FOLD EXIT REQUIREMENTS MAX.TRAVEL DISTANCE ALLOWED: (TABLE ) MAX. COMMON PATH TRAVEL: (CBC ) MAX. DEAD ENDS: (TABLE 1018.

Similar documents
FIRE PREVENTION STANDARDS

CITY OF HEALDSBURG SENIOR CENTER IMPROVEMENT PROJECT

FIRE SAFETY INSPECTION REPORT

Large Family Daycare Guideline

January 1, 2014 Mandatory Effective Date

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE PROTECTION KEY DESIGN CONCEPTS IN HEALTHCARE FACILITIES Scott Twele, Aman Shah Steven Dannaway. AIA Healthcare Group

FIRE SAFETY INSPECTION REPORT

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

FIRE/SMOKE BARRIER FUNDAMENTALS

CHAPTER 7 ALTERATIONS LEVEL

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU TENANT IMPROVEMENT GROUP A FIRE PLAN REVIEW CHECKLIST

Residential Based Care Facility Guidelines

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

Ch. 54 GROUP B EDUCATIONAL 34 CHAPTER 54. GROUP B EDUCATIONAL OCCUPANCY GROUP

Residential-based Care Facility R-4 Guideline

PRESENTERS OVERVIEW COMMUNITY WORKSHOP OVERVIEW OF THE 2010 EDITION OF THE CALIFORNIA BUILDING STANDARDS CODE AND LOCAL AMENDMENTS

CODE SUMMARY REQUIREMENTS (NEW CONSTRUCTION/TENANT IMPROVEMENT (TI))

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

BUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007

PROJECT: CIVIC ADDRESS:... PERMIT APPLICATION NO.: DATE:... CRP:. Certified Professional:.

FIRE SAFETY INSPECTION REPORT

The project scope work is 90% new construction and 10% remodel in Esslinger Hall.

FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

APPLICATION FOR Large Family Day Care Permit

American Fire Sprinkler Association. An Introduction to the IBC and IFC

2012 B.C. Building Code Compliance Review (Division B Part 3)

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19

CITY OF PASADENA FIRE DEPARTMENT

GUIDELINES FOR INSPECTING GROUND BASED SPARKLING DEVICE (GBSD) RETAIL SALES FACILITIES

CITY of MODESTO 14 JAN IS AD 38

Apartment Fire & Safety Inspection. City of Guadalupe

COMPLIANCE ALTERNATIVES

Objectives. To review updated IBC and fire test requirements when designing for life safety.

PERFORMANCE COMPLIANCE METHODS

4. Distances to property line, buildings, other tents, parked vehicles and engines;

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

OCFEC Fire Marshal Summary Report

Rental Housing Initial Inspection Checklist Community Development Department 208 NW 1 st Ave., Faribault, MN

Business Fire Inspection. City of Guadalupe

PERFORMANCE COMPLIANCE METHODS

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

Preview of the MA Building Code (780 CMR) 9 th edition

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

CONSTRUCT JTC/TRS FACILITY FTEV

Appendix B Florida Building Code Building, 6 th Edition Section Public Shelter Design Criteria

INITIAL FIRE SAFETY ASSESSMENT

COMPLIANCE ALTERNATIVES

Residential Care Facilities Requirements

To provide the requirements needed for Care Facilities Having 6 or Fewer Clients. This occupancy is classified as an R-3.1.

INITIAL FIRE ASSESSMENT REPORT (FAR)

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

The Cannabis Industry: Fire Department Requirements

Common Fire Code Violation Checklist. Listed are some of the most commonly found fire code violations and should not be considered as all inclusive.

BC Building Code Checklist Part 3 Planning and Development Department

FIRE SAFETY INSPECTION REPORT

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

Educational Occupancies

FIRE SAFETY INSPECTION REPORT

PERFORMANCE COMPLIANCE METHODS

FIRE SAFETY INSPECTION REPORT

REGULATIONS FOR OUTDOOR GATHERINGS AND EVENTS TENTS & MEMBRANE STRUCTURES

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

NFPA 45 NFPA 211 NFPA 1600

FIRE SAFETY INSPECTION REPORT

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

For additional information regarding R-3.1 residential care facilities please contact (951)

SAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly.

