A. Project Identification: Lions Club Sensory Garden Water Feature. 1. Project Location: 1301 Pennsylvania Ave., Lansing, MI 48912

Size: px
Start display at page:

Download "A. Project Identification: Lions Club Sensory Garden Water Feature. 1. Project Location: 1301 Pennsylvania Ave., Lansing, MI 48912"

Transcription

1 SECTION SUMMARY PART 1 - GENERAL Ingham County would like to add a waterfall feature to the Sensory Garden located within Potter Park Zoo. The intent of the attraction is to be able to stimulate the audio sensory with the crashing sound of the water falling. 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Project information. 2. Work covered by Contract Documents. 3. Project Scheduling. 4. Work by Ingham County. 5. Ingham County furnished products. 6. Access to site. 7. Coordination with occupants. 8. Work Restrictions. 9. Specification and Drawing conventions. 1.3 PROJECT INFORMATION A. Project Identification: Lions Club Sensory Garden Water Feature 1. Project Location: 1301 Pennsylvania Ave., Lansing, MI B. Owner: City of Lansing C. Landscape Architect: Elements Studio, Inc., WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Base Bid: Construction of (1) approximately 25 long x 2 wide pondless stream and waterfalls underneath the canopy of existing Oak and Hemlock trees and other Work indicated in the Contract Documents. a. The intent of the project is to create an auditory, sensory experience for visitors of the Lions Club Sensory Garden at the Potter Park Zoo. Water feature construction SUMMARY

2 shall be done in an artful manner that maximizes the sound of the rushing waterfalls while containing water within the limits of the pond liner. 2. Alternate Bid: Construction of (1) approximately 25 long x 2 wide and (1) approximately 22 long x 2 wide pondless stream and waterfalls underneath the canopy of existing Oak and Hemlock trees and other Work indicated in the Contract Documents. a. The intent of the project is to create an auditory, sensory experience for visitors of the Lions Club Sensory Garden at the Potter Park Zoo. Water feature construction shall be done in an artful manner that maximizes the sound of the rushing waterfalls while containing water within the limits of the pond liner. B. Type of Contract: 1. Project will be constructed under a single contract. 1.5 PROJECT SCHEDULING A. Before commencing Work, submit an updated copy of Contractor's construction schedule showing the sequence, commencement and completion dates, for all of the Work. 1.6 WORK BY INGHAM COUNTY A. General: Cooperate fully with Ingham County representative so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Ingham County. Coordinate the Work of this Contract with work performed by Ingham County. B. Concurrent Work: Ingham County will perform the following construction operations at Project site. Those operations will be conducted simultaneously with Work under this Contract. 1. Removal of (1) 10 DBH Hemlock tree and (1) 7 DBH Pine tree (after installation of Silt Fence and Tree Protection-Zone Fencing by Contractor) amp weatherproof quadplex outlet adjacent to pump vault. Connect to its own circuit in existing electrical panel. Mount quadplex outlet to 4 x4 treated wood post. Mount bottom of quadplex outlet at maximum 8 above finished grade to keep outlet hidden amongst plantings. 3. Timer to control run-time of pump. C. Subsequent Work: Ingham County will perform the following additional work at site after Substantial Completion. Completion of that work will depend on successful completion of preparatory Work under this Contract. 1. All proposed plantings, including lawn seed to stabilize all disturbed areas 2. Wood post and cable fence SUMMARY

3 1.7 INGHAM COUNTY FURNISHED PRODUCTS A. Ingham County will furnish products indicated. The Work includes installation/placement of Ingham County furnished products. B. Ingham County Furnished Products: 1. Decaying stumps and logs with splintered ends (not saw-cut) to be furnished by Ingham County and integrated into stream / waterfall in an artful manner by Contractor. 1.8 ACCESS TO SITE A. General: The Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. B. Use of Site: Limit use of Project site to Limit of Proposed Earth Change Area as indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, zoo visitors, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. c. Keep pavements clean and work areas in an orderly condition. C. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations. 1.9 COORDINATION WITH OCCUPANTS A. Full Owner Occupancy: Owner will occupy site during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated. 1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction. 2. Notify Owner not less than 48 hours in advance of activities that will affect Owner's operations WORK RESTRICTIONS A. Work Restrictions, General: Comply with restrictions on construction operations. SUMMARY

4 1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction. B. On-Site Work Hours: Limit work on the site to normal business working hours of 7am to 4pm., Monday through Friday, unless otherwise indicated. 1. Weekend Hours: to be considered upon request. C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated: 1. Notify: Brian Fisher, Ingham County Facilities Manager, (517) , 2 days in advance of proposed utility interruptions. D. Nonsmoking Site: This is a non-smoking facility, there is no smoking allowed within the Zoo or within 50 feet of any entrance or County Building. E. Restricted Substances: Use of tobacco products and other controlled substances is not permitted SPECIFICATION AND DRAWING CONVENTIONS A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. 2. Specification requirements are to be performed by Contractor unless specifically stated otherwise. B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) SUMMARY

