2 CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Monday, November 24, 2014 at 10:00 a.m. in the City Council Chambers, Virginia Beach Municipal Center, Virginia Beach, Virginia. An informal session is held at 9:00 a.m. in the City Council Chambers at which time staff briefs the Board on agenda items. All interested persons are invited to attend. There is no opportunity for citizenry to speak at the briefing session; however, the public is invited to speak at the formal Public Hearing held at 10:00 a.m. in the City Council Chambers. Those members of the public interested in attending the public hearing should be advised that, for reasons the board deems appropriate, certain items on the agenda may be heard out of order and that it should not be assumed that the order listed below will be exactly followed during the public hearing. Those members of the public interested in speaking in support or in opposition to an agenda item shall be limited to 3 minutes in which to address the board. At the discretion of the CBPA Board Chairman, this time may be increased to 5 minutes. Speakers will be electronically timed. The staff reviews of some or all of the items on this agenda and offer certain conditions for consideration by the Chesapeake Bay Preservation Area Board, in the event they should approve the application. However, it should not be assumed that those conditions constitute all the conditions that will ultimately be attached to the project. Staff agencies may impose further conditions and requirements during administration of applicable city ordinances. If you are physically disabled or visually impaired and need assistance at this meeting, please call the Planning Department at Richard Scarper Planning Department

3 November 24, 2014 CBPA Agenda TABLE OF CONTENTS NEW BUSINESS: 1. OCEAN RENTAL PROPERTIES, LLC th Street 2. HANES PROPERTIES VIRGINIA, LLC th Street 3. DAVID KELLY S. Spigel Drive 4. MICHAEL SCOTT NIBLO E. Admiral Drive 5. SONG JIAN CHEN Copper Kettle Drive 6. JOSEPH BENEDETTO White Acres Road 7. ISABEL & WILLIAM FLY FAMILY TRUST Hermitage Point 8. JOSEPH GILBERT Back Cove Road NEXT CBPA PUBLIC HEARING DATE FRIDAY, DECEMBER 19 th Chesapeake Bay Preservation Area Board Public Hearing dates. Monday January 26 Monday February 23 Monday March 23 Monday April 27 Thursday May 21 Monday June 22 Monday July 27 Monday August 24 Monday September 28 Monday October 26 Monday November 23 Tuesday December 22

4 Revised Plans and Correspondences 30 DAY DEFERRALS For 30 day deferrals revised plans and any correspondence to be distributed to Board members for items to be heard at the FRIDAY, December 19, 2014 Public Hearing are due in the Planning Department, Room 115 by: 5:00 p.m. on Monday, December 1, Please provide the following: 15 copies of revised plans 3 copies of the CBPA application 3 copies of the Water Quality Impact Assessment (WQIA) 60 DAY DEFERRALS For 60 day deferrals revised plans and any correspondence to be distributed to Board members for items to be heard at the Monday, January 26, 2015 Public Hearing are due in the Planning Department, Room 115 by: 5:00 p.m. on Monday December 29, Please provide the following: 15 copies of revised plans 3 copies of the CBPA application 3 copies of the Water Quality Impact Assessment (WQIA) Please note that if any additional correspondences for distribution to Board members are required than 15 copies of each correspondence must be provided. Please note that if any additional correspondences for distribution to Board members are required than 15 copies of each correspondence must be provided.

5 Resources The following resources are provided for information use: City of Virginia Beach Environment and Sustainability Office Website City of Virginia Beach Chesapeake Bay Preservation Area Board Website City of Virginia Beach Wetland Boards Website City of Virginia Beach City of Virginia Beach Map City of Virginia Beach Development Services Center Center for Coastal Resource Management CCRMP Map Viewer Center for Coastal Resource Management Sea Level Rise Map Viewer

6 Ocean Rental Properties, LLC 1. Ocean Rental Properties, LLC TH Street GPIN ; Beach District Applicant Agent: Eddie Bourdon, Agent; Sykes, Bourdon, Ahern & Levy P.C. SUMMARY OF PROPOSAL: Existing Impervious Cover: x -or- x Demolition of: Existing structure on lots 27A and 25A for future development, Phase 2 (II) Plan. Proposed Impervious Cover: x -or- x New Impervious Cover in the RPA - Redevelopment in the RPA - Construction of: Two (2) proposed two-story residences on lot 29A, Phase 1 (I) Plan. Four (4) proposed two-story residences on lots 27A and 25A, Phase 2 (II) Plan. Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer, Landward 50 foot buffer, Variable Width 100 foot buffer of the Resource Protection Area (RPA), and Resource Management Area (RMA) Land Disturbance Amount: >2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer, Landward 50 foot buffer, Variable Width 100 foot buffer of the Resource Protection Area (RPA), and Resource Management Area (RMA) ENVIRONMENTAL ANALYSIS: Soil Type(s): Rappahannock Series Soils (deep and poorly drained). Soil is formed from partially decomposed organic materials and strata of loamy marine and fluvial sediments. Soils are in tidal marshes on the lower part of the Coastal Plain. Soils can be flooded daily with saline water and support marsh vegetation. Udorthents Soil Series (well drained and moderately well drained). Soil consists of areas where the natural soil has been altered by excavation or covered by earthy fill materials. OCEAN RENTAL PROPERTIES, L.L.C. Page 1

7 Ocean Rental Properties, LLC Condition of Riparian Buffer: The parcel is sparsely wooded with marsh shading occurring along the shoreline. Existing canopy trees and understory vegetation appears to be healthy. All trees to be removed. Means of Riparian Buffer Restoration: None shown. Condition of Shoreline: Retaining wall and backfill proposed adjacent to existing marsh feature to elevate grade of lots. The existing grade is shallow and transitions into existing grade of adjacent marsh. Flood Zone: Zone AE, 7.0 Base Flood Elevation (BFE). Stormwater Run-off: Means of Stormwater Management: None shown. HISTORY OF PROPERTY: Lot Recorded: Map Book 5, Page 103 6/4/15 EVALUATION AND CONDITIONS: The applicant s agent has requested a 60 deferral. Staff supports the request. OCEAN RENTAL PROPERTIES, L.L.C. Page 2

8 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 3

9 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 4

10 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 5

11 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 6

12 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 7

13 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 8

14 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 9

15 Ocean Rental Properties, LLC OCEAN RENTAL PROPERTIES, L.L.C. Page 10

16 Ocean Rental Properties, LLC PHASE 1 (I) PLAN OCEAN RENTAL PROPERTIES, L.L.C. Page 11

17 Ocean Rental Properties, LLC PHASE 2 (II) PLAN OCEAN RENTAL PROPERTIES, L.L.C. Page 12

18 Hanes Properties Virginia, LLC 2. Hanes Properties Virginia, LLC th Street GPIN Lynnhaven District Applicant Agent: Eddie Bourdon, Agent; Sykes, Bourdon, Ahern & Levy P.C. SUMMARY OF PROPOSAL: Existing Impervious Cover: 0% of site -or- 0 square feet Proposed Impervious Cover: 17.5% of site -or- 2,403 square feet New Impervious Cover in the RPA 2,403 square feet Redevelopment in the RPA 0 square feet Construction of: Open-pile structure residence with concrete driveway. Area under structure to park. Four (4) foot wide mulch path with stepping stones. Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer, Landward 50 foot buffer, and Resource Management Area (RMA) Land Disturbance Amount: >2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer, Landward 50 foot buffer, and Resource Management Area (RMA) ENVIRONMENTAL ANALYSIS: Soil Type(s): Psamments Series Soils (moderately well drained material, disturbed from excavation) Condition of Riparian Buffer: The parcel is heavily wooded with marsh shading occurring along the shoreline. Existing canopy trees and understory vegetation appears to be healthy. 25 trees to be removed Means of Riparian Buffer Restoration: None shown HANES PROPERTIES VIRGINIA, LLC Page 13