FIRE SAFETY INSPECTION REPORT

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

FIRE SAFETY INSPECTION REPORT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

City of Long Beach. Medical Marijuana Facilities Permit Requirements

The one-half hour seminar in module 2 that follows, will complete the remainder of chapter 3, building planning, already begun in module 1.

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

PLAN REVIEW SUBMITTAL GUIDE

Questions related to specific materials, methods, and services will be addressed at the conclusion of the presentation.

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Rental Housing Inspection Guide

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

OXNARD FIRE DEPARTMENT 360 West Second Street Oxnard, CA (805) Fax (805)

Life Safety Codes for Assisted Living Facilities

Assisted Living Facilities

Residential Large Family Daycare Facilities

IBC Committee Responsibility Matrix January 2017

MWL Consulting Company

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

TABLE OF CONTENTS. Part I Administrative

Transcription:

1 2 3 4 5 6 7 8 9 10 E D C B A N1808 A A B A.8 A A 13' - 0" 13' - 0" A.4 B A.8 28' - 6" 1' - 3" 26' - 0" 1' - 3" Level 1_Code 1 1/4" = 1'-0" Level 2_Code 2 1/4" = 1'-0" 1 1.6 2.2 2.7 1' - 3" 14' - 0" 15' - 0" 14' - 0" 1' - 3" 21' - 1" 6' - 7" C 23 T @ 11" FE-1 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 DN 45' - 6" OUTDOOR AREA MAINTANANCE PLATFORM LEVEL 1 02 1153 SF 1 1.6 2.2 2.7 14' - 0" 15' - 0" 14' - 0" C OUTDOOR AREA LEVEL 2 01 1260 SF 39' UP R E V I S I O N S FE-1 FE-1 EXIT REQUIREMENTS REQUIRED EXITS (CBC 1015.1 & 1021): MAX.TRAVEL DISTANCE ALLOWED: (TABLE 1016.2) MAX. COMMON PATH TRAVEL: (CBC 1014.3) MAX. DEAD ENDS: (TABLE 1018.4) CORRIDOR WIDTH (CBC 1018.2): MIN. EGRESS WIDTH (CBC 1005.1): PLUMBING FIXTURES (CPC TABLE 422.1) CPC TABLE A MINIMUM WC LAV URINAL SHOWER FIXTURE COUNT M F M F M F 0 0 0 0 0 0 DF ACTUAL WC LAV URINAL SHOWER FIXTURE M F M F M F COUNT 0 0 0 0 0 0 DF URINALS (CPC TABLE 422.1, FOOTNOTE #3) - - - - REQUIRED FIRE RESISTANT RATINGS BUILDING ELEMENTS (TABLE 601) STRUCTURAL FRAME EXTERIOR BEARING WALLS INTERIOR BEARING WALLS INTERIOR NON-BEARING WALLS FLOOR CONSTRUCTION ROOF CONSTRUCTION SHAFT ENCLOSURE (707.4) STAIRWAY ENCLOSURE (1019.1) CORRIDOR (TABLE 1016.1) FIRE SEPARATION DISTANCE (TABLE 602) DISTANCE FROM ADJACENT BUILDING OR PROPERTY LINE INTERIOR FINISHES OCCUPANCY: - AREA: - CLASSIFICATION: OCCUPANCY: AREA: CLASSIFICATION: INSULATION REQUIREMENTS INSULATION (R-VALUE): OTHER: ALLOWABLE AREA OF EXTERIOR DOORS AND WINDOWS (704.8) OCCUPANCY SEPARATIONS (CBC 508.3.3) INCIDENTAL USE AREAS (508.2) ACCESSORY USE AREAS (508.3.1) NON-SEPARATED USE (508.3.2) ROOF: WALLS: EXTERIOR DOORS: WINDOWS: ATTIC: UNHEATTED SLAB ON GRADE: SGHC: ROLL-UP OR SLIDING DOORS: GLAZING PERCENTAGE: WINDOW: SKYLIGHT: DAYLIGHT CONTROLS: PERIMETER SLAB INSULATION: R E V I S I O N S 1 200 75 20 44" 36" 0 HR 0 HR 0 HR 0 HR 0 HR 0 HR 0 HR 0 HR 0 HR 30' >30' 0 SINK 0 0 SS 0 0 SINK 0 0 SS 0 NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY UNLIMITED - 0 9/8/14 PRE-FINAL (90%) DESIGN RV RD CH AV N N CODE DATA BUILDING: PROJECT: PACIFIC GAS & ELECTRIC COMPANY TOPOCK REMEDIATION LOCAL OFFICIALS: BUILDING DEPARTMENT CONTACTS FIRE DEPARTMENT CONTACT OTHER PROJECT DESCRIPTION NEW 2 STORY WATER TREATMENT SHELTER OUTDOOR AREA - WEATHER PROTECTION GENERAL INFORMATION USE AND OCCUPANCY CLASSIFICATION (CHAPTER 3) CONSTRUCTION CLASSIFICATION (IBC 602 & TABLE 503) AREA AND HEIGHT LIMITATIONS MAXIMUM ALLOWABLE AREA PER STORY (TABLE 503) ALLOWABLE AREA A = T + [TF/100] + [TS/100} OCCUPANCY: TABULAR AREA (T) [TABLE 503]: SPRINKLER INCREASE (S) [506.3]: FRONTAGE INCREASE (F) [506.2]: ALLOWABLE AREA