5 SECTION TEMPORARY TREE AND PLANT PROTECTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes general protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction. B. Related Requirements: 1. Section "Site Clearing" for removing existing underbrush. 1.3 DEFINITIONS A. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction as indicated. B. Vegetation: Trees, shrubs, groundcovers, grass, and other plants. 1.4 FIELD CONDITIONS A. The following practices are prohibited within protection zones: 1. Storage of construction materials, debris, or excavated material. 2. Moving or parking vehicles or equipment. 3. Foot traffic. 4. Excavation or other digging unless otherwise indicated. 5. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated. B. Do not direct vehicle or equipment exhaust toward protection zones. C. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and organic mulch. TEMPORARY TREE AND PLANT PROTECTION

6 PART 2 - PRODUCTS 2.1 MATERIALS A. Protection-Zone Fencing: Fencing fixed in position and meeting the following requirements: 1. Plastic Protection-Zone Fencing: Poly Laminar Snow Fence secured with plastic bands or galvanized-steel or stainless-steel wire ties; and supported by tubular or T-shape galvanized-steel posts spaced not more than 10 apart. a. Height: 48 inches. b. Color: High-visibility orange, nonfading. PART 3 - EXECUTION 3.1 PREPARATION A. Locate and clearly identify trees, shrubs, and other vegetation to remain as indicated. Flag each tree trunk at 54 inches above the ground. 3.2 PROTECTION ZONES A. Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones before materials or equipment are brought on the site and construction operations begin in a manner that will prevent people from easily entering protected areas. 1. Posts: Set or drive posts into ground one-third the total height of the fence without concrete footings. B. Maintain protection zones free of trash. C. Maintain protection-zone fencing in good condition as acceptable to Owner and remove when construction operations are complete and equipment has been removed from the site. 1. Do not remove protection-zone fencing, even temporarily, to allow equipment access through the protection zone. 3.3 ROOT PRUNING A. Oak Wilt Prevention: Avoid disturbing the roots of existing oak trees onsite from April through July. If pruning or planting that disturbs oak roots must occur between April and July, paint resulting wounds within minutes of injury with an emulsified asphalt or other coating formulated for use on damaged plant tissues. B. Prune tree roots that are affected by temporary and permanent construction. Prune roots as follows: TEMPORARY TREE AND PLANT PROTECTION

7 1. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other equipment that rips, tears, or pulls roots. 3.4 CROWN PRUNING A. Oak Wilt Prevention: Avoid pruning the branches of existing oak trees onsite from April through July. If pruning must occur between April and July, paint resulting wounds within minutes of injury with an emulsified asphalt or other coating formulated for use on damaged plant tissues. B. Do not prune branches of existing trees to be preserved in order to maintain natural landscape setting. 1. Prune to remove only injured, broken, or dead branches unless otherwise indicated. Do not prune for shape unless otherwise indicated. C. Cut branches with sharp pruning instruments; do not break or chop. D. Only paint or apply sealants to wounds as described above for Oak Wilt Prevention. 3.5 REGRADING A. Lowering Grade within Protection Zone: Where new finish grade is indicated below existing grade around trees, slope grade away from trees. 1. Root Pruning: Prune tree roots exposed by lowering the grade. Do not cut main lateral roots or taproots; cut only smaller roots. Cut roots as required for root pruning. B. Minor Fill within Protection Zone: Where existing grade is approximately 6 inches or less below elevation of finish grade, fill with imported planting soil. Place imported planting soil in a single uncompacted layer and hand grade to required finish elevations. 3.6 REPAIR AND REPLACEMENT A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain that are damaged by construction operations, in a manner approved by Owner. 1. Submit details of proposed pruning and repairs. 2. Perform repairs of damaged trunks, branches, and roots within 24 hours. 3. Replace trees and other plants that cannot be repaired and restored to full-growth status, as determined by Owner. END OF SECTION TEMPORARY TREE AND PLANT PROTECTION

8 SECTION OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for preparing operation and maintenance manuals. B. Related Requirements: 1. Section "Pond and Reservoir Liners" for maintenance data. 1.3 CLOSEOUT SUBMITTALS A. Submit operation and maintenance manuals indicated. Provide content for each manual as specified in individual Specification Sections, and as reviewed and approved at the time of Section submittals. Submit reviewed manual content formatted and organized as required by this Section. B. Format: Submit operation and maintenance manuals in the following format: 1. Submit two paper copies to Owner. C. Final Manual Submittal: Submit each manual in final form at project completion and before commencing demonstration and training. 1.4 FORMAT OF OPERATION AND MAINTENANCE MANUALS A. Manuals, Paper Copy: Submit manuals in the form of hard-copy, bound and labeled volumes. 1. Binders: Heavy-duty, three-ring, vinyl-covered binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets. a. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," and Project name. 2. Supplementary Text: Prepared on 8-1/2-by-11-inch white bond paper. 3. Drawings: OPERATION AND MAINTENANCE DATA