19 Hanes Properties Virginia, LLC Condition of Shoreline: No method of abetment proposed, marsh shading occurring along the shoreline. Flood Zone: Zone AE, 7.0 Base Flood Elevation (BFE), Floodway - not present on site. Stormwater Run-off: Stormwater run-off flows from the front of the property to the rear. Existing soils are moderately well drained and coupled with the existing canopy cover rainfall is intercepted and infiltrated on the lot. The parcel is impacted by tidal flooding during sever storm events. Means of Stormwater Management: Bioretention HISTORY OF PROPERTY: Lot Recorded: Map Book 77, Page 29 10/15/68 EVALUATION AND CONDITIONS: Due to the existing elevations and proximity to the shoreline, the introduction of fill to the lot would compromise the intrinsic water quality value by interrupting the ecological and biological processes the lot currently performs. Staff met with the applicant and applicant s agent to discuss the proposed improvements. Staff disclosed that a conventional residential building approach consistent with the style of the neighborhood would not be supported. In response to staffs concerns, the applicant has designed the residence to be an open-pile structure with on-site understory parking. The applicant adheres to the front yard setback thereby minimizing displacement of natural resources in the rear of the property. The following conditions are offered for Board consideration should the variance be approved: Standard Site Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. HANES PROPERTIES VIRGINIA, LLC Page 14

20 Hanes Properties Virginia, LLC 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 10 feet from proposed improvements. 5. Construction limits shall lie a maximum of 10' seaward of improvements. All areas outside limits of construction shall be left in a natural state to include the forest floor (leaf litter) left intact. Said condition shall be so noted on the site plan. 6. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 7. For all areas to be preserved outboard of the limits of construction that are encroached upon, replacement of existing vegetation shall be provided at a 3:1 ratio for all unauthorized (damaged or removed) vegetation impacts. 8. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. Site Specific Conditions: 9. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. 10. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 11. *Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. HANES PROPERTIES VIRGINIA, LLC Page 15

21 Hanes Properties Virginia, LLC 12. Due to the limited lot size above water, marsh, & wetlands the remainder of the lot shall be devoted to buffer restoration. Buffer restoration shall be installed equal to 200% of the proposed new impervious cover within the RPA (2,403 sq. ft. x 200% = 4,806 sq. ft.) and shall achieve the full complement of vegetation. The required restoration shall be located in the Resource Protection Area, and plant quantities utilized to infill the existing vegetated buffer in areas devoid of understory vegetation. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 13. No perimeter fill is authorized outboard or seaward of the proposed improvements. 14. Revised site plan shall identify a contractor parking area during the construction of the residence. There shall be no contractor parking outboard of the limits of construction. Revise the sequence of events for construction accordingly. 15. On-grade impervious cover, exclusive of the open-pile residence shall be limited to the proposed driveway and walkway, area of parking under the structure, and the stepping stone walkway to the water. 16. **As offered by the applicant, payment shall be made to the Lynnhaven Oyster Heritage Program concurrent with site plan approval. Payment shall be in the amount of $ and is based on 25% of the proposed impervious cover. Said payment shall provide for the equivalent of an approximate 600 sq. ft., 12-inch deep oyster shell plant within the Lynnhaven River Basin. 17. It is the opinion of the Board that the approval granted is the maximum impervious cover the site can support. 18. The conditions and approval associated with this variance are based on the exhibit plan dated October 3, 2014, prepared by Gallup Surveyors and Engineers, signed October 6, 2014 by David Butler. Deviation from said exhibit plan may require re-submittal for Board consideration. HANES PROPERTIES VIRGINIA, LLC Page 16

22 Hanes Properties Virginia, LLC * NOTE: Staff is of the opinion given the elevation of the lot, tidal influence of adjacent waterway, and elevation of groundwater the use of a permeable paver driveway and rainwater harvesting of the proposed structure shall be installed as components of compliance with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. HANES PROPERTIES VIRGINIA, LLC Page 17

23 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 18

24 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 19

25 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 20

26 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 21

27 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 22

28 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 23

29 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 24

30 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 25

31 Hanes Properties Virginia, LLC HANES PROPERTIES VIRGINIA, LLC Page 26

32 David Kelly 3. David Kelly 805 South Spigel Drive GPIN Lynnhaven District Applicant Agent: Billy Garrington, Governmental Permitting Consultant SUMMARY OF PROPOSAL: Existing Impervious Cover: 20.6% of site -or- 6,143 square feet Demolition of: Porch, walkways and deck. Play equipment and shed in the 50 foot seaward buffer Proposed Impervious Cover: 29.7% of site -or- 8,856 square feet New Impervious Cover in the RPA 3,829 square feet Redevelopment in the RPA 887 square feet Construction of: Concrete driveway addition and walkways. Wood deck Swimming pool with associated retaining wall and stone terrace. Stepping stone walkway, stone patio and fire pit area. Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer, Landward 50 foot buffer, Variable Width 100 foot buffer of the Resource Protection Area (RPA). Land Disturbance Amount: >2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer, Landward 50 foot buffer, Variable Width 100 foot buffer of the Resource Protection Area (RPA), and Resource Management Area (RMA) ENVIRONMENTAL ANALYSIS: Soil Type(s): Rumford Series Soils (highly erodible) located below the top of bank. Yeopim Series Soils (deep, moderately well drained) located above the top of bank. DAVID KELLY Page 27

33 David Kelly Condition of Riparian Buffer: The parcel is sparsely wooded. Existing canopy trees and understory vegetation appears to be healthy. 6 trees to be removed. Revised plan submitted proposing an additional 10 trees to be removed. Arborist report provided. Means of Riparian Buffer Restoration: Standard buffer restoration for new impervious cover Standard buffer restoration for redeveloped impervious cover or substitute a 10% stormwater pollutant reduction in lieu of redevelopment buffer restoration. Condition of Shoreline: No method of abetment proposed, a minor scarp is present due to tidal fluctuation present along point. The Center for Coastal Resource Management (CCRMP) evaluates the existing property as an area for potential enhancement / integration to the existing riparian buffer/marsh buffer. Flood Zone: Zone AE, 7.0 Base Flood Elevation (BFE) Stormwater Run-off: Means of Stormwater Management: Bioretention planting bed for proposed areas of redevelopment HISTORY OF PROPERTY: Lot Recorded: Map Book 27, Page 13 3/5/52 EVALUATION AND CONDITIONS: The applicant s agent should be commended for providing relevant information towards the restoration of the site by incorporating existing planting beds areas into required buffer restoration areas. However, clarification of hazardous, yet healthy trees and striking distances to existing residence should be discussed in more detail. The removal of healthy trees should be a last resort action in-lieu of riparian buffer management. Important to this site and several other parcels within the city is the expansion of restoration beyond that typical of strictly addressing upland conditions. With the presence of a minor scarp at the toe of the slope and existing grades in the rear yard being moderate, potential exist to restore and promote the intrinsic water quality value of the Lynnhaven River by addressing processes where upland conditions meet tidal conditions. Addressing the scarp by grading the DAVID KELLY Page 28

34 David Kelly bank, maintaining and enhancing the existing marsh, and transitioning into the integration of upland planting would promote the ecological and biological processes of the Lynnhaven River. The following conditions are offered for Board consideration should the variance be approved: Standard Site Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 15 feet from proposed improvements. 5. Construction limits shall lie a maximum of 15' seaward of improvements. Within the RPA, exclusive of limits of construction, areas of existing landscaped beds, trees, areas of existing leaf litter or forest floor, and other naturalized areas, such as shoreline vegetation, may not be removed. 6. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 7. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. Site Specific Conditions: 8. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. DAVID KELLY Page 29

