ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON
|
|
- Franklin Walters
- 5 years ago
- Views:
Transcription
1
2 ASPEN GROVE D-1 DETAIL STANDARD NOTES ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF WAY OR ON PUBLIC LANDS ARE APPROXIMATE AND ARE SHOWN FOR REFERENCE ONLY. THE LOCATIONS, SPECIFICATIONS AND PLANTING METHODS OF ALL PROPOSED NEW OR REPLACEMENT TREES IN THE PUBLIC RIGHT OF WAY OR ON PUBLIC LANDS SHALL BE APPROVED BY THE CITY FORESTER PRIOR TO INSTALLATION. NO TREES IN THE RIGHT OF WAY OR ON PUBLIC LANDS SHALL BE TRIMMED, PRUNED, REMOVED OR ADVERSELY AFFECTED IN ANY WAY UNTIL THE DEVELOPER HAS RECEIVED WRITTEN PERMISSION FROM THE CITY ENGINEER OR CITY FORESTER. SAID WRITTEN PERMISSION SHALL INCLUDE LANGUAGE INDICATING THAT SECTION OF THE MADISON GENERAL ORDINANCES AND ADMINISTRATIVE PROCEDURE MEMORANDUM NO. 6-2, REFERING TO NOTIFICATION OF PROPERTY OCCUPANTS AND/OR OWNERS, HAS BEEN COMPLIED WITH. ALL PAVEMENT WITHIN THE RIGHT-OF-WAY SHALL BE TYPE A PAVEMENT. ALL PAVEMENT WITHIN THE HAWKS RIDGE DRIVE RIGHT-OF-WAY SHALL BE TYPE B PAVEMENT. ALL GUTTERS SHALL DRAIN WITH A MINIMUM GRADES OF 0.5% TOWARD STORM SEWER INLETS. THE CROSS SLOPE OF SIDEWALKS AND BARRIER FREE SIDEWALK CURB RAMPS SHALL BE 2%. THE LONGITUDINAL GRADE OF BARRIER FREE SIDEWALK CURB RAMPS SHALL NOT EXCEED 8.33%. ALL SIDEWALK RAMPS SHALL BE CONSTRUCTED ACCORDING TO S.D.D AT ALL OTHER LOCATIONS THE LONGITUDINAL GRADE OF SIDEWALKS SHALL NOT EXCEED 5.0 % OR THE ADJACENT STREET GRADE WHICHEVER IS GREATER NOR BE LESS THAN 0.4% AND SHALL DRAIN TOWARD STORM SEWER INLETS. SIDE SLOPES WITHIN TEN FEET OF A PUBLIC SIDEWALK SHALL NOT EXCEED 4.00:1. ALL SIDEWALK AND SIDEWALK RAMP ELEVATIONS AND GRADES SHALL BE FIELD VERIFIED AND SET TO COMPLY WITH THE STANDARD SPECIFICATIONS AND THE A.D.A. GUIDELINES. OBTAIN A PRINT OUT OF THE ALIGNMENT FROM THE CITY ENGINEER PRIOR TO STAKING THIS PROJECT. CURB STATION AND OFFSETS SHALL BE TO THE FACE OF CURB UNLESS OTHERWISE INDICATED. CURB ELEVATIONS SHALL BE TO THE TOP OF CURB (OR EXTENDED TOP OF CURB FOR DRIVEWAYS OR RAMPS) UNLESS OTHERWISE INDICATED. POWER POLES AND OTHER OBSTRUCTIONS SHALL BE MOVED TO PROVIDE 2 FEET MINIMUM OF CLEAR DISTANCE FROM ANY FACE OF CURB OR EDGE OF SIDEWALK. ANY INFORMATION SHOWN ON THIS PLAN, WHICH IS NOT PART OF THIS PROJECT, IS PRELIMINARY AND NOT FOR CONSTRUCTION. THERE MAY BE EXISTING UTILITIES OR OTHER FEATURES WHICH ARE EITHER NOT SHOWN OR SHOWN INCORRECTLY ON THIS PLAN. IT IS THE RESPONSIBILITY OF THE DEVELOPER TO LOCATE AND IDENTIFY ALL UTILITIES AND TOPOGRAPHY WHICH MAY AFFECT THE CONSTRUCTION OF THESE IMPROVEMENTS. ALL PERMANENT SIGNING AND POSTING WILL BE DETERMINED AND PROVIDED BY THE TRAFFIC ENGINEERING DIVISION, FOLLOWING CONSTRUCTION OF THESE IMPROVEMENTS. THE DEVELOPER SHALL PROVIDE, INSTALL AND MAINTAIN ALL STREET END BARRICADES, SIGNING AND TRAFFIC CONTROL, AS REQUIRED BY THE CITY TRAFFIC ENGINEER. PAVEMENT SAWCUTS SHALL BE AS DIRECTED BY THE CITY CONSTRUCTION ENGINEER. SAWCUTS SHOWN ON THE PLAN ARE APPROXIMATE. DAMAGE TO ANY EXISTING CURB, PAVEMENT, SIDEWALK, ETC. THAT IS TO REMAIN SHALL BE REPAIRED BY THE DEVELOPER/CONTRACTOR AS DIRECTED BY THE ENGINEER. FILE NAME: M:\DESIGN\Projects\53B2390\Streets\Design\53B2390EN_Details##.dgn DATE: 9/18/2014
