Chesapeake Bay Preservation Area Board Agenda

Size: px
Start display at page:

Download "Chesapeake Bay Preservation Area Board Agenda"

Transcription

1 Agenda February 2016

2

3 CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Monday, February 22 nd, 2015 at 10:00 a.m. in the City Council Chambers, Virginia Beach Municipal Center, Virginia Beach, Virginia. An informal session is held at 9:00 a.m. in the City Council Chambers at which time staff briefs the Board on agenda items. All interested persons are invited to attend. There is no opportunity for citizenry to speak at the briefing session; however, the public is invited to speak at the formal Public Hearing held at 10:00 a.m. in the City Council Chambers. Those members of the public interested in attending the public hearing should be advised that, for reasons the board deems appropriate, certain items on the agenda may be heard out of order and that it should not be assumed that the order listed below will be exactly followed during the public hearing. Those members of the public interested in speaking in support or in opposition to an agenda item shall be limited to 3 minutes in which to address the board. At the discretion of the CBPA Board Chairman, this time may be increased to 5 minutes. Speakers will be electronically timed. The staff reviews all of the items on this agenda and offer recommendations for consideration by the Chesapeake Bay Preservation Area Board, in the event they should approve the application. However, it should not be assumed that those conditions constitute all of the conditions that will ultimately be attached to the project. Staff agencies may impose further conditions and requirements applicable to city ordinances. If you are physically disabled or visually impaired and need assistance at this meeting, please call the Planning Department at or Richard Scarper Environmental Coordinator Planning Department rscarper@vbgov.com (757)

4 February 22 nd, 2016 CBPA Agenda TABLE OF CONTENTS OLD BUSINESS: 1. River Shore Condominium Association River Forest Road 2. Stephen Ballard Arnold Court NEW BUSINESS: 3. Leif & Julia Lagergren Woodhouse Road 4. Tony Lucas Quail Point Road 2016 CBPA BOARD PUBLIC HEARING DATES Monday January 25 Monday February 22 Monday March 28 Monday April 25 Monday May 23 Monday June 27 Monday July 25 Monday August 22 Monday September 26 Monday October 24 Monday November 28 Wednesday December 21(tentative)

5 Revised Plans and Correspondences 30 DAY DEFERRALS For 30 day deferrals revised plans and any correspondence to be distributed to Board members for items to be heard at the Monday, March 8 th, 2016 Public Hearing are due in the Planning Department, Room 115 by: 5:00 p.m. on Friday, February 19 th, Please provide the following: 15 copies of revised plans 3 copies of the CBPA application 3 copies of the Water Quality Impact Assessment (WQIA) 60 DAY DEFERRALS For 60 day deferrals revised plans and any correspondence to be distributed to Board members for items to be heard at the Monday, April 25 th, 2016 Public Hearing are due in the Planning Department, Room 115 by: 5:00 p.m. on Friday, March 25 th, Please provide the following: 15 copies of revised plans 3 copies of the CBPA application 3 copies of the Water Quality Impact Assessment (WQIA) Please note that if any additional correspondence for distribution to Board members is required, than 15 copies of each correspondence must be provided. Please note that if any additional correspondence for distribution to Board members is required, than 15 copies of each correspondence must be provided.

6 Resources The following resources are provided for information use: City of Virginia Beach Environment and Sustainability Office Website City of Virginia Beach Chesapeake Bay Preservation Area Board Website City of Virginia Beach Wetland Boards Website City of Virginia Beach City of Virginia Beach Map City of Virginia Beach Development Services Center Center for Coastal Resource Management CCRMP Map Viewer

7 1 River Shore Condominiums 499 River Forest Road GPIN Beach District Applicant Agent: Jennifer Copeland, Community First Management SUMMARY OF PROPOSAL: Existing Impervious Cover: 44.8% of site -or- 95,395 square feet Proposed Impervious Cover: 44.8% of site -or- 95,395 square feet New Impervious Cover in the RPA 0 square feet Redevelopment in the RPA 0 square feet Approximate fill in the RPA 225 cubic yards Construction of: Three options are proposed: fill only, bulkhead with fill, or segmental block wall with fill, construction of maintenance path with gravel or mulch Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer Land Disturbance Amount: greater than 2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer, Landward 50 foot buffer, Variable Width 100 foot buffer of the Resource Protection Area (RPA), and Resource Management Area (RMA) ENVIRONMENTAL ANALYSIS: Soil Type(s): Yeopim, Rumford, Rappahanock Soils (deep, well drained). Condition of Riparian Buffer: The parcel is sparsely wooded with riparian vegetation, primarily located seaward of existing improvements. Existing canopy trees and understory vegetation appears to be healthy. Approximately 54 trees to be removed Approximately 16,000 square footage of canopy to be removed Approximately 22,000 square footage of understory/brush/leaves/needles to be removed River Shore Condominiums 400 River Forest Road Page 1

8 Approximately 50 trees to be heavily pruned Condition of Shoreline: Moderate erosion of the shoreline and to adjacent highly erodible soils is evident, hence the need for the project. Much of the eroded material has been absorbed and retained within the adjacent organic leaf litter and high tidal fringe marsh. Erosion is attributable to a lack of vegetation (shading), and point source discharge of stormwater. Outboard of the toe of slope and shade zone, a resilient vegetative tidal fringe marsh exists. The Center for Coastal Resource Management has provided information towards the Preferred Shoreline Best Management Practices and suggests the following: Uplands and Bank Areas: Enhance Riparian/Marsh Buffer: Vegetation stabilization provided by a blended area of upland riparian and/or tidal marsh vegetation; target area extends from mid-tide to upland area where plants can occupy suitable elevations in dynamic fashion, e.g. seasonal fluctuations, gradual storm recovery; no action may be necessary in some situations; may include existing marsh management; may include planted marsh, sand fill, and/or fiber logs; restore riparian forest buffer where it does not exist; replace waterfront lawns with ornamental grasses, native shrubs and small trees; may include invasive species removal to promote native vegetation growth. Flood Zone: Zone AE, X, Elevation 8.0. Stormwater Management: Downspout Dispersion HISTORY OF PROPERTY: Lot Recorded: Map Book 2803, Page /3/89 EVALUATION AND CONDITIONS: This project was deferred from the January 2016 hearing. The Board desired additional information regarding the scope of the project and site specific construction proposals. The revised submittal has reduced the limit of fill, identified vertical retaining structures (substantial and minor), additional tree removal, understory clearing, tree limbing, and maintenance foot path. A recent site inspection revealed that the subject condominium structures, sidewalks, air conditioning compressor pads, and associated parking facility lie adjacent to steep slopes (slopes typically range between 10% to 30%) and a tidal fringe marsh. The structures proximity to the aforementioned features has resulted in a substantial loss of topsoil and exposure of structural River Shore Condominiums 400 River Forest Road Page 2