35 David Kelly 9. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 10. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. 11. For all trees outboard of the limits of construction requested to be removed, replacement shall be provided at a 3:1 ratio. 12. Buffer restoration shall be installed equal to 200% of the proposed new impervious cover within the RPA (3,829 sq. ft. x 200% = 7,658 sq. ft.) and shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance. The required restoration shall be located in the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 13. Buffer restoration shall be installed equal to 100% of the proposed area of redevelopment within the RPA (887 sq. ft. x 100% = 887 sq. ft.) and shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance. The required restoration shall be located within the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of DAVID KELLY Page 30

36 David Kelly shoreline structures. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. In lieu of 100% restoration for redeveloped areas, a 10% reduction in pollutant removal load is acceptable via a structural best management practices (BMP). 14. A means or method to abate the ongoing shoreline erosion shall be addressed on the submitted site plan. A Joint Permit Application (JPA) may be required. Said erosion abatement shall be completed prior to the release of the final building permit. 15. The pool shape, size, and location shall be as shown on the submitted exhibit/site plan. 16. The pool shall be constructed prior to or concurrent with the other proposed improvements exclusive of the proposed concrete driveway addition. 17. Under deck treatment of sand and gravel shall be installed. 18. No perimeter fill is authorized outboard or seaward of the proposed improvements. 19. **As offered by the applicant, payment shall be made to the Lynnhaven Oyster Heritage Program concurrent with site plan approval. Payment shall be in the amount of $ and is based on 25% of the proposed impervious cover within the Resource Protection Area (RPA). Said payment shall provide for the equivalent of an approximate 957 sq. ft., 12-inch deep oyster shell plant within the Lynnhaven River Basin. 20. It is the opinion of the Board that the approval granted is the maximum impervious cover the site can support. 21. The conditions and approval associated with this variance are based on the exhibit plan dated August 11, 2014, prepared by WP Large, signed October 6, 2014 by Eric Garner. Deviation from said exhibit plan may require re-submittal for Board consideration. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. DAVID KELLY Page 31

37 David Kelly DAVID KELLY Page 32

38 David Kelly DAVID KELLY Page 33

39 David Kelly DAVID KELLY Page 34

40 David Kelly DAVID KELLY Page 35

41 David Kelly DAVID KELLY Page 36

42 David Kelly DAVID KELLY Page 37

43 David Kelly DAVID KELLY Page 38

44 David Kelly DAVID KELLY Page 39

45 David Kelly REVISED TREE REMOVAL DAVID KELLY Page 40

46 David Kelly DAVID KELLY Page 41

47 David Kelly DAVID KELLY Page 42

48 Michael Scott Niblo 4. Michael Scott Niblo 2120 E. Admiral Drive GPIN Lynnhaven District Applicant Agent: Billy Garrington, Governmental Permitting Consultant SUMMARY OF PROPOSAL: Existing Impervious Cover: Demolition of: Shed and portion of concrete walkway. 27.5% of site -or- 4,580 square feet Proposed Impervious Cover: 32.7% of site -or- 5,450 square feet New Impervious Cover in the RPA 870 square feet Redevelopment in the RPA 0 square feet Construction of: Swimming pool, associated pool patio, and equipment pad. Location of Proposed Impervious Cover: Within the Landward 50 foot buffer and Variable Width 100 foot buffer of the Resource Protection Area (RPA). Land Disturbance Amount: <2,500 square feet Location of Land Disturbance: Within the Landward 50 foot buffer and Variable Width 100 foot buffer of the Resource Protection Area (RPA). ENVIRONMENTAL ANALYSIS: Soil Type(s): Psamments Series Soils (Well drained and moderately well drained, sandy material that has been distributed during excavation, grading, or filling. Many of the fill areas within this soil series consist of stockpile materials from dredge operations.). Condition of Riparian Buffer: The parcel is sparsely wooded. Existing canopy trees and understory vegetation appears to be healthy. 0 trees to be removed MICHAEL SCOTT NIBLO Page 43

49 Michael Scott Niblo Means of Riparian Buffer Restoration: 1,978 sq. ft. of buffer restoration proffered (1,740 sq. ft. required at 200 percent of proposed new impervious cover). Condition of Shoreline: Shoreline is hardened with a bulkhead. No signs of bulkhead failure or loss of back fill. Flood Zone: Zone AE, 7.0 Base Flood Elevation (BFE). Stormwater Run-off: Stormwater run-off flows from the front of the property to the street and from the rear of the property to the adjacent canal. Means of Stormwater Management: Bioretention planting bed HISTORY OF PROPERTY: Lot Recorded: Map Book 62, Page 30 10/15/68 Previous Variance(s) to the Chesapeake Bay Preservation Area Ordinance: An administrative variance was granted May 1, 2012 for the construction of an addition to the primary structure over an existing patio: 1. A reduction of 10 percent for pollutant loading is required as a result of this project. One of two options may be utilized bioretention planting bed BMP or buffer restoration in the amount of 100 percent of the redevelopment area. EVALUATION AND CONDITIONS: Proposed improvements introduce 870 square feet of new impervious cover within the 50 foot landward buffer and increase the post-impervious cover of the parcel to 32.7 percent. Although the proposed impervious cover is landward of the 50 foot seaward buffer the overall impervious cover of the site coupled with the location of the buffer restoration does not address water quality. The intent of the Chesapeake Bay Preservation Area Ordinance is to minimize impervious cover and promote infiltration of stormwater into the ground. Moreover, buffer restoration is to be located within the 50 foot seaward buffer and progress landward. Staff if of the opinion, that all required buffer restoration can and should be located within the 50 foot seaward buffer. Accordingly, sediments and pollutants associated with stormwater run-off will be assimilated prior to reaching the adjacent tidal features. MICHAEL SCOTT NIBLO Page 44

50 Michael Scott Niblo The following conditions are offered for Board consideration should the variance be approved: Standard Site Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 10 feet from proposed improvements and outside of the 50 foot seaward buffer delineation. 5. Construction limits shall lie a maximum of 10' seaward of improvements and outside of the 50 foot seaward buffer delineation. Within the RPA, exclusive of limits of construction, areas of existing landscaped beds, trees, areas of existing leaf litter or forest floor, and other naturalized areas, such as shoreline vegetation, may not be removed. 6. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 7. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. Site Specific Conditions: 8. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. MICHAEL SCOTT NIBLO Page 45

51 Michael Scott Niblo 9. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 10. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. 11. The conditions of the existing Chesapeake Bay Preservation Area (CBPA) administrative variance, specifically the required buffer restoration and stormwater management facilities shall be documented on the revised site plan. Documentation shall describe the health and functionality of said requirements. Prior restoration requirements shall be installed if not present ,978 square feet of buffer restoration shall be installed within the RPA. Said buffer restoration shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance. The required restoration shall be located in the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed in the seaward portion of the buffer and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 13. The pool shape, size, and location shall be as shown on the submitted exhibit/site plan. 14. No perimeter fill is authorized outboard or seaward of the proposed improvements. 15. **As offered by the applicant, payment shall be made to the Lynnhaven Oyster Heritage Program concurrent with site plan approval. Payment shall be in the amount of $ and is based on 25% of the proposed impervious cover within the Resource Protection Area (RPA). Said payment shall provide for the equivalent of an approximate 217 sq. ft., 12-inch deep oyster shell plant within the Lynnhaven River Basin. 16. It is the opinion of the Board that the approval granted is the maximum impervious cover the site can support. MICHAEL SCOTT NIBLO Page 46