3 ASPEN GROVE D-2 ROW EX. CENTERLINE OF (REFERENCE LINE) ROW TYPICAL SECTION DETAIL VAR. 30'-60' 30' 10' 4' TO 44' 16' VAR., 8.00% MAX ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: TYPE 4" TOPSOIL, SEED & MAT (TYP.) TYPE 'A' CONCRETE CURB & GUTTER * MINIMUM PAVEMENT DESIGN CRUSHED AGG. BASE COURSE LOWER LAYER GRADATION 1 2% ASPHALTIC CONCRETE PAVEMENT UPPER LAYER (TYP)* UPPER LAYER GRADATION 2 A 6" 4" B 6" 4" C 6" 4" CRUSHED AGGREGATE BASE COURSE (TYP)* ASPHALTIC CONCRETE PAVEMENT LOWER LAYER (TYP)* ASPHALTIC CONCRETE PAVEMENT LOWER LAYER UPPER LAYER TYPE THICKNESS TYPE THICKNESS E " E " E " E " E " E " REPLACE TY 'A' FULL CURB WITH TY 'A' DRIVEWAY CURB AS SHOWN ON THE PLANS OR AS DETERMINED BY THE CONSTRUCTION ENGINEER TYPICAL SECTION STA TO STA NOT TO SCALE USE CAUTION TO NOT DAMAGE EX. PAVEMENT EDGE. PATCH PAVEMENT PER CITY PATCHING CRITERIA IF DAMAGED. VAR. CRUSHED AGGREGATE BASE COURSE (TYP)* ASPHALTIC CONCRETE PAVEMENT UPPER LAYER (TYP)* ASPHALTIC CONCRETE PAVEMENT LOWER LAYER (TYP)* NOTES: EX. CENTERLINE OF (REFERENCE LINE) 16' 16' 14' VAR. EXTEND PAVEMENT IN EXISTING ROADWAY STA TO STA * A PAVEMENT DESIGN IN ACCORDANCE WITH STANDARD DETAIL DRAWING 4.06 IS REQUIRED ON ALL PROJECTS. TYPE 'A' PAVEMENT SHALL BE USED ON 4.00% 4" TOPSOIL, TYPE 'A' CONCRETE CURB & GUTTER ROW SEED & MAT (TYP.) FILE NAME: M:\DESIGN\Projects\53B2390\Streets\Design\53B2390EN-Typical_Section##.dgn DATE: 9/30/2014
4 3 ASPEN GROVE STREET AND STORM PLAN P-1 ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: 6 5 TC: POB 8" T v T T LOT " PC 12" STA , LT 28.84' MATCH EX. SIDEWALK PI STA , LT 28.69' BW/KEYSTONE STA , LT 16.00' MATCH EX. CURB LOT 34 SAN STA , LT 24.06' TC/MC TY'A' DRIVEWAY CURB RIM: INV: E STA , LT 43.36' TC/PRC W R1' 12" PT TC: INV: TC: R 75' NOTE HAWKS RIDGE ESTATES T NOTE 2 2% R 40' 8" 18" NOTES: 8 STA , LT 56.28' TC/QC 2% 8" LOT TYPE 'A' PAVEMENT. STA , LT 59.83' TC/MC TY 'A' CURB & GUTTER WITH FULL CURB HEAD (TYPICAL) TY'A' DRIVEWAY CURB EX. TYPE 'H' INLET REPLACE CASTING WITH R-3290-A FLOWLINE= STA , LT 16.00' EI(SE)= (EX. 12" RCP) EI(E)= (PR. 12" RCP) 2" MILL AND OVERLAY CONSTRUCT CUL-DE-SAC PER S.D.D " 8" TC: " SAN RIM: INV: N W EX. TYPE 'H' INLET. REPLACE CASTING WITH R-3290-A. ADJUST CASTING AND REPLACE CURB AS NECESSARY. USE CAUTION TO NOT DAMAGE PAVEMENT EDGE. PATCH PAVEMENT PER CITY CRITERIA IF DAMAGED. 2. REMOVAL, REPLACEMENT OR RELOCATION OF WIRES, POLES, PEDESTALS, ETC. BY OTHERS. COORDINATE WITH UTILITY COMPANIES. 5. PATCH PAVEMENT PER CITY CRITERIA AND REMOVE AND REPLACE CURB AND SIDEWALK AS NECESSARY FOR LATERAL INSTALLATION. 2% STA , LT 16.00' FL/PC SAW CUT R 4' 16.5'-12" STA , LT 53.08' TC/QC NOTE 3 R4' TY 'A' CURB W/ FULL CURB HEAD STA , RT 16.00' TC/LOW POINT POE R 4' PLAT BOUNDARY R8' 20' WIDE PUBLIC SANITARY SEWER EASEMENT DOC.NO LANDS LANDS STA , LT 37.79' TC/PT STA , LT 19.92' TC/PC STA , LT 16.35' TC/PT PR. TYPE 'H' INLET W/R TC= (LOW POINT) STA , LT 14.22' EI(W)= (PR. 12" RCP) STA , TC/HI POINT STA , RT 12.00' TC/PC STA , RT 16.00' TC/PT FILE NAME: M:\DESIGN\Projects\53B2390\Streets\Design\53B2390EN-Plan##.dgn DATE: 9/30/2014
5
6
7