9 footers. The majority of topsoil has eroded into the adjacent tidal fringe marsh and organic leaf litter. Moreover, it was noted that one of the existing private drop inlets is completely compromised by sediment/debris. Stormwater is being discharged via over the curb. The residual sloped and flat surface zones adjacent to the structures are devoid of any stabilizing vegetative cover. The applicant has indicated that geotechnical and structural design professionals were consulted prior to submission of the subject variance request. It was agreed that a minimum of 18 of topsoil be applied above the concrete footers and denuded portions of the site. The site conditions (proximity to top of bank, below top of bank, near tidal fringe marsh, etc.) bordering the perimeters of the buildings vary, thereby precipitating the need for an array of erosion abatement methods. The applicant has indicated that an embankment cross sectional analysis be performed individually, given the structural improvements proximity to wetlands, minimal exposure to sunlight, severity of slope, volume of fill needed, and potential exposure to storm tides. Staff concurs with this analysis and will be involved when said analysis is conducted. As noted above, the majority of the subject activity will occur within the upland riparian buffer. Staff is of the opinion that in order for the subject fill material to remain stable, not only in the short term but long term, sunlight availability to the entire shoreline is critical. In the absence of this objective, the subject fill material will eventually erode into the Lynnhaven River. As such, it is understood that as part of the design team, a local certified landscape professional will be an integral part of the aforementioned analysis. Extensive maintenance and modification of the woody vegetation around the shoreline perimeter is necessary. Also of importance, a management plan needs to be developed and implemented for the duration of the River Shore Condominium development. The following conditions are offered for Board consideration should the variance be approved: CBPA Variance Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 5 from improvements. River Shore Condominiums 400 River Forest Road Page 3

10 5. Construction limits shall lay a maximum of 5' seaward of improvements. 6. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 7. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. 8. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. 9. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 10. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. 11. The drop inlets on the property shall be cleaned and maintained of sediment and debris. 12. Post approval of the site plan, an annual report shall be submitted in the month of October to the Environment & Sustainability Office to ensure compliance with the approved site plan/permit for three years. Said report shall include information relative to the current state of the maintenance paths, bulkheads, segmental block walls, downspout interceptors, requisite vegetation, and fill material. 13. No perimeter fill is permitted below the 5 contour elevation or seaward of any vertical retaining structure. In the event that fill is desired below the 5 contour elevation, an additional retaining structure will be installed where that occurs. 14. The conditions and approval associated with this variance are based on the revised exhibit prepared by American Engineering, signed February 10, 2015 by Scott M. Wilkins. Deviation from said conditions during site plan review may require re-submittal for Board consideration. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site River Shore Condominiums 400 River Forest Road Page 4

11 plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. River Shore Condominiums 400 River Forest Road Page 5

12 River Shore Condominiums 400 River Forest Road Page 6

13 River Shore Condominiums 400 River Forest Road Page 7

14 River Shore Condominiums 400 River Forest Road Page 8

15 River Shore Condominiums 400 River Forest Road Page 9

16 River Shore Condominiums 400 River Forest Road Page 10

17 River Shore Condominiums 400 River Forest Road Page 11

18 River Shore Condominiums 400 River Forest Road Page 12

19 River Shore Condominiums 400 River Forest Road Page 13

20 River Shore Condominiums 400 River Forest Road Page 14

21 . 2 Stephen Ballard 1612 Arnold Circle GPIN Lynnhaven District Applicant s Agent: Billy Garrington Governmental Permitting Consultant SUMMARY OF PROPOSAL: Existing Impervious Cover: 26.6% of site -or- 21,522 square feet Demolition of: Existing residence, pool, pool decking, recent demolition of 1,600 s.f. basketball court, shoreline hardening structures Proposed Impervious Cover: 31.2% of site -or- 25,250 square feet New Impervious Cover in the RPA 3,023 - square feet Redevelopment in the RPA 9,298 - square feet Construction of: New residence, driveway, pool, pool decking, walkways After-the-Fact synthetic turf steps, four concrete terrace walls, conversion of turf to synthetic turf, sand traps, two golf greens, flower beds, approximately 7,000 constructed wetlands, flagpole with concrete base Location of Proposed Impervious Cover: Within the seaward, landward, variable width portions of the Resource Protection Area (RPA) Land Disturbance Amount: more than 2,500 square feet Location of Land Disturbance: Within the seaward, landward, variable width portions of the Resource Protection Area (RPA), Resource Management Area (RMA) Total land disturbance approximately 64,500 s.f. or 1.48 acres (29,500 for new proposal, approximately 35,000 s.f. for the after-the-fact synthetic turf/golf green improvements). ENVIRONMENTAL ANALYSIS: Soil Type(s): State Series Soils (deep, well drained) Bojac Series Soils (deep, well drained) Condition of Riparian Buffer: STEPHEN BALLARD 1612 Arnold Circle Page 15