52 Michael Scott Niblo 17. The conditions and approval associated with this variance are based on the exhibit plan dated October 3, 2014, prepared by Siska Aurand, signed October 3, 2014 by C. Douglas Aurand. Deviation from said exhibit plan may require re-submittal for Board consideration. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. MICHAEL SCOTT NIBLO Page 47

53 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 48

54 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 49

55 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 50

56 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 51

57 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 52

58 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 53

59 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 54

60 Michael Scott Niblo MICHAEL SCOTT NIBLO Page 55

61 Song Jian Chen 5. Song Jian Chen 668 Copper Kettle Drive GPIN Kempsville District Applicant Agent: Song Jian Chen Small Project in the RPA SUMMARY OF PROPOSAL: Proposed Impervious Cover: New Impervious Cover in the RPA Redevelopment in the RPA Construction of: Wood deck. 166 square feet 120 square feet Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer of the Resource Protection Area (RPA) Land Disturbance Amount: <2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer of the Resource Protection Area (RPA) ENVIRONMENTAL ANALYSIS: Soil Type(s): Munden-Urban Series Soils (deep, nearly level, moderately well-drained). Udorthents Series Soils (moderately well-drained soils altered by excavation). Condition of Riparian Buffer: The parcel is not wooded. 0 trees to be removed Means of Riparian Buffer Restoration: Two (2) trees and three (3) shrubs. Condition of Shoreline: No method of abetment proposed. Existing shoreline is hardened by concrete rubble. SONG JIAN CHEN Page 56

62 Song Jian Chen Flood Zone: Zone AE, 8.0 Base Flood Elevation (BFE), Floodway - not present on site. Stormwater Run-off: Stormwater sheetflows from the existing impervious cover into the adjacent tidal waters untreated. Means of Stormwater Management: None shown HISTORY OF PROPERTY: Lot Recorded: Map Book 81, Page 50 10/22/69 EVALUATION AND CONDITIONS: The proposed improvements are within the 50 foot seaward buffer of the Resource Protection Area (RPA). Although 166 square feet of new impervious cover is minimal, the proposed improvements are directly adjacent to the tidal feature. Moreover the new impervious cover would disturb a sloped area that is surprisingly stable given the condition of the hardened shoreline. Staff is of the opinion that the request is ill-advised and recommends the applicant redevelops with a wood deck that is within the footprint of the existing concrete patio permitting safe ingress/egress to the rear. The following conditions are offered for Board consideration should the variance be approved: Standard Site Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the CBPA exhibit. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. If necessary, wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 5 feet from proposed improvements. SONG JIAN CHEN Page 57

63 Song Jian Chen 5. Construction limits shall lie a maximum of 5' seaward of improvements. Within the RPA, exclusive of limits of construction, areas of existing landscaped beds, trees, areas of existing leaf litter or forest floor, and other naturalized areas, such as shoreline vegetation, may not be removed. 6. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. 7. If and when the shoreline is hardened, a rip-rap revetment or living shoreline, if applicable shall be constructed in lieu of a vertical retaining structure (vinyl, timber or steel bulkhead). The toe of said rip-rap revetment shall lie at or landward of mean high water or tidal vegetated wetlands, unless the Wetlands Board determines that site specific conditions warrant a more seaward alignment. Said condition shall be so noted on the site plan. Site Specific Conditions: 8. The proposed wood deck shall be constructed within the foot print of the existing concrete patio and steps. Said existing concrete patio and steps shall remain and not be removed with the construction of the wood deck. 9. Buffer restoration shall be installed equal to 100% of the proposed area of redevelopment within the RPA (120 sq. ft. x 100% = 120 sq. ft.) and shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance. The required restoration shall be located within the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. In lieu of 100% restoration for redeveloped areas, a 10% reduction in pollutant removal load is acceptable via a structural best management practices (BMP). 10. The conditions and approval associated with this variance are based on the exhibit prepared by the applicant and presented to the Board. Said exhibit and conditions shall be submitted to the Department of Planning, Development Services Center for review and approval prior SONG JIAN CHEN Page 58

64 Song Jian Chen to the issuance of a building permit. The Development Services Center and/or Permits and Inspections may require additional information that may affect the release of a building permit. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. SONG JIAN CHEN Page 59

65 Song Jian Chen SONG JIAN CHEN Page 60

66 Song Jian Chen SONG JIAN CHEN Page 61

67 Song Jian Chen SONG JIAN CHEN Page 62

68 Song Jian Chen SONG JIAN CHEN Page 63

69 Song Jian Chen SONG JIAN CHEN Page 64

70 Song Jian Chen SONG JIAN CHEN Page 65

71 Joe Benedetto 6. Joe Benedetto 4183 White Acres Road GPIN Lynnhaven District Applicant Agent: Richard Bartlett, Agent; Professional Construction Consultants, L.L.C. SUMMARY OF PROPOSAL: Existing Impervious Cover: Demolition of: (complete demolition) Residence, associated walkways, and sheds. Fountain pool. Septic field and 550 gallon underground storage tank (UST). Relocate barn outside of 100 foot buffer. x -or- x Proposed Impervious Cover: x -or- x New Impervious Cover in the RPA - Redevelopment in the RPA - Construction of: Residence with swimming pool and associated retaining walls. Shed. Pervious concrete driveway at residence. Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer and Landward 50 foot buffer of the Resource Protection Area Land Disturbance Amount: >2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer and Landward 50 foot buffer of the Resource Protection Area ENVIRONMENTAL ANALYSIS: Soil Type(s): Rumford Series Soils (highly erodible) located below the top of bank. Tetotum Series Soils (deep, nearly level, moderately well drained). JOE BENEDETTO Page 66

72 Joe Benedetto Condition of Riparian Buffer: The parcel is heavily wooded with marsh shading occurring along the shoreline. Existing canopy trees and understory vegetation appears to be healthy. 2 trees to be removed Means of Riparian Buffer Restoration: Standard buffer restoration for new impervious cover Standard buffer restoration for redeveloped impervious cover or substitute a 10% Condition of Shoreline: No method of abetment proposed Flood Zone: Zone AE, 8.0 Base Flood Elevation (BFE). Stormwater Run-off: Given the parcels high amount of permeable surface, mature forest floor, and substantial canopy cover the majority of rainfall is intercepted and infiltrated on the lot Means of Stormwater Management: None shown HISTORY OF PROPERTY: Lot Recorded: Instr. No /27/04 Previous Variance(s) to the Chesapeake Bay Preservation Area Ordinance: A variance was granted June 24, 2002 for a seven lot subdivision with the following conditions: 1. For proposed Lots 2 and 3, no portion of the pool shall be located within the 50' seaward portion of the buffer. The proposed pool for Lot 7 shall lie a maximum of 15 feet east of proposed improvements to the existing dwelling. In addition, said pool for Lot 7 shall lie equidistant of the top-of-banks. 2. For proposed Lot 5, no portion of any improvement (impervious cover) shall lie within the 100 foot buffer as shown on the revised site plan dated July 12, 2002 prepared by TES Inc. In addition, the driveway extension for said residence / Lot 5, shall be crush in run or equivalent. Said driveway shall be circuitous in nature within the White Acre Lane rightof-way so as to minimize the removal of any mature trees. 3. Seaward construction limits, for all proposed lots, shall lie a maximum of 15' seaward of improvements. No portion of any existing riparian forest and associated forest floor, shall JOE BENEDETTO Page 67