PER FLOOR (A): ACTUAL AREA: ACTUAL PER FLOOR: INTERMEDIATE LEVELS: MEZZANINE: INDUSTRIAL EQUIPMENT PLATFORM (CBC 505.5): MAXIMUM ALLOWABLE STORIES (TABLE 503) ACTUAL NUMBER OF STORIES: MAXIMUM ALLOWABLE HEIGHT (TABLE 503) ACTUAL HEIGHT: OCCUPANCY / EGRESS INFORMATION DESIGN OCCUPANCY (TABLE 1004.1.2) EGRESS WIDTH BASED ON OCCUPANCY (TABLE 1005.1) FIRE PROTECTION AREA: # OF OCCUPANTS: # OF EXITS: AUTOMATIC SPRINKLER FOR STORY INCREASE (CBC 504.2): SPRINKLERS (IBC SECT 903) FIRE EXTINGUISHERS (SECT 906) FIRST SECOND NUMBER OF OCCUPANCY PER FLOOR: DISTANCE TO FIRE HYDRANT APPROVED BY SO SUPV BUILDING OFFICIAL: TBD PLANS EXAMINER: TBD FIRE MARSHAL: TBD DSGN AV DWN RV CHKD RD OK - DATE 09/08/14 SCALES 2013 CALIFORNIA BUILDING CODE ARCHITECT: CH2M HILL 2020 SW 4th AVENUE PORTLAND, OREGON AREA: 4' 0' 4' 8' SCALE 1/4"=1' WEATHER PROTECTION 1500 SF 1500 SF 1125 SF 1 - OUTDOOR AREA 2625 SF 1260 SF 1 39' 4 44" PHONE: PHONE: PHONE: PHONE: 2A:40BC TBD NOTES: XXX-XXX-XXXX XXX-XXX-XXXX XXX-XXX-XXXX GENERAL NOTES: 1. FOR SIGN INFORMATION AND TYPE DESCRIPTIONS SEE SPECIFICATIONS SECTION 10 14 00. 2. FOR ARCHITECTURAL LEGEND SEE DWG CH-A-XXX-1201AD. 3. FOR ABBREVIATIONS SEE DWG CH-A-XXX-1201AD. 4. FOR FIRE EXTINGUISHER INFORMATION SEE SPECIFICATIONS SECTION 10 14 00. LEGEND X' X" FE-1 TRAVEL DISTANCE (X = TOTAL DISTANCE TO EXIT IN FEET) EGRESS WIDTH (IN INCHES) FIRE EXTINGUISHER CONTINGENT EYEWASH/SAFETY SHOWER 1. THE EQUIPMENT AND FACILITY SHOWN IS PART OF A CONTINGENT SYSTEM AND MAY BE CONSTRUCTED IN THE FUTURE. TOPOC GROUNDWATER REMEDIATION PROJECT FRESH WATER PRE-INJECTION TREATMENT SYSTEM CODE SUMMARY SHEET GAS TRANSMISSION & DISTRIBUTION PACIFIC GAS AND ELECTRIC COMPANY SAN FRANCISCO, CALIFORNIA - Applicable Code Code Schedule Standard a Zoning Code: San Bernardino County Development Code b Building code: 2013 CALIFORNIA BUILDING CODE (CBC), TITLE 24, PART 2 c Fire code: 2013 CALIFORNIA FIRE CODE (CFC), TITLE 24, PART 9 d Mechanical code: 2013 CALIFORNIA MECHANICAL CODE (CMC), TITLE 24, PART 4 e Plumbing code: 2013 CALIFORNIA PLUMBING CODE (CPC), TITLE 24, PART 5 f Electrical code: 2013 CALIFORNIA ELECTRICAL CODE (CEC), TITLE 24, PART 3 g Energy code: 2013 CALIFORNIA ENERGY CODE (CEC), TITLE 24, PART 6; See 2013 Non-residential compliance manual for support h Green Code: 2013 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC). TITLE 24, PART 11, applicable to newly constructed buildings. i Accessibility: CH11B ACCESSIBILITY TO PUBLIC BUILDINGS, PUBLIC ACCOMODATIONS, COMMERCIAL BUILDINGS AND PUBLIC HOUSING j Fire CCR T19 D1 CH3 PORTABLE FIRE EXTINGUISHERS Extinguishers: k Health and Sanitation: Title 6 Health and Sanitation, Chapter 6.96, Hazardous Material Business Plans and The California Accidental Release Prevention Program (HMBP & CARPP), Reference for the California State Health Safety Code l Fire Sprinkler 2013 NFPA 13 Installation of Sprinkler Systems standard: m Flammable Liquids 2008 NFPA 30 Flammable and Combustible Liquids Code standard: n Fire Alarm 2013 NFPA 72 National Fire Alarm Code standard: o Exit Signs 2009 NFPA 170 Standard for Fire Safety and Emergency Symbols p Hazard Identification 2012 NFPA 704 Standard System for Identification of the Hazards of Materials for Emergency Response standard: q ASCE 7 2010 ASCE 7 Minimum Design Loads for Buildings and Other Structures r Fire Doors 1997 UL10B Fire Test for Door Assemblies; 2013 NFPA 80 FIRE DOORS AND OTHER OPENING PROTECTIVES s Panic 2007 UL 305 Panic Hardware Hardware t Fire Dampers 2006 UL 555 Fire Dampers u Cabinets 2005 UL 1275 Flammable Liquid Storage Cabinets DRAFT NOT FOR CONSTRUCTION MICROFILM BILL OF MATL DWG LIST SUPSDS SUPSD BY SHEET NO. of A-13-01 SHEETS REV 0 FILENAME: PLOT DATE: $PLOTDATE PLOT TIME: $PLOTTIME