22 Prior to the installation of the water-dependent facilities, the riparian buffer was devoted primarily to turf. Post-construction of the water-dependent facilities, said turf was eliminated and replaced with golf greens, sand traps, synthetic turf, landscaped native and adaptive plants, and bioretention trenches. 0 trees to be removed Means of Riparian Buffer Restoration: None shown Condition of Shoreline: Vertical bulkhead with concrete cap, rip rap revetment, marsh sill and constructed wetlands, sandy beach Flood Zone: Zone AE, X Stormwater Management: Bioretention trenches, constructed wetland, and sand traps with gravel infiltration beds HISTORY OF PROPERTY: Lot Recorded: Map Book 34, Page 42 1/9/53 Previous Variance(s) to the Chesapeake Bay Preservation Area Ordinance: A variance was granted January 29, 1996 with the following conditions: 1. Elimination of an 8 wide by 750 long concrete walkway adjacent to tidal waters and wetlands. Sand and gravel is acceptable. 2. Permit one pedestrian access point to the water consistent with Section 108 (D) (4) of the Ordinance. 3. Reduction of the concrete pad/tunnel to 17 x 35 with proper BMP s. 4. Allow dredge spoil material in the Resource Protection Area Buffer with sand to have topsoil and be sodded. Undesirable material is to be hauled away. 5. A site plan shall be submitted to the Development Services Center for review and approval prior to the issuance of a building permit A variance was granted May 22, 2000 with the following conditions: 1. Dual erosion and sedimentation control measures are to be installed prior to any land disturbance and shall be maintained until such time as vegetative cover is established. STEPHEN BALLARD 1612 Arnold Circle Page 16

23 2. Construction limits shall lay a maximum of 15' channelward of structural improvements. 3. All stormwater associated with the existing principal structure and the proposed impervious area to be developed on this site shall be conveyed to a structural stormwater management facility. 4. Buffer restoration employing bayscape landscaping principles shall be installed downslope of improvements. The restoration area shall be equal to new impervious cover (6,844 square feet) and shall be linear in design to the greatest extent practical. A separate landscape plan shall accompany the site plan. 5. The steps shall employ under deck treatment if developed with timber and shall be a maximum of 10' in width. 6. A revised site plan shall be submitted to the Department of Planning, Development Services Center for review and approval prior to the issuance of a building permit. EVALUATION AND CONDITIONS: The following conditions are offered for Board consideration should the variance be approved: CBPA Variance Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 15 from improvements. 5. Construction limits shall be contained within the limits of the delineated silt fence per the CBPA Variance Exhibit. All areas outside limits of construction shall be left in a STEPHEN BALLARD 1612 Arnold Circle Page 17

24 natural state to include the forest floor (leaf litter) left intact. Said condition shall be so noted on the site plan. 6. For all trees to be preserved outboard of the limits of construction that are encroached upon, replacement of existing vegetation shall be provided at a 3:1 ratio for all unauthorized (damaged or removed) vegetation impacts. 7. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 8. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. 9. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. 10. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 11. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. 12. Buffer restoration shall be installed equal to 200% of the proposed new impervious cover within the RPA: 3,023 sq. ft. x 200% = 6,046 sq. feet. Said restoration shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance: 15 canopy trees, 30 understory, and 45 shrubs. The required restoration shall be located in the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of approximately 50% deciduous and 50% evergreen species and shall STEPHEN BALLARD 1612 Arnold Circle Page 18

25 be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 13. The pool shall be constructed prior to or concurrent with the residence. 14. **As offered by the applicant, payment shall be made to the Lynnhaven Oyster Heritage Program concurrent with site plan approval. Payment shall be in the amount of $ and is based on 25% of the proposed impervious cover within the Resource Protection Area (RPA). Said payment shall provide for the equivalent of an approximate 756 sq. ft., 12-inch deep oyster shell plant within the Lynnhaven River Basin. 15. It is the opinion of the Board that the approval granted is the maximum impervious cover the site can support. 16. This variance and associated conditions will supersede the conditions of the Board variance granted January 29, 1996 and May 22, The conditions and approval associated with this variance are based on the exhibit plan sealed January 29, 2016, prepared by SB Ballard, signed Wayne Barrett, L.S. Deviation from said conditions during site plan review may require re-submittal for Board consideration. Said exhibit and conditions shall be submitted to the Department of Planning, Development Services Center for review and approval prior to the issuance of a building permit. The Development Services Center and/or Permits and Inspections may require additional information that may affect the release of a building permit. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. STEPHEN BALLARD 1612 Arnold Circle Page 19

26 1612 Arnold Circle GPIN R40 STEPHEN BALLARD 1612 Arnold Circle Page 20

27 STEPHEN BALLARD 1612 Arnold Circle Page 21

28 STEPHEN BALLARD 1612 Arnold Circle Page 22

29 STEPHEN BALLARD 1612 Arnold Circle Page 23

30 STEPHEN BALLARD 1612 Arnold Circle Page 24

31 STEPHEN BALLARD 1612 Arnold Circle Page 25

32 STEPHEN BALLARD 1612 Arnold Circle Page 26

33 STEPHEN BALLARD 1612 Arnold Circle Page 27

34 3 Leif & Julia Lagergren 1412 North Woodhouse Road GPIN Lynnhaven District Applicant Agent: Eric Garner, LS, WPL SUMMARY OF PROPOSAL: Existing Impervious Cover: 18% of site -or- 6,894 square feet Proposed Impervious Cover: 20.6% of site -or- 7,823 square feet New Impervious Cover in the RPA 960 square feet Redevelopment in the RPA 549 square feet Demolition of: Existing wood deck and portion of existing structure Construction of: Building addition, screen porch, covered patio, open paver patio, paver walkway Location of Proposed Impervious Cover: Within the 50 landward and Variable-Width buffer Land Disturbance Amount: greater than 2,500 square feet Location of Land Disturbance: Within the Landward 50 foot buffer and Variable Width 100 foot buffer of the Resource Protection Area (RPA), and Resource Management Area (RMA) ENVIRONMENTAL ANALYSIS: Soil Type(s): State Series Soils (deep, well drained). Condition of Riparian Buffer: The parcel is primarily turf with several canopy trees. Along the lower reach there exists mowed tidal marsh and an emergent fringe marsh along the navigable canal. Existing canopy trees and understory vegetation appears to be healthy. 0 trees to be removed Leif and Julia Lagergren 1412 North Woodhouse Road Page 28