9 a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts. b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations. 1.5 REQUIREMENTS FOR OPERATION AND MAINTENANCE MANUALS A. Organization of Manuals: Each manual shall contain the following materials, in the order listed: 1. Title page. 2. Table of contents. 3. Manual contents. B. Title Page: Include the following information: 1. Subject matter included in manual. 2. Name and address of Project. 3. Name and address of Owner. 4. Date of submittal. 5. Name and contact information for Contractor. 6. Name and contact information for Landscape Architect. C. Table of Contents: List each product included in manual, identified by product name. D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by equipment. 1.6 OPERATION AND MAINTENANCE MANUALS A. Content: Include operation data required in Section Pond and Reservoir Liners and the following information: 1. Piped system diagrams. 2. Pump 3. Shut-off Switch 4. Precautions against improper use. B. Descriptions: Include the following: 1. Product name and model number. 2. Manufacturer's name. 3. Equipment identification with serial number of each component. 4. Equipment function. C. Operating Procedures: Include the following, as applicable: 1. Startup procedures. 2. Routine and normal operating instructions. OPERATION AND MAINTENANCE DATA

10 3. Normal cold weather shutdown instructions. D. Maintenance Procedures: Include manufacturer's written recommendations and the following: 1. Types of cleaning agents to be used and methods of cleaning. 2. List of cleaning agents and methods of cleaning detrimental to product. 3. Schedule for routine cleaning and maintenance. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION OPERATION AND MAINTENANCE DATA

11 SECTION SITE CLEARING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Protecting existing vegetation to remain. 2. Removing existing vegetation. 3. Clearing and grubbing. 4. Temporary erosion and sedimentation control. B. Related Requirements: 1. Section Temporary Tree and Plant Protection for tree protection zone standards. 2. Section "Soil Preparation" for placing soil. 1.3 DEFINITIONS A. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil. B. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and indicated according to requirements in Section "Temporary Tree and Plant Protection." C. Vegetation: Trees, shrubs, groundcovers, grass, and other plants. 1.4 MATERIAL OWNERSHIP A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site. SITE CLEARING

12 1.5 INFORMATIONAL SUBMITTALS A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing. 1. Use sufficiently detailed photographs or video recordings. 2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plant designated to remain. 1.6 FIELD CONDITIONS A. Examine and evaluate grades, soils and water levels. Observe the conditions under which work is to be performed and notify Owner of unsatisfactory conditions. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner. B. Traffic: Minimize interference with adjoining walks and other adjacent occupied or used facilities during site-clearing operations. 1. Do not close or obstruct walks or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. C. Utility Locator Service: Notify MISS DIG (800) three (3) working days before site clearing. 1. Contractor shall be responsible for any damage to utilities or property. D. Do not commence site clearing operations until temporary erosion-, sedimentation-control and tree-protection measures are in place. E. Tree- and Plant-Protection Zones: Protect according to requirements in Section "Temporary Tree and Plant Protection." F. Soil Stripping, Handling, and Stockpiling: Perform only when the soil is dry or slightly moist. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 PREPARATION A. Protect and maintain benchmarks and survey control points from disturbance during construction. B. Protect existing site improvements to remain from damage during construction. 1. Restore damaged improvements to their original condition, as acceptable to Owner. SITE CLEARING

13 3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation-control drawing, and requirements of authorities having jurisdiction. B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones. C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established. D. Remove erosion and sedimentation controls, and restore and stabilize areas disturbed during removal. 3.3 TREE AND PLANT PROTECTION A. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations according to requirements in Section "Temporary Tree and Plant Protection." 3.4 CLEARING AND GRUBBING A. Remove vegetation as indicated to permit installation of new construction. 1. Do not remove trees, shrubs, and other vegetation indicated to remain. 2. Where existing stumps and roots conflict with water feature construction, remove stump and roots to necessary depth to prevent puncture of underlayment and liner. B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated. 1. Place fill material in horizontal layers according to Section "Soil Preparation." 3.5 DISPOSAL OF SURPLUS AND WASTE MATERIALS A. Remove unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property. END OF SECTION SITE CLEARING

14 SECTION SOIL PREPARATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes planting soils specified by composition of the mixes. 1.3 DEFINITIONS A. Imported Soil: Soil that is transported to Project site for use. B. Planting Soil: Existing, on-site soil or imported soil that has been modified as specified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth. C. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed. D. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil"; but in disturbed areas such as urban environments, the surface soil can be subsoil. PART 2 - PRODUCTS 2.1 PLANTING SOILS A. Planting-Soil Type: Imported, naturally formed soil from off-site sources and modified to produce viable planting soil. 1. Source: a. Pro-Soil (or equal) Hammond Farms Landscape Supply Phone: (517) b. Soil shall not contain undesirable organisms; disease-causing plant pathogens; or noxious weeds and invasive plants including, but not limited to, quackgrass, Johnsongrass, poison ivy, nutsedge, nimblewill, Canada thistle, bindweed, bentgrass, wild garlic, ground ivy, perennial sorrel, and bromegrass. SOIL PREPARATION

