Sustainable Road Design And Multimodal Roads. Presented by: Sheina Hughes

Similar documents
Low Level Road Project. Canadian Consulting Engineers Award 2016

DRAFT Subject to Modifications

Envision Sustainable Infrastructure

ENVISION The Rating System for sustainable infrastructure in the USA

Transportation. Strategies for Action

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

CITY COUNCIL AGENDA REPORT

Envision Sustainable Infrastructure

The transportation system in a community is an

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Low Level Road Project Consultation Discussion Guide. September 2012

HELLO & WELCOME. Prior/Venables Replacement A NEW PLAN FOR THE FALSE CREEK FLATS PLANNING PROCESS OVERVIEW

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor

Designing INSIDE the Box

Slope Stability Management Framework

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

Strasbourg SUMP Award: Finalist factsheet. Local Transport facts. Urban transport policy objectives of the city:

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

38 Queen s University Campus Master Plan Part 1

CHAPTER 7: Transportation, Mobility and Circulation

Edmonton s LRT Setting the Stage for Heading Further South

edmonton.ca/ribbonofgreen #ribbonofgreen

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

Welcome to the Oakridge Centre Open House

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Subarea Plan 2 Point Wells

Chapter 5: Natural Resources and Environment

1.0 Circulation Element

Complete Neighbourhood Guidelines Review Tool

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

TORONTO COMPLETE STREETS GUIDELINES

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Parks, Trails, and Open space Element

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

North Somerset Council Local Development Framework

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

Toronto Complete Streets Guidelines

Parks, Trails, and Open Space Element

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

The West Vaughan Employment Area Secondary Plan Policies

Rolla Comprehensive Plan Update, 2005 COMMUNITY ISSUES MEMORANDUM 11/1/2004

I-70 Corridor Enhancement Plan

Miami Valley Regional Planning Commission Regional Land Use Planning

Kenilworth Avenue and Town of Cheverly Industrial Study Briefing

Creating Complete Roadway Corridors:

PROJECTS AND THE PUBLIC ART MASTER PLAN

ELK GROVE GENERAL PLAN VISION

Parapet/Formliner/Fencing

Supporting our communities. Bridges

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

Edmonton s Transit Oriented Development Journey

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Glenn Highway MP DSR. Landscape Narrative

City of Bristol Route 6 Corridor Implementation Program

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Route 1 Corridor Study

Toronto Complete Streets Guidelines Stakeholder Advisory Group #

EDMONTON: Changing the Way We Grow and the Way We Move

FY Capital Improvement Program Arroyo Projects - Central Arroyo Summary

Municipal Development Plan Update Urban Service Area and Hamlets

FHWA INVEST. And the Harbor Bridge Project

Key Themes and Responses May 2016

LANDSCAPE SCALE PLANNING AND SITING FOR SHALE DEVELOPMENT

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

Designing for Sustainability: A Consultant s Perspective

Clay Street Bridge Replacement Project

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

CITY VIEW OBJECTIVES

T H A T E V E R Y O N E

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Integration of Trees into Roads Policy - the road to success -

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

11 GUIDING PRINCIPLES:

City of Tacoma Planning and Development Services

RE: QUEENSLAND GOVERNMENT PLANNING POLICY REVIEW

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

FUNDING CORRIDOR REVITALIZATION

A Unified Auckland The challenge of developing transport based Design Standards for the Auckland Region

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Preliminary Plan Framework: Vision and Goals

2017 Canadian Consulting Engineering Awards

Workshop on Practice & Research in Urban Sustainability Assessment

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

Witteveen+Bos. Strategy // Planning // Design for resilient urban places. Rachael Cox April 2017

Implementation Guide Comprehensive Plan City of Allen

Transportation Research Center

South 200 th Link Extension Open House April 3, 2013

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

Transcription:

Sustainable Road Design And Multimodal Roads Presented by: Sheina Hughes May 21, 2015

Roadways more than just mobility Perspectives from a former City Engineer LEED for Buildings made a Public Agency change its approach Envision for Roadways

Beyond Business as Usual US Federal Highway Administration defines sustainable roadways as those that: Consider life cycle costs Reduce consumption of natural resources Enhance the natural environment Provide access to all people and goods Provide transportation choices Promote safety and raise comfort for walking, cycling, and transit Recognition that technical design excellence alone is not enough to guarantee an optimal end result

What does a sustainable road look like? Image courtesy of the Greenroads Foundation