35 Means of Riparian Buffer Restoration: Standard buffer restoration for new impervious cover Condition of Shoreline: Minimal erosion of the shoreline was observed and there exists little or no site fetch conditions. The Center for Coastal Resource Management has provided information towards the Preferred Shoreline Best Management Practices and suggests the following: Uplands and Bank Areas: Enhance Riparian/Marsh Buffer: Vegetation stabilization provided by a blended area of upland riparian and/or tidal marsh vegetation; target area extends from mid-tide to upland area where plants can occupy suitable elevations in dynamic fashion, e.g. seasonal fluctuations, gradual storm recovery; no action may be necessary in some situations; may include existing marsh management; may include planted marsh, sand fill, and/or fiber logs; restore riparian forest buffer where it does not exist; replace waterfront lawns with ornamental grasses, native shrubs and small trees; may include invasive species removal to promote native vegetation growth. Flood Zone: Zone AE, X Stormwater Management: Bioretention (WQIA) HISTORY OF PROPERTY: Lot Recorded: Map Book 32, Page 13 7/7/52 EVALUATION AND CONDITIONS: A recent field visit suggests that the majority of the buffer is devoted to turf with mowed marsh along the lower reaches of the property. Canopy trees are primarily located along both sides of the property lines. The following Conditions are offered for Board consideration: 1. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. Leif and Julia Lagergren 1412 North Woodhouse Road Page 29

36 2. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 3. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 15 from improvements. 4. Construction limits shall be contained within the limits of the delineated silt fence per the CBPA Variance Exhibit. All areas outside limits of construction shall be left in a natural state to include the forest floor (leaf litter) left intact. Said condition shall be so noted on the site plan. 5. For all trees to be preserved outboard of the limits of construction that are encroached upon, replacement of existing vegetation shall be provided at a 3:1 ratio for all unauthorized (damaged or removed) vegetation impacts. 6. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 7. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. 8. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. 9. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 10. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. Leif and Julia Lagergren 1412 North Woodhouse Road Page 30

37 11. Buffer restoration shall be installed equal to 200% of the proposed new impervious cover within the RPA: 960 sq. ft. x 200% = 1,920 sq. feet. Said restoration shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance: 5 canopy trees, 10 understory, and 15 shrubs. The required restoration shall be located in the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of approximately 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 12. **As offered by the applicant, payment shall be made to the Lynnhaven Oyster Heritage Program concurrent with site plan approval. Payment shall be in the amount of $ and is based on 25% of the proposed impervious cover within the Resource Protection Area (RPA). Said payment shall provide for the equivalent of an approximate 240 sq. ft., 12-inch deep oyster shell plant within the Lynnhaven River Basin. 13. The conditions and approval associated with this variance are based on the exhibit plan dated January 25, 2016, prepared by WPL, signed by Eric Garner, L.S. Deviation from said conditions during site plan review may require re-submittal for Board consideration. Said exhibit and conditions shall be submitted to the Department of Planning, Development Services Center for review and approval prior to the issuance of a building permit. The Development Services Center and/or Permits and Inspections may require additional information that may affect the release of a building permit. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the Leif and Julia Lagergren 1412 North Woodhouse Road Page 31

38 signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. Leif and Julia Lagergren 1412 North Woodhouse Road Page 32

39 Leif and Julia Lagergren 1412 North Woodhouse Road Page 33

40 Leif and Julia Lagergren 1412 North Woodhouse Road Page 34

41 Leif and Julia Lagergren 1412 North Woodhouse Road Page 35

42 Leif and Julia Lagergren 1412 North Woodhouse Road Page 36

43 Leif and Julia Lagergren 1412 North Woodhouse Road Page 37

44 Leif and Julia Lagergren 1412 North Woodhouse Road Page 38

45 Leif and Julia Lagergren 1412 North Woodhouse Road Page 39

46 Leif and Julia Lagergren 1412 North Woodhouse Road Page 40

47 Leif and Julia Lagergren 1412 North Woodhouse Road Page 41

48 4 Tony Lucas 1500 Quail Point Road GPIN Lynnhaven District Applicant Agent: Billy Garrington SUMMARY OF PROPOSAL: Existing Impervious Cover: 25.2% of site -or- 9,212 square feet Demolition of: Existing residence and associated accessory structures, driveway, two sheds, and walkways leading to the gazebo Proposed Impervious Cover: 22.2% of site -or- 8,110 square feet New Impervious Cover in the RPA 1,959 square feet Redevelopment in the RPA 5,638 square feet Construction of: Residence with swimming pool, patio areas, and driveway Location of Proposed Impervious Cover: Within the Seaward 50 foot buffer, Landward 50 foot buffer, and Variable Width 100 foot buffer of the Resource Protection Area (RPA). Land Disturbance Amount: more than 2,500 square feet Location of Land Disturbance: Within the Seaward 50 foot buffer, Landward 50 foot buffer, and Variable Width 100 foot buffer of the Resource Protection Area (RPA) ENVIRONMENTAL ANALYSIS: Soil Type(s): Yeopim (deep, well drained). Condition of Riparian Buffer: The parcel is sparsely wooded with moderate to extreme shoreline erosion. Recent site visit revealed that a failed vertical bulkhead and subsequent revetment structure have both been compromised with resultant loss of upland backfill into receiving waters. Existing canopy trees and understory vegetation appears to be healthy. 0 trees to be removed Tony Lucas 1500 Quail Point Road Page 42