1 2 3 4 5 6 7 8 9 10 1 1.6 2.2 2.7 46' - 0" 1' - 6" 14' - 0" 15' - 0" 14' - 0" 1' - 6" 1 1.6 2.2 2.7 45' - 6" 1' - 3" 14' - 0" 15' - 0" 14' - 0" 1' - 3" E A-13-04 C A 4' - 0" 4' - 0" 4' - 0" 4' - 0" C A-13-04 A 22' - 0" 6' - 7" 24 T @ 11" D A A.4 A.8 1' - 6" 13' - 0" 13' - 0" 1' - 6" A A-13-04 D B 5' - 6" 2' - 8 5/8" 3' - 4" 3' - 4" 2' - 2" FE-1 DN FE-1 B A-13-04 A A.8 28' - 6" 1' - 3" 26' - 0" 1' - 3" A A-13-04 D B 5' - 6" 2' - 8" 2' - 10" 2' - 10" 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 UP FE-1 B A-13-04 C 7' - 6" 6' - 6" 7' - 6" 7' - 6" 6' - 6" 7' - 6" C A-13-04 4' - 7" 5' - 10" 3' - 7" 4' - 7" 5' - 10" 4' - 7" 3' - 7" 5' - 10" 4' - 7" C A-13-04 2 SECOND FLOOR 1/4" = 1'-0" 1 FIRST FLOOR 1/4" = 1'-0" B A N1808 NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY R E V I S I O N S 0 9/8/14 PRE-FINAL (90%) DESIGN RV RD CH AV R E V I S I O N S N N 4' 0' 4' 8' SCALE 1/4"=1' APPROVED BY SO SUPV DSGN AV DWN RV CHKD RD OK - DATE 09/08/14 SCALES NOTES: CONTINGENT 1. THE EQUIPMENT AND FACILITY SHOWN IS PART OF A CONTINGENT SYSTEM AND MAY BE CONSTRUCTED IN THE FUTURE. TOPOC GROUNDWATER REMEDIATION PROJECT FRESH WATER PRE-INJECTION TREATMENT SYSTEM FLOOR PLANS GAS TRANSMISSION & DISTRIBUTION PACIFIC GAS AND ELECTRIC COMPANY SAN FRANCISCO, CALIFORNIA DRAFT NOT FOR CONSTRUCTION MICROFILM BILL OF MATL DWG LIST SUPSDS SUPSD BY SHEET NO. of A-13-02 SHEETS REV 0 FILENAME: PLOT DATE: $PLOTDATE PLOT TIME: $PLOTTIME