15 PART 3 - EXECUTION 3.1 GENERAL A. Place planting soil according to requirements in other Specification Sections. 3.2 PREPARATION OF UNAMENDED, ON-SITE SOIL A. Excavation: Excavate soil from designated area(s) to depth as indicated. B. Unacceptable Materials: Clean soil of concrete slurry, concrete layers or chunks, cement, plaster, building debris, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, acid, and other extraneous materials that are harmful to plant growth. C. Unsuitable Materials: Clean soil of stones, roots, plants, sod, clay lumps, and pockets of coarse sand. 3.3 PLACING SOIL A. Use excavated soil to fill under waterfall and stream locations. B. Use Imported Planting Soil to achieve finish grade as indicated. C. Compaction Under Waterfall and Stream: Compact each 4 lift of excavated and imported planting soil to 92 percent of maximum Standard Proctor density according to ASTM D698 and tested in-place. D. Compaction In Planting Beds Surrounding Waterfall and Stream: Compact each 4 lift of imported planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D698 and tested in-place. E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades. 3.4 PROTECTION AND CLEANING A. Protection Zone: Identify protection zones according to Section "Temporary Tree and Plant Protection." B. Remove surplus soil and waste material including excess subsoil, unsuitable materials, trash, and debris and legally dispose of them off Owner's property unless otherwise indicated. END OF SECTION SOIL PREPARATION

16 SECTION COMMON WORK RESULTS FOR UTILITIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Piping joining materials. 1.3 DELIVERY, STORAGE, AND HANDLING A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture. B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending. PART 2 - PRODUCTS 2.1 PIPING JOINING MATERIALS A. Solvent Cements for Joining Plastic Piping: 1. PVC Piping: PVC Primer & Glue PART 3 - EXECUTION 3.1 PIPING INSTALLATION A. Install piping according to the following requirements. B. Install piping free of sags and bends. C. Install fittings for changes in direction and branch connections. D. Ensure piping to be hidden from view. COMMON WORK RESULTS FOR UTILITIES

17 3.2 PIPING JOINT CONSTRUCTION A. Join pipe and fittings according to the following requirements. B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly. C. Plastic Piping Solvent-Cemented Joints: Clean and dry joining surfaces. Join pipe and fittings according to manufacturer s specification. END OF SECTION COMMON WORK RESULTS FOR UTILITIES

18 SECTION POND AND RESERVOIR LINERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes geomembrane liners for waterfalls, stream(s), and reservoir fabricated from the following: 1. Ethylene-propylene-diene monomer (EPDM). B. Related Requirements: 1. Section "Soil Preparation" for excavating, compacting, and grading the excavated and imported planting soil. 1.3 INFORMATIONAL SUBMITTALS A. Product Certificates: For each EPDM 45mil liner and underlayment B. Manufacturer s warranty: For each EPDM 45mil liner C. Contractor s warranty: For materials and workmanship 1.4 CLOSEOUT SUBMITTALS A. Maintenance Data: Include operation and maintenance information for each of the following to be included in the maintenance manual: 1. Each EPDM 45mil liner. 2. General streambed maintenance a. Algae growth prevention using Rock & Waterfall Cleaner-Dry (application instructions) b. Removal of leaves and other organic debris 1.5 WARRANTY A. Contractor s Warranty: Contractor agrees to repair or replace geomembrane liner that fail(s) in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: POND AND RESERVOIR LINERS

19 a. Leaks in geomembrane liner. b. Defects in seams. 2. Warranty Period: One (1) year from date of Substantial Completion. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Recommended Materials Supplier - or Equivalent: EasyPro Pond Products. 1. Contact: Phil Higgins Address: 4385 E. 110 th St. Grant, MI Phone: (800) MISCELLANEOUS MATERIALS A. Underlayment: Provide 5 oz. nonwoven geotextile fabric under entire EPDM 45mil liner. B. Adhesives: Provide types of adhesive primers, compounds, solvents, and tapes recommended by geomembrane liner manufacturer for sealing of seams in geomembrane liner and for sealing penetrations through geomembrane liner. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates for compliance with requirements for soil compaction and grading; for subgrade free from angular rocks, rubble, roots, vegetation, debris, voids, protrusions, and ground water; and for other conditions affecting performance of geomembrane liner. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Underlayment: Place underlayment over prepared surfaces. Ensure that underlayment is in full contact with subgrade. B. Liner: Place geomembrane liner over underlayment to ensure minimum handling. Install in compliance with geomembrane liner manufacturer's written instructions. Begin placing geomembrane liner at Project's upwind direction and proceed downwind. Install geomembrane liner in a relaxed condition, free from stress and with minimum wrinkles, and in full contact with underlayment and subgrade. Do not bridge over voids or low areas in the subgrade. Fit closely and seal around inlets, outlets, and other projections through geomembrane liner. Secure and disguise edges of liner with rounded granite boulders and soil as indicated. POND AND RESERVOIR LINERS