49 Means of Riparian Buffer Restoration: Standard buffer restoration for new impervious cover Condition of Shoreline: No method of abatement proposed. The Center for Coastal Resource Management has provided information towards the Preferred Shoreline Best Management Practices and suggests the following: Uplands and Bank Areas: Enhance Riparian/Marsh Buffer: Vegetation stabilization provided by a blended area of upland riparian and/or tidal marsh vegetation; target area extends from mid-tide to upland area where plants can occupy suitable elevations in dynamic fashion, e.g. seasonal fluctuations, gradual storm recovery; no action may be necessary in some situations; may include existing marsh management; may include planted marsh, sand fill, and/or fiber logs; restore riparian forest buffer where it does not exist; replace waterfront lawns with ornamental grasses, native shrubs and small trees; may include invasive species removal to promote native vegetation growth. Tidal Wetlands, Beach, and Shoreline Areas: Enhance / Maintain Marsh: Preserve existing tidal marsh for wave attenuation. Avoid using herbicides near marsh. Encourage both low and high marsh areas, do not mow within 100 ft from top of bank. Remove tidal debris at least annually. Repair storm damaged marsh areas with new planting. Flood Zone: Zone AE, X Stormwater Management: Bioretention HISTORY OF PROPERTY: Lot Recorded: Map Book 47, Page 58 8/26/59 EVALUATION AND CONDITIONS: Staff is of the opinion that given the disposition of the shoreline, the subject request is not ripe for Board consideration. Recent site visit revealed that a failed vertical bulkhead and subsequent revetment structure have both been compromised with resultant loss of upland backfill into receiving waters. In addition, retention of the concrete slab and sidewalk adjacent to the gazebo is also ill-advised. Construction inclusive of demolition, limits of construction, stockpile and staging area, will likely accelerate upland erosion into receiving tidal waters. Tony Lucas 1500 Quail Point Road Page 43

50 However, the following Conditions are offered for Board consideration should the variance be approved: CBPA Variance Conditions: 1. A pre-construction meeting shall be held with the CBPA Inspector prior to any land disturbance, including demolition. 2. Land disturbance shall be limited to the area necessary to provide for the proposed use or development. Said areas of land disturbance shall be quantified on revised site plan submittals. 3. The construction access way, staging area, stockpiling area and contractor parking area shall be noted on the site plan. Said areas shall be quantified as land disturbance if not occurring on a paved or graveled surface. 4. Wire reinforced 36 silt fence, for erosion and sedimentation control measures, shall be installed along the seaward portion of the project prior to any land disturbance and shall remain in place until such time as vegetative cover is established. Said silt fence shall be installed 15 from improvements. 5. Construction limits shall lay a maximum of 15' seaward of improvements. 6. For all trees to be preserved outboard of the limits of construction that are encroached upon, replacement of existing vegetation shall be provided at a 3:1 ratio for all unauthorized (damaged or removed) vegetation impacts. 7. Prior to clearing, grading, demolition or construction, suitable protective barriers, such as safety fencing, shall be erected outside of the dripline (to the greatest extent practicable) of any tree or stand of trees to be preserved. These protective barriers shall remain so erected throughout all phases of construction. The storage of equipment, materials, debris, or fill shall not be allowed within the area protected by the barrier. 8. Permanent and / or temporary soil stabilization measures shall be applied to all disturbed / denuded area(s) prior to a final building inspection or certificate of occupancy. All disturbed or denuded areas shall be stabilized in accordance with the Virginia Erosion and Sediment Control Law and Regulations. 9. A site plan shall be submitted to the Department of Planning, Development Services Center (DSC) for review and approval prior to the issuance of a building permit. 10. Submitted concurrent with the site plan shall be a separate planting / buffer restoration plan detailing location, number, and species of vegetation to be installed as per the buffer Tony Lucas 1500 Quail Point Road Page 44

51 restoration requirements. The planting / buffer restoration plan shall clearly delineate existing naturalized area (forest floor), planting beds, turf zones and areas of shoreline vegetation to be managed permitting sunlight to interface with tidal fringe marsh. 11. Stormwater management shall comply with the requirements set forth within the Code of Ordinances, Appendix D Stormwater Management. 12. Buffer restoration shall be installed equal to 200% of the proposed new impervious cover within the RPA: 1,959 sq. ft. x 200% = 3,918 sq. feet. Said restoration shall achieve the full complement of vegetation consisting of canopy trees, understory trees, shrubs and groundcovers consistent with the Riparian Buffers Modification & Mitigation Guidance Manual, prepared by Virginia Dept. of Conservation & Recreation, Chesapeake Bay Local Assistance: 10 canopy trees, 20 understory, and 30 shrubs. The required restoration shall be located in the Resource Protection Area, in areas currently devoted to turf or where impervious cover is removed. The restoration shall be installed beginning in the seaward portion of the buffer and progressing landward and shall have a mulch layer of organic material 4 6 in depth. Said mulched restoration areas shall be maintained and not removed or allowed to revert to turf in the future. The required trees shall be comprised of approximately 50% deciduous and 50% evergreen species and shall be evenly distributed within the RPA buffer. Trees shall not be planted within 15 feet of the shoreline where such planting would result in marsh shading or interference with the integrity of shoreline structures. Salt and flood tolerant plant species shall be planted below the five foot contour to ensure greater survival of the plantings. Said restoration shall be installed prior to the issuance of the certificate of occupancy or release of the building permit. 13. A means or method to abate the ongoing shoreline erosion shall be addressed on the submitted site plan. A Joint Permit Application (JPA) may be required. 14. The proposed walkways, exclusive of the walkway to the front door, shall be constructed of organic material (mulch), and maximum of 4 in width, with stepping stones not to exceed 50% of the path area. 15. Pool decking shall be as depicted on the site plan sealed 12/29/ The pool shall be constructed prior to or concurrent with the residence. 17. Under deck treatment of sand and gravel shall be installed. 18. No perimeter fill is authorized outboard or seaward of the proposed improvements. Tony Lucas 1500 Quail Point Road Page 45