8 PLOT NAME: PLOT SCALE: MATCH LINE STA EX.SAN.LAT. 4 EX.8" SAN@1.30% 5 REMOVE& REPLACE CURB AND GUTTER AND SW AS NECESSARY TO INSTALL LATERAL PATCH STREET PER CITY OF C2 4 MADISON PATCHING CRITERIA EX.SAS # NEW.SAN.LAT. 5 EX.8" WATER MAIN REMOVE& REPLACE CURB AND GUTTER AND SW AS NECESSARY TO INSTALL LATERAL PATCH STREET PER CITY OF MADISON PATCHING CRITERIA EX.8" SAN.@4.07% EX.LAT.203'FROM PROP.CORNER 43' C1 EX.12" STM NEW.SAN.LAT. EX.SAS # SEE STREET & STORM PLAN FOR PROPOSED STREET AND STM DESIGN 62' EX. 8" SAN.@5.78% EX.SAN.LAT EX.8" WATER MAIN EX.18" STM EXTEND SEWER LATERAL 8 EX.LAT.70'FROM PROP.CORNER 60' EX.SAS # EX.8"SAN@0.40% Sta 'SL'= Sta 'S2' UNIVERSITY RIDGE GOLF COURSE ASPEN GROVE 9205 MIDTOWN RD EOP Sta = PLAN AND PROFILE U REV. DATE: ORIGINATOR:, STREETS DIVISION EX.SAS# STA 18'SL'+51 R6.5' RIM= EI(W)= EI(E)= " WATER MAIN EX, 8" PVC EX 12"STM EX.SAS STA 20'SL'+60 L1.5' RIM= EI(W)= EI(E)= " WATER MAIN EX.8" EX.SAS # STA 21'SL'+72 R0' RIM= EI(W)= EI(N)= EX 18"STM FILE NAME: M:\DESIGN\Projects\53B2390\Utilities\RCp03001.dgn DATE: 9/30/2014
9 SANITARY SEWER SCHEDULE ALIGNMENT CODES: 'HR' = HAWKS RIDGE DRIVE 'SL' = ASPEN GROVE U5 SANITARY SEWER SCHEDULE PROPOSED SANITARY STRUCTURES PROPOSED SANITARY SEWER PIPES STRUC. STATION LOCATION TOP OF E.I. DEPTH NOTES FROM TO LGTH DISCH. INLET SLOPE PIPE TYPE NOTES NO. (OFFSET) CASTING (DNSTM) (UPSTM) (FT) E.I. E.I. (%) SIZE SAS #1 17'SL' RT SAS #1 SAS # % 8" SDR -35 PVC SAS #2 13'HR' LT SAS #2 SAS # % 8" SDR -35 PVC SAS #3 12'HR' LT ORIGINATOR: STREETS DIVISION REV. DATE: _ PLOT NAME: _ PLOT SCALE: _ FILE NAME: M:\DESIGN\STREETS\DGN\53B2087\UTILITIES\STORM SCHEDULE.XLS DATE: 09/18/2014
10 M:\DESIGN\Projects\53B2390\Water\W1_53B2390WU-Plan.dgn 9/18/2014 ASPEN GROVE W-1 WATER PLAN ASPEN GROVE NOTE: - NO WATER MAIN TO BE INSTALLED; WATER SERVICE WORK ONLY - PROVIDE SERVICE LATERALS TO LOTS 1, 2, 5 & 7 - REMOVE AND REPLACE CURB AND GUTTER AS NECESSARY TO INSTALL WATER SERVICE. PATCH STREET PER CITY PATCHING CRITERIA REV. DATE: PLOT NAME: PLOT SCALE: W N9 1-IN W N9 1-IN WN9 1-IN WN9 1-IN TO OBTAIN LOCATION OF PARTICIPANTS' UNDERGROUND FACILITIES BEFORE YOU DIG IN WISCONSIN ORIGINATOR:, STREETS DIVISION CALL DIGGERS HOTLINE TOLL FREE 811 OR FAX-A-LOCATE TDD (FOR HEARING IMPAIRED) WIS. STATUTE (1974) REQUIRES MIN. OF 3 WORK DAYS NOTICE BEFORE YOU EXCAVATE. ONE CALL SY MEMBER STEMS INTER NATIONAL DISCLAIMER NOTE: UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCING WORK. FILE NAME: DATE:
11
FEB 2016 COUNTY MAP NTS
COUNTY MAP NTS MILWAUKEE COUNTY SHEET INDEX N. 76TH STREET N. 70TH STREET N. 60TH STREET PROJECT LOCATION N. PARK PLAZA COURT ALDI'S SITE N. 51ST STREET SHEET SHEET TITLE G1 TITLE SHEET G2 GENERAL SYMBOLS
More information183
182 183 184 185 186 187 188 189 190 LEFTHAND CANYON DR. DRIVE ROWAY PHASING PLAN PHASE 1 PHASE 2 PHASE 3 CONSTRUCT RETAINING WALLS 8 AND 100, INCLUDING SHORING, EXCAVATION, WALL AND BACKFILL. UTILIZE FLAGGING
More informationTABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08
TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL
More informationThe following two (2) checklists verify what information is being provided and required.
PLAN REVIEW CHECKLIST ROADWAY DEVELOPMENTS FOR ANY MINOR OR MAJOR REVIEW Instructions: Failure to complete the checklist, or provide the information listed therein, will result in the application being
More informationDepartment of Planning & Development Planning Unit