1 2 3 4 5 6 7 8 9 10 1 1.6 2.2 2.7 2' - 0" 14' - 0" 15' - 0" 14' - 0" 2' - 0" E C A-13-04 A GUTTER D A A.4 A.8 3' - 0" 13' - 0" 13' - 0" 3' - 0" A A-13-04 D B 3" / 1'-0" 3" / 1'-0" STANDING SEAM METAL ROOF B A-13-04 C C A-13-04 GUTTER 1 T.O. STEEL 1/4" = 1'-0" B A N1808 NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY R E V I S I O N S 0 9/8/14 PRE-FINAL (90%) DESIGN RV RD CH AV R E V I S I O N S N N 4' 0' 4' 8' SCALE 1/4"=1' APPROVED BY SO SUPV DSGN AV DWN RV CHKD RD OK - DATE 09/08/14 SCALES NOTES: CONTINGENT 1. THE EQUIPMENT AND FACILITY SHOWN IS PART OF A CONTINGENT SYSTEM AND MAY BE CONSTRUCTED IN THE FUTURE. TOPOC GROUNDWATER REMEDIATION PROJECT FRESH WATER PRE-INJECTION TREATMENT SYSTEM ROOF PLAN GAS TRANSMISSION & DISTRIBUTION PACIFIC GAS AND ELECTRIC COMPANY SAN FRANCISCO, CALIFORNIA DRAFT NOT FOR CONSTRUCTION MICROFILM BILL OF MATL DWG LIST SUPSDS SUPSD BY SHEET NO. of A-13-03 SHEETS REV 0 FILENAME: PLOT DATE: $PLOTDATE PLOT TIME: $PLOTTIME

