WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Similar documents
Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Project Overview. Get Involved. Public Information Meeting. Contact Information

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Fairfax County Parkway (Route 286) Widening Project

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

Reconnecting New Haven: Downtown Crossing

US-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer

SECTION 4(f) DE MINIMIS DOCUMENTATION

Right-of-Way Acquisitions and Relocations Technical Memorandum

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Ann Arbor Intermodal Station Environmental Review

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Cottage Grove Road Reconstruction. City of Madison Engineering

Citizen Information Meeting

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

DESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

I-70 Corridor Enhancement Plan

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

S SUMMARY S.1 PREFACE S.2 PURPOSE AND NEED S.3 PROJECT BACKGROUND

Pine Flat Lake Master Plan Update FACT SHEET September 2014

SR 916/NW/NE 135 Street Public Hearing

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

LOCATION AND DESIGN DIVISION

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Public Information Centre. Welcome

Capital Projects in and near Odenton Town Center

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Appendix E Preliminary Location Hydraulic Study

Berkshire Regional Planning Commission Clearinghouse Review Report

ITS Concept Development Activity Descriptions

FDOT D4 Complete Streets

Clay Street Bridge Replacement Project

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Capital Projects impacting Odenton Town Center

Corridor Enhancements

St. Clair Avenue West Area Transportation Master Plan

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Fall 2017 Construction Update

RIVERSIDE, Newton MA June 9, 2011

COLLIER BOULEVARD (CR 951) CORRIDOR

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015

STREAM BUFFERS

Mavis Road Class Environmental Assessment

Parks, Trails, and Open space Element

Potential Green Infrastructure Strategies May 6, 2015 Workshop

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

City of Los Angeles Department of Public Works

AGENDA ACTION ITEMS INFORMATION ITEMS

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

2 ALTERNATIVES AND OPTIONS

DESIGN PUBLIC HEARING. Phase II

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Chesterfield County Project Update

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Pennsy Greenway Trail

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Title 11 Streets and Sidewalks

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

Commissioners Road West Realignment Environmental Assessment

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

East Corridor Final Environmental Impact Statement

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

COMPLETE GREEN STREET CHECKLIST

JOB CREATION PROJECTS

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

TRANSPORTATION COMMITTEE

WELCOME TO OPEN HOUSE TWO November 28, 2018

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

SEWRPC. Joint Meeting of the Advisory Committees on Regional Land Use Planning and Regional Transportation Planning APRIL 26, 2018

A/E REVIEW CHECKLIST SITE & LANDSCAPE

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing

Transcription:

WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House

WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project Manager Murthy Koti Traffic Engineer Tim Phelan Right of Way Coordinator ENGINEERING & DESIGN SECTION 4(F) / PARKS / TRAILS ENVIRONMENTAL ASSESSMENT RIGHT OF WAY NOISE IMPACTS

COMMENTS Written comments will be responded to in the final Environmental Assessment Document Please sign in at the back table to make a public comment following the presentation

PROJECT LOCATION

PURPOSE & NEED The project is also intended to support local and regional goals and objectives of the City of Omaha and MAPA. The Project is needed because of the insufficient roadway capacity, inadequate bridge conditions, discontinuity with adjacent roadways and intersections, and inadequate pedestrian facilities within the corridor. Enhance Vehicular Transportation System & Improve Connectivity Reduce Driver Delays Improve Pedestrian Accessibility

PROJECT OVERVIEW Because of increasing traffic volumes, 168 th Street s existing two lane rural street will be upgraded to a four lane urban street with turn lanes, curbs and gutters. THE PROJECT INCLUDES: Installing drainage facilities and reconstructing water and wastewater mains and private utility lines Constructing concrete pavement, bike paths, sidewalks, and curb ramps Installing a new traffic signal, street lighting, and communications infrastructure Building retaining walls and noise walls Reconstructing adjacent roads to match improvements Rehabilitating and widening the bridge over Zorinsky Lake Erosion control and water quality basins

PROPOSED ALTERNATIVE The Proposed Alternative is a four lane roadway, with raised medians and curbs, and separated, parallel sidewalks or combination sidewalk/bike paths as shown.

PROPOSED ALTERNATIVE

OTHER ALTERNATIVES CONSIDERED

OTHER ALTERNATIVES CONSIDERED

DRAFT ENVIRONMENTAL ASSESSMENT Draft EA prepared under guidelines of the National Environmental Policy Act (NEPA) Evaluates social, environmental, and economic impacts of the project. Required due to federal funding. Federal Highway Administration (FHWA) is the lead agency. Results in Finding of No Significant Impact (FONSI) or a Notice to Prepare an Environmental Impact Statement (EIS) if there are significant impacts.

DRAFT ENVIRONMENTAL ASSESSMENT AFFECTED RESOURCES Land Use Zorinsky Lake and Edward Zorinsky Recreation Area (Dam Site 18) Social and Economic Considerations Title VI and Environmental Justice Right of Way, Acquisitions, and Relocations Pedestrians, Bicyclists, and Accessibility for Individuals with Disabilities Parks, Recreation Areas, and Section 4(f) Resources Historic and Archeological Resources Water Resources and Water Quality Wetlands and Riparian Areas Floodplains Vegetation, Wildlife, and Migratory Birds Invasive species Threatened and Endangered Species Utilities Noise Impacts Air Quality, Mobile Source Air Toxics, and Greenhouse Gases Hazardous Materials and Recognized Environmental Conditions Visual Impacts and Aesthetic Considerations Temporary Construction Impacts Secondary and Cumulative Impacts

ZORINSKY LAKE DAM SITE 18 The City would obtain a permit from the USACE for modifications to Dam Site 18 and excavate to offset the flood storage impacts. Tree removal would be mitigated in accordance with a re vegetation plan approved by the City and USACE. Disturbed areas would be re vegetated with native species.