Complete Streets A set of design principles for transportation planning intended to: Provide travel options for all users in a safe and accessible manner Forma network that allows for efficient and high quality travel experiences Be adaptable to accommodate present and future needs Contribute to environmental sustainability and resiliency Consider life cycle costs -taken from City of Edmonton Complete Streets Guidelines

What does a sustainable road look like? Cermak Road Chicago, IL

Rating Sustainability Ratings frameworks and systems can benefit the design process in the following ways by: 1. Providing best practice guidance 2. As a platform for considering design alternatives 3. As a communications and stakeholder engagement tool 4. As a method for verifying performance

Rating Sustainability Many transportation-specific tools available to assist with technical design: I-LAST Illinois State DOT New York State DOT US Federal Highway Administration Greenroads Foundation Cobb County, GA

Rating Sustainability What about situations where issues beyond transportation-related challenges need to be considered? Introducing Envision

Introducing Envision Envision provides a holistic framework for planning, evaluating and rating the community, environmental, and economic benefits of all types and sizes of infrastructure projects. It gives recognition to infrastructure projects that use transformational and collaborative approaches to assessing sustainable performance over the course of a project's life cycle. - Institute for Sustainable Infrastructure

A Joint Collaboration ISI Founding Organizations

The Envision Framework In a nutshell: Think LEED (for buildings), only enhanced and more broadly applicable, more flexible, more adaptable, more focused on community priorities and a project s lifecycle From planning and design framework to validation and recognition Uses outcome-based objectives (with the goal of no net impact or restorative performance) 55 credits (plus 5 innovation) across 5 categories

The Envision Framework Envision can add value to design through: Helping to determine the right project to pursue Consideration of the full project lifecycle Incorporating stakeholder needs and concerns Facilitating integration with existing assets & networks Identifying synergies and cost efficiencies THE ENVISION RATING SYSTEM

Envision addresses the public side of infrastructure Infrastructure is a public asset not a private commodity No single responsible entity Multiple stakeholders with different agendas, schedules, customers Taxpayer funding predominates Integration is essential for achieving optimal performance across the entire infrastructure network

Relationship to other standards Envision is not intended to supplant existing, sector-specific infrastructure rating systems Envision draws on niche standards to create a consolidated standard for ALL infrastructure in North America THE ENVISION RATING SYSTEM

1 A Practical Example: Sustainable Transportation Design Low Level Road North Vancouver, Canada

Low Level Road Stantec worked with Port Metro Vancouver and the City of North Vancouver as Prime Design Consultant on the realignment of 2.2 km of rail tracks and a major east-west artery known as the Low Level Road This roadway and rail represents a vital transportation link that enables the Port to move cargo in and out of its facilities, and required expansion to meet projected increases in demand Key project aspects: Extensive stakeholder engagement Minimization of noise/lighting impacts Expansion of pedestrian and cyclist networks Slope stabilization Preservation of Bald Eagle habitat Expansion and realignment of the Low Level Road was constrained by limited space, steep slopes, and the close proximity of local residential homes and parkland in a heavily urbanized area Development was also complicated by significant geotechnical risks (including landslides and earthquakes)

Project Challenges Increased rail traffic to Port facilities outstripped existing rail infrastructure Roadway bordered by private residences immediately to the north with significant concerns around lighting/noise Endangered Bald eagles maintained nests on the project site The City desired to expand cycling networks to enable connection with transit facilities Project site presented an opportunity for linking existing trailways and green spaces known as the Spirit Trail Site lies in an earthquake fault zone and was determined to have unstable slopes and suffered from rockfalls onto road surface

What we did Eliminated three at-grade rail crossings Stabilized slopes with tiered retaining walls Raised roadway above projected 200 year flood levels Mitigated environmental damage through off-site remediation, preservation, and installation of artificial eagle nesting poles Expanded pedestrian/cyclist access and reconfigured lanes Installed noise walls to reduce impact on local residents Engaged extensively with local community, First Nations, and stakeholders Eliminated invasive species on site and planted native species Selected high efficiency LED streetlights Incorporated work by local artists and vegetated retaining walls to raise aesthetic value

Noise walls Vegetated walls and public art Moodyville Park Stabilized retaining walls Spirit Trail & pedestrian overpass Overpass Expanded rail track network Diverging diamond intersection All images courtesy of PMV

Low Level Road & Envision Project currently undergoing Envision certification process, targeting highest level of achievement (Platinum) First transportation-based project to undergo certification This project will serve as a case study for sustainable roadway design at Stantec

Envision For Roadways Takes the focus from a department and brings all the stakeholders together Provides an approach to allow all stakeholder a voice Balances the playing field for all users and stakeholders