Department of Planning & Development Planning Unit Website: www.cityofmadison.com Madison Municipal Building 215 Martin Luther King, Jr. Boulevard P.O. Box 2985 Madison, Wisconsin 53701-2985 TDD 608 266
More informationTown of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE
Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE 1.01 PURPOSE The purpose of this ordinance is to regulate the establishment, construction, improvement, modification or reworking of a driveway
More informationGRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.
GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387
More informationVALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION
MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...
More informationSTI Street Maintenance & Overlay Project
6TH ST 6TH ST FOREST STELM AVE PA M ELA DR CT KING ARTHURCT S 33RD AVE RAMP RAM RAMP 5TH AVE 20TH AVE W 16TH AVE US HWY 14 BYP W US HWY 14 BYP RAMP RESEARCH PKWY STAD INNOVATION D R I UM RD N CAMPUS DR
More informationWHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area
City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the
More informationDepartment of Planning & Development Planning Unit
Department of Planning & Development Planning Unit Website: www.cityofmadison.com Madison Municipal Building 215 Martin Luther King, Jr. Boulevard P.O. Box 2985 Madison, Wisconsin 53701-2985 TDD 608 266
More informationTitle 11 Streets and Sidewalks
Chapter 11.01 - Definitions Title 11 Streets and Sidewalks Low Impact Development (LID) - A stormwater and land use management strategy that strives to mimic predisturbance hydrologic processes of infiltration,
More informationProject will Replace: Utilities Curb Pavement Lighting. City of Madison
Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,
More informationROADWAY SECTION PRINCIPAL ARTERIAL 2-01
ROADWAY SECTION PRINCIPAL ARTERIAL 2-01 ROADWAY SECTION MINOR ARTERIAL COMMERCIAL/MIXED USE 2-02 ROADWAY SECTION MINOR ARTERIAL REDISENTIAL 2-03 ROADWAY SECTION COLLECTOR COMMERCIAL MIXED USE 2-04 ROADWAY
More informationAPPENDIX F: DETAIL DRAWINGS
APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017
& PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL
More informationDEPARTMENT OF PUBLIC WORKS & UTILITIES
CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS & UTILITIES URBAN SERVICES STANDARDS AND GUIDELINES January 2017 Craig Fulton, P.E., Director TABLE OF CONTENTS "URBAN SERVICES STANDARDS AND GUIDELINES"
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NYS Tug Hill Commission Local Government Conference March 31, 2016 Prepared by: Peter G. Vars, P.E. BME ASSOCIATES Stages of Plan
More informationSITE PLAN REVIEW APPLICATION AND CHECKLIST
SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 27, 2007 DATE: January 12, 2007 SUBJECT: U-3101-04-2 Use Permit Review for drive-through facilities; premises known as 5222 Lee Highway
More informationMCKINNEY FIRE DEPARTMENT FIRE MARSHAL S OFFICE FIRE LANES
MCKINNEY FIRE DEPARTMENT FIRE MARSHAL S OFFICE FIRE LANES This guide is intended to be a resource for when a building, structure, or facility, within the City of McKinney, is required to be provided with
More informationUniversity Park Subdivision Street Assessment Report
University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...
More informationCARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015
CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide
More informationHANOVER EXTON SQUARE
RESIDENTIAL DEVELOPMENT PLAN SITUATED IN: (S.R. 000) & LINCOLN HIGHWAY (U.S. BUSINESS ROUTE 30) TAX MAP RCEL 4-5-90 CHESTER COUNTY, PENNSYLVANIA OWNER: PR EXTON PROPERTY LP THE BELLEVUE 200 SOUTH BROAD
More informationCoffee Creek Park Development Low Impact Development (LID)
Coffee Creek Park Development Low Impact Development (LID) City of Duluth, St. Louis County, MN Presented By: Christopher J. Rousseau, P.E. February 27, 2008 Developer / Owner Information Trinity Development
More informationCOUNCIL POLICY. 1. Removals. a) Dead or Hazardous Trees
COUNCIL POLICY SUBJECT: BOULEVARD TREE POLICY DATE: MARCH 14, 1988 REFERENCE: 88/CW Revised: June 27/88, Jan. 2/90, Jan. 27/92, Jan. 4/93, March 15/93, Jan. 17/94 1. Removals a) Dead or Hazardous Trees
More informationA. Site plan notes. Include the heading Site Plan Notes.
Community Development and Neighborhood Services Planning Services 281 North College Ave. P.O. Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview The following City
More informationVT Route 15 - Pearl Street Link
VT Rte 2A VT Route 5 - Pearl Street Link VT Route 5 VT Route 5 VT Rte 2A VT Route 7 BEGINNING ON VT 5 (PEARL STREET) IN JUNCTION AT STATION 0+68 (MM.70) AND EXTENDING EASTERLY ALONG PEARL STREET A DISTANCE
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationSTANDARD DETAILS QUICK REFERENCE
STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)
More information30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN
LEGAL PROPERTY DESCRIPTION SEE NOTES SHEET FOR LEGAL PROPERTY DESCRIPTIONS THE CITY OF PLEASANT RIDGE GAINSBORO PARK IMPROVEMENT PROJECT CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN 4444 Second Avenue
More informationPRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016
PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS
More informationTOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST
TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk
More informationCottage Grove Road Reconstruction. City of Madison Engineering
Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs
More informationThe Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.
ORDINANCE DRIVEWAYS AND CULVERTS NO. 6-5-06 ORDINANCE CONCERNING DRIVEWAY AND CULVERT REQUIREMENTS 1-1-1 Driveway Permits; Culvert Requirements 1-1-2 Driveway and Culvert Location, Design and Construction
More informationINDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES
INDEX EXECUTIVE SUMMARY...1 INTRODUCTION...2 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS... 4-5 EXISTING UTILITIES... 6-7 MEDIAN BREAKS AND TURN LANE STORAGE REQUIREMENTS...8 PRELIMINARY DESIGN
More informationZoning Ordinance Section 1.100
4.800 (ZC 98-45; Ordinance No. 98-9-13) 4.801 Purpose To provide appropriate design standards for the development of properties within the State Highway 121 corridor. These standards recognize the significance
More informationIOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014
IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational
More informationPREPARED FOR THE URBAN DESIGN COMMISSION AND PLAN COMMISSION
PLANNING DIVISION STAFF REPORT PREPARED FOR THE URBAN DESIGN COMMISSION AND PLAN COMMISSION Project Address: Application Type: Legistar File ID # 30134 Prepared By: Summary 1613-1721 N. Sherman Avenue
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More informationINFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities
7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure
More informationBIRMINGHAM TOWNSHIP CHESTER COUNTY, PENNSYLVANIA Subdivision and Land Development Ordinance No Dated 02/18/03
BIRMINGHAM TOWNSHIP CHESTER COUNTY, PENNSYLVANIA Subdivision and Land Development Ordinance No. 0302 Dated 02/18/03 Section 103-40. OUTDOOR LIGHTING A. Purpose. The standards in this section shall require
More informationFor the purposes of this chapter, the words and terms used herein are defined as follows:
City of Visalia Street Tree Ordinance 12.20.010 Purpose. The purpose of this chapter is to promote and regulate the planting, long term care, maintenance, and protection of street trees within the city.