SOCIAL & ECONOMIC CONSIDERATIONS Access would be provided for residents temporarily affected by construction. Access to CHI Lakeside from 168 th Street would be maintained at all times. Emergency services would be notified & coordinated with before and during construction. Vehicular and pedestrian access to Willowdale Elementary School at P Street would be maintained at all times while school is in session. U turns would be allowed at designated areas to maintain access to certain areas.

RIGHT OF WAY ACQUISITIONS & RELOCATIONS ROW impacts would be minimized through the use of retaining walls, to reduce grading on adjacent property. Designs are preliminary at this time. ROW acquisition will follow the Uniform Act. Property values would be determined by independent appraisers.

PEDESTRIAN & BICYCLIST ACCESSIBILITY Temporary alternate routes or advanced notice of closures would be provided, if necessary. Temporary crossings would be installed during construction to maintain connectivity. New sidewalks would be added where none exist now to improve accessibility and mobility. During construction, existing pedestrian access would be maintained to the maximum extent practicable along the entire corridor.

PARKS TRAILS SECTION 4(F) RESOURCES Temporary trail and boat access closures would be less than one year during construction. Temporary at grade crossings would be provided for trail users at Zorinsky Lake. Phasing would be used to minimize impacts. Flaggers and signage would be used to notify trail users during construction. Retaining wall along Pinewood Park to minimize impacts to the park. Tree and vegetation impacts would be mitigated with a re vegetation plan

WATER QUALITY The City would follow regional guidelines for stormwater permits. Permanent detention basins would be constructed at two locations (on north and south side of Zorinsky Lake, west of 168 th Street) to improve water quality from road and bridge runoff.

WETLANDS & STREAMS The City would obtain appropriate wetland permits. Impacts would be minimized through the use of retaining walls and temporary fencing. No direct impacts anticipated to Zorinsky Lake.

FLOODPLAINS Existing roadway alignment offers the least amount of possible impact to the floodplain. Impacts minimized by using existing embankment and minimizing fill. Appropriate floodplain modeling was conducted, and permits will be obtained. No planned increase in surface water elevation or floodwater elevations.

INVASIVE SPECIES Mitigation commitments have been developed to avoid the spread of zebra mussels and other invasive species. Construction equipment will be cleaned prior to and after being in the lake.

UTILITIES Coordination letters, notifications, and agreements with utility companies would be used.

NOISE IMPACTS 10 wall locations were determined to be feasible and reasonable, and were voted in favor by benefited receivers. Proposed walls do not block all sound Funded by federal and local funds, no cost to homeowner Vary in height Final design profile may differ slightly

VISUAL IMPACTS & AESTHETICS Trees in the ROW would not be replaced. Tree impacts in the existing ROW would not be mitigated. Instead, the City would provide funding for future tree planting projects that meet requirements of the Green Streets Plan for Omaha. Re vegetation plans would be developed for Zorinsky recreation area and Pinewood Park

TEMPORARY CONSTRUCTION IMPACTS Traffic would be maintained in both directions for the majority of the project. Trash service and mail delivery would not be interrupted. Dust emissions would be controlled. Best Management Practices would be used to minimize temporary construction impacts, including dust control, working hours, sediment and erosion control, and temporary fencing.

TEMPORARY CONSTRUCTION IMPACTS A three month closure of 168 th Street would be required to reconstruct the culvert at Pinewood Park (between Frances and Pine Street). This closure would occur during the summer while school is out of session. Coordination with the public, emergency services, Lakeside Hospital and schools will occur.

PRELIMINARY COST ESTIMATE The cost of the project would be paid for 80% by the Federal government, and 20% by the City of Omaha Construction Costs (not including Right of Way, or Engineering) are estimated at $15.2 MILLION

PROPOSED PROJECT SCHEDULE This project is currently scheduled to begin in 2021. Some utility work may begin ahead of this time. ROW is scheduled to be acquired in late 2018 and 2019.

PUBLIC INVOLVEMENT Public Hearing (Tonight) May 11 th, 2017 Draft EA available on City and NDOR websites, Millard Library, and other locations. Public Forum tonight to record spoken comments Written/emailed comments accepted until May 26 th, 2017

OPEN HOUSE STATIONS ENGINEERING & DESIGN SECTION 4(F) / PARKS / TRAILS ENVIRONMENTAL ASSESSMENT RIGHT OF WAY NOISE IMPACTS

CONTACT Jon Meyer City of Omaha, Public Works Dept. 1819 Farnam St Omaha, NE 68183 phone: (402) 444 4191 email: jon.meyer@cityofomaha.org STPC 3811(1) and STPC 3811(2) CN 22209 and CN 22210 The City of Omaha thanks you for your participation!