUS DRAINAGE CAUTIONS MAINTENANCE/EMERGENCY

WARNING/CAUTION DESCRIPTION OF COMPONENTS FUNCTION EXPLANATION OPERATION INSTRUCTIONS CONTINUOUS DRAINAGE CAUTIONS MAINTENANCE/EMERGENCY 抽濕機 使用說明書 PDN20S WARNING/CAUTION DESCRIPTION OF COMPONENTS FUNCTION EXPLANATION OPERATION INSTRUCTIONS CONTINUOUS DRAINAGE CAUTIONS MAINTENANCE/EMERGENCY SPECIFICATION 1 2 3 4 5 6 7 WARNING CAUTION 1

More information

RTKL 谨在此向中国客户呈献本系列宣传册 本丛书一套四册, 涵盖内容广泛, 不仅向您展示 RTKL 过去辉煌的历史, 更力图展现我们对未来的卓越见解 我们的每件作品都富于灵动性和高品质, 在此呈献的仅仅是我们宏大作品库中的极小部分

RTKL 谨在此向中国客户呈献本系列宣传册 本丛书一套四册, 涵盖内容广泛, 不仅向您展示 RTKL 过去辉煌的历史, 更力图展现我们对未来的卓越见解 我们的每件作品都富于灵动性和高品质, 在此呈献的仅仅是我们宏大作品库中的极小部分 娱乐 play RTKL 谨在此向中国客户呈献本系列宣传册 本丛书一套四册, 涵盖内容广泛, 不仅向您展示 RTKL 过去辉煌的历史, 更力图展现我们对未来的卓越见解 我们的每件作品都富于灵动性和高品质, 在此呈献的仅仅是我们宏大作品库中的极小部分 RTKL is pleased to present this series of brochures designed specifically for

More information

A TOUCH OF INSPIRATION FOR MY NICE HOME. Housing & Development Board SAFE RENOVATION WITHOUT COMPROMISING BUILDING SAFETY

A TOUCH OF INSPIRATION FOR MY NICE HOME. Housing & Development Board SAFE RENOVATION WITHOUT COMPROMISING BUILDING SAFETY Renovasi Kontraktor dan Bahan Pembekal Persatuan Singapura RENOVATION Guide Book A TOUCH OF INSPIRATION FOR MY NICE HOME Housing & Development Board SAFE RENOVATION WITHOUT COMPROMISING BUILDING SAFETY

More information

Enlightenment of Biodiversity Construction in Chanba Ecological District of Xi 'an

Enlightenment of Biodiversity Construction in Chanba Ecological District of Xi 'an Enlightenment of Biodiversity Construction in Chanba Ecological District of Xi 'an Administration Committee of Xi an Chanba Ecological District Fan Ming In May 2014 Location of Xi an Chanba Ecological

More information

WAT E R S O U R C E H E AT P U M P S

WAT E R S O U R C E H E AT P U M P S WAT E R S O U R C E H E AT P U M P S - 小 Water To Water 3 in 1 Units High Efficiency E Vintage Sizes 024~142 Installation Operation and Maintenance Instructions Important: These instructions are for the

More information

Tokyo Gas Engineering Solutions Corporation

Tokyo Gas Engineering Solutions Corporation Laser Methane mini SA3C32A Operation Manual Read this manual before using the equipment. Keep this manual with the equipment. Tokyo Gas Engineering Solutions Corporation For Safety Prior to using this

More information

Coils Connectors Bosch Rexroth

Coils Connectors Bosch Rexroth Coils Connectors Bosch Rexroth 1 / 6 2 / 6 3 / 6 Coils Connectors Bosch Rexroth Replacement solenoid coils are needed in hydraulic systems when the solenoid coil used to control a hydraulic solenoid valve

More information

XJTLU 2017 INTERNATIONAL SYMPOSIUM 国际学术研讨会 TRANSPORT AND URBAN TRANSFORMATION IN CONTEMPORARY CHINA 当代中国的交通与城乡转型发展. Date and Location 会议时间与地点

XJTLU 2017 INTERNATIONAL SYMPOSIUM 国际学术研讨会 TRANSPORT AND URBAN TRANSFORMATION IN CONTEMPORARY CHINA 当代中国的交通与城乡转型发展. Date and Location 会议时间与地点 XJTLU 2017 INTERNATIONAL SYMPOSIUM 国际学术研讨会 TRANSPORT AND URBAN TRANSFORMATION IN CONTEMPORARY CHINA 当代中国的交通与城乡转型发展 Date and Location 会议时间与地点 1-2 July 2017 IAG08, International Academic Exchange and Collaboration

More information

A Study of the Improvement of Planning Systems for Land Use Control in Agricultural Heritage Sites

A Study of the Improvement of Planning Systems for Land Use Control in Agricultural Heritage Sites May, 2016 Journal of Resources and Ecology Vol. 7 No.3 J. Resour. Ecol. 2016 7(3) 180-186 DOI: 10.5814/j.issn.1674-764x.2016.03.005 www.jorae.cn A Study of the Improvement of Planning Systems for Land