20 C. Field Seams: Comply with geomembrane liner manufacturer's written instructions. Form seams by lapping edges of panels 12 inches, unless instructions require a larger overlap. Upstream liner shall be applied on top of downstream liner. Wipe contact surfaces clean and free of dirt, dust, moisture, and other foreign materials. Apply primer to overlapping liner faces with liner cleaning pad. Proceed with seaming at required temperatures and ambient conditions for materials. Continuously bond liner to liner. Inspect seams and reseal voids. 1. Adhesive Bonding: Apply double sided tape to seam area and press together immediately, or use other seaming methods as instructed by geomembrane liner manufacturer. Roll to press surfaces together, to distribute adhesive to leading edges of panels, and to remove wrinkles and fishmouths. Remove excess adhesive. D. Liner Repairs: Repair tears, punctures, and other imperfections in geomembrane liner field and seams using patches of geomembrane liner material, liner-to-liner bonding materials, and bonding methods according to geomembrane liner manufacturer's written instructions. Apply bonding solvent to contact surfaces of both patch and geomembrane liner and press together immediately. Roll to remove wrinkles. END OF SECTION POND AND RESERVOIR LINERS

A. Contractor shall provide product data for each type of product indicated.

A. Contractor shall provide product data for each type of product indicated. 31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution

More information

a. Section includes planting soils specified by composition of the mixes.

a. Section includes planting soils specified by composition of the mixes. SECTION 32 9113 SOIL PREPARATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION FINE GRADING AND SOIL PREPARATION

SECTION FINE GRADING AND SOIL PREPARATION SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.

More information

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00

More information

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS Prepared by TenCate Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel: (706) 693-2226 Fax:

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. SECTION 7300 LANDSCAPING 7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. 7302 QUALITY ASSURANCE. A. Qualifications of Personnel.

More information

Section Specification for Geotextile Used in Permanent Erosion Control Application

Section Specification for Geotextile Used in Permanent Erosion Control Application Project Name: Project Number: 1 GENERAL Section 02370 Specification for Geotextile Used in Permanent Erosion Control Application 1.1 SECTION INCLUDES A. Geotextile to prevent soil loss resulting in excessive

More information

1. Vinyl wall covering. 2. Woven glass-fiber wall covering. 3. Textile wall covering. 4. Wallpaper. 5. Heavy-duty, synthetic, textile wall covering.

1. Vinyl wall covering. 2. Woven glass-fiber wall covering. 3. Textile wall covering. 4. Wallpaper. 5. Heavy-duty, synthetic, textile wall covering. SECTION 09950 - WALL COVERINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of

More information

SITE TOPSOIL & FINISH GRADING

SITE TOPSOIL & FINISH GRADING CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02911-1 PART 1 GENERAL 1.1 Related Work.1 Section 02311 Site Grading.2 Section 02315 Excavating, Trenching, & Backfilling.3 Section 02906 Planting of Trees,

More information

Section Seeding

Section Seeding Section 02936 Seeding PART 1 - GENERAL 1.01 SECTION INCLUDES A. Fertilizing. B. Seeding. C. Hydroseeding. D. Mulching. E. Maintenance. F. Sodding. 1.02 RELATED WORK A. Documents affecting work of this

More information

SECTION AMENDED TOPSOIL

SECTION AMENDED TOPSOIL SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration

More information

SECTION 02230BP AGGREGATE BASE

SECTION 02230BP AGGREGATE BASE SECTION 02230BP AGGREGATE BASE This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department of Energy

More information

SECTION 605 PLANTING

SECTION 605 PLANTING SECTION 605 PLANTING I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall

More information

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

1. Division 2 Section Earthwork for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials. SECTION 329300 - LANDSCAPE PLANTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION SODDING

SECTION SODDING SECTION 02925 SODDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparation of subsoil. 2. Placing topsoil. 3. Fertilizing. 4. Sod installation. 5. Maintenance. B. Related Sections: 1. Drawings

More information

3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING Section 02922 PART 1 GENERAL 1.01 SUMMARY This Section includes the following: A. Restoration of existing lawn areas disturbed by construction shall be by installation of new sod. B. Planting of sod within

More information

Write Walls Dry Erase Specification Data (Section 09720)

Write Walls Dry Erase Specification Data (Section 09720) Write Walls Dry Erase Specification Data (Section 09720) Section 1 Part 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry Erase Wallcovering 2. Accessories B. Related Sections / Items 1. Section 09250

More information

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

SECTION TURF AND GRASSES

SECTION TURF AND GRASSES SECTION 32 92 00 TURF AND GRASSES PART 1: GENERAL 1.01 DESCRIPTION Restore all disturbed grass and landscaped areas to conditions equal to or better than before the work began and to the satisfaction of

More information

ARBOR SERIES DIVISION FLEXIBLE WOOD VENEER WALLCOVERING

ARBOR SERIES DIVISION FLEXIBLE WOOD VENEER WALLCOVERING PART 1 - GENERAL 1.01 SUMMARY A. Provide wood wallcovering, complete. B. Related Sections 1. Section 165000 - Lighting: Permanent during installation. 2. Section 092500 - Gypsum Board: Wall Substrates.