73 Joe Benedetto be removed seaward of said construction limits. Said condition shall be noted on each site plan. 4. Tree compensation shall be at a 1 to 1 ratio for proposed Lots 1 through 3 and 5. Compensation shall be at a 3:1 ratio for proposed lots 4, 6, and Improvements for proposed Lot 6, inclusive of the swimming pool, shall be re-located no less than 35' to the south. 6. No portion of any improvement associated with proposed Lot 7, inclusive of the swimming pool, shall lie within 50 feet of the toe-of-slope. 7. All swimming pools shall be installed prior to or concurrent with construction of the primary residences. 8. If and when the shoreline is hardened for any proposed lot, a riprap revetment shall be installed in lieu of a vertical retaining structure. 9. Buffer restoration, equal to 1 2 times proposed impervious cover, shall be provided for Lots 4, 6, and 7. A separate buffer restoration / landscape plan shall accompany said site plans. Existing forest cannot be counted towards required restoration. Restoration shall occur within those areas currently devoted to turf. Said restoration shall be installed prior to the issuance of a certificate of occupancy. 10. A temporary chain link fence shall be provided adjacent to the northern and southern limits of construction associated with proposed Lot Payment into the Lynnhaven River Oyster Heritage Fund for an area equal in size to 25% of any impervious cover encroachment into the buffer associated with the proposed lots. Payment is designed to establish the equivalent of a 12 inch deep oyster shell plant within the Lynnhaven River Basin for the 25% of displaced buffer. The formula for payment shall be total impervious cover divided by 27 = cubic yards X 15 (bushels per cubic yard) X $1.65 ( cost per bushel installed). Said payment shall be made prior to approval of any site plan. 12. All stormwater from new impervious cover shall be conveyed to structural stormwater management facilities. For Lot 7 all stormwater from existing and proposed improvements shall be conveyed to structural stormwater management facilities. 13. The size of homes and pools shall be in substantial compliance with that which was provided on the site plan dated July 12, 2002, prepared by TES, Inc. JOE BENEDETTO Page 68

74 Joe Benedetto 14. A revised site plan shall be submitted to the Department of Planning, Development Services Center for review and approval prior to the issuance of a building permit. EVALUATION AND CONDITIONS: A 30 day deferral has been requested by the applicant s agent to coordinate submitted application with the conditions of the June 24, 2002 Chesapeake Bay Preservation Area Board variance. Staff supports the request. JOE BENEDETTO Page 69

75 Joe Benedetto JOE BENEDETTO Page 70

76 Joe Benedetto JOE BENEDETTO Page 71

77 Joe Benedetto JOE BENEDETTO Page 72

78 Joe Benedetto JOE BENEDETTO Page 73

79 Joe Benedetto JOE BENEDETTO Page 74

80 Joe Benedetto JOE BENEDETTO Page 75

81 Joe Benedetto JOE BENEDETTO Page 76

82 Joe Benedetto JOE BENEDETTO Page 77

83 Joe Benedetto JOE BENEDETTO Page 78

84 Isabel & William Fly Family Trust 7. Isabel & William Fly Family Trust 4117 Hermitage Point GPIN Bayside District Applicant Agent: Billy Garrington, Governmental Permitting Consultant SUMMARY OF PROPOSAL: *2,999 square feet of city street is within the parcel Existing Impervious Cover: Proposed Impervious Cover: *26% of site -or- *7,915 square feet *36% of site -or- *10,952 square feet IMPERVIOUS COVERS CALCULATED WITHOUT THE CITY STREET Existing Impervious Cover: 16.2% of site -or- 4,916 square feet Demolition of: (complete demolition) Existing residence and associated accessory structures, driveway, and shed. Proposed Impervious Cover: 26.2% of site -or- 7,953 square feet New Impervious Cover in the RPA 5,053 square feet Redevelopment in the RPA 2,900 square feet Construction of: Residence with attached garage, screened porch and paver walkways. Concrete circular driveway. Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer, Landward 50 foot buffer, Variable Width 100 foot buffer of the Resource Protection Area (RPA). Land Disturbance Amount: >2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer, Landward 50 foot buffer, Variable Width 100 foot buffer of the Resource Protection Area (RPA). ISABEL & WILLIAM FLY FAMILY TRUST Page 79

85 Isabel & William Fly Family Trust ENVIRONMENTAL ANALYSIS: Soil Type(s): Rumford Series Soils (highly erodible) located below the top of bank. Tetotum Series Soils (deep, nearly level, moderately well drained). Condition of Riparian Buffer: The parcel is sparsely wooded with marsh shading occurring along the shoreline. Existing canopy trees and understory vegetation appears to be healthy. 18 trees to be removed Means of Riparian Buffer Restoration: Standard buffer restoration for new impervious cover Standard buffer restoration for redeveloped impervious cover or substitute a 10% stormwater pollutant reduction in lieu of redevelopment buffer restoration. Condition of Shoreline: Existing shoreline partially hardened by a wood bulkhead. Existing concrete driveway directly discharges into tidal water via an old concrete boat ramp. Flood Zone: Zone AE, 7.0 Base Flood Elevation (BFE). Stormwater Run-off: The existing concrete driveway directly discharges into adjacent tidal waters. The submitted application proposes to remove the existing concrete driveway and restore the disturbed area. Means of Stormwater Management: None shown HISTORY OF PROPERTY: Lot Recorded: Map Book 39, Page 37 9/9/55 EVALUATION AND CONDITIONS: The overall impervious cover for the proposed improvements is 26 percent absent the impervious cover contributed from the public street being within the parcel. The proposed improvements do provide areas of benefit by utilizing redevelopment, maintaining existing canopy cover within the 50 foot buffer, and removing the concrete driveway that directly discharges stormwater into the adjacent tidal waters. However, staff is of the opinion that the proposed driveway is excessive and does not provide the minimum necessary to afford relief. Moreover, the required buffer restoration is 10,106 square feet. Staff questions how the required buffer restoration will ISABEL & WILLIAM FLY FAMILY TRUST Page 80

86 Isabel & William Fly Family Trust be addressed should the variance be approved. Given the retention of existing riparian forest and limited areas to be converted to riparian forest, the applicant s agent should address this concern. The following conditions are offered for Board consideration should the variance be approved: Standard Site Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 10 feet from proposed improvements. 5. Construction limits shall lie a maximum of 10' seaward of improvements. Within the RPA, exclusive of limits of construction, areas of existing landscaped beds, trees, areas of existing leaf litter or forest floor, and other naturalized areas, such as shoreline vegetation, may not be removed. 6. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 7. For all areas to be preserved outboard of the limits of construction that are encroached upon, replacement of existing vegetation shall be provided at a 3:1 ratio for all unauthorized (damaged or removed) vegetation impacts. 8. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. ISABEL & WILLIAM FLY FAMILY TRUST Page 81

87 Isabel & William Fly Family Trust Site Specific Conditions: 9. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. 10. If and when the shoreline is hardened, a living shoreline, if applicable shall be constructed in lieu of a vertical retaining structure (vinyl, timber or steel bulkhead) or riprap revetment. The toe of said rip-rap revetment shall lie at or landward of mean high water or tidal vegetated wetlands, unless the Wetlands Board determines that site specific conditions warrant a more seaward alignment. Said condition shall be so noted on the site plan. 11. Reduce the circular portion of the proposed driveway to be a minimum of 12 feet in width or utilize a permeable paver system for the proposed driveway. 12. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 13. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. 14. Buffer restoration shall be installed equal to 200% of the proposed new impervious cover within the RPA (5,053 sq. ft. x 200% = 10,106 sq. ft.) and shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance. The required restoration shall be located in the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 15. Buffer restoration shall be installed equal to 100% of the proposed area of redevelopment within the RPA (2,900 sq. ft. x 100% = 2,900 sq. ft.) and shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers ISABEL & WILLIAM FLY FAMILY TRUST Page 82