More information

E-waste Management in China

E-waste Management in China E-waste Management in China WNE Xuefeng, JIN Jing National Center for Solid Waste Management, MEP July 8,2010 Contents 1 2 E-waste Definition and Amount E-waste Management Policy 3 E-waste Collection and

More information

compact Bagless Cyclonic Vacuum Cleaner IMPORTANT: Read carefully before assembly and use.

compact Bagless Cyclonic Vacuum Cleaner IMPORTANT: Read carefully before assembly and use. compact Bagless Cyclonic Vacuum Cleaner Instruction Manual IMPORTANT: Read carefully before assembly and use. 2015 Techtronic Floor Care Technology Limited. All Rights Reserved. Welcome to Hoover ownership.

More information

Repair Station Manual. Ameco Components Repair Capability List. Ameco 部件修理能力清单. Document No.: QM 005/95 FAA FAA

Repair Station Manual. Ameco Components Repair Capability List. Ameco 部件修理能力清单. Document No.: QM 005/95 FAA FAA Repair Station Manual Ameco Components Repair Capability List Ameco 部件修理能力清单 Document No.: QM 005/95 FAA 文件号 : QM 005/95 FAA FAA Foreword 前言 Only those Radio, Instrument, Accessories components, and etc.that

More information

New Town Development and Practices

New Town Development and Practices New Town Development and Practices - Cases from Japan 日本案例 : 新城镇的发展和实践 Shige SAKAKI ( 榊茂之 ) Sr. Urban Transport Specialist GTIDR South Asia 世界银行城市高级交通专家 Contents of this presentation 目录 1. New Town Development

More information

8 Filtration Systems Air Purifier 8 重過濾空氣清新機 User Manual 產品說明書

8 Filtration Systems Air Purifier 8 重過濾空氣清新機 User Manual 產品說明書 8 Filtration Systems Air Purifier 8 重過濾空氣清新機 User Manual 產品說明書 Model No. 型號 : CAP200W Please read this instruction manual carefully before use and keep it for future reference. 請於使用前細閱本說明書並加以保存 1 2 Thank

More information

New Rural Planning Guidelines in the Chengdu Plain: The Case of Tianfu New Area

New Rural Planning Guidelines in the Chengdu Plain: The Case of Tianfu New Area New Rural Planning Guidelines in the Chengdu Plain: The Case of Tianfu New Area Prof. Wei Zhao Department of Urban and Rural Planning Southwest Jiaotong University cq_zhaowei@163.com 2015.03.30 Seattle,U.W

More information

TeMA. Vol.10 n.2 August 2017 METHODS, TOOLS AND BEST PRACTICES TO INCREASE THE CAPACITY OF URBAN SYSTEMS TO ADAPT TO NATURALAND MAN-MADE CHANGES

TeMA. Vol.10 n.2 August 2017 METHODS, TOOLS AND BEST PRACTICES TO INCREASE THE CAPACITY OF URBAN SYSTEMS TO ADAPT TO NATURALAND MAN-MADE CHANGES TeMA The 10th volume of the TeMA Journal will promote the debate on the definition and the implementation of methods, tools and best practices aimed at improving energy efficiency at the neighbourhood

More information

FRENCH EXHIBITORS 法国展商

FRENCH EXHIBITORS 法国展商 FRENCH EXHIBITORS 法国展商 HORTIFLOREXPO-IPM CHINA SHANGHAI 10-12 MAY 2017 中国国际花卉园艺博览会 上海 2017年5月10-12日 WWW.FOODLOIRE.FR CONTENTS 目录 SITE MAP 展位平面图 Site map... p. 3 展位平面图 Overview of Pays de la Loire as a

More information

EU Declaration of Conformity

EU Declaration of Conformity 18 October 2018 EU Declaration of Conformity Model Number: ET1902L, ET2202L, ET2402L, ET2702L Equipment Category: Information Technology and Telecommunications Equipment Equipment Class: Commercial and

More information

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.017 Version 2 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group

More information

"Three Preventions" System Design Based On Single-Chip Microcomputer SCM Control Jiaxiong Wen

Three Preventions System Design Based On Single-Chip Microcomputer SCM Control Jiaxiong Wen 6th International Conference on Machinery, Materials, Environment, Biotechnology and Computer (MMEBC 2016) "Three Preventions" System Design Based On Single-Chip Microcomputer SCM Control Jiaxiong Wen

More information

Plant Safety 沼气厂安全. Raphael Thies and Dr Katharina Backes

Plant Safety 沼气厂安全. Raphael Thies and Dr Katharina Backes Plant Safety 沼气厂安全 Raphael Thies and Dr Katharina Backes Krieg & Fischer Ingenieure GmbH Bertha-von-Suttner-Straße 9, 37085 Göttingen Tel.: +49 551 900 363-0, Fax: +49 551 900 363-29 Fischer@KriegFischer.de

More information