More information

SECTION SOIL PREPARATION

SECTION SOIL PREPARATION SECTION 329113 SOIL PREPARATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Components of planting mediums. 2. Testing and certification of components. 3. Mixing of planting mediums. 4. Transporting

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

DIVISION II PLANTING SECTION 02950

DIVISION II PLANTING SECTION 02950 Subdivision Requirements Manual Page 1 of 9 PART I - GENERAL 1.1 Related Work.1 Topsoil and Finish Grade : Section 02212.2 Seeding : Section 02933.3 Hydraulic Seeding : Section 02934.4 Sodding : Section

More information

B. Finish Grade: Elevation of finished surface of planting soil.

B. Finish Grade: Elevation of finished surface of planting soil. SECTION 02930 - PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A.

More information

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for APPROVED BY COUNCIL FEBRUARY 15, 1994 CITY OF BE CONVEYED TO THE CITY The Owner will be responsible to ensure that all lands which will be transferred to the City for parkland, drainage or boulevard purposes

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. SECTION 32 9300 PLANTS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. B. Related Sections: 1. Section 32 9001:

More information

Milpitas College Extension Milpitas Dry Landscape

Milpitas College Extension Milpitas Dry Landscape SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document

More information

2-B-18-UR. Revised: 3/27/2018

2-B-18-UR. Revised: 3/27/2018 Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard

More information

GEOMEMBRANE FIELD INSTALLATION

GEOMEMBRANE FIELD INSTALLATION GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive

More information

SECTION LANDSCAPE

SECTION LANDSCAPE 1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation

More information

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation 1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not

More information

c. Oko-Tex (European environmental health standard)

c. Oko-Tex (European environmental health standard) SECTION 09720 Wall Covering Texturglas WALL FINISH SYSTEM GENERAL 1.1 SUMMARY A. Section Includes: Texturglas Wall Finish System. B. Related Sections: Section(s) related to this section include: 1. Gypsum

More information

I N D U S T R I A L Y A R D S

I N D U S T R I A L Y A R D S I N D U S T R I A L Y A R D S GEOTEXTILES INDUSTRIAL YARDS 1.0 Features of INDUSTRIAL PG 2 YARDS 2.0 How Typar geotextiles PG 2 work 4.0 Installation guide PG 7 5.0 Overlap and joining PG 8 6.0 Setting

More information

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following: SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring

More information

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used This specification defines material and performance requirements for soils which are to be used within the Silva Cell system. The SPECIFICATION EDITOR must select the type of soil appropriate to each particular

More information

SKAPS GEOTEXTILE SUBSURFACE DRAINAGE

SKAPS GEOTEXTILE SUBSURFACE DRAINAGE SKAPS INDUSTRIES 335 Athena Drive, Athens, GA 30601 Ph: (706)-354-3700 Fax: (706)-354-3737 Email: contact@skaps.com DROP-IN SPECIFICATIONS SKAPS GEOTEXTILE SUBSURFACE DRAINAGE The following drop-in specification

More information

SPECIAL SPECIFICATION 3687 Impermeable Liner

SPECIAL SPECIFICATION 3687 Impermeable Liner 1993 Specifications CSJ s 0569-01-043 & 0945-04-025 SPECIAL SPECIFICATION 3687 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane)

More information

EXTERIOR PLANTS

EXTERIOR PLANTS c. Fertilize immediately prior to sodding or immediately after the sodding operation at a rate of.5 pounds of nitrogen per 1000 square feet. d. Work is to be done at typically accepted sodding times in

More information

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3 SECTION VI (Sub-section 241) Grassing Article Page 1. Scope of Work 241-1 2. General 241-1 3. Sprigging 241-1 4. Sodding 241-1 thru 241-3 5. Soil Amendments 241-3 6. Non Grassed Areas 241-4 7. Topsoil

More information

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent: 32 00 00 EXTERIOR IMPROVEMENTS 32 90 00 PLANTING.02 Lawns and Grasses A. General 1. Intent: a. The work in this section specifies the labor, materials, and installation methods necessary to establish the

More information

Town of Fuquay-Varina

Town of Fuquay-Varina 170 LANDSCAPING 170.01 GENERAL 170.01.01 Street trees shall be provided in accordance with the Land Development Ordinance for site plans and subdivisions 170.01.02 Street trees, landscape areas, landscape

More information

A. Surface parking areas shall be constructed of bituminous paving.

A. Surface parking areas shall be constructed of bituminous paving. September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.