1 2 3 4 5 6 7 8 9 10 2.7 14' - 0" 2.2 15' - 0" 1.6 C 14' - 0" 1 A.8 B 26' - 0" 13' - 0" 13' - 0" A.4 A A METAL ROOF METAL ROOF E T.O. STEEL 653' - 0" T.O. STEEL 653' - 0" GUTTER, TYP. EXPOSED STEAL 13' - 0" ALUMINUM BAR GRILLE 6" DEEP 13' - 0" ALUMINUM BAR GRILLE 6" DEEP EXPOSED STEAL SECOND FLOOR 640' - 0" DOWNSPOUT TYP. SECOND FLOOR 640' - 0" D 14' - 0" DOWNSPOUT TYP. 14' - 0" FIRST FLOOR 626' - 0" A North B East 1/4" = 1'-0" 1/4" = 1'-0" FIRST FLOOR 626' - 0" C 1 1.6 2.2 2.7 14' - 0" 15' - 0" 14' - 0" A B A A.4 A.8 13' - 0" 26' - 0" 13' - 0" METAL ROOF METAL ROOF C T.O. STEEL 653' - 0" GUTTER, TYP. T.O. STEEL 653' - 0" EXPOSED STEAL ALUMINUM BAR GRILLE 6" DEEP 13' - 0" 13' - 0" B A N1808 R E V I S I O N S 14' - 0" EXPOSED STEAL SECOND FLOOR 640' - 0" DOWNSPOUT TYP. FIRST FLOOR 626' - 0" C South D West 1/4" = 1'-0" 1/4" = 1'-0" 4' 0' 4' 8' 0 9/8/14 PRE-FINAL (90%) DESIGN RV RD CH AV NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY R E V I S I O N S SCALE 1/4"=1' APPROVED BY SO SUPV 14' - 0" DSGN AV DWN RV CHKD RD OK - DATE 09/08/14 SCALES ALUMINUM BAR GRILLE 6" DEEP DOWNSPOUT TYP. SECOND FLOOR 640' - 0" FIRST FLOOR 626' - 0" NOTES: CONTINGENT 1. THE EQUIPMENT AND FACILITY SHOWN IS PART OF A CONTINGENT SYSTEM AND MAY BE CONSTRUCTED IN THE FUTURE. TOPOC GROUNDWATER REMEDIATION PROJECT FRESH WATER PRE-INJECTION TREATMENT SYSTEM EXTERIOR ELEVATIONS GAS TRANSMISSION & DISTRIBUTION PACIFIC GAS AND ELECTRIC COMPANY SAN FRANCISCO, CALIFORNIA DRAFT NOT FOR CONSTRUCTION MICROFILM BILL OF MATL DWG LIST SUPSDS SUPSD BY SHEET NO. of A-13-04 SHEETS REV 0 FILENAME: PLOT DATE: $PLOTDATE PLOT TIME: $PLOTTIME

1 1 2 3 4 5 6 7 8 9 10 1 1.6 2.2 2.7 C E T.O. STEEL 653' - 0" 25 24 23 22 SECOND FLOOR 640' - 0" 21 20 19 18 17 16 15 14 13 12 D 11 10 9 8 7 6 5 4 3 2 FIRST FLOOR 626' - 0" T.O. Footing 623' - 0" B.O. Footing 621' - 0" A Section 1 3/16" = 1'-0" C A A.4 A.8 13' - 0" 26' - 0" A B 13' - 0" 1 C 1.6 2.2 2.7 T.O. STEEL 653' - 0" T.O. STEEL 653' - 0" 13' - 0" B A N1808 14' - 0" SECOND FLOOR 640' - 0" FIRST FLOOR 626' - 0" T.O. Footing 623' - 0" B.O. Footing 621' - 0" NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY NO. DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY R E V I S I O N S R E V I S I O N S SECOND FLOOR 640' - 0" FIRST FLOOR 626' - 0" C Section 3 B Section 2 3/16" = 1'-0" 3/16" = 1'-0" 4' 0' 4' 8' 0 9/8/14 PRE-FINAL (90%) DESIGN RV RD CH AV T.O. Footing 623' - 0" B.O. Footing 621' - 0" SCALE 1/4"=1' APPROVED BY SO SUPV DSGN AV DWN RV CHKD RD OK - DATE 09/08/14 SCALES NOTES: CONTINGENT 1. THE EQUIPMENT AND FACILITY SHOWN IS PART OF A CONTINGENT SYSTEM AND MAY BE CONSTRUCTED IN THE FUTURE. TOPOC GROUNDWATER REMEDIATION PROJECT FRESH WATER PRE-INJECTION TREATMENT SYSTEM BUILDING SECTIONS GAS TRANSMISSION & DISTRIBUTION PACIFIC GAS AND ELECTRIC COMPANY SAN FRANCISCO, CALIFORNIA DRAFT NOT FOR CONSTRUCTION MICROFILM BILL OF MATL DWG LIST SUPSDS SUPSD BY SHEET NO. of SHEETS REV 0 FILENAME: PLOT DATE: $PLOTDATE PLOT TIME: $PLOTTIME