More informationDepartment of Planning & Development Planning Unit
May 20, 2005 Department of Planning & Development Planning Unit Website: www.cityofmadison.com Madison Municipal Building 215 Martin Luther King, Jr. Boulevard P.O. Box 2985 Madison, Wisconsin 53701-2985
More information4.500 Preston Road Overlay District
Section 4.500 Preston Road Overlay District 2004 Zoning Ordinance 4.500 Preston Road Overlay District (ZC 98-29; Ordinance No. 98-9-12) 4.501 Purpose To provide appropriate design standards for the use
More informationAREA LIGHTING TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS FOR YOUR PROPERTY OVERHEAD FEED UNDERGROUND FEED. Electrical Service Requirements
Electrical Service Requirements AREA LIGHTING PUD SERVICE TERRITORY & CONTACTS FOR YOUR PROPERTY Yard light Flood light OVERHEAD FEED PUD responsibilities Customer responsibilities UNDERGROUND FEED PUD
More informationAPPROXIMATE LIMIT OF CITY LANDFILL LIMIT OF CONTRACTOR WORK ZONE. INSTALL CONSTRUCTION SNOW FENCE.
EX. 5Ø WM EX. 6Ø SAN EX. 4Ø STM EX. 5Ø SAN EX. 75Ø SAN APPROXIMATE LIMIT OF CITY LANDFILL ZONE. INSTALL CONSTRUCTION SNOW FENCE. STUB FOR FUTURE 6Ø WATERMAIN 4 6 8 ZONE. INSTALL CONSTRUCTION SNOW FENCE.
More informationChecklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:
Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number
More informationParks & Recreation Tree Board - Tree Ordinance Angola, Indiana
Parks & Recreation Tree Board - Tree Ordinance Angola, Indiana 97.01 PURPOSE. (A) Promote and enhance the beauty of the city through tree preservation and landscaping. (B) Safeguard the ecological environment
More informationHUNTSVILLE PHYSICAL SERVICES DEPARTMENT
HUNTSVILLE PHYSICAL SERVICES DEPARTMENT URBAN DEVELOPMENT SITE PLAN CONTROL DRAWING DESIGN GUIDE April, 2000 (Revised June, 2003) TABLE OF CONTENTS Part A. General Information Page 1 Part B. Site Servicing
More informationCITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL
CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted
More informationL100 LANDSCAPE PLAN L101 SITE PHOTOMETRICS A1 BUILDING ELEVATIONS A2 BUILDING ELEVATIONS A3 BUILDING ISOMETRICS A-2 ARCHITECTURAL FLOOR PLAN
WARNING!: These plans are for the exclusive use of Culver Franchising Systems, Inc. and authorized franchise holders only. No part of these plans or the design they represent may be duplicated or reproduced
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012 DEVELOPMENT NAME SUBDIVISION NAME LOCATION OSR Subdivision OSR Subdivision 5559 Old Shell Road (South side of Old Shell Road, 570
More informationJOB CREATION PROJECTS
SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each
More informationARTICLE 17 SITE PLAN REVIEW
ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant
More informationARTICLE 6 ACCESS AND RIGHT-OF-WAY REQUIREMENTS; AND STREET IMPROVEMENT AND CONSTRUCTION REQUIREMENTS
ARTICLE 6 ACCESS AND RIGHT-OF-WAY REQUIREMENTS; AND STREET IMPROVEMENT AND CONSTRUCTION REQUIREMENTS 6.1 ACCESS 6.1.1 When land is subdivided into larger parcels than ordinary building lots, such parcels
More informationInstallation Manual May 9/14 No revision
815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Manual May 9/14 No revision Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles
More informationCITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL
CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL 34135 239-949-6246 DRIVEWAY PERMIT FEES Single Residential Driveway Connection/ Filling in Swale Permit Fee $215.00 After