88 Isabel & William Fly Family Trust consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance. The required restoration shall be located within the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. In lieu of 100% restoration for redeveloped areas, a 10% reduction in pollutant removal load is acceptable via a structural best management practices (BMP). 16. No perimeter fill is authorized outboard or seaward of the proposed improvements. 17. Gravel downspout intercepts and/or gravel dripline intercepts shall be provided as a means of erosion and sediment control for stormwater run-off from the proposed improvements. 18. **As offered by the applicant, payment shall be made to the Lynnhaven Oyster Heritage Program concurrent with site plan approval. Payment shall be in the amount of $1, and is based on 25% of the proposed impervious cover within the Resource Protection Area (RPA). Said payment shall provide for the equivalent of an approximate 1,263 sq. ft., 12- inch deep oyster shell plant within the Lynnhaven River Basin. 19. It is the opinion of the Board that the approval granted is the maximum impervious cover the site can support. 20. The conditions and approval associated with this variance are based on the exhibit plan dated September 22, 2014, prepared by WP Large, signed November 4, 2014 by Eric Garner. Deviation from said exhibit plan may require re-submittal for Board consideration. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. ISABEL & WILLIAM FLY FAMILY TRUST Page 83

89 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 84

90 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 85

91 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 86

92 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 87

93 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 88

94 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 89

95 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 90

96 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 91

97 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 92

98 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 93

99 Isabel & William Fly Family Trust ISABEL & WILLIAM FLY FAMILY TRUST Page 94

100 Joseph Gilbert 8. Joseph Gilbert 1428 Back Cove Road GPIN Lynnhaven District Applicant Agent: Joseph Gilbert Small Project in the RPA SUMMARY OF PROPOSAL: Existing Impervious Cover: Proposed Impervious Cover: New Impervious Cover in the RPA Redevelopment in the RPA Construction of: Riprap retaining wall. 19% of site -or- 10,988 square feet 20% of site -or- 11,267 square feet 279 square feet 0 square feet Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer of the Resource Protection Area (RPA). Land Disturbance Amount: <2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer of the Resource Protection Area (RPA). ENVIRONMENTAL ANALYSIS: Soil Type(s): Rumford Series Soils (highly erodible) located below the top of bank. Tetotum Series Soils (deep, nearly level, moderately well drained). Condition of Riparian Buffer: The parcel is moderately wooded with marsh shading occurring along the shoreline. Existing canopy trees and understory vegetation appears to be healthy. 0 trees to be removed Means of Riparian Buffer Restoration: Standard buffer restoration for new impervious cover JOSEPH GILBERT Page 95

101 Joseph Gilbert Condition of Shoreline: Shoreline has not been hardened. A wood retaining wall is present along the shoreline and is located above mean high water. Flood Zone: Zone AE, 8.0 Base Flood Elevation (BFE). Stormwater Run-off: Given the parcels high amount of permeable surface, mature forest floor, and substantial canopy cover the majority of rainfall is intercepted and infiltrated on the lot Means of Stormwater Management: None shown HISTORY OF PROPERTY: Lot Recorded: Map Book 38, Page 14 2/11/55 EVALUATION AND CONDITIONS: The applicant s agent has indicated that the homeowner intends to have all construction activity performed by hand, inclusive of placement of the riprap retaining structure. Staff questioned the Engineer of Record as to the homeowners desire to retain the wood retaining wall. The Engineer of Record indicated that the homeowner does not want to disturb the area any more than necessary. This application lies within the realm of high risk given the location of the proposed improvements and condition of the existing wood retaining wall. The following conditions are offered for Board consideration should the variance be approved: Standard Site Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Dual wire re-enforced 36 erosion and sedimentation control measures (silt fences), shall be installed along the seaward portion of the project prior to any land JOSEPH GILBERT Page 96

102 Joseph Gilbert disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed in accordance with a field alignment to be determined at the pre-construction meeting. Best management practices for erosion and sediment control shall be employed during restoration activities to protect adjacent wetlands and shorelines of water bodies. Said erosion and sedimentation measures shall be inspected by the contractor at the end of every work day. 5. Construction limits shall be in accordance with a field alignment to be determined at the pre-construction meeting. Within the RPA, exclusive of limits of construction, areas of existing landscaped beds, trees, areas of existing leaf litter or forest floor, and other naturalized areas, such as shoreline vegetation, may not be removed. 6. For all areas to be preserved outboard of the limits of construction that are encroached upon, replacement of existing vegetation shall be provided at a 3:1 ratio for all unauthorized (damaged or removed) vegetation impacts. 7. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. Site Specific Conditions: 8. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. The Development Services Center and/or Permits and Inspections may require additional information that may affect the release of a building permit inclusive of a site plan being submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. 9. Specifications of the proposed riprap retaining structure shall be provided with the site plan in lieu of the generic rip-rap revetment detail provided. A Joint Permit Application (JPA) may be required. 10. All excavation associated with the proposed improvements shall occur by hand. No equipment shall be utilized seaward of the existing wood retaining wall. 11. All construction materials (i.e. riprap) associated with the proposed improvements shall be placed by hand. No equipment shall be utilized seaward of the existing wood retaining wall. 12. The amount of excavation/open trench associated with the installation of the riprap retaining structure shall not exceed the amount of riprap that will be hand-placed in a single day. JOSEPH GILBERT Page 97

103 Joseph Gilbert 13. Excavated material from the open trench associated with the installation of the riprap retaining structure shall be removed immediately. Any excavated material shall not be stockpiled downslope of the work area. Excavated material shall be stockpiled within a stable area (i.e. rear yard where existing slope is minimal) and encompassed with silt fence unless said material is being removed from the site and disposed of in a lawful manner the day of excavation. 14. Once the riprap retaining structure is complete, all areas of disturbance shall be temporarily stabilized during construction and permanently stabilized immediately once construction is completed. 15. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. 16. Buffer restoration shall be installed equal to 200% of the proposed new impervious cover within the RPA (279 sq. ft. x 200% = 558 sq. ft.) and shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance. The required restoration shall be located in the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 17. No perimeter fill is authorized outboard or seaward of the proposed improvements. 18. The conditions and approval associated with this variance are based on the exhibit plan dated August 19, 2014, prepared by WP Large, signed August 29, 2014 by Eric Garner. Deviation from said exhibit plan may require re-submittal for Board consideration. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days JOSEPH GILBERT Page 98

104 Joseph Gilbert after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. JOSEPH GILBERT Page 99

105 Joseph Gilbert JOSEPH GILBERT Page 100

106 Joseph Gilbert JOSEPH GILBERT Page 101

107 Joseph Gilbert JOSEPH GILBERT Page 102

108 Joseph Gilbert JOSEPH GILBERT Page 103

109 Joseph Gilbert JOSEPH GILBERT Page 104

110 Joseph Gilbert JOSEPH GILBERT Page 105

111 Joseph Gilbert JOSEPH GILBERT Page 106

112 Joseph Gilbert JOSEPH GILBERT Page 107

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015 Vice Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

August 2015 Chesapeake Bay Preservation Area Board Agenda

August 2015 Chesapeake Bay Preservation Area Board Agenda August 2015 Chesapeake Bay Preservation Area Board Agenda CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JULY 24, 2017

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JULY 24, 2017 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JULY 24, 2017 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA NOVEMBER 21, 2018

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA NOVEMBER 21, 2018 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA NOVEMBER 21, 2018 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JANUARY 23, 2017

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JANUARY 23, 2017 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JANUARY 23, 2017 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 27, 2016

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 27, 2016 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 27, 2016 Chair Mr. Sobota, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

Chesapeake Bay Preservation Area Board Agenda

Chesapeake Bay Preservation Area Board Agenda Agenda February 2016 CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Monday, February 22 nd, 2015