52 19. **As offered by the applicant, payment shall be made to the Lynnhaven Oyster Heritage Program concurrent with site plan approval. Payment shall be in the amount of $ and is based on 25% of the proposed impervious cover within the Resource Protection Area (RPA). Said payment shall provide for the equivalent of an approximate 489 sq. ft., 12-inch deep oyster shell plant within the Lynnhaven River Basin. 20. It is the opinion of the Board that the approval granted is the maximum impervious cover the site can support. 21. The conditions and approval associated with this variance are based on the exhibit plan dated 12/29/15 prepared by Gallup Surveyors and Engineers, signed by Bruce Gallup, P.E. Deviation from said conditions during site plan review may require re-submittal for Board consideration. 22. The conditions and approval associated with this variance are based on the exhibit prepared by the applicant and presented to the Board. Said exhibit and conditions shall be submitted to the Department of Planning, Development Services Center for review and approval prior to the issuance of a building permit. The Development Services Center and/or Permits and Inspections may require additional information that may affect the release of a building permit. ** NOTE: The amount to be paid into the Lynnhaven River Oyster Heritage Fund may change based on the square footage of impervious cover shown on the final submitted site plan. ***NOTE: The applicant is responsible for removal of the Chesapeake Bay Preservation Area Variance Signs posted on the property. Said signs shall be removed within 5 days after the Board renders a final decision on the variance request. Failure to remove the signs within 5 days is a violation of Section 113(E) of the Chesapeake Bay Preservation Area Ordinance. ****NOTE: Please be advised that the Development Services Center (DSC) and Permits and Inspections (P&I) may require additional information during the site plan submittal process. Tony Lucas 1500 Quail Point Road Page 46

53 Tony Lucas 1500 Quail Point Road Page 47

54 Tony Lucas 1500 Quail Point Road Page 48

55 Tony Lucas 1500 Quail Point Road Page 49

56 Tony Lucas 1500 Quail Point Road Page 50

57 Tony Lucas 1500 Quail Point Road Page 51

58 Tony Lucas 1500 Quail Point Road Page 52

59 Tony Lucas 1500 Quail Point Road Page 53

60 Tony Lucas 1500 Quail Point Road Page 54

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015 Vice Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JULY 24, 2017

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JULY 24, 2017 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JULY 24, 2017 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

August 2015 Chesapeake Bay Preservation Area Board Agenda

August 2015 Chesapeake Bay Preservation Area Board Agenda August 2015 Chesapeake Bay Preservation Area Board Agenda CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JANUARY 23, 2017

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JANUARY 23, 2017 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JANUARY 23, 2017 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 27, 2016

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 27, 2016 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 27, 2016 Chair Mr. Sobota, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING

CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Monday, November 24, 2014 at 10:00 a.m. in the City

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA NOVEMBER 21, 2018

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA NOVEMBER 21, 2018 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA NOVEMBER 21, 2018 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING

CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Monday, February 24 th, 2014 at 10:00 a.m. in the

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 25, 2018

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 25, 2018 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JUNE 25, 2018 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA FEBRUARY 25, 2019

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA FEBRUARY 25, 2019 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA FEBRUARY 25, 2019 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA DECEMBER 20, 2017

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA DECEMBER 20, 2017 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA DECEMBER 20, 2017 Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

JANUARY, 2012 Virginia Beach, VA

JANUARY, 2012 Virginia Beach, VA JANUARY, 2012 Virginia Beach, VA CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING January 23, 2012 The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on

More information

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB 6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB REQUEST: Conditional Use Permit (outdoor recreational facility) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

P A G E L E F T B L A N K

P A G E L E F T B L A N K PAGE LEFT BLANK CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board will hold a Public Hearing on Wednesday, December 21, 2016 at 10:00

More information

Chesapeake Bay Preservation Area Board Agenda

Chesapeake Bay Preservation Area Board Agenda Chesapeake Bay Preservation Area Board Agenda November 21, 2018 PAGE LEFT BLANK CHESAPEAKE BAY PRESERVATION AREA BOARD NOTICE OF PUBLIC HEARING The Virginia Beach Chesapeake Bay Preservation Area Board

More information

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM Name: CCW Development Associates, L.L.C. Street Address: Telephone Number(s): 1209 Laskin Road, Virginia Beach, VA 23451 (757) 491-1996 Email: chris@vbhomesliving.com

More information

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060 May 12, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: May, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00am in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:30am a.m.

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00 a.m. in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:45 a.m.

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00 a.m. in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:30 a.m.

More information

Monitoring and Maintenance Permit Process

Monitoring and Maintenance Permit Process Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary April 9, 2010 Living Shorelines for Contractors and Project

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA Phone: Fax:

King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA Phone: Fax: King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA 23085 Phone: 804-785-5975 Fax: 804-769-5000 Water Quality Impact Assessment (WQIA) Application Note: Encroachment

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW 2008-211 SENATE BILL 1967 AN ACT TO PROVIDE FOR IMPROVEMENTS IN THE MANAGEMENT OF STORMWATER IN THE COASTAL COUNTIES IN ORDER TO PROTECT WATER

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

March, 2016 Wetlands Board Applications

March, 2016 Wetlands Board Applications March 16, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: March, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

North Carolina Coastal Federation

North Carolina Coastal Federation North Carolina Coastal Federation Erosion Control: Non-Structural Alternatives A Shorefront Property Owner s Guide Shoreline erosion and landward migration of marshes are natural processes, and are important

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

COUNTY OF PRINCE WILLIAM 5 County Complex Court, Suite 120 Prince William, Virginia (703) Metro Fax: (703)

COUNTY OF PRINCE WILLIAM 5 County Complex Court, Suite 120 Prince William, Virginia (703) Metro Fax: (703) COUNTY OF PRINCE WILLIAM 5 County Complex Court, Suite 120 Prince William, Virginia 22192-5308 (703) 792-6930 Metro 631-1703 Fax: (703) 792-5285 DEPARTMENT OF DEVELOPMENT SERVICES Wade A. Hugh Director

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan County of Prince Edward Stormwater Management Program Date: E-Permitting Number: This stormwater management plan (Agreement) is hereby submitted by the Owner to specify the methods that will be implemented