More informationSIGN PLACEMENT-ELEVATION VIEW: FREEWAY SIGN PLACEMENT-ELEVATION VIEW: FREEWAY ROADSIDE SIGN LOCATIONS & SUPPORT SPACING NOT TO SCALE
HINGE POINT EACH POST (TYP) HINGE POINT EACH POST (TYP) (MIN.) EDGE OF FORESLOPE 4" STEEL COLUMN 6" WOOD POST 4" (STEEL COLUMN) 6" (WOOD POST) 4' MIN. THRU TRAVELED 7'MIN. THRU TRAVELED MIN. 5' LATERAL
More informationCITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details
CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting
More informationReevesland (ca.1900) 400 N. Manchester Street, Arlington, VA Clarendon Blvd., Suite 400, Arlington, VA See below
COUNTY, HISTORICAL AFFAIRS AND LANDMARK REVIEW BOARD APPLICATION FOR CERTIFICATE OF APPROPRIATENESS DATE March 9, 2018 Z- - -HD RPC# (TO BE COMPLETED BY STAFF) DESIGNATED PROPERTY: Name of Historic District
More informationSUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)
1) Application form and filing fee. Application Form.pdf Development Review Guide STEP 6 of 8 SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP) 2) Transportation Development Review
More informationBOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM
BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard
More informationA. Regional Detention Requirements
I. GENERAL DESIGN GUIDELINES A. Full-spectrum detention is provided for all new development, redevelopment or expansion of a site to provide for water quality and flood control detention. B. Detention
More informationTown of Florence Florence County, WI DRIVEWAY ORDINANCE
Town of Florence Florence County, WI 08-10-09 DRIVEWAY ORDINANCE 1.01 PURPOSE The purpose of this Ordinance is to regulate the establishment, construction, improvement, modification or reworking of a driveway
More informationSTORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE
STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.
More informationFebruary 17, Sara Ullman Planner I. Sincerley,
February 17, 2016 Sara Ullman Planner I City of Aurora Planning Department Re: Mrachek Middle School Replacement (#1116704)/Response Initial Submission Review Dear Ms. Ullman, Thank you for your assistance
More informationRequest for Approval of Design Modification
March 7, 2017 Piper Peterson U. S. Environmental Protection Agency 1200 Sixth Avenue, ECL-122, Suite 900 Seattle, Washington 98101 Subject: Request for Approval of Design Modification T-117 Early Action
More informationChain Bridge Road Sidewalk Improvements Citizen Council Work Session
Chain Bridge Road Sidewalk Improvements Citizen Council Work Session May 10, 2016 Project Location 2 Project Objectives Provide a continuous pedestrian facility (sidewalk) connection from Downtown City
More informationBUSINESS PARK TOWN OF OKOTOKS
@ TOWN OF OKOTOKS LANDSCAPE TENDER DRAWINGS - 31 JANUARY 2016 L1. DEMOLITION PLAN L2. LAYOUT PLAN L3. GRADING PLAN L4. PLANTING PLAN. SECTIONS AND DETAILS File Location: N:\Projects\. Business Park MR
More informationCarolina North Individual Permit Application September 2010 Draft
Carolina North Individual Permit Application September 2010 Draft Appendix C Jurisdictional Streams, Wetlands, and Buffer Impacts Figures (C- 1 through C-17) C-1 Sheet Index: Impacts within and Outside
More informationAppendix G. Detailed Design
Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information
More information815 NE 172 nd Avenue Vancouver, WA Installation Manual
815 NE 172 nd Avenue Vancouver, WA 98684 800-377-3877 www.xeripave.com info@xeripave.com Installation Manual Installation steps include job planning, layout, excavating and preparing the soil sub grade,
More informationCRESCENT RESOURCES INC.