More information

CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING

CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Monday, February 24 th, 2014 at 10:00 a.m. in the

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 25, 2018

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 25, 2018 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 25, 2018 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA FEBRUARY 25, 2019

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA FEBRUARY 25, 2019 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA FEBRUARY 25, 2019 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA DECEMBER 20, 2017

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA DECEMBER 20, 2017 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA DECEMBER 20, 2017 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

JANUARY, 2012 Virginia Beach, VA

JANUARY, 2012 Virginia Beach, VA JANUARY, 2012 Virginia Beach, VA CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING January 23, 2012 The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on

More information

P A G E L E F T B L A N K

P A G E L E F T B L A N K PAGE LEFT BLANK CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Wednesday, December 21, 2016 at 10:00

More information

Chesapeake Bay Preservation Area Board Agenda

Chesapeake Bay Preservation Area Board Agenda Chesapeake Bay Preservation Area Board Agenda November 21, 2018 PAGE LEFT BLANK CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board

More information

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB 6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB REQUEST: Conditional Use Permit (outdoor recreational facility) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM Name: CCW Development Associates, L.L.C. Street Address: Telephone Number(s): 1209 Laskin Road, Virginia Beach, VA 23451 (757) 491-1996 Email: chris@vbhomesliving.com

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00 a.m. in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:45 a.m.

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW 2008-211 SENATE BILL 1967 AN ACT TO PROVIDE FOR IMPROVEMENTS IN THE MANAGEMENT OF STORMWATER IN THE COASTAL COUNTIES IN ORDER TO PROTECT WATER

More information

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060 May 12, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: May, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PLEASE REFER TO THE CLEARING & GRADING PERMIT CHECKLIST BELOW FOR SUBMITTAL REQUIREMENTS. SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PROJECT ADDRESS (Street, Suite #): Parcel(s) #: Total Site Area

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00am in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:30am a.m.

More information

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan County of Prince Edward Stormwater Management Program Date: E-Permitting Number: This stormwater management plan (Agreement) is hereby submitted by the Owner to specify the methods that will be implemented

More information

Three threshold measures will be applied together to capture project scale and scope and impacts:

Three threshold measures will be applied together to capture project scale and scope and impacts: The regulatory consequences to the County from State and Federal water quality regulations if the pollution impacts are not addressed by each project. The extreme difficulty, cost, and equity issues associated

More information

ARTICLE 22 CHESAPEAKE BAY PRESERVATION AREA (CBPA) OVERLAY DISTRICT. Statement of Intent

ARTICLE 22 CHESAPEAKE BAY PRESERVATION AREA (CBPA) OVERLAY DISTRICT. Statement of Intent ARTICLE 22 CHESAPEAKE BAY PRESERVATION AREA (CBPA) OVERLAY DISTRICT Statement of Intent A. This ordinance is enacted to implement the requirements of Section 10.1-2100 et seq. of the Code of Virginia (The

More information

CHESAPEAKE LANDSCAPE ORDINANCE

CHESAPEAKE LANDSCAPE ORDINANCE CHESAPEAKE LANDSCAPE ORDINANCE CONSERVATION PRESERVATION CZO 19-600 Effective October 16, 2008 BUFFER YARD C PARKING LOT REFORESTATION YEAR 1 REFORESTATION YEAR 4 BUFFER YARD F CBPA REFORESTATION Page

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy. Landscape design is an integral component of Site Planning and Building. The current pattern of walkways, driveways and landscape elements such as fences, hedges, and retaining walls in the neighborhood

More information

ARTICLE XIX SCREENING, LANDSCAPING AND TREES

ARTICLE XIX SCREENING, LANDSCAPING AND TREES ARTICLE XIX SCREENING, LANDSCAPING AND TREES Part I. Landscaping and Screening Section 304 Purpose. The purpose of this Part is to establish minimum landscaping and screening requirements that provide

More information

7 May 9, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: COASTAL ENTERPRISES, LLC

7 May 9, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: COASTAL ENTERPRISES, LLC 7 May 9, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: COASTAL ENTERPRISES, LLC REQUEST: Variance to Section 5B of the Site Plan Ordinance (Floodplain Regulations) ADDRESS / DESCRIPTION: 601 Sandbridge

More information

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara Applicant Franklin Johnston Group Management & Development, LLC Property Owner Virginia Wesleyan College Public Hearing July 12, 2017 City Council Election District Bayside Agenda Item 3 Request Conditional

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00 a.m. in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:30 a.m.

More information

Request Change in Nonconformity. Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Change in Nonconformity. Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant & Owner Public Hearing April 11, 2018 City Council Election District Beach Agenda Item 5 Request Change in Nonconformity Staff Recommendation Approval Staff Planner Jonathan Sanders Location

More information

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows. Adopted November 1999 I. Purpose A. The purpose of these guidelines is to assist in the design and layout of open space, as provided on developed lots within the District. The intent of these guidelines

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

Chesapeake Bay Critical Area Conservation Plan

Chesapeake Bay Critical Area Conservation Plan The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL The following checklist summarizes development guidelines and standards. See the appropriate section for a complete explanation of the

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Lesson 2: Stormwater Best Management Practices (BMPs)

Lesson 2: Stormwater Best Management Practices (BMPs) Lesson 2: Stormwater Best Management Practices (BMPs) Environmental Stewards Class Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources 732-932-9800 ext. 6209 obropta@envsci.rutgers.edu

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS TO: FROM: APPLICANT: AGENT: Shore Protection Committee: Commissioner Mark Williams, Chairman Mr. Richard Gardner Mr. Henry Morgan Mr. Zach Harris

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA Phone: Fax:

King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA Phone: Fax: King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA 23085 Phone: 804-785-5975 Fax: 804-769-5000 Water Quality Impact Assessment (WQIA) Application Note: Encroachment

More information

City of Richmond Chesapeake Bay Preservation Program. Public Information Manual

City of Richmond Chesapeake Bay Preservation Program. Public Information Manual City of Richmond Chesapeake Bay Preservation Program Public Information Manual Department of Public Utilities Water Resources Division Adoption Date March 9, 2009 Revised August 2017 Table of Contents

More information

March, 2016 Wetlands Board Applications

March, 2016 Wetlands Board Applications March 16, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: March, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

ARTICLE 9: LANDSCAPING AND FENCING REQUIREMENTS

ARTICLE 9: LANDSCAPING AND FENCING REQUIREMENTS ARTICLE 9: LANDSCAPING AND FENCING REQUIREMENTS Section 9.01 Intent The intent of the landscaping requirements are to improve the appearance of lot areas and soften paved areas and buildings; to provide

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

Request Conditional Rezoning (R-15 Residential to Conditional B-2 Community Business) Staff Planner Kevin Kemp

Request Conditional Rezoning (R-15 Residential to Conditional B-2 Community Business) Staff Planner Kevin Kemp Applicant Property Owner Three Five Ministries, Inc. Public Hearing May 11, 2016 City Council Election District Lynnhaven Agenda Item 4 Request Conditional Rezoning (R-15 Residential to Conditional B-2

More information

Request Conditional Rezoning (R-10 Residential & I-1 Light Industrial to Conditional I-1 Light Industrial) Staff Recommendation Approval

Request Conditional Rezoning (R-10 Residential & I-1 Light Industrial to Conditional I-1 Light Industrial) Staff Recommendation Approval Applicant & Property Owner Public Hearing January 9, 2019 City Council Election District Beach Agenda Item 1 Request Conditional Rezoning (R-10 Residential & I-1 Light Industrial to Conditional I-1 Light