More information

A. Provide labor and materials necessary for installation of turf sod and other related work as required.

A. Provide labor and materials necessary for installation of turf sod and other related work as required. SECTION 32 92 00 TURF AND GRASSES PART 1 - GENERAL 1.1 SUMMARY A. Provide labor and materials necessary for installation of turf sod and other related work as required. B. Related work described elsewhere:

More information

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. SECTION 02910 TREE RELOCATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. B. Related Section: 1. 02900 - Landscaping.

More information

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS Van Buren Bridge Project IFB #0721-17-VBB GENERAL TREE & LANDSCAPE PROVISIONS CONSTRUCTION SPECIFICATIONS PROJECTS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS DEPARTMENT OF PUBLIC

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE. THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.2 THE COMPLETE 2011 EDITION MAY BE FOUND AT: HTTP://WWW.SEATTLE.GOV/UTIL/ENGINEERING/STANDARD_PLANS_&_SPECS/INDEX.ASP

More information

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer. Authorised by : Parks & Gardens Manager Section 5 Page 1 of 6 SECTION 5: STREET TREE PLANTING 1.0 GENERAL This section describes the work to be carried out to prepare planting sites and complete planting

More information

SECTION TREE TRANSPLANTING

SECTION TREE TRANSPLANTING SECTION 329643 TREE TRANSPLANTING PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for transplanting trees. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Qualifications:

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner 1993 Specifications CSJ 0128-01-085 SPECIAL SPECIFICATION ITEM 5327 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane) shown

More information

SECTION SODDING

SECTION SODDING SECTION 02924 SODDING PART 1 GENERAL 1.01 SUMMARY A. Repair lawns and grassed rights of way damaged or removed during the construction of the pump station. 1.02 RELATED WORK A. Clearing and Grubbing -

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-02 66 00 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UFGS-02 66 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION TOPSOIL AND SEEDING

SECTION TOPSOIL AND SEEDING SECTION 13400 TOPSOIL AND SEEDING DECEMBER 2015 TOPSOIL AND SEEDING Page 1 1 GENERAL... 2 DESCRIPTION... 2 RELATED SECTIONS... 2 JOB CONDITIONS... 2 INSPECTION... 2 2 PRODUCTS... 3 SEEDING PRODUCT DELIVERY,

More information

EXAMPLE SPECIFICATION ONLY

EXAMPLE SPECIFICATION ONLY SECTION 097200 WALL COVERINGS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Prime Agreement, including General and Supplementary Conditions, when referenced by the Prime

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES 32 92 00 PART 1 - GENERAL 1.01 INTRODUCTION A. Preferred Methods for Installation of Turf: On the Pullman, Tri-Cities and Spokane campuses, sod is the preferred method of turf installation. On the Vancouver

More information

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 511 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING 511.01 SCOPE 511.02 REFERENCES 511.03 DEFINITIONS 511.04

More information

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE 06/2/204 C 204 THIS DOCUMENT AND THE DESIGNS CONTAINED THEREIN REMAINS THE PROPERTY OF PROSS DESIGN GROUP, INC. AS AN INSTRUMENT OF PROFESSIONAL SERVICE. IT IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

SECTION SEEDING

SECTION SEEDING SECTION 32 92 19 SEEDING PART 1 GENERAL 1.01 DESCRIPTION A. The WORK under this section consists of the revegetation with seeded grasses. CONTRACTOR shall furnish all labor, materials, equipment, tools,

More information

ARBOR SERIES WOOD WALLCOVERINGS

ARBOR SERIES WOOD WALLCOVERINGS PART 1 - GENERAL 1.01 SUMMARY ARBOR SERIES WOOD WALLCOVERINGS A. A. Provide wood wallcovering, complete. B. B. Related Sections 1. 1. Section 09 74 00 Wall Finishes 2. 2. Section 09 74 13 Wood Wallcovering

More information

Case Study Bioretention Installation and Maintenance

Case Study Bioretention Installation and Maintenance Case Study Bioretention Installation and Maintenance Bioretention Crime Scene Investigation A reality TV series where you get to watch disturbing bioretention crimes and use advanced forensics to solve

More information

4.6. Low Impact and Retentive Grading

4.6. Low Impact and Retentive Grading 4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces

More information

SECTION TREES, PLANTS AND GROUND COVERS

SECTION TREES, PLANTS AND GROUND COVERS SECTION 02950 TREES, PLANTS AND GROUND COVERS PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Trees. 2. Plants and shrubs. 3. Ground covers. 4. Non-plant materials required to complete installation

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

317)

317) NDS, Inc. (317) 317) 346-4110 www.drainagesolutionsinc.com April 2015 Product Guide Specification Specifier Notes: This product guide specification is written in Construction Specifications Institute (CSI)