CRESCENT RESOURCES INC. Due Diligence Checklist Project Name: Client: Project No. Date: 1 Survey Review survey for compliance with Crescent Resources, Inc. s Instructions to Surveyors (see below): All
More informationAgenda Item # 1. Meeting Date September 21, Prepared By. Approved By
Agenda Item # 1 Work Session Meeting Date September 21, 2015 Prepared By Approved By Erkin Ozberk, Senior Planner Suzanne R. Ludlow City Manager Discussion Item Background Discussion of Site Plan Application
More informationW E A V E R C R O S S I N G Concept Plan
W E A V E R C R O S S I N G Concept Plan February 19, 2014 APPLICANT: Contact: Scott Murray 2522139501 EUBANKS ROAD RAMP NC 86 MLK JR. BLVD. INTERSTATE 40 Vicinity Map DEVELOPER: Mangement Co. Inc. Contact:
More informationPROJECT AND PUBLIC UTILITY CONTACTS VILLAGE OF BEAR LAKE PO BOX VIRGINIA STREET BEAR LAKE, MI (231) VILLAGE OF BEAR LAKE
MAPLE ST. WISE ST. LYNN ST. VIRGINIA ST. SMITH ST. RUSSELL ST. BODWELL ST. RUSSELL ST. MANISTEE COUNTY CHIGAN USDA WATER SYSTEM IMPROVEMENTS PROJECT CONTRACT 1 - DISTRIBUTION SYSTEM VICINITY MAP Know what's
More informationA/E REVIEW CHECKLIST SITE & LANDSCAPE
A/E REVIEW CHECKLIST SITE & LANDSCAPE Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Architectural, Boiler Safety Devices Operation
More informationThe following specific definitions shall apply to the landscaping and screening regulations contained in this article:
ARTICLE XII. LANDSCAPING Sec. 5-421. Purpose. The purpose of landscaping and screening requirements is to improve certain setback and yard areas, including off-street vehicular parking and open-lot sales
More informationCITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX
CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES
More informationConcluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).
Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking
More informationENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN
ENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN PROJECT NAME: PROJECT ADDRESS: TAX MAP REFERENCES: ENGINEER: E-MAIL:
More informationCONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE
CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
More informationDES_DETAIL_NSCG N S. C G. DES_FENCE_CORNER_BRACE_UNIT_FE-CL_VINYL_COATED Corner Brace Unit FE-CL Vinyl Coated
Level Name DES_HOR_CL DES_HOR_CL_LABELS DES_HOR_CL_CURVE _DATA DES_HOR_CL_TICK_MARKS DES_HOR_CL_STATIONS DES_HOR_CL_TAN_LINE DES_VERT_PROF DES_VERT_PROF_LABELS DES_VERT_PROF_TAN_LINE DES_VERT_PROF_ELEV
More informationCHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment
CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design
More informationProject phasing plan (if applicable) 12 copies of site plan
SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location
More informationAPPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania
APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management
More informationCase Martin Luther King Drive and 212 and 216 North 6 th Street
Case 93 Applicant: Owner: Request: Location: Zoning: Stable Family Investment, LLC Same Site Plan Approval for the District on Martin Luther King a 6 unit, 4-bed residential condominium development 35
More informationConst. ROADS - Description
Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects
More informationSubdivision Staff Report
Subdivision Staff Report Name: Bridgewalk Subdivision Date: December 8, 2004 File: SUB04-00089 Meeting: December 14, 2004 Approval: Preliminary To: City Council Lead Agency: Boise City From: Richard Beck
More informationSpreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev
Spreadsheet Report Page 1 Phase I Wickenburg, AZ SD Estimate Rev 0 9-29-11 Project name Estimator Labor rate table Equipment rate table Job size Duration Wickenburg AZ Hal White Denver Denver 121 ac 9
More informationMain Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre
Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville
More informationSection 9 Landscaping and Street Trees
Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3
More informationSITE PLAN REVIEW APPLICATION AND SUBMITTAL CHECKLIST FOR PLANNING COMMISSION
SUBMITTAL CHECKLIST FOR PLANNING COMMISSION Cash Receipting Code: Plan Com Application Fees: $200.00 Single & Multi-Family (up to 3 units) $300.00 Commercial, Industrial, Subdivisions, Condos, Multi-Family
More informationTransportation Systems and Utility Infrastructure
77 Audience Local and regional units of government, Landowners and developers, Community and citizen organizations, and Transportation/utility planners and engineers. Overview Transportation systems and
More informationCommercial Site Plan Review Checklist
Commercial Site Plan Review Checklist Updated 1/5/2015 Project Name: EPM #: _ Street: Contact: Phone: Date Submitted: _ Fax: Reviewer: Email: First Review: Second Review: _ Third Review: Reviews Required
More informationPROPOSED BLOCK LENGTH CODE AMENDMENT
10.426 Street Circulation Design and Connectivity. These standards are intended to assure that development will ultimately result in complete blocks bound by a network of public streets, and/or private
More information