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

Nick Sigmund, Sr. Zoning Officer

Nick Sigmund, Sr. Zoning Officer Nick Sigmund, Sr. Zoning Officer Wisconsin Department of Natural Resources Administrative Code NR 115 under the authority of Wisconsin Statute 59.692, establishes and provides that shoreland zoning regulations

More information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PLEASE REFER TO THE CLEARING & GRADING PERMIT CHECKLIST BELOW FOR SUBMITTAL REQUIREMENTS. SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PROJECT ADDRESS (Street, Suite #): Parcel(s) #: Total Site Area

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET SUPPTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WKSHEET For Department of Ecology Stormwater BMP T5.13 This submittal worksheet will help determine what soil amendments are needed to meet the

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

Deb Grube, Sr. Zoning Officer

Deb Grube, Sr. Zoning Officer Deb Grube, Sr. Zoning Officer Wisconsin Department of Natural Resources Administrative Code NR 115 under the authority of Wisconsin Statute 59.692, establishes and provides that shoreland zoning regulations

More information

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS TO: FROM: APPLICANT: AGENT: Shore Protection Committee: Commissioner Mark Williams, Chairman Mr. Richard Gardner Mr. Henry Morgan Mr. Zach Harris

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

ARTICLE 22 CHESAPEAKE BAY PRESERVATION AREA (CBPA) OVERLAY DISTRICT. Statement of Intent

ARTICLE 22 CHESAPEAKE BAY PRESERVATION AREA (CBPA) OVERLAY DISTRICT. Statement of Intent ARTICLE 22 CHESAPEAKE BAY PRESERVATION AREA (CBPA) OVERLAY DISTRICT Statement of Intent A. This ordinance is enacted to implement the requirements of Section 10.1-2100 et seq. of the Code of Virginia (The

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

R E S O L U T I O N. Designation: R-2A (1-Family, 2-acre Minimum Lot Size)

R E S O L U T I O N. Designation: R-2A (1-Family, 2-acre Minimum Lot Size) PLANNING BOARD Arthur Adelman, Chair TOWN OF NORTH CASTLE WESTCHESTER COUNTY 17 Bedford Road Armonk, New York 10504-1898 R E S O L U T I O N Telephone: (914) 273-3542 Fax: (914) 273-3554 www.northcastleny.com

More information

Stormwater Drainage Assessment For Single Family Residence

Stormwater Drainage Assessment For Single Family Residence Stormwater Drainage Assessment For Single Family Residence Project Name: SEADER SFD Project Address: 2301 NE Perkins Way, Lake Forest Park, King County WA. Parcel Number(s): Tax Parcel No. 86659-00181

More information

Options for Managing Coastal Erosion. Presentation by: Ashley Sprague

Options for Managing Coastal Erosion. Presentation by: Ashley Sprague Options for Managing Coastal Erosion Presentation by: Ashley Sprague Shoreline stabilization methods Armouring - Boulders/rockwalls most common method of erosion control in Nova Scotia Concerns: - Accelerate

More information

Small Project Guidance Document

Small Project Guidance Document Small Project Guidance Document Introduction If you are considering a relatively small construction project on your property that creates new impervious area and you need to manage the stormwater that

More information

ARTICLE 9: Landscaping

ARTICLE 9: Landscaping ARTICLE 9: Landscaping 9-10 Legislative Intent The purpose of this Article is to regulate the planting and preservation of landscape materials; to facilitate the creation of an attractive and healthy environment;

More information

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management VORS 2018 Stormwater Management Session 2 Stormwater Management, Green Infrastructure,

More information

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary March 20, 2009 Low-Impact Shoreline Stabilization Cumulative

More information

R E S O L U T I O N. Designation: Section 2, Block 17, Lot 20.G-1 ( ) R-2A (1-Family, 2-acre Minimum Lot Size) 46 North Greenwich Road

R E S O L U T I O N. Designation: Section 2, Block 17, Lot 20.G-1 ( ) R-2A (1-Family, 2-acre Minimum Lot Size) 46 North Greenwich Road PLANNING BOARD Arthur Adelman, Chair TOWN OF NORTH CASTLE WESTCHESTER COUNTY 17 Bedford Road Armonk, New York 10504-1898 R E S O L U T I O N Telephone: (914) 273-3542 Fax: (914) 273-3554 www.northcastleny.com

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL The following checklist summarizes development guidelines and standards. See the appropriate section for a complete explanation of the

More information

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI Project supported via financial assistance provided by the Coastal Zone Management Act of 1972, as amended, administered by the Office of the Ocean

More information

Stormwater Management for Homeowners Fact Sheet 6: Buffers

Stormwater Management for Homeowners Fact Sheet 6: Buffers Publication SPES-14P Stormwater Management for Homeowners Fact Sheet 6: Buffers Laurie J. Fox, Research Associate, Horticulture, Virginia Tech Daniel J. Robinson, Graduate Student, Biological Systems Engineering,

More information

Request Modification of Conditions of a Conditional Use Permit approved October 14, Staff Recommendation Approval. Staff Planner Stephen White

Request Modification of Conditions of a Conditional Use Permit approved October 14, Staff Recommendation Approval. Staff Planner Stephen White Applicant Property Owner Public Hearing September 13, 2017 City Council Election District Lynnhaven Agenda Item 3 Request Modification of Conditions of a Conditional Use Permit approved October 14, 2003.

More information

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations 2 Executive Summary The City of Ramsey contracted the Anoka Conservation District to complete an inventory of riverbank condition along the entire 5.8 miles of City that border the Mississippi River. The

More information

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following: SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring

More information

Weston s Wetlands, Stormwater, & Open Space

Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Conservation Commission Role and Responsibilities Laws that protect wetlands What residents can do to protect wetlands

More information

Lesson 2: Stormwater Best Management Practices (BMPs)

Lesson 2: Stormwater Best Management Practices (BMPs) Lesson 2: Stormwater Best Management Practices (BMPs) Environmental Stewards Class Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources 732-932-9800 ext. 6209 obropta@envsci.rutgers.edu

More information

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy. Landscape design is an integral component of Site Planning and Building. The current pattern of walkways, driveways and landscape elements such as fences, hedges, and retaining walls in the neighborhood

More information

Working Group Meeting

Working Group Meeting April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome

More information

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas. Chapter 19.06. Landscaping and Fencing. Sections: 19.06.01. Purpose. 19.06.02. Required Landscaping Improvements. 19.06.03. General Provisions. 19.06.04. Landscaping Plan. 19.06.05. Completion of Landscape

More information

Landscaping Standards

Landscaping Standards CHAPTER 29 ARTICLE 403 29.403 Landscaping Standards Purpose: The purpose of this section is to protect and promote the public health, safety and general welfare by requiring landscaping in relation to

More information

Zoning Ordinance Article 3

Zoning Ordinance Article 3 Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

ARTICLE XIX SCREENING, LANDSCAPING AND TREES

ARTICLE XIX SCREENING, LANDSCAPING AND TREES ARTICLE XIX SCREENING, LANDSCAPING AND TREES Part I. Landscaping and Screening Section 304 Purpose. The purpose of this Part is to establish minimum landscaping and screening requirements that provide

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

Stormwater Control Plan: Small (Tier 1) Land Development Project

Stormwater Control Plan: Small (Tier 1) Land Development Project Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

5. Standard Details & Design Guidance

5. Standard Details & Design Guidance 5. Standard Details & Design Guidance Standard details and design guidance contain the recommended content and guidelines for mitigation plans using various techniques. Each section also contains relevant

More information

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads; Bedford Township, MI (Monroe Co.) 2012 http://library.municode.com/index.aspx?clientid=02123 400.1907 - Landscaping and screening. Se 1907. 1. Intent. Landscaping, greenbelts, and screening are necessary

More information

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES BIO-RETENTION FACILITIES (for all basins / BMPs) Annually Prepare Operation and Maintenance Plan. Clearly outline how vegetation in the facility and its buffer area will be managed or harvested in the

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria CleanSScapes Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria Howard County Office of Community Sustainability, 410-313-0678 CleanScapes Program, www.cleanwaterhoward.com

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL Effective July 1, 2007 HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL EFFECTIVE JULY 1, 2007 FIFTH EDITION Lower Colorado River Authority TABLE OF CONTENTS DESIGN SPREADHEET

More information

Gloucester County PLAN SUBMITTER'S CHECKLIST

Gloucester County PLAN SUBMITTER'S CHECKLIST Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

CHESAPEAKE LANDSCAPE ORDINANCE

CHESAPEAKE LANDSCAPE ORDINANCE CHESAPEAKE LANDSCAPE ORDINANCE CONSERVATION PRESERVATION CZO 19-600 Effective October 16, 2008 BUFFER YARD C PARKING LOT REFORESTATION YEAR 1 REFORESTATION YEAR 4 BUFFER YARD F CBPA REFORESTATION Page

More information

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and, Article 5. Landscaping 5.1 Purpose The Town of Laurel Park s landscape standards are designed to create a beautiful, aesthetically pleasing built environment that will complement and enhance community

More information

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows. Adopted November 1999 I. Purpose A. The purpose of these guidelines is to assist in the design and layout of open space, as provided on developed lots within the District. The intent of these guidelines

More information

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code Directors Rules for Seattle Municipal Code, Chapters 22.800 22.808 Stormwater Code Requirements for Green Stormwater Infrastructure to the Maximum Extent Feasible for Single-Family Residential and Parcel-Based

More information

Pavement Removal Fact Sheet

Pavement Removal Fact Sheet Rushern L. Baker, III County Executive Pavement Removal Fact Sheet What is pavement removal? Pavement removal is the replacement of impervious surfaces, such as asphalt and concrete, with grass or native

More information

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School West Little Pimmit Storm Sewer & John Marshall Green Street Projects July 7, 2015 Nottingham Elementary School Project Timeline February 2015: Archeological study of island, including historic spring location,

More information

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer Sustainable Sites RDN Workshop June 25, 2011 David Reid, FCSLA, Landscape Architect, Environmental Designer hblanarc.ca Surrey ESA Networks & linear corridors ESA Network: Develop with Care SITE Hub >10

More information

Florence County Small Commercial Land Disturbance Permit Application

Florence County Small Commercial Land Disturbance Permit Application Florence County Small Commercial Land Disturbance Permit Application Florence County Engineering Division 518 South Irby Street Florence, S.C. 29501 Phone (843) 676-8600 Fax (843) 676-8667 Tax Map Number:

More information

TO BE FILLED OUT BY APPLICANT

TO BE FILLED OUT BY APPLICANT CITY OF BAINBRIDGE ISLAND CLEARING PERMIT APPLICATION FORM MUST BE COMPLETED IN INK, PREFERABLY BLUE. PENCIL WILL NOT BE ACCEPTED. DATE STAMP FOR CITY USE ONLY PROJECT NAME: TAX ASSESSOR S NUMBER(S): TO

More information

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013 St. Croix County Shoreland Overlay Zoning Districts Public Hearing Community Development Committee December 19, 2013 Timeline CDC Review October 17 Public Information Meeting October 29 (6:00-8:00 pm)

More information

Fact Sheet Regulating Oceanfront Accessory Structures Updated June 10, 2013

Fact Sheet Regulating Oceanfront Accessory Structures Updated June 10, 2013 What is being considered? Fact Sheet Regulating Oceanfront Accessory Structures Updated June 10, 2013 The Town of Duck is considering an ordinance that would limit how close pools, decks, and other accessory

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Operations and Maintenance Plan

Operations and Maintenance Plan Civil Engineering Land Surveying Environmental Consulting Landscape Architecture Operations and Maintenance Plan for Solar Panel Facility Haverhill, MA Prepared By: Hancock Associates #19168 Prepared For:

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information