More information

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Key Topics Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Bioretention Crime Scenes Investigation A 9 part reality TV series where you get to watch disturbing

More information

Section 9 Landscaping and Street Trees

Section 9 Landscaping and Street Trees Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3

More information

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02951 PLANTING DETAILS A. This section consists of AutoCad drawings depicting typical landscape details governing the installation of plant materials on the

More information

Tips for Maintaining and Enhancing Stormwater Management Areas

Tips for Maintaining and Enhancing Stormwater Management Areas 4 4 N. Second Street, Denton, Md. 21629 (410) 479-3625 (410) 479-3534 fax www.dentonmaryland.com Tips for Maintaining and Enhancing Stormwater Management Areas Information provided by the Town of Denton

More information

Section 815. LANDSCAPING

Section 815. LANDSCAPING 815.01 Section 815. LANDSCAPING 815.01. Description. This work consists of providing and planting trees, shrubs, and other plants, including replacements, classified as nursery stock. The Engineer may

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 - EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Grading and Excavation B. Trenching C. Bedding D. Backfill and Compaction (New and Native) E. Aggregate Material F. Geotextile Fabric PART

More information

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO. Public Notice REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material June 22, 2018 ADDENDUM NO.: One (1) TO ALL PROSPECTIVE BIDDERS: PLEASE BE ADVISED OF THE FOLLOWING

More information

Turfgrass Sod General

Turfgrass Sod General 8 8.1. General 8.1.1. Purpose statement & intent 1. The intent of this section of the standard is to state standard requirements for quality grades and other classifications of grass types in turfgrass

More information

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION NO CONSTRUCTION OR EXCAVATION IS TO OCCUR ON LOTS THAT REQUIRE TREE PRESERVATION UNTIL PROPER APPROVALS HAVE BEEN GIVEN BY A CITY ARBORIST 1. When trees

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

Installation Manual May 9/14 No revision

Installation Manual May 9/14 No revision 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Manual May 9/14 No revision Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles

More information

SECTION SEEDING

SECTION SEEDING PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 32 9219 SEEDING A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

E R O S I O N C O N T R O L

E R O S I O N C O N T R O L E R O S I O N C O N T R O L GEOTEXTILES T O U G H O V E R T I M E EROSION CONTROL 1.0 Features of PERMANENT PG 2 EROSION CONTROL 2.0 How Typar geotextiles PG 2 work 4.0 Installation guide PG 6 5.0 Overlap

More information

SECTION LANDSCAPING

SECTION LANDSCAPING PART 1 -GENERAL 1.01 DESCRIPTION SECTION 32 9200 A. Furnish all labor, materials, and equipment required to complete all landscaping work indicated on the drawings and specified herein. This includes seeding,

More information

III.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions:

III.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions: III.DRAINAGE This section describes the use of geotextiles in underdrains for two different field conditions: Protected (or light duty installations) and, Unprotected (for heavy duty installations). Both

More information

WALLCOVERINGS WALLCOVERINGS

WALLCOVERINGS WALLCOVERINGS 09950 - WALLCOVERINGS 09950-1 PART ONE: GENERAL 1.1 Description WALLCOVERINGS 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance

More information

14 HIGHWAY PLANTING AND IRRIGATION

14 HIGHWAY PLANTING AND IRRIGATION 14 HIGHWAY PLANTING AND IRRIGATION 14.1 General The Design-Builder shall conduct all Work necessary to meet the requirements for highway planting and irrigation, including erosion control, weed control,

More information

Geosynthetic Institute GSI GRI GT13(b) ISO Version

Geosynthetic Institute GSI GRI GT13(b) ISO Version Geosynthetic Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII Revision 1: December 19, 2012 Revision Schedule on pg. 9 GRI GT13(b) ISO

More information

NATURAL GAS PIPING

NATURAL GAS PIPING SECTION 15496 - NATURAL GAS PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

DIVISION 32 EXTERIOR IMPROVEMENTS

DIVISION 32 EXTERIOR IMPROVEMENTS A. Standard DIVISION 32 EXTERIOR IMPROVEMENTS PARKING LOTS Layout: Layout parking lots with nine by eighteen foot (9 x18 ) stall perpendicular to the drive lane. Widths of all drive lanes will be twenty-four

More information

Subsurface Infiltration Bed

Subsurface Infiltration Bed Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater

More information

SITE PREPARATION GRADING

SITE PREPARATION GRADING 17 SITE PREPARATION GRADING Objectives 1. Be able to describe and explain why grading is done in the landscape. 2. Be able to define and summarize how cutting and filling affect plant growth. 3. Be able

More information

Vegetation Management

Vegetation Management Vegetation Management GENERAL CONSTRUCTION PRACTICE Best practice vegetation management involves giving appropriate consideration to the following issues. Not all the issues will be relevant on every site.

More information