More information

Article 10: Landscaping and Buffering

Article 10: Landscaping and Buffering 10.01: Purpose Article 10: Landscaping 10.01: Purpose The purpose of this article is to: A) Promote and protect the interest of the public convenience, comfort, prosperity, or general welfare in accordance

More information

Landscaping Standards

Landscaping Standards CHAPTER 29 ARTICLE 403 29.403 Landscaping Standards Purpose: The purpose of this section is to protect and promote the public health, safety and general welfare by requiring landscaping in relation to

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

Project phasing plan (if applicable) 12 copies of site plan

Project phasing plan (if applicable) 12 copies of site plan SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch Applicant Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch Public Hearing March 14, 2018 City Council Election District Kempsville Agenda Item 6 Request Conditional Rezoning (B-2 Community

More information

Nick Sigmund, Sr. Zoning Officer

Nick Sigmund, Sr. Zoning Officer Nick Sigmund, Sr. Zoning Officer Wisconsin Department of Natural Resources Administrative Code NR 115 under the authority of Wisconsin Statute 59.692, establishes and provides that shoreland zoning regulations

More information

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and, Article 5. Landscaping 5.1 Purpose The Town of Laurel Park s landscape standards are designed to create a beautiful, aesthetically pleasing built environment that will complement and enhance community

More information

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Recommendation Approval

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Recommendation Approval Applicant & Property Owner Public Hearing February 8, 2017 City Council Election District Beach Agenda Item D1 Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District

More information

Request Modification of Proffers Approved by City Council on May 8, 2012 Modification of Conditions (Mini- Warehouse) Staff Recommendation Approval

Request Modification of Proffers Approved by City Council on May 8, 2012 Modification of Conditions (Mini- Warehouse) Staff Recommendation Approval Applicant & Property Owner Salem Lakes Storage, LLC, a VA Limited Liability Company Public Hearing February 8, 2017 City Council Election District Centerville Agenda Item 4 Request Modification of Proffers

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

Chesapeake Bay Preservation Area Board

Chesapeake Bay Preservation Area Board City of Chesapeake MINUTES The Chesapeake Bay Preservation Area Board Planning Department 306 Cedar Road PO Box 15225 Chesapeake, Virginia 23328 (757) 382-6176 FAX: (757) 382-6406 Chesapeake Bay Preservation

More information

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary March 20, 2009 Low-Impact Shoreline Stabilization Cumulative

More information

Stormwater Management for Homeowners Fact Sheet 6: Buffers

Stormwater Management for Homeowners Fact Sheet 6: Buffers Publication SPES-14P Stormwater Management for Homeowners Fact Sheet 6: Buffers Laurie J. Fox, Research Associate, Horticulture, Virginia Tech Daniel J. Robinson, Graduate Student, Biological Systems Engineering,

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

R E S O L U T I O N. Designation: R-2A (1-Family, 2-acre Minimum Lot Size)

R E S O L U T I O N. Designation: R-2A (1-Family, 2-acre Minimum Lot Size) PLANNING BOARD Arthur Adelman, Chair TOWN OF NORTH CASTLE WESTCHESTER COUNTY 17 Bedford Road Armonk, New York 10504-1898 R E S O L U T I O N Telephone: (914) 273-3542 Fax: (914) 273-3554 www.northcastleny.com

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

ARTICLE VI: SITE PLAN REVIEW

ARTICLE VI: SITE PLAN REVIEW Section 6.01 - Site Plan Review (All Districts) ARTICLE VI: SITE PLAN REVIEW Site plans give the Planning commission an opportunity to review development proposals in a concise and consistent manner. The

More information

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

STORMWATER PERMIT SUBMITTAL REQUIREMENTS STORMWATER PERMIT SUBMITTAL REQUIREMENTS Most development within the City of Bellingham that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater

More information

3 June 10, 2015 Public Hearing

3 June 10, 2015 Public Hearing 3 June 10, 2015 Public Hearing APPLICANT & PROPERTY OWNERS: DAVID S. & TERESSA A. ITALIANO STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (bulk storage yard) ADDRESS / DESCRIPTION: 1417 London

More information

Zoning Ordinance Article 3

Zoning Ordinance Article 3 Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety

More information

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) 26.01 DESCRIPTION AND PURPOSE. Landscaping is an important element of the use, development and preservation of land, and a significant factor

More information

Working Group Meeting

Working Group Meeting April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome

More information

County of Fairfax, Virginia

County of Fairfax, Virginia County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods, and diverse communities of Fairfax County DATE: July 16, 2007 TO: SUBJECT: All Architects, Attorneys,

More information

Chair Leskinen and Planning Commission Members Jessica Loftus, City Administrator

Chair Leskinen and Planning Commission Members Jessica Loftus, City Administrator Agenda Item 3 Date Application Received: 10/21/15 Date Application Considered as Complete: 10/30/15 120-Day Review Period Expires: 02/27/16 To: From: Chair Leskinen and Planning Commission Members Jessica

More information

Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit?

Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit? Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit? Karen Duhring Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

More information

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures. Chapter 4 Site Design Measures This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures. Site design measures for water quality protection are

More information

SMALL PROJECTS SIMPLIFIED APPROACH

SMALL PROJECTS SIMPLIFIED APPROACH SMALL PROJECT APPLICATION AND STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL FOR SMALL PROJECTS IN FULTON TOWNSHIP LANCASTER COUNTY, PENNSYLVANIA SMALL PROJECTS SIMPLIFIED APPROACH Prepared By: Light-Heigel

More information

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control

More information

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant Property Owner SunTrust Bank Public Hearing October 10, 2018 City Council Election District Princess Anne Agenda Item 2 Request Conditional Use Permit (Car Wash Facility) Staff Recommendation

More information

4 September 14, 2011 Public Hearing APPLICANT:

4 September 14, 2011 Public Hearing APPLICANT: 4 September 14, 2011 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: KHJ, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (motor vehicle rental, automotive service, and automotive/bulk

More information

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads; Bedford Township, MI (Monroe Co.) 2012 http://library.municode.com/index.aspx?clientid=02123 400.1907 - Landscaping and screening. Se 1907. 1. Intent. Landscaping, greenbelts, and screening are necessary

More information

Request Alternative Compliance (Commercial Parking Lot in Restricted Area) Staff Recommendation Approval. Staff Planner Ashby Moss

Request Alternative Compliance (Commercial Parking Lot in Restricted Area) Staff Recommendation Approval. Staff Planner Ashby Moss Applicant Property Owners Pacific Avenue West, LLC Public Hearing April 11, 2018 City Council Election District Beach Agenda Item 2 Request Alternative Compliance (Commercial Parking Lot in Restricted

More information

North Carolina Coastal Federation

North Carolina Coastal Federation North Carolina Coastal Federation Erosion Control: Non-Structural Alternatives A Shorefront Property Owner s Guide Shoreline erosion and landward migration of marshes are natural processes, and are important

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

6 July 9, 2014 Public Hearing

6 July 9, 2014 Public Hearing 6 July 9, 2014 Public Hearing APPLICANT: CAMERON JUSTIN MUNDEN PROPERTY OWNER: GRANTED WISH, L.L.C. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Bulk Storage Yard) ADDRESS / DESCRIPTION:

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

Deb Grube, Sr. Zoning Officer

Deb Grube, Sr. Zoning Officer Deb Grube, Sr. Zoning Officer Wisconsin Department of Natural Resources Administrative Code NR 115 under the authority of Wisconsin Statute 59.692, establishes and provides that shoreland zoning regulations

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5)

REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5) REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5) 26 March 14, 2012 Public Hearing APPLICANT: KROLL ENTERPRISES, INC. PROPERTY OWNER: N&K PROPERTIES, LLC/B&W DEVELOPMENT LLC